Disclosure Guide eOperations ADB Disclosure Management System
26 September 2016
Abbreviations ADB Asian Development Bank
ADMS ADB Disclosure Management System
COBP Country Operations Business Plan
CPS Country Partnership Strategy
CSS Country Safeguard Systems
DER Department of External Relations
EIA Environmental Impact Assessment
IEE Initial Environmental Examination
ICM Implementation Completion Memorandum
IMF International Monetary Fund
IPP Indigenous Peoples Plan
IPSA Initial Poverty and Social Analysis
MFF Multitranche Financing Facility
MRM Management Review Meeting
PCP Public Communications Policy
PDS Project Data Sheet
PI Project Implementation
PP Project Processing
RCS Regional Cooperation Strategy
RRP Report and Recommendation of the President
SRM Staff Review Meeting
TA Technical Assistance
System Roles and Responsibilities The table below describes the different actors or roles within the system and the corresponding responsibility assigned to them. ADMS responsibilities are derived from the team members’ composition in eOps and can be requested through eAccess.
Actor/Role System Responsibility Description
Project Processing Lead or Specialist
ADB Project Manager The Specialist assigned to lead the processing and implementation of the project. PTL can submit documents for disclosure to DER, and request replacement and removal of documents already disclosed on ADB’s website.
Project Processing or Implementation Analyst
ADB Project Member Staff assigned as project analyst and is allowed to submit documents for disclosure to DER, and request replacement and removal of documents already disclosed on ADB’s website.
PTL
PA
Chapter 1: Chapter Name
Contents Abbreviations 2
System Roles and Responsibilities 3
Introduction 6
Disclosing Project Documents in ADMS 7
Document disclosure scenarios 8
Accessing ADMS 10
ADMS page elements 12
Searching for a record 13
Disclosing a project document 14
Creating a new project document for disclosure 19
Disclosing project documents with Linked Documents 24
Withholding a document for disclosure 27
Updating the disclosure request if it was returned for revision by DER 32
Requesting to replace a disclosed document 33
Requesting to remove a disclosed document 36
Disclosing Non-Project Documents in ADMS 39
Disclosing a non-project document 40
Chapter 1: Chapter Name
Appendix 1: User Interface Guide 45
Appendix 2: Document Types and Versions 46
Appendix 3: Document Status in ADMS 76
Introduction The revised Public Communications Policy (PCP) 2011 which took effect on 2 April 2012 guides ADB’s efforts for transparency and accountability to the people it serves. Contained in the policy are the disclosure requirements for ADB documents.
DER’s Public Information and Disclosure Unit (InfoUnit) provides advice, guidance and tools on the disclosure requirements and monitors disclosure compliance to fulfill the requirements under the PCP.
The ADB Document Management System (ADMS) is the system used for submitting documents, both project and nonproject-related documents, for disclosure.
The ADB Disclosure Management System (ADMS) was developed as part of the eOperations Simplification effort. This is the system where documents, primarily those required by the PCP to be disclosed, are submitted for posting on ADB’s website. The system has built-in notifications for selected documents to remind staff to submit their documents for disclosure. The ADMS is also linked to eServe to handle disclosure of documents circulated to ADB’s Board of Directors.
Only documents are disclosed in ADMS. The disclosure and updating of the Project Data Sheet (PDS) will still be done in eOperations.
Disclosing Project Documents in ADMS
7
Chapter 1 Disclosing Project Documents in ADMS The Public Communications Policy (PCP) 2011 establishes the disclosure requirements for documents and information ADB produces or requires to be produced. It mandates project-related documents normally produced during the project cycle to be posted on the web.
Disclosing Project Documents in ADMS
8
Document disclosure scenarios
Automatic Disclosure – An automatic disclosure request is created for documents circulated to the Board for information, e.g. completion reports, COBP, etc. (except for nonsovereign projects). Documents tagged as “For Early Disclosure” in the circulation form are simultaneously disclosed to ADB.org and to the Board. The Project Lead and Analyst will receive an email notification once the documents are posted in ADB.org
Under PCP 2011, some Board documents may be posted on the ADB website at the same time they are circulated to the Board (For Early Disclosure), subject to the concurrence of the member country concerned.1 This is applicable to RRPs of sovereign projects and final proposals of regional cooperation strategies (RCS) and country partnership strategies (CPS).
Supporting documents (electronically linked documents) that are referred to in the RRP, CPS, or RCS shall be posted on the ADB website at the same time as the main document unless stated otherwise in the PCP.
Documents with Disclosure Reminder – Disclosure reminders are sent to the project lead, CC project analyst, for documents with specific project milestones or deadlines (based on MRM/SRM/Final ICM dates, e.g. draft safeguard documents as required by the Safeguard Policy Statement) or upon consideration ( endorsement/approval) by the Board.2 Refer to Appendix 2 for the list of project documents for disclosure and the corresponding disclosure rules for each and notification reminders.
Documents disclosed upon Board endorsement/approval include the following:
• Board-approved TA Reports
• RRPs, CPS, iCPS, and RCS, if member country did not consent to disclose early
• Board-approved major changes
1 This consent should be noted in the minutes of the loan negotiations and management review meeting for the RRP and
CPS/iCPS/RCS respectively. The concurrence of the member country concerned must be attached to the circulation request in eServe.
2 “Upon” is a defined term to mean no later than 2 weeks (14 calendar days) following the date of approval or circulation.
Disclosing Project Documents in ADMS
9
• Progress reports on tranche releases for policy-based loans and grants
Documents without Disclosure Reminder – These are the documents that will not have reminders from ADMS and are required to be disclosed only upon receipt or completion and acceptance by ADB.
To avoid delays in disclosing documents, ensure that all submitted documents follow the templates available in the Board Documents and References section of http://eboard/.
Update the Milestone Events page in eOps to ensure timely sending of disclosure reminders.
Disclosing Project Documents in ADMS
10
Accessing ADMS
Actor/s:
ADMS can be accessed in two ways: 1) access directly via URL, 2) access from eOps.
Access ADMS directly
To access ADMS, go to http://adms.adb.org/ on your browser or simply type ‘adms’ in the URL field. The ADMS homepage opens displaying the list of projects you are a member or assigned to. Click the [Twistie] icon beside the project number and it will show the documents that are due for disclosure.
Disclosed documents appear in the [All Documents] view or tab.
Use the same URL (http://adms.adb.org/) when accessing ADMS outside ADB. Login using the Windows ID and password.
PTL PA
Disclosing Project Documents in ADMS
11
Access ADMS from eOps
To access ADMS via eOperations, open the project record, and then click on the [Disclose Project Documents] button found in the Project Tasks page.
ADMS opens showing only the exact project record you accessed from eOps.
Disclosing Project Documents in ADMS
12
ADMS page elements
1. Use the [Search Bar] to find documents by Project Number, Project Name, Document Type, and Approval Number.
2. Use the [Quick Links] to easily access the guidelines and references about document disclosure.
3. Use the [View by:] tabs to quickly track projects with documents that are due for disclosure or display all documents for a project. The list displays only projects that you are a member of.
4. The [Operations] section is a list of projects with documents for disclosure. Certain documents may also be disclosed via eOperations.
5. The [Non-Operations] section is a list of non-project documents for disclosure.
1
2
3 4
5
Disclosing Project Documents in ADMS
13
Searching for a record
Actor/s:
1. To search for a record, type any one of the following in the [Search Bar], and then press
the [Enter] key or click the [Search] icon.
• Project Number (the 8 digit code or the first 5 digit code )
• Project Name
• Document Type
• Approval Number
2. The system filters the list with the matching record.
To display all the records again, click the [Refresh] icon in the [Search Bar].
PTL PA
1
2
Disclosing Project Documents in ADMS
14
Disclosing a project document
Actor/s:
To disclose a project document in ADMS:
1. Open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. The Disclosure Management page opens. You may click the [Twistie] icon beside the [Project Number] to hide/show the list of documents to be disclosed.
A pre-determined list of document types will be shown depending on the project modality, amount, safeguard categorization, etc.
3. If the Board-approved or Management-approved document is on the list, click the [Update Details] icon.
To disclose non-project documents, scroll down to the Non-Operations section and click on the [Add Non-Operations Document for Disclosure] button. This button is different from the add button under the Operations section and is used SOLELY for adding documents which are not project-specific, such as annual reports, Board papers, policy papers, etc. For more information, refer to Chapter 2.
PTL PA
3
2
Disclosing Project Documents in ADMS
15
4. The Add Document for Disclosure form will open. Click the [Browse] button, and then search your computer for the document to be disclosed.
The file size must not be over 5MB. Otherwise, contact IT Service Desk (loc. 5555) to get assistance on reducing the size.
5. The [Document Title] field defaults to the filename of the attachment. Edit as necessary. Specials characters are allowed and the maximum number of characters is 1,333.
6. Enter the document’s official cover date in the [Document Date] field.
• The Document Date should be consistent with the date provided on the attachment's cover page.
• Additional date details may be required depending on the document type and version.
• Future date is not accepted in all date fields.
4
5
6
Disclosing Project Documents in ADMS
16
7. Indicate the document status using the [Document Version] options.
• For most documents, the version to be used is Final.
• The other versions are typically used on safeguard documents, procurement plans, etc.
• Please refer to Appendix 2 for the complete list of documents for disclosure and their corresponding versions.
8. The [Withhold from Disclosure] setting indicates if the document is to be disclosed or not. By default, the “No” radio button is ticked. If the document will be withheld from disclosure, click here to know how.
7
8
Disclosing Project Documents in ADMS
17
9. Optionally, enter notes in the [Remarks] field. Text entered in the [Remarks] field will reflect in the history.
10. Click [Submit Document for Disclosure] to send the request to DER.
Save – Click the [Save] button to save the request as draft or if the document will be withheld from disclosure. The status will become “Pending for Submission”.
Cancel – Click the [Cancel] button to close the window or disregard the data entry. Data entered will not be saved.
11. Click [OK] in the message that appears.
9
10
11
Disclosing Project Documents in ADMS
18
12. A message appears upon submission. Click the [Cancel] button to close the form.
13. The system sends a notification to DER. Once the request is complete, a notification is sent to the requestor and the status of the document changes to “Disclosed”.
12
13
Disclosing Project Documents in ADMS
19
Creating a new project document for disclosure
Actor/s:
To disclose a new project document in ADMS:
1. Open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. The Disclosure Management page opens. You may click the [Twistie] icon beside the [Project Number] to hide/show the list of documents to be disclosed.
3. If the document you will submit for disclosure is not on the list, click the [Add Project Document for Disclosure] button.
To disclose non-project documents, scroll down to the Non-Operations section and click on the [Add Non-Operations Document for Disclosure] button. This button is different from the add button under the Operations section and is used SOLELY for adding documents which are not project-specific, such as annual reports, Board papers, policy papers, etc. For more information, refer to Chapter 2.
PTL PA
3
2
Disclosing Project Documents in ADMS
20
4. The Add Document for Disclosure form will open. Click the [Browse] button, and then search for the document to disclose.
The file size must not be over 5MB. Otherwise, contact IT Service Desk (loc. 5555) to get assistance on reducing the size.
5. The [Document Title] field defaults to the filename of the attachment. Edit as necessary. Special characters are allowed and the maximum number of characters is 1,333.
6. The [Document Type] is a predictive text field. A list of document types that contain the same word(s) you entered will appear as you type. Depending on your internet speed, this feature may require a few seconds before the options come out. Please refer to Appendix 2 for the list of document types in ADMS. If the document type is not yet in ADMS like CPS documents (e.g. COBP), submit document for disclosure through [email protected]
4
5
6
Disclosing Project Documents in ADMS
21
7. Enter the document’s official cover date in the [Document Date] field.
• The Document Date should be consistent with the date provided on the attachment's cover page.
• Additional date details may be required depending on the document type and version.
• Future date is not accepted in all date fields.
8. Indicate the document status using the [Document Version] options.
Please refer to Appendix 2 for the complete list of documents for disclosure and their corresponding versions.
9. The [Withhold from Disclosure] setting indicates if the document is to be disclosed or not. By default, the “No” radio button is ticked. If the document will be withheld from disclosure, click here to know how.
7
8
9
Disclosing Project Documents in ADMS
22
10. Optionally, enter notes in the [Remarks] field. Text entered in the [Remarks] field will reflect in the history.
11. Click [Submit Document for Disclosure] to send the request to DER.
Save – Click the [Save] button to save the request as draft or if the document will be withheld from disclosure. The status will become “Pending for Submission”.
Cancel – Click the [Cancel] button to close the window or disregard the data entry. Data entered will not be saved.
12. Click [OK] in the message that appears.
10
11
12
Disclosing Project Documents in ADMS
23
13. A message appears upon submission. Click the [Cancel] button to close the form.
14. The system sends a notification to DER. Once the request is complete, a notification is sent to the requestor and the status of the document changes to “Disclosed”.
13
14
Disclosing Project Documents in ADMS
24
Disclosing project documents with Linked Documents
Actor/s:
RRPs, Grant Assistance Reports, Major Change Documents, Periodic Financing Requests, and Report to the President may have linked documents attached to them. Use the [Create Linked Documents] button in ADMS to view or add linked documents.
1. Open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. The Disclosure Management page opens. Click the [Create Linked Documents] button.
PTL PA
2
Disclosing Project Documents in ADMS
25
3. The Select Document Type form appears. Click the dropdown list, and then select the document type intended for addition, revision or update of linked documents.
4. Click the [Create Linked Documents] button.
5. The Linked Documents home page opens. Refer to the Linked Documents QRG to learn how to add, revise or update linked documents.
3
4
Disclosing Project Documents in ADMS
26
6. After adding, revising or updating the linked documents, disclose the main document (e.g. RRPs, Grant Assistance Reports, Major Change Documents, Periodic Financing Requests, Report to the President) in ADMS. Click here to know how to disclose project documents.
When submitting documents for disclosure which may have Linked Documents attached (e.g. RRPs, Grant Assistance Reports, Major Change Documents, Periodic Financing Requests, and Report to the President) please always indicate in the [Remarks] field if :
1. All linked documents are for disclosure or
2. if there are documents that should be withheld, in which case, provide the specific PCP exception for each.
Disclosing Project Documents in ADMS
27
Withholding a document for disclosure
Actor/s:
A document can be withheld from disclosure if it falls under the PCP’s exceptions to presumed disclosure. To withhold a document for disclosure, follow the steps below.
1. Open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. The Disclosure Management page opens. You may click the [Twistie] icon beside the [Project Number] to hide/show the list of documents to be disclosed.
A pre-determined list of document types will be shown depending on the project modality, amount, safeguard categorization, etc.
3. If the Board-approved or Management-approved document is on the list, click the [Update Details] icon. If not, click the [Add Project Document for Disclosure] button.
PTL PA
3
2
3
Disclosing Project Documents in ADMS
28
4. The Request Details form will open. Click the [Browse] button, and then search your computer for the document to be disclosed.
The file size must not be over 5MB. Otherwise, contact IT Service Desk to get assistance on reducing the size.
5. The [Document Title] field defaults to the filename of the attachment. Edit as necessary.
6. Enter the document’s official cover date in the [Document Date] field.
• The Document Date should be consistent with the date provided on the attachment's cover page.
• Additional date details may be required depending on the document type and version.
• Future date is not accepted in all date fields.
4
5
6
Disclosing Project Documents in ADMS
29
7. Indicate the document status using the [Document Version] options.
• For most documents, the version to be used is Final.
• The other versions are typically used on safeguard documents, procurement plans, etc.
• Please refer to Appendix 2 for the complete list of documents for disclosure and their corresponding versions.
8. The [Withhold from Disclosure] setting indicates if the document will be withheld from disclosure because it falls under the PCP’s exceptions to presumed disclosure. Choosing “Yes” requires exception(s) to be specified and disables the [Submit Document for Disclosure] button.
7
8
Disclosing Project Documents in ADMS
30
You can select multiple exceptions by pressing on the [CTRL] key while doing the selection.
9. Provide supporting notes or comments to DER in the [Remarks] field. Text entered in the [Remarks] field will reflect in the history.
10. Click [Save] to save in ADMS.
Cancel – Click the [Cancel] button to close the window or disregard the data entry. Data entered will not be saved.
11. Click [OK] in the message that appears.
9
10
11
Disclosing Project Documents in ADMS
31
12. A message appears upon saving. Click the [Cancel] button to close the form.
13. The status of the document is “Withheld”. When the time comes the document is for disclosure, click the [Update Details] icon, and click the “No” radio button in the [Withhold from Disclosure] section. Then click the [Submit Document for Disclosure] button.
12
13
Disclosing Project Documents in ADMS
32
Updating the disclosure request if it was returned for revision by DER
Actor/s:
DER may return the request if there are inconsistencies or missing information in the request. When DER returns the request, the PTL and PA will be notified through email together with the reason for the return. The status of the request will become “For Revision”. To update and resubmit the request, follow the steps below.
1. Open the link in the e-mail notification to open the record. You can also open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. The Disclosure Management page opens. Look for the request with the “For Revision” status. Click the [Update Details] icon.
When the request is for revision, a [Delete] icon will appear in the Delete Document column. Clicking the [Delete] icon will remove the request in ADMS. This action is irreversible. This can be used if the reason for revision is, for example, the use of an incorrect document type.
3. The Request Details form will open. Scroll down and see the reason why DER returned the request in the History section. This is also available in the email notification.
4. Update the request as necessary, all fields are open for editing. Click [Resubmit].
PTL PA
2
3
4
Disclosing Project Documents in ADMS
33
Requesting to replace a disclosed document
Actor/s:
Disclosed documents may still be replaced if there are updates or corrections to the document.
1. Open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. From the search result, click the [Update Details] icon of the disclosed document.
3. The Request Details form will open showing the information about the disclosed document. Click the [Replace] button at the bottom.
PTL PA
2
3
Disclosing Project Documents in ADMS
34
4. The Request for Replacement form appears. Click [Browse] to search for the new document.
5. Initially, the [Document Title] copies the file name. You may edit this as necessary. This will help inform the title of the document displayed on ADB.org
6. State the justification for changing the document in the [Reason for replacement] field.
7. Click the [Submit Request for Replacement] button.
After submission, the justification entered in the [Reason for replacement] field will appear in the History section found at the bottom of the Request Details form.
8. Click [OK] in the message that appears.
5
4
6
7
8
Disclosing Project Documents in ADMS
35
9. A message appears upon submission. Click the [Close] button to close the form.
10. The system sends a notification to DER. Once the request is complete, a notification is sent to the requestor and the status of the document changes to “Replaced”.
9
10
Disclosing Project Documents in ADMS
36
Requesting to remove a disclosed document
Actor/s:
Documents already disclosed can still be removed from the ADB website (except for Board-approved documents).
1. Open ADMS from eOps or directly. If accessed directly, click here to know how to search a project record.
2. From the search result, click the [Update Details] icon of the disclosed document.
3. The Request Details form will open showing the information about the disclosed document. Click the [Remove] button at the bottom.
PTL PA
2
3
Disclosing Project Documents in ADMS
37
4. The Request for Removal form appears. State the justification for document removal in the [Reason for removal] field.
5. Click the [Submit Request for Removal] button.
After submission, the justification entered in the [Reason for removal] field will appear in the History section found at the bottom of the Request Details form.
6. Click [OK] in the message that appears.
4
6
5
Disclosing Project Documents in ADMS
38
7. A message appears upon submission. Click the [Close] button to close the form.
8. The system sends a notification to DER. Once the request is complete, a notification is sent to the requestor and the status of the document changes to “Removed”.
7
8
Disclosing Non-Project Documents in ADMS
39
Chapter 2 Disclosing Non-Project Documents in ADMS The disclosure of other types of documents not related to any particular project like annual reports, Board papers, host country agreements, and policy papers are now done through ADMS. This chapter will discuss how to disclose non-project documents in ADMS.
Disclosing Non-Project Documents in ADMS
40
Disclosing a non-project document
Actor/s:
To disclose a document in ADMS:
1. Open ADMS directly. Click here to know how to search a record.
2. The Disclosure Management page opens. Click the [Add Non-Operations Document for Disclosure] button below the Non-Operations section.
This button is different from the add button under the Operations section and is used SOLELY for adding documents which are not project-specific, such as annual reports, Board papers, policy papers, manuals, etc.
3. The Add Document for Disclosure form will open. Click the [Browse] button to attach the document for disclosure.
PTL PA
2
3
Disclosing Non-Project Documents in ADMS
41
The file size must not be over 5MB. Otherwise, contact IT Service Desk (loc. 5555) to get assistance on reducing the size.
4. Initially, the [Document Title] copies the file name. Edit it as necessary. Special characters are allowed and the maximum number of characters is 1,333.
5. The [Document Type] is a predictive text field. A list of document types that contain the same word(s) you entered will appear as you type. Depending on your internet speed, this feature may require a few seconds before the options come out. Please refer to Appendix 2 for the list of document types in ADMS. If the document type is not yet in ADMS, submit document for disclosure through [email protected]
6. Enter a country in the [Country] field (optional) if the document for disclosure is specifically for an ADB member country.
7. Enter the local number of the point person in the [Contact Person] field.
4
5
6
7
Disclosing Non-Project Documents in ADMS
42
8. Enter the document’s official cover date in the [Document Date] field.
• The Document Date should be consistent with the date provided on the attachment's cover page.
• Additional date details may be required depending on the document type and version.
• Future date is not accepted in all date fields.
9. Indicate the document status using the [Document Version] options.
• For most documents, use “Final“.
• Please refer to Appendix 2 for the complete list of documents for disclosure and their corresponding versions.
10. The [Withhold from Disclosure] setting indicates if the document is to be disclosed or not. By default, the “No” radio button is ticked. If the document will be withheld from disclosure, click here to know how.
8
9
10
Disclosing Non-Project Documents in ADMS
43
You can select multiple exceptions by pressing on the [CTRL] key while doing the selection.
11. Optionally, enter notes in the [Remarks] field. Texts entered in the [Remarks] field reflect in the history.
12. Click [Submit Document for Disclosure] to send the request to DER.
Save – Click the [Save] button to save the request as draft. The status will become “Pending for Submission” or “Withheld” if Withhold from Disclosure is set to “Yes”.
Cancel – Click the [Cancel] button to close the window or disregard the data entry. Data entered will not be saved.
13. Click [OK] in the message that appears.
11
12
13
Disclosing Non-Project Documents in ADMS
44
14. A message appears upon submission. Click the [Cancel] button to close the form.
15. The document is then added. The status is updated to “For Disclosure” and DER is notified on the request. The Requestor will also be notified upon disclosure or if DER returns the document for revision.
14
15
Appendix 1: User Interface Guide Using a form
A form refers to an editable page that allows user-inputted data to be saved. It is composed of any or a combination of the following elements:
• Text Field – an input field that allows direct text input.
• Radio buttons – an input field that allows selection of a value from a set of mutually-exclusive options laid out either horizontally or vertically.
• Date Field – refers to a date input field (with format dd-MMM-yyyy) that allows selection
of a value from a date picker pop-up window, accessed by clicking the Date Picker icon.
• Buttons – rectangular buttons that accomplishes a specific form command.
Appendix 2: Document Types and Versions How to use the table:
Document Type - gives the user an idea what document type to enter in the [Document Type] field in ADMS.
Document Version - what version to choose in the Document Version section in ADMS.
Disclosure Rule (When to disclose) – tells the user when to disclose the document.
Timing of Notification Reminder sent from ADMS – shows the timing of email notification reminder from ADMS (applicable only to certain types of document).
Remarks – other important information about the document.
Operational document types Project Documents:
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Additional Financing Final
Administration Document Final
Administration of Additional Grant
Final Only if there are changes to the
project
Appendix 2: Document Types and Versions
47
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Annual ESMS Performance/Implementation Reports (for Category FI and Category A and B General Corporate Finance projects)
Final
For category FI and category A and B General Corporate Finance projects No later than 14 days after receipt date by ADB
Not mandatory but encouraged to be posted upon receipt Category FI and category A and B General Corporate Finance projects
Annual Monitoring Report Final
Attached Technical Assistance Final Disclosed together with the main document
For projects with TA components This is a linked document
Audited Project Financial Statement
Final Within 14 days after date of acceptance (if acceptable to ADB)
1 day after date of acceptance by ADB
Date of Acceptance by ADB is manually entered by the user in EDM
Cancellation of Loan Final
Cancellation of TA Final
Chair Summary - Development Effectiveness Committee
Final No later than 14 days after Board circulation
Change Request Final Only if there are changes to the project
Appendix 2: Document Types and Versions
48
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Completion Reports (Project/Program/Facility) Final
No need to indicate modality as this applies to all No later than 14 days after circulation date
1 day after circulation date
Compliance Review - Final Report
Final
Compliance Review - Monitoring Report Final
Compliance Review - Remedial Action Plan
Final
Compliance Review - Report on Eligibility
Final
Compliance Review - Terms of Reference Final
Concept Paper Final Mandatory for all except PPTA and
emergency assistance
Conference Materials Final
Contribution to ADB Results Framework
Final Disclosed together with the main document
This is a linked document
Contribution to the Output Aggregates of the ADB's Results
Final
Appendix 2: Document Types and Versions
49
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Corporate Audit (for Category FI) Final
For SOV: 1 day before MRM/SRM date For NSO: 1 day before Final ICM
Not mandatory but encouraged to be posted before project appraisal (if no mission for appraisal is required)
Corporate Safeguards Audit Final
Country Economic Indicators Final Disclosed together with the main document
This is a linked document
Details of Implementation Arrangements
Final Disclosed together with the main document
This is a linked document
Development Coordination Final Disclosed together with the main document
All except emergency assistance This is a linked document
EA's Progress Report Final
Economic Analysis Final Disclosed together with the main document
Only for projects This is a linked document
Economic and Financial Analysis Final Disclosed together with the main document
Only for projects This is a linked document
Effectiveness Letter Final
Appendix 2: Document Types and Versions
50
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Emergency Assistance Coordination
Final Disclosed together with the main document
Only for projects This is a linked document
Environmental Assessment and Review Framework
Draft For SOV: 30 days before MRM / SRM date
30 days before MRM / SRM date
Only for emergency assistance, MFF, sector loans
Final
Disclosed together with the main document
Only for emergency assistance, MFF, sector loans This is a linked document
Environmental Compliance Audit Report (for existing facilities), including a Corrective Action Plan (CAP), if required
Final
1. 1 day before MRM / SRM date
2. If project is environment category A, at least 120 days before Board date
1. 30 days before MRM/SRM date
2. 150, 135, 133, and 132 days before Board date
Projects involving existing facilities and/or business activities that already exist or are under construction
Environmental Impact Assessment
Draft At least 120 days before Board approval date
150, 135, 133, and 132 days before Board date
Only for projects classified as environment category A
Final
Disclosed together with the main document
Only for projects classified as environment category A This is a linked document
Environmental Impact Matrix
Draft At least 120 days before Board approval date
150, 135, 133, and 132 days before Board date
Only for policy-based projects classified as environment category B
Final At least 120 days before Board approval date
150, 135, 133, and 132 days before Board date
Only for policy-based projects classified as environment category B
Appendix 2: Document Types and Versions
51
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Environmental Monitoring Report Final No later than 14 days after document completion (acceptable to ADB)
1 day after receipt date Only for projects classified as environment category A or B
Equivalence and Acceptability Assessments
Draft No later than 14 days after document completion
1 day after document completion date
Only for projects that use country safeguard
Final No later than 14 days after document completion
1 day after document completion date
Only for projects that use country safeguard
Updated 1 day after document
completion date Only for projects that use country safeguard
Extended Annual Review Report Final No later than 14 days after board circulation date
1 day after circulation date
Facility Administration Manual Final Disclosed together with the main document
Only for MFF This is a linked document
FAST Report Final
Final Report of the Special Project Facilitator
Final
Final TA Consultants’ Reports Final No later than 14 days after document completion
Financial Analysis Final Disclosed together with the main document
Only for projects This is a linked document
Appendix 2: Document Types and Versions
52
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Financial Intermediary: Environmental and Social Management System Arrangement
Final
Disclosed together with the main document
Only for projects with FI safeguard issues (Env, IR, IP) This is a linked document
Financing Plan Final
Framework Financing Agreement Final Disclosed together with the main document
1 day after signing date Only for MFF This is a linked document
Gender Action Plan Final
Disclosed together with the main document
Only for projects classified as "gender equity" or "effective gender mainstreaming" (project classification) This is a linked document
Gender and Social Inclusion Action Plan
Final Disclosed together with the main document
Only for Nepal projects
Grant Assistance Report for JFPR and JFICT Final
No later than 14 days after Board approval date (if no government consent)
1 day after Board date For standalone JFPR Grant Disclosed together with the linked documents
Grant Implementation Manual Final No later than 14 days after approval by division or Country Director
Only if project is funded by JFPR Grant
Appendix 2: Document Types and Versions
53
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
IED Annual Evaluation Report Final No later than 14 days after Development Effectiveness Committee discussion date
1 day after Development Effectiveness Committee (DEC) discussion date
IED Comments on the Management Response to Independent Evaluations
Final No later than 14 days after document completion date
1 day after document completion date
Implementation Completion Memorandum
Final
Increase in Technical Assistance Budget Amount
Final Only if applicable to the TA
Independent Evaluation Report Final No later than 14 days after Board circulation date
1 day after circulation date
Appendix 2: Document Types and Versions
54
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Indigenous Peoples Plan
Draft
For SOV:
1. Before MRM/SRM 2. Before approval of the
subproject for resettlement category A of a sector or financial intermediary project;
3. Before Management consideration of the periodic financing request for MFF tranches after the 1st tranche
For NSO: 1 day before final ICM date
For SOV:
1. 30, 15, 5 days before MRM/SRM date
For NSO: 30, 15, 5 days before final ICM date
Only for projects classified as indigenous peoples A or B
Final
Disclosed together with the main document
Only for projects classified as indigenous peoples A or B This is a linked document
Indigenous Peoples Planning Framework Draft
For SOV: 1 day before MRM / SRM date For NSO: 1 day before final ICM date
For SOV: 30, 15, 5 days before MRM/SRM date For NSO: 30, 15, 5 days before final ICM date
ALL loans and grants for sector loan and multitranche financing facility
Appendix 2: Document Types and Versions
55
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Final
Disclosed together with the main document
Only for emergency assistance, MFF, sector loans This is a linked document
New No later than 14 days after receipt by ADB
1 day after receipt date Indigenous peoples A or indigenous peoples B
Updated No later than 14 days after receipt by ADB
1 day after receipt date Indigenous peoples A or indigenous peoples B
Initial Environmental Examination
Draft
Disclosed together with the main document
Only for project classified as environmental category B This is a linked document
Final
Disclosed together with the main document
Only for project classified as environmental category B This is a linked document
New 14 days after receipt date 1 day after receipt date Only for project classified as
environmental category B
Updated 14 days after receipt date 1 day after receipt date Only for project classified as environmental category B
Appendix 2: Document Types and Versions
56
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Initial Poverty and Social Analysis Final
For SOV: No later than 14 days after approval of the project concept paper For NSO: No later than 14 days after board date
For SOV: 1 day after Concept Paper approval date For NSO: 1 day after Board date
Mandatory except for PPTA and emergency assistance
Integrated Risk Assessment and Mitigating Measures
Final
Disclosed together with the main document
Only for result-based lending projects This is a linked document
Interim/Midterm Report Final
Interim Operational Strategy Final Disclosed together with the main document
Only for emergency assistance This is a linked document
International Monetary Fund Assessment Letter Final
Disclosed together with the main document
Only for policy-based projects This is a linked document
Issues Paper Final
Japan Fund for Poverty Reduction (JFPR) Grant Proposal
Final
Lapse of Loan Offer or Approval Final Only if there are changes to the
project
Appendix 2: Document Types and Versions
57
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Legal Agreement Final
No later than 14 days after signing date
1 day after signing date or 1 day after effectivity date of amendment
Only OGC is allowed to disclose ADMS will send disclosure reminder
List of Ineligible Items Final Disclosed together with the main document
Only for policy-based projects This is a linked document
Loan Agreement Final No later than 14 days after signing date
Only OGC is allowed to disclose
Mandate Letter Final
Major Change in Scope/Amount/Implementation Arrangements
Final
No later than 14 days after Board approval date
1 day after Board date Only if there are changes to the project Disclosed together with the linked documents
Management Response to Independent Evaluations Final
No later than 14 days after document completion
1 day after document completion date
Memorandum of Agreement (MOU)/Aide Memoire
Final
Multitranche Financing Facility Annual Report
Final Only for MFF-Facility
Ownership, Management, and Governance Final
Disclosed together with the main document
This is a linked document
Appendix 2: Document Types and Versions
58
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Performance Evaluation Report (Project/Program)
Final
c/o IED; No later than 14 days after circulation to Management and the Board
Performance Evaluation Report (TA)
Final
c/o IED; No later than 14 days after circulation to Management and the Board
Performance Overview Final Disclosed together with the main document
Mandatory for projects and MFF This is a linked document
Periodic Financing Request for Project 1 Final
Disclosed together with the main document
Only for MFF This is a linked document
Periodic Financing Request Monthly Report
Final No later than 14 calendar days from Board circulation date
1 day after circulation date Prepared by SPD
Periodic Financing Request Report
Final No later than 14 calendar days from Board circulation
For subsequent MFF tranches
PPTA Appendix Final No later than 14 days After approval of the project concept paper
1 day after concept paper approval date
Mandatory for all except PPTA and emergency assistance
Priority Sector Diagnosis and Analyses
Final
Appendix 2: Document Types and Versions
59
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Program Action Plan Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Program Expenditure and Financing Assessment
Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Program Fiduciary Systems Assessment Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Program Implementation Document
Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Program Monitoring and Evaluation System Assessment
Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Program Results Assessment Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Appendix 2: Document Types and Versions
60
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Program Results Framework Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Program Safeguard Systems Assessment Final
Disclosed together with the main document
Only for results-based lending projects classified under environment category B, involuntary resettlement category A or B, and/or indigenous peoples category A or B This is a linked document
Program Soundness Assessment Final
Disclosed together with the main document
Only for results-based lending projects This is a linked document
Progress Report on Tranche Release Final
If waived compliance (Board approval), within 14 days after Board approval date If complied (Management approval), within 14 days after Board circulation date
1 day after Board date 1 day after circulation date
Only for policy-based projects Document is automatically sent for disclosure upon circulation date for SOV projects
Progress Report on Tranche Report
Final No later than 14 days after Board approval
Progress Towards Millennium Development Goals and Targets
Final
Appendix 2: Document Types and Versions
61
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Project Administration Manual Final Disclosed together with the main document
Only for projects This is a linked document
Project Design Advance Final
No later than 14 days of Board circulation
This document is Management-approved and is required to be circulated to the Board for information, FYI A PDA may only be provided for a first tranche under a multitranche financing facility (MFF), and not for subsequent tranches
Quarterly Monitoring Report Final
Reallocation of Loan Proceeds Final Only if there are changes to the
project
Reallocation of Proceeds Final Disclosed together with the main document
Only if applicable to the TA This is a linked document
Appendix 2: Document Types and Versions
62
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Report and Recommendation of the President
Final
For SOV: No later than 14 days after Board circulation (early disclosure with government consent) For SOV: No later than 14 days after Board approval date (if no government consent) For NSO: No later than 14 days after Board approval date (if no government consent)
1 day after circulation date For SOV: Document is automatically sent to DER for web posting upon circulation For SOV: ADMS will send disclosure reminder For NSO: ADMS will send disclosure reminder Disclosed together with the linked documents
Report to the President Final
A redacted/abbreviated version shall be manually submitted in ADMS for disclosure no later than 14 days from Board circulation (for information).
1 day after circulation date Prepared for NSO projects where approval level = President Disclosed together with the linked documents A redacted/abbreviated version shall be manually submitted to ADMS for disclosure no later than 14 days from Board circulation (for information)
Appendix 2: Document Types and Versions
63
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Resettlement Framework
Draft
For SOV: 1 day before MRM / SRM For NSO: 1 day before final ICM
For SOV: 30, 15, 5, 4, 3, 2 days before MRM/SRM date For NSO: 30, 15, 5 days before final review investment committee date
Only for MFF, sector loans
Final
Disclosed together with the main document
Only for emergency assistance, MFF, sector loans This is a linked document
Updated For SOV/NSO: No later than 14 days after receipt by ADB
1 day after receipt date Only for emergency assistance, MFF, sector loans
Appendix 2: Document Types and Versions
64
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Resettlement Plan
Draft
For SOV:
1. 1 day before MRM/SRM date
2. Before approval of the subproject for resettlement category A of a sector or financial intermediary project
3. Before Management consideration of the periodic financing request for MFF tranches after the 1st tranche
For NSO: Before Final ICM
For SOV:
1. 30, 15, 5 days before MRM/SRM date
For NSO: 30, 15, 5 days before final review investment committee date
Only for projects classified as involuntary resettlement A or B
Final
Disclosed together with the main document
Only for projects classified as involuntary resettlement A or B This is a linked document
New No later than 14 days after receipt date by ADB
1 day after receipt date Only for projects classified as involuntary resettlement A or B
Updated No later than 14 days after receipt date by ADB
1 day after receipt date Only for projects classified as involuntary resettlement A or B
Appendix 2: Document Types and Versions
65
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Revised Financing Plan Final Disclosed together with the main document
Only if applicable to the TA This is a linked document
Revised Project/Facility Administration Manual
Final Disclosed together with the main document
Mandatory for projects and MFF This is a linked document
Updated No later than 14 days after document completion
Mandatory for projects and MFF This is a linked document
Risk Assessment and Risk Management Plan
Final Disclosed together with the main document
This is a linked document
Safeguards and Social Dimensions Summary
Final Disclosed together with the main document
This is a linked document
Safeguards Compliance Note/Checklist Final
Safeguards Due Diligence Report Final
Safeguards screening checklist and categorization
Final
Sector Overview Final Disclosed together with the main document
This is a linked document
Small Scale Technical Assistance (SSTA) Memo
Final
Appendix 2: Document Types and Versions
66
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Social Compliance Audit Report (for existing facilities), including a Corrective Action Plan (CAP), if required
Final
1 day before MRM / SRM date 30 days before MRM/SRM date
Projects involving existing facilities and/or business activities that already exist or are under construction
Social Impact Matrix Final
1 day before MRM / SRM 30, 15, 4, 3, and 2 days before MRM/SRM date
Only for policy-based projects classified as i) involuntary resettlement category A or B or ii) indigenous peoples category A or B
Social Monitoring Report Final No later than 14 days after receipt date (acceptable to ADB)
180, 365, and 730 days after project effectiveness date
Only for projects classified as involuntary resettlement A or B and indigenous peoples A or B
SSTA Memo Or Small Scale Technical Assistance (SSTA) Memo
Final
Only for TAs with amount of up to $225,000
Strategic Environmental Assessment
Draft At least 120 days before Board approval date
150, 135, 124, 123, and 122 days before Board date
Only for policy-based projects classified as environment category A
Summary Assessment of Damage and Needs
Final Disclosed together with the main document
Only for emergency assistance This is a linked document
Appendix 2: Document Types and Versions
67
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Summary of Program Performance Final
Disclosed together with the main document
Only for result-based lending projects tagged as emergency assistance This is a linked document
Summary of Project Performance Final Disclosed together with the main document
This is a linked document
Summary Poverty Reduction and Social Strategy Final
Disclosed together with the main document
This is a linked document
Summary Sector Assessment Final Disclosed together with the main document
Only for emergency assistance This is a linked document
Supplementary Documents Final Disclosed together with the main document
This is a linked document
TA Completion Report Final
No later than 14 days after Board circulation
1 day after circulation date For SOV projects : Document is automatically sent for disclosure upon circulation date For NSO projects: Notification reminder will be sent
TA Subproject Proposal Final No later than 14 calendar days of approval by the relevant authority
Appendix 2: Document Types and Versions
68
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
TA Validity Extension Approval Final No later than 14 calendar days of circulation to the Board for information
1 day after circulation date Not required but may be disclosed
Technical Assistance Report Final
If Approval = Board No later than 14 days after Board date If Approval = Management (VP/President) Within 14 days after Board circulation date If PPTA and amount is up to $1.5 million Within 14 days after concept paper approval date
1 day after Board date 1 day after circulation date 1 day after concept paper approval date
SOV projects: Document is automatically sent for disclosure upon circulation date For NSO projects: Reminder notification will be sent (see timing of notification reminder sent by ADMS)
Technical Assistance (TA) Letter Final
Technical Assistance (TA) Paper Final
Technical Assistance (TA) Subproject Proposal
Final
TOR of Consultants Final
Tranche Compliance Final
Updated Procurement Plan Final No later than 14 days after document completion date
1 day after document completion date
Appendix 2: Document Types and Versions
69
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Waiver of Loan Effectiveness Condition
Final Only if there are changes to the project
Appendix 2: Document Types and Versions
70
Non-Operational document types Administrative Documents:
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
ADB Annual Reports Final No later than 14 days after Board date
1 day after Board date As applicable
ADB budget for each fiscal year Final No later than 14 days after Board approval date
1 day after Board date As applicable
ADB Work Program and Budget Framework
Final No later than 14 days after Board date
1 day after Board date As applicable
Administrative Tribunal Decisions
Final No later than 14 days after Administrative Tribunal notifies the Secretary to post a decision
1 day after Administrative Tribunal notifies SEC to post a decision
As applicable
Annual Report on Country Performance Assessment with access to Asian Development (ADF) resources
Final
No later than 14 days after document completion
1 day after document completion date
As applicable
Annual Report on loan servicing of developing member countries
Final No later than 14 days after Board approval date
1 day after Board date As applicable
Asian Development Fund Final
Asian Development Outlook and Asian Development Outlook Update
Final No later than 14 days after document completion
As applicable
Appendix 2: Document Types and Versions
71
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Board of Directors Committee Annual Reports
Final 1 day after Board date As applicable
Chair Summary - Development Effectiveness Committee
Final No later than 14 days after Board circulation
Chairs Summary related to ADF Negotiations
Final No later than 14 days after meeting with donors
Contract Awards Final Timing of disclosure not specified in the PCP but should be document completion date
1 day after document completion date
As applicable
Corporate Evaluation Study Final
Country Classification Final No later than 14 days After Board approval date
1 day after Board date
Donors Report related to ADF Negotiations
Final No later than 14 days after Board endorsement date
1 day after Board date
Financial Highlights Final
Host Country Agreements Final No later than 14 days after document completion
1 day after document completion date
Subject to concurrence of country
Impact Evaluation Study Final
Invitations to submit bids or proposals for institutional procurement
Final Timing of disclosure not specified in the PCP but should be document completion date
1 day after document completion date
As applicable
Appendix 2: Document Types and Versions
72
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Key Indicators Final No later than 14 days after document completion
1 day after document completion date
As applicable
Management Discussion and Analysis of ADB's Ordinary Capital Resources and Special Funds Resources
Final
No later than 14 days after Board date
1 day after Board date
Minutes of Board of Director's Meetings Final
No later than 14 days after Board approval of minutes but no later than 60 calendar days after Board date
As applicable
Non-financial discussion papers related to ADF Negotiations
Final No later than 14 days after circulation to the donors
Operations Manual Final No later than 14 days after document completion (issuance to staff)
1 day after document completion date
As applicable
Other Resolutions of the ADB Board of Governors Final
Timing of disclosure not specified in the PCP but should be adoption date of the resolution by the Board of Governors, if Board of Directors authorizes disclosure
Outstanding Loan Service Payments
Final
Appendix 2: Document Types and Versions
73
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
PCP Annual Report Final No later than 14 days after Development Effectiveness Committee discussion date
1 day after circulation date
Policy Paper Draft
No later than 14 days after Board circulation (for public consultation)
1 day after circulation date Document is automatically sent for disclosure upon circulation date (if Board scenario selected in eServe is For information)
Project Administration Instructions
Final No later than 14 days after document completion (issuance to staff)
1 day after document completion date
As applicable
Quarterly Portfolio Update Final
Quarterly Status of PCRs and TCRs
Final
Quarterly Summary Report on Approved PPTA, SSTA, and TA Cluster Subprojects
Final
Receipt of Loan Service Payment Final
Report on Budget for Internal Administrative Expenses and Annual Capital Expenditures
Final
Resolutions of the ADB Board of Governors
Final No later than 60 days after annual meeting
As applicable
Appendix 2: Document Types and Versions
74
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Review of ADB's Loan Charges and Allocation of Net Income
Final
Revised Lending Rates and Funding Cost Margins for ADB's Loan Products
Final
Risk Management Report Final
Sector Assistance Program Evaluation
Final
Staff Consultant Report Final No later than 14 calendar days of document completion/ finalization date
1 day after document completion date
Statement of Recruitment and Employment Final
Strategy and Policy Paper Final
No later than 14 days after Board circulation (if public consultation is conducted) No later than 14 days after Board date (if no public consultation is conducted, except for sector and thematic policies and strategies)
1 day after circulation date Document is automatically sent for disclosure upon circulation date (if Board scenario selected in eServe is For information)
Strategy and Policy Paper: Chair's Summary
Final No later than 14 days after final Board circulation date
1 day after circulation date
Appendix 2: Document Types and Versions
75
Document Type Document Version
Disclosure Rule (When to disclose)
Timing of Notification Reminder sent from ADMS Remarks
Strategy and Policy Paper: Plan for consultation (if available)
Final No later than 14 days after document completion date
1 day after document completion date
Summary of Proceedings of the Annual Meeting of the Board of Governors
Final No later than 60 days after annual meeting
As applicable
Thematic Evaluation Study Final
Treasury Report Final
Unaudited condensed quarterly financial statements
Final No later than 14 days after Board date
1 day after Board date
Appendix 3: Document Status in ADMS Below are the different document statuses in ADMS.
Status Description
Pending for Submission
When the [Save] button was clicked and not yet submitted to DER, the request will be saved as draft. The status of the request will become “Pending for Submission”.
For Disclosure When the request has been submitted to DER.
For Revision When DER returns the request for changes.
Disclosed When DER disclosed the request in the ADB website. Once disclosed,
the [Link to ADB Website] icon will appear. Click to open the disclosed document from the ADB website.
For Replacement When the Requestor submitted a request to replace a previously disclosed document.
Replaced When DER has replaced the previously disclosed document.
Replacement Rejected
When DER rejected the request to replace the disclosed document.
For Removal When the Requestor submitted a request to remove a previously disclosed document.
Removed When DER removed the document from ADB website.
Removal Rejected When DER rejected the request for document removal.
Withheld When the Requestor selects “Yes” in the [Withhold from Disclosure] section in ADMS.
Appendix 3: Document Status in ADMS