SITE PLAN LEGEND Existing Buildings Annex Buildings Back-up generators Boiler Plants Community Centers/ Childc Existing Funded Buildings Annex Buildings Community Center / Childcare Center Back-up Generators Mercedez Harvell Congressional (D-7): Nydia Velasquez NYS Senate (D-27): Brad Hoylman NYS Assembly (D-74): Vacant NYC Council (D-2): Carlina Rivera Buildings benefiting from FEMA funding: 6 Building heights: 6-14 stories Total Buildings: 6 Property Size: 5.94 acres Development Information Development Statistics: Elected Representative: JACOB RIIS II HOUSES Manhattan, NY Capital Projects Division - Recovery and Resiliency

DISASTER Y JACOB RIIS II HOUSES - Welcome to … II.pdfJACOB RIIS II HOUSES. Manhattan, NY Capital Projects Division - Recovery and Resiliency. DISASTER Y e Plan d ... related piping

Embed Size (px)

Citation preview

DISASTER RECOVERY

1) Site Plan w/Legend(Make sure street names appear on the Site Plan)

2) Renderings(Arrange as necessary)

3) Renderings(Arrange as necessary)

DEVELOPMENT NAMEBorough, NY

JACOB RIIS 2 HOUSESManhattan, NY

SITE PLAN ELEVATION (TYPICAL)

LEGENDExisting Buildings

Annex Buildings

Back-up generators

Boiler Plants

Community Centers/ Childcare Centers

2

67

8

5

9

10

4

1

E A S T 1 0 5 T H S T R E E T

E A S T 1 0 2 N D S T R E E T

F I R S T A

V E N U E

F D R

D R

I V E

3

34

LiRo Architects + Planners, P.C

A LiRo Group Company

111 Broadway, New York, NY 10006

212.563.0280 [P] 212.563.1841 [F]

Borough of:

Conceptual

Existing Funded Buildings

Annex Buildings

Community Center / Childcare CenterBack-up Generators

Tenant Association:

Mercedez Harvell

Congressional (D-7): • Nydia Velasquez

NYS Senate (D-27): • Brad Hoylman

NYS Assembly (D-74): • Vacant

NYC Council (D-2): • Carlina Rivera

Buildings benefiting from FEMA funding: 6

Building heights: 6-14 stories

Total Buildings: 6

Property Size: 5.94 acres

Development Information

Development Statistics:

Elected Representative:

JACOB RIIS II HOUSESManhattan, NY

Capital Projects Division - Recovery and Resiliency

DISASTER RECOVERY

1) Site Plan w/Legend(Make sure street names appear on the Site Plan)

2) Renderings(Arrange as necessary)

3) Renderings(Arrange as necessary)

DEVELOPMENT NAMEBorough, NY

JACOB RIIS HOUSESManhattan, NY

SITE PLAN

LEGENDExisting Buildings

Annex Buildings

Back-up generators

Boiler Plants

Community Centers/ Childcare Centers

2

67

8

5

9

10

4

1

E A S T 1 0 5 T H S T R E E T

E A S T 1 0 2 N D S T R E E T

F I R S T A

V E N U E

F D R

D R

I V E

3

34

LiRo Architects + Planners, P.C

A LiRo Group Company

111 Broadway, New York, NY 10006

212.563.0280 [P] 212.563.1841 [F]

Borough of:

Conceptual

DISASTER RECOVERY

1) Site Plan w/Legend(Make sure street names appear on the Site Plan)

2) Renderings(Arrange as necessary)

3) Renderings(Arrange as necessary)

DEVELOPMENT NAMEBorough, NY

JACOB RIIS HOUSESManhattan, NY

SITE PLAN

LEGENDExisting Buildings

Annex Buildings

Back-up generators

Boiler Plants

Community Centers/ Childcare Centers

2

67

8

5

9

10

4

1

E A S T 1 0 5 T H S T R E E T

E A S T 1 0 2 N D S T R E E T

F I R S T A

V E N U E

F D R

D R

I V E

3

34

LiRo Architects + Planners, P.C

A LiRo Group Company

111 Broadway, New York, NY 10006

212.563.0280 [P] 212.563.1841 [F]

Borough of:

Conceptual

Project Scope

Safety• Installation of new security cameras.• Door security access systems.• Replacement of exterior site lighting fixtures and bulbs.

Building Improvements

Development Improvements • Restoration of 1 playground.• Resurfacing of sidewalks, pavement and asphalt sitewide that are impacted by construction.• Replacement of underground electrical wiring system.• Provision of flood barrier system at the building entrances.

Resiliency• Manual dry flood proofing of areas below the established FEMA flood level.

Energy• Installation of full backup power generators at buildings 14, 15, 18 and 19.• Additional sitewide energy and sustainability measures (awaiting HUD approval).

• Removal of hazardous materials and cleaning of building crawl spaces.• New MEP annexes above the FEMA flood level to house ATS, CT cabinets and distribution panels.• Partial roof replacement for buildings 14, 15, 18 and 19.• Replacement and/or repair of doors, door frames and hardware damaged by water.• Replacement and/or repair of mechanical, electrical and plumbing equipment damaged by water to

include: vacuum/condensate pumps, related piping and insulation of piping in crawlspace.• Renovation of 7 first floor apartments damaged by Sandy.• Back water valves on sewer/storm plumbing lines.• Replacement of sump pumps.

JACOB RIIS II HOUSESManhattan, NY

Capital Projects Division - Recovery and Resiliency

CONCEPTUAL

CONCEPTUAL