Disaster Recovery Transformed into Business Continuity Kevin Gunn Director of Technology Services City of Denton

Disaster Recovery Transformed into Business Continuity

  • Upload
    sanne

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

Disaster Recovery Transformed into Business Continuity. Kevin Gunn Director of Technology Services City of Denton. City of Denton. City of Denton. 94 square miles 114,000 population Two Major Universities University of North Texas (36,000 enrollment) - PowerPoint PPT Presentation

Citation preview

Page 1: Disaster Recovery Transformed into  Business Continuity

Disaster Recovery Transformed into Business Continuity

Kevin GunnDirector of Technology Services

City of Denton

Page 2: Disaster Recovery Transformed into  Business Continuity

City of Denton

Page 3: Disaster Recovery Transformed into  Business Continuity

City of Denton94 square miles114,000 populationTwo Major Universities

University of North Texas (36,000 enrollment)Texas Women’s University (14,000 enrollment)

Denton Airport 8th busiest in TexasSolid Waste, Water, Wastewater and Electric

Utilities$590M Annual expenditures

Page 4: Disaster Recovery Transformed into  Business Continuity

Potential for Disaster

Page 5: Disaster Recovery Transformed into  Business Continuity

Potential for Disaster

Page 6: Disaster Recovery Transformed into  Business Continuity

April 3, 2012

Potential for Disaster

Page 7: Disaster Recovery Transformed into  Business Continuity

Outage CostsFire Department – 30 calls for service per dayPolice Department – 100 calls for service per

dayUtility Collections - $188K per dayCourts Collections – $87K per dayWater/ Electric Meter readings – 5,000 per

dayEmail – 250,000 sent/ received per day

Page 8: Disaster Recovery Transformed into  Business Continuity

Enabling TechnologiesVirtualization – VMware hypervisorCisco UCS Blade servers and Nexus 5000

switchesEMC VNX5300 SAN

Page 9: Disaster Recovery Transformed into  Business Continuity

New FacilityElectric Operations building a new facility for

Systems Operators3.5 miles from primary data centerBuilt to withstand EF3 tornadoOutside of 500 year flood plainNo adjacent railroad

Page 10: Disaster Recovery Transformed into  Business Continuity

DR Site

Page 11: Disaster Recovery Transformed into  Business Continuity

DR Site

Page 12: Disaster Recovery Transformed into  Business Continuity

Site BSite A

SYNCHRONOUS/ASYNCHRONOUS REPLICATION

Active-Passive Site

Active-Passive Data AccessBefore VPLEX

Data on disaster recovery site is used on failure

Outage to move applications

Page 13: Disaster Recovery Transformed into  Business Continuity

vPlex

Page 14: Disaster Recovery Transformed into  Business Continuity

VPLEX Metro

Site BSite A

TRANSFER PROTOCOL

Active-Active Site

VPLEX enables active use of resources at two sites

Federated Data AccessWith VPLEX

DISTRIBUTED VIRTUAL VOLUME

Page 15: Disaster Recovery Transformed into  Business Continuity

Demonstration

Page 16: Disaster Recovery Transformed into  Business Continuity

ExpensesvBlock, Nexus 7K, and Professional Services

$670KvPlex $180K (25 percent)

Page 17: Disaster Recovery Transformed into  Business Continuity

I don’t have $850K

Page 18: Disaster Recovery Transformed into  Business Continuity

Business Continuity Planning

Page 19: Disaster Recovery Transformed into  Business Continuity

Ask Customers to ConsiderCritical processes to restore and what time

framePersonnel involved and alternatesResources needed to support these processesExpectations for day zero through day threeExpectations for day four through full

recoveryContact information

Page 20: Disaster Recovery Transformed into  Business Continuity

Critical ProcessNot everything!Collect revenueOperations movingResponders and cleanup

Page 21: Disaster Recovery Transformed into  Business Continuity

PersonnelOne person that owns the process and an

alternate pg 16CoordinationEmpowered to make decisionsKnow the process and resources needed

Page 22: Disaster Recovery Transformed into  Business Continuity

ResourcesAlternate facility pg23Desktops computers PhonesAnalog/fax linesElectronic and paper filesInternal and external support for the process

(e.g. other departments, vendors, regulatory agencies)

Page 23: Disaster Recovery Transformed into  Business Continuity

ExpectationsZero to three days restoration time frameChanges needed for Day 4 to complete

restoration

Page 24: Disaster Recovery Transformed into  Business Continuity

Denton Airport Plan DocumentBCP page 28

Page 25: Disaster Recovery Transformed into  Business Continuity

DocumentationExample and blank forms located at:http://www.cityofdenton.com/index.aspx?page=1608