DIRFT III PLANNING FOR THE FUTURE THE EXPANSION OF DAVENTRY INTERNATIONAL RAIL FREIGHT INTERCHANGE www.DIRFTIII.com

DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III

PLANNING FOR THE FUTURE

THE EXPANSION OF DAVENTRY INTERNATIONAL

RAIL FREIGHT INTERCHANGE

www.DIRFTIII.com

� � � � � � � � � � � � � � � � �� � � � � � � � �� � � � � �� � � � � � � � � � � � �

Page 2: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No
Page 3: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

DIRFT III Document List Document 1.5

Document/Plan Status/ Regulation Plan No.

Doc No. Date first submitted to PINS

Application Documents 1.Application Form

Application Form

Reg 5(1) 1.1 22.02.13

Letter Accompanying Original Application

1.2 31.10.12

Letter Accompanying Resubmission 1.2A 22.02.13

Newspaper Notices Report (s48)

1.3 31.10.12

Site Notice Information

1.4 31.10.12

DIRFT III Document List

1.5 22.02.13

Applicant’s Original S.55 Checklist

1.6 22.10.12

DIRFT III Pre Acceptance Submission Update

1.7 22.02.13

2. Plans/ Drawings/ Sections Location Plan

Reg 5(2)(o) P001 Rev G

2.1

31.10.12

Overall Scheme Plan

Reg 5(2)(o) 11041/PD/54

2.1A

22.02.13

Ease of Reference Plans Bundle Reg 5 (2)(o) 2.1B 22.02.13

Main Site and Rail Land Plans Main Site and Rail Land Plans – Key Plan Main Site and Rail Land Plans – Sheet 1 Main Site and Rail Land Plans – Sheet 2

Reg 5(2)(i) and 5(2)(n) L020(Key) Rev E L020(SHEET 1) Rev E L020 (SHEET 2) Rev E

2.2 2.2A 2.2B

31.10.12 31.10.12 31.10.12

Page 4: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

Main Site and Rail Land Plans – Sheet 3

L020 (SHEET 3) Rev E

2.2C 31.10.12

Main Site and Rail Works Plans Main Site and Rail Works Plans – Key Plan Main Site and Rail Works Plans – Sheet 1 Main Site and Rail Works Plans – Sheet 2 Main Site and Rail Works Plans – Sheet 3

Reg 5(2)(j) A058 (KEY) Rev C A058 (SHEET 1) Rev C A058 (SHEET 2) Rev C A058 (SHEET 3) Rev C

2.3 2.3A 2.3B 2.3C

31.10.12 31.10.12 31.10.12 31.10.12

Highway Mitigation Land and Works Plans (labelled as Highway Works Area Plans) Highway Mitigation Land and Works Plans – Key Plan Highway Mitigation Land and Works Plans – A5/A426 Highway Mitigation Land and Works Plans – M1 Junction 18 Highway Mitigation Land and Works Plans – A5/A428 Halfway House Highway Mitigation Land and Works Plans – Lilbourne Junction Highway Mitigation Land and Works Plans – Catthorpe Junction Highway Mitigation Land and Works Plans – Clifton upon Dunsmore Highway Mitigation Land and Works Plans – Kilsby

Reg 5(2) (i) (j) and (n) 11041/PD/49 Rev A 110041/PD/23 Rev C 110041/PD/24 Rev C 110041/PD/25 Rev C 110040/PD/27 Rev C 110041/PD/28 Rev C 110041/PD/29 Rev C 110041/PD/30 Rev C

2.4 2.4A 2.4B 2.4C 2.4D 2.4E 2.4F 2.4G

22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13

Page 5: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

Highway Mitigation Land and Works Plans – A5 to A428 at Crick Highway Mitigation Land and Works Plans – DIRFT III to Hilmorton Highway Mitigation Land and Works Plans – DIRFT III to Hilmorton

110041/PD/31 Rev C 110041/PD/32 Rev E 110041/PD/45 Rev C

2.4H 2.4I 2.4J

22.02.13 22.02.13 22.02.13

Access and Rights of Way Plan

Reg 5(2)(k) 83538/D3-100 Rev H

2.5

31.10.12

Land Ownership Plans Land Ownership Plans

- Key Plan Land Ownership Plans Sheet 1 Land Ownership Plans Sheet 2 Land Ownership Plans Sheet 3

Reg 5(2)(o) L019 (KEY) Rev D L019 (SHEET 1) Rev C L019 (SHEET 2) Rev D L019 (SHEET 3) Rev C

2.6 2.6A 2.6B 2.6C

31.10.12 31.10.12 31.10.12 31.10.12

Main Site and Rail Corridor Framework Plans and Schedule of Parameters Main Site and Rail Corridor Framework - Key Plan Main Site and Rail Corridor Framework Sheet 1 Main Site and Rail Corridor Framework Sheet 2 Main Site and Rail Corridor Framework Sheet 3

Reg 5(2)(o) AO39 (KEY) Rev L AO39 (SHEET 1) Rev D AO39 (SHEET 2) Rev E AO39 (SHEET 3) Rev D

2.7 2.7A 2.7B 2.7C

31.10.12 31.10.12 31.10.12 31.10.12

Page 6: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

Main Site and Rail Corridor Framework Schedule of Parameters

2.7D 31.10.12

Illustrative Masterplan Illustrative Masterplan - Key Plan Illustrative Masterplan - Sheet 1 Illustrative Masterplan - Sheet 2 Illustrative Masterplan - Sheet 3

Reg 5(2)(o) FO14 (KEY) Rev D FO14 (SHEET 1) Rev A FO14 (SHEET 2) Rev B FO14 (SHEET 3) Rev A

2.8 2.8A 2.8B 2.8C

31.10.12 31.10.12 31.10.12 31.10.12

Ecology and Landscape Plans and Assessment

Reg 5(2)(l) In Chapter F and H of the ES

31.10.12

Heritage Plans and Assessment Reg 5(2)(m) In Chapter G of the ES

31.10.12

Rail Background Information Plans

• Existing Rail Layout

• Rail Structures Key Plan

Reg 5(2)(o) URS 47056898/SLD/03 Rev B URS 47056898/KEY/01 Rev B

2.9A 2.9B

31.10.12 31.10.12

Rail Framework Plans

• Rail Framework Plan (Single Line Drawing) Sheet 1

• Rail Framework Plan (Single Line Drawing) Sheet 2

Reg 5(2)(o) URS 47056898/SLD/01 Rev C URS 47056898/SLD/02 Rev C

2.10A 2.10B

31.10.12 31.10.12

Page 7: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

• Bridge A (Tunnel) (Replacement of existing tunnel to accommodate twin track

• Bridge over the A428 – in the alternative:

(a) Bridge B (as permitted)

with Bridge B1 (two single track bridges)*

(b) Bridge B Viaduct (as

permitted) with Bridge B1 Viaduct (two single track viaducts)

OR

(c) Bridge B2 (single bridge with double rail track)**

• Bridge D (over the A5)

• Bridge E (over the internal) estate road

*to be used if most eastern alignment of rail track is used **to be used if rail track is on any alignment other than the most eastern

URS D122659-SW-CV-DRG-1002 Rev E Bridge – URS D122659-SW-CV-DRG-1004 Rev D Viaduct - URS D122659-SW-CV-DRG-1003 Rev D URS 47056898-SW-CV-DRG-1005 Rev A URS D122659-SW-CV-DRG-1000 Rev G URS D122659-SW-CV-DRG-1001 Rev E

2.10C 2.10D 2.10E 2.10F 2.10G 2.10H

31.10.12 31.10.12 31.10.12 31.10.12 31.10.12 31.10.12

Rail Embankments

• Rail embankment through DIRFT II and III in the alternative:

(a) Eastern Embankment Option*

(b) Alternative Embankment

Alignment Option ** *to be used if most eastern alignment

Reg 5(2)(o) URS D122659-SW-PW-GEO1 Rev F URS D122659-SW-PW-GE02 Rev C

2.10I 2.10J

31.10.12 31.10.12

Page 8: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

of rail track is used **to be used if rail track is on any alignment other than the most eastern

Minor Watercourse Bridges and

Flow Control Structure

• West Footbridge and

Maintenance Access

• Bridleway Bridge and

Maintenance Access

• Clifton Brook Tributary Storage

Scheme Flow Control Structure

• Clifton Brook Realignment

Access Bridge, General

Arrangement

Bridleway Bridges over Rail on

Main Site

• Bridleway Details Plan and

Longitudinal Section

• Bridleway Details Cross

Sections

• Bridleway Bridge West

General Arrangement

• Bridleway Bridge Central

General Arrangement

• Bridleway Bridge East general

Arrangement

Reg 5(2)(o)

PBA 2.11A Rev C

PBA 2.11B Rev C

PBA 2.11C Rev C

PBA 2.11D Rev C

60051619/100 P4

60051619/101 P4

60051619/103 P4

60051619/104 P4

60051619/105 P4

2.11A

2.11B

2.11C

2.11D

2.11E

2.11F

2.11G

2.11H

2.11I

31.10.12

31.10.12

31.10.12

31.10.12

31.10.12

31.10.12

31.10.12

31.10.12

31.10.12

Page 9: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

Flood Alleviation Works

• Long Dole Culvert A5/125.20 Replacement, General Arrangement

• Danes Way Culvert Replacement, General Arrangement

Reg 5(2)(o) PBA 2.11J Rev A PBA 2.11K Rev A

2.11J 2.11K

31.10.12 31.10.12

Railway Bridging Structures over Clifton Brook

• Western Alignment

• Eastern Alignment

Reg 5(2)(o) PBA 2.11L Rev A PBA 2.11M Rev A

2.11L 2.11M

31.10.12 31.10.12

Lilbourne Meadows Lilbourne Ridge Proposed Contours and Sections

Reg 5(2)(o) AECOM – 600519/CIV/PD/016 Rev. P3

2.12

31.10.12

Highway Works Framework Plans

• General Arrangement Plan

o Key Plan

o Gibbet Roundabout

o M1 J18

o A5/A428 (Halfway

House)

o Lilbourne Junction

o Catthorpe Junction

110041/PD/42 Rev B 110041/PD/08 Rev D 110041/PD/09 Rev D 110041/PD/10 Rev D 110041/PD/12 Rev D 110041/PD/13 Rev C

2.13 2.13A 2.13B 2.13C 2.13D 2.13E

22.02.13 22.02.13 22.02.13 22.02.13 22.02.13 22.02.13

Page 10: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

o A5/A428 (Parklands) 110041/PD/53 Rev A

2.13F

22.02.13

Highway Works Illustrative Plans

• Indicative Scheme Drawings

o Clifton upon Dunsmore Indicative Traffic Calming Scheme

o Kilsby Indicative Traffic Calming Scheme

o A5 to A428 at Crick Ped/Cycle Improvement Scheme.

o DRIFT III to Hillmorton Ped/Cycle Improvement Scheme. [This plan is at a scale of 1:5000 at A1 – No detail is shown and it enables the context to be appreciated]

o Key Plan

110041/PD/14 Rev C to 17 Rev C (overview plan and 3 sheets) 110041/PD/18.1 to 18.5 Rev C and 18.6 Rev D and 18.7 Rev C (7 sheets) 110041/PD/19 Rev C to 21 Rev C ( 3 sheets) 110041/PD/22 Rev C 110041/PD/43 Rev B

2.13G 2.13H 2.13I 2.13J 2.13K

22.02.13 22.02.13 22.02.13 22.02.13 22.02.13

Site Access Plans

• Southern Access to DIRFT III

• Northern Access to DIRFT III

Reg 5(2)(o) 110041/PD/44 Rev A 110041/PD/06A Rev B

2.14A 2.14B

31.10.12 31.10.12

Phasing Plan Phasing Plan – Key plan

Reg 5(2)(o) A049 Rev D

2.15

31.10.12

Page 11: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

Phasing Plan – Sheet 1 Phasing Plan – Sheet 2 Phasing Plan – Sheet 3

A049 (SHEET 1) Rev B A049 (SHEET 2) Rev B A049 (SHEET 3) Rev B

2.15A 2.15B 2.15C

31.10.12 31.10.12 31.10.12

3.Draft Development Order and associated plans Draft Proposed Development Consent Order (including requirements)

Reg 5(2)(b) 3.1 22.02.13

Explanatory Memorandum to Draft Development Consent Order

Reg 5(2)(c) 3.2 22.02.13

4. Compulsory Acquisition Information Statement of Reasons

Reg 5(2)(h) 4.1 22.02.13

Funding Statement

Reg 5(2)(h) 4.2 31.10.12

Book of Reference

Reg 5(2)(d) 4.3 22.02.13

5. Reports/Statements Consultation Report

S.37 Planning Act 2008

5.1 31.10.12

Consultation Report Update

S.37 Planning Act 2008

5.1A 22.02.13

Section 79(1) of Environmental Protection Act 1990 Statement (re statutory nuisance)

Reg 5(2)(f)

5.2 31.10.12

Regulation 48 European Site Statement Reg 5(2)(g))

Reg5(2)(g)

5.3 31.10.12

6. Environmental Impact Assessment & Habitat Regulations Information Environmental Statement (With replacement chapters B & C)

Reg 5(2)(a) FRA Reg 5(2)(e) Heritage Assessment Reg (m) Nature Conservation Reg (l)

6.1 22.02.13

ES Technical Appendices (With replacement appendices C1 & D1)

Reg 5(2)(a) 6.2 22.02.13

ES Non-Technical Summary

Reg 5(2)(a) 6.3 22.02.13

ES Scoping Opinion Reg 5(2)(a) 6.4 31.10.12

Page 12: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

7. Other Documents Summary of Proposals Document

Reg 5(2)(q) 7.1

31.10.12

Update on Proposals Document

Reg 5(2)(q) 7.2 31.10.12

Planning Statement

Reg 5(2)(q) 7.3 22.02.13

Need Report

Reg 5(2)(q) 7.4 31.10.12

Assessment of Sites for Rail Freight Development Potential

Reg 5(2)(q) 7.5 31.10.12

Design and Access Statement (including Design Guide and sustainability of buildings)

Reg 5(2)(q) 7.6 31.10.12

Sustainability Report

Reg 5(2)(q) 7.7 31.10.12

Rail Operations Report

Reg 5(2)(q) 7.8 31.10.12

Summary of Draft Development Consent Obligation – February 2013

Reg 5(2)(q) 7.9A 22.02.13

Draft Development Consent Obligation – Draft February 2013

Reg 5(2)(q) 7.9B 22.02.13

Additional Information relating to Provision for European Protected Species

Reg 5(2)(q) 7.10 31.10.12

8. Statements of Common Ground and Correspondence M1 Works (Highways Agency)

Reg 5 (2)(q) 8.1 31.10.12

Archaeology/ Heritage (English Heritage)

Reg 5 (2)(q) 8.2A (EH) 8.2B (NCC)

31.10.12

Correspondence from Network Rail

Reg 5 (2)(q) 8.3 31.10.12

Planning (Daventry District Council) Reg 5(2)(q) 8.4 31.10.12

Flood Risk (Environment Agency)

Reg 5(2)(q) 8. 5 31.10.12

Bridge A (Highways Agency)

Reg 5 (2)(q) 8.6A 31.10.12

Bridge D (Highways Agency)

Reg 5 (2)(q) 8.6B 31.10.12

Page 13: DIRFT III PLANNING FOR THE FUTURE · 2016-04-20 · DIRFT III Document List Marrons 22 February 2013 DIRFT III Document List Document 1.5 Document/Plan Status/ Regulation Plan No

DIRFT III Document List Marrons

22 February 2013

New Rail Bridges over A428 (Northamptonshire County Council)

Reg 5 (2)(q) 8.7 22.02.13

Draft EPS Mitigation Licence Application – Letter of Comfort between Natural England and Aviva Investors with regard to Brown Long Eared Bats

Reg 5 (2)(q) 8.8 22.02.13