(458431) Radio Regulations Board Geneva, 15 – 19 July 2019 Document RRB19-2/DELAYED/2-E 8 July 2019 Original English Director, Radiocommunication Bureau FURTHER SUBMISSION BY THE ADMINISTRATION OF INDONESIA REQUESTING AN EXTENSION OF THE REGULATORY PERIOD FOR THE BRINGING INTO USE OF THE FREQUENCY ASSIGNMENTS IN THE Ku BAND TO THE PALAPA-C1-B (113ºE) SATELLITE NETWORK This delayed submission from the Administration of Indonesia, which contains information in the attachment that complements the information provided in Document RRB19-2/19, is for the consideration of the Radio Regulation Board. Attachment

Director, Radiocommunication Bureau - itu.int filePAL-APA NI satellite, therefore is expected to come into operation after the expiry of the last date of bringing into use of the above

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Director, Radiocommunication Bureau - itu.int filePAL-APA NI satellite, therefore is expected to come into operation after the expiry of the last date of bringing into use of the above

(458431)

Radio Regulations Board Geneva, 15 – 19 July 2019

Document RRB19-2/DELAYED/2-E

8 July 2019

Original English

Director, Radiocommunication Bureau

FURTHER SUBMISSION BY THE ADMINISTRATION OF INDONESIA

REQUESTING AN EXTENSION OF THE REGULATORY PERIOD FOR THE

BRINGING INTO USE OF THE FREQUENCY ASSIGNMENTS IN THE Ku

BAND TO THE PALAPA-C1-B (113ºE) SATELLITE NETWORK

This delayed submission from the Administration of Indonesia, which contains information in the

attachment that complements the information provided in Document RRB19-2/19, is for the

consideration of the Radio Regulation Board.

Attachment

Page 2: Director, Radiocommunication Bureau - itu.int filePAL-APA NI satellite, therefore is expected to come into operation after the expiry of the last date of bringing into use of the above

- 2 -

RRB19-2/DELAYED/2-E

(458431)

Attachment

Page 3: Director, Radiocommunication Bureau - itu.int filePAL-APA NI satellite, therefore is expected to come into operation after the expiry of the last date of bringing into use of the above

- 3 -

RRB19-2/DELAYED/2-E

(458431)

_______________