Direct Coupling® Solar PV

Into Building Loads

PRESENTED BY PAUL SAVAGE, CEO

Page 2: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

The Idea

Page 3: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Energy costs ↑

Grid reliability ↓

Utilities need reduced peak demand; fixes are complex

Net-Metering is not a sustainable business practice

Billions of Compromises

Better metering, monitoring and control with integrated storage

10% to 50% improvement!

Use power where, when, and how it is generated

Buildings that integrate DG

The Need

Page 4: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Bring Simplicity to These Problems

The Trend

Page 5: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Our Case Study

Page 6: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Load Profile Before

Page 7: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Introducing Connectivity & Control

+

Page 8: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Post-Installation Load

North Fan Speed, Power & Irradiance

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

4/1

9 0

:00

4/1

9 1

:00

4/1

9 2

:00

4/1

9 3

:00

4/1

9 4

:00

4/1

9 5

:00

4/1

9 6

:00

4/1

9 7

:00

4/1

9 8

:00

4/1

9 9

:00

4/1

9 1

0:0

0

4/1

9 1

1:0

0

4/1

9 1

2:0

0

4/1

9 1

3:0

0

4/1

9 1

4:0

0

4/1

9 1

5:0

0

4/1

9 1

6:0

0

4/1

9 1

7:0

0

4/1

9 1

8:0

0

4/1

9 1

9:0

0

4/1

9 2

0:0

0

4/1

9 2

1:0

0

4/1

9 2

2:0

0

4/1

9 2

3:0

0

4/2

0 0

:00

Wa

tts

-

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

1,300

1,400

1,500

1,600

1,700

1,800

Sp

ee

d (

RP

M),

Irra

dia

nc

e (

W/m

2)

Nth MEC Watts Nrth Speed Irradiance

100% Speed

50% Speed

75% Speed

17% Power

100% Power

45% Power

Page 9: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Combined Systems Lower Utility Load by 75%

North Fan Load, PV Contribution and Net Utility Load

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

4/1

9 0

:00

4/1

9 1

:00

4/1

9 2

:00

4/1

9 3

:00

4/1

9 4

:00

4/1

9 5

:00

4/1

9 6

:00

4/1

9 7

:00

4/1

9 8

:00

4/1

9 9

:00

4/1

9 1

0:0

0

4/1

9 1

1:0

0

4/1

9 1

2:0

0

4/1

9 1

3:0

0

4/1

9 1

4:0

0

4/1

9 1

5:0

0

4/1

9 1

6:0

0

4/1

9 1

7:0

0

4/1

9 1

8:0

0

4/1

9 1

9:0

0

4/1

9 2

0:0

0

4/1

9 2

1:0

0

4/1

9 2

2:0

0

4/1

9 2

3:0

0

4/2

0 0

:00

Mo

tor

Wat

ts

-

100

200

300

400

500

600

700

800

900

1,000

1,100

1,200

So

lar

Irra

dia

nc

e W

/m^

2

North Load North PV North Utility Irradiance

Page 10: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

Savings Components

Avoided AC Kilowatt Hours; Greater Than 100%

Reduced Demand ChargeLower Usage due to Control

Page 11: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

www.directcoupling.com

Page 12: Direct Coupling ® Solar PV Into Building Loads PRESENTED BY PAUL SAVAGE, CEO

The Addressable Loads Today

Applications: Computers Overhead Lights Motors Phones Chargers Fans Task lighting UPS