Upload
trinhdung
View
225
Download
0
Embed Size (px)
Citation preview
C o m p l e t e S o l u t i o n s
f o r t h e C o n s t r u c t i o n I n d u s t r y
DIPLOMAT GROUP W.L.L.
A N M E P S P E C I A L I S T
P r e - Q u a l i f i c a t i o n
Introduction 1
Company Details 2
Activities 3
Commercial Registration 4
Kahramaa License 5
Civil Defence Certificate 6
ISO 9001:2008 Certificate 7
Organization Chart 8
Total Manpower Strength 9
Projects in Qatar 10
Photographs of Completed Projects 11
Photographs of Ongoing Projects 12
Complete Solutions
for Construction Industry
Introduction
Diplomat Group of Companies was established in Sharjah, United Arab Emirates In the year 1991 with an expertise in Electro - Mechanical Works. Since the
inception, the Company had recorded remarkable vertical growth in the field serving the building industry in the entire United Arab Emirates. Worked as
specialist sub-contractor for various Building Contractors and also undertaken and carried-out major projects in Central Air-Conditioning, Ventilation, Electrical,
Plumbing Works, Kitchen Extraction Systems and Infrastructure Works.
As part of the expansion plan Diplomat has started Qatar operations by forming a Qatar based limited liability company named “DIPLOMAT GROUP WLL” in joint
venture with the local sponsor and partner Mr. Saud O. Al-Mana in the year 2004.
Since the foundation of the company, Diplomat Group has booked and executed prestigious Government and Semi-Government projects including Qatar
Petroleum, Qatar Foundation, Ashghal, etc.
The Company Board has envisaged the need for backward integration of the contracting business and spread the wings in the following areas:
Switchgear Manufacturing
Art & Décor and Interior Works
Ducts & Accessories Manufacuring
Specialist Fire Division
Infrastructure & Building Civil works
Company Details
Complete Solutions
for Construction Industry
Company Name : Diplomat Group WLL Postal Address : P.O. Box: 24935, Doha – Qatar Office Location : Diplomat Group Building, C-Ring Road, Doha-Qatar Contact Nos Telephone : +974 44069444 – 47 Fax : +974 44270258 Email : [email protected] Web : www.diplomatgroup.org CR No : 28104
CC OO MM PP AA NN YY BB OO AA RR DD
Saud Omar H. Al-Mana Chairman
JVN Prakash Rao CEO
Activities
Complete Solutions
for Construction Industry
DIPLOMAT HAS GOT EXPERTISE ON THE FOLLOWING FIELDS:
AIR CONDITIONING AND VENTILATION
Design, Supply, installation and commissioning of Air conditioning and ventilation works on turnkey basis including chilled water, packaged type central air conditioning systems for Residential, Commercial, Institutional, and Industrial Buildings.
ELECTRICAL
Detailed Engineering, Supply and Installation of Electrical networks from Low Voltage to Medium Voltage systems for Residential, Commercial, Institutional and Industrial Buildings including underground cable networks and commissioning.
ALARM & FIRE FIGHTING SYSTEMS
Design, Supply, Installation and Commissioning of Fire Alarm & Firefighting systems such as Wet and Dry life safety Sprinkler systems, Deluge Systems, Wet & Dry Risers, Fire Hose Reels, FM 200 Systems, etc. for all types of buildings & factories compliance with Qatar Civil Defense & NFPA Regulations.
PLUMBING AND DRAINAGE
Design, Supply, Installation and commissioning of Plumbing & Drainage System for various buildings and for outdoor drainage systems, storm drainage and irrigation water supply networks.
MAINTENANCE & FACILITY MANAGEMENT
The Company undertakes various maintenance and Facility Management of all the Operational System, Civil & Interior works for all size and type of the building.
CIVIL WORKS
The Company has ventured into Infrastructure and Civil building works and acquired expertise in this area
Commercial Registration
Complete Solutions
for Construction Industry
Issue Date: Page No: 1
Page 1 of 2CR No : 28104
تشهد غرفة تجارة وصناعة قطر بأن المنشاة المذكورة اعاله سجلت لديناQatar Chamber certifies that the above mentioned establishment has been registered
*28104*
Issue Date: 30/08/2016
Commercial Reg. No.: 28104 No. of Branches: 9Trade Name: DIPLOMAT GROUP WLL Trade Type:Creation Date: 02/06/2004 Expiry Date: 02/06/2017Legal Form: W.L.L Capital: 6000000Commercial Reg. Status: Active Firm Nationality: QATAR
Contact Information
Mail Box: 24935 Contacts Numbers: 44069444/44270258Email:
Partners
Name Document No CR No Nationality Percentage StatusSAOUD OMAR H A AL-MANA 26763400061 QATAR 32% ActiveDar Aamal Alkhaleej International Company
39766 QATAR 68% Active
Managers (Authorized Signatories)
Name Document No CR No Nationality Designation(Authority)
PRAKASH RAO KANNA BABU JAKKULA
26735609426 INDIAManager - Full and Absolute
AuthoritySAOUD OMAR H A AL-MANA 26763400061 QATAR Manager -
MOHAMED ELAMIR BALOL ELFAKI 27073600062 SUDANManager - Full and Absolute
Authority
Commercial Registration Data
Issue Date: Page No: 1
Page 2 of 2CR No : 28104
تشهد غرفة تجارة وصناعة قطر بأن المنشاة المذكورة اعاله سجلت لديناQatar Chamber certifies that the above mentioned establishment has been registered
Business Activities
Activity Name Activity CodeThe works of designing and
establishment of the central control systems
458050
Providing technical and IT services 741840Trading in fire extinguishing
equipment544465
Electrical work (electrical equipment) such as extension cords
and connectors ... and fixing it
457060
Trading in pipes and tubes 2002100Trading in wooden or metal ready
buildings (movable houses)578300
Activity Name Activity CodeElectrical engineering and mechanical and industrial
equipment contracts
457010
Trading in Engineering equipment and devices
532410
Fire-fighting Systems Contracting 458010Installation and repairing of
antennas (Central antenna), alarm systems and fire systems in
buildings
458110
Trading in Used Car 501300Trading in electrical appliances 562000Trading in electrical equipment 531010
Branches
Sequence No Branch Name Branch CR Branch Status1 28104/1 Scarified2 28104/2 Active3 28104/3 Active4 28104/4 Scarified5 28104/5 Active6 28104/6 Scarified7 28104/7 Scarified8 28104/8 Scarified9 28104/9 Scarified
Commercial Registration Data
Kahramaa License
Complete Solutions
for Construction Industry
Civil Defence Certificate
Complete Solutions
for Construction Industry
تاريخ الطباعة :
PM 1:34اإلدارة العامة للدفاع المدني22-11-2016وزارة الداخليــــة
وقـت الطباعة :
إدارة الوقـــايــــــــة
نوع الشهادة :شهــــــــــادة تأهيل
تصنيف شركات تركيب / صيانة أنظمة السالمة
بيانات المنشأة
مالحظات :
تفاصيل اإلفادة
االسم التجاري:
رقم قيد المنشأة:
رقم السجل التجاري:
رقم الهاتف:
رقم الرخصة التجارية:
شركه مجموعه دبلومات
28104
11-9302-0044069444
1 - يجب على المهندسين المسجلين االلتزام بكافة اللوائح والقوانين المنظمة لمزاولة المهنة بدولة قطر مع مراعاة أي قرارات تصدر من لجنة قبول المهندسين بصفتها جهةاالختصاص.
2 - يجب مراجعة اإلدارة العامة للدفاع المدني في حالة الرغبة بإعتماد مهندسين إضافيين للشركة من اجل الحصول على بطاقة تسجيل المهندس.3 - ضرورة تواجد المهندس في الموقع اثناء مواعيد تفتيش اإلدارة العامة للدفاع المدني وإبراز بطاقة تسجيل المهندس الخاصة به والصادرة من قبل إدارة الوقاية.
4 - ان تكون تقارير الفحص والصيانة موقعة ومصدقة من قبل المهندسين المذكورين أعاله.
ال مانع من إضافة المهندسين المؤهلين والمذكورين بعالية علما بأن تصنيف الشركة فئة أولي إطفاء - فئة ثالثة إنذار
المهندسينتاريخ االنتهاء نوع التعاقد المجال الرقم الشخصي / جواز السفر اسم المهندس
2018/10/05 مقيم إطفاء الحريق 27135617425 جوكوالراج شاكارافارتي جوبي
2018/09/03 مقيم إطفاء الحريق 27835627880 اجيت ميسرا شاندرا كيشور ميسرا
2018/03/01 مقيم إطفاء الحريق 28535650534 باالسوامي باليكوندا
2018/03/15 مقيم إنذار الحريق 26035613444 ناج سينغ
2018/10/01 مقيم إطفاء الحريق 28835633024 شيخ منهاج احمد
2018/07/12 مقيم إنذار الحريق 28735640728 جاثير راج راجيندرا
* هذه اإلفادة صالحة حتي شهر من تاريخ الطباعة.
مدير إدارة الوقايةاإلدارة العامة للدفاع المدني
ع/
ISO 9001:2008 Certificate
Complete Solutions
for Construction Industry
Organization Chart
Complete Solutions
for Construction Industry
Engineering & Procurement Manager
MEP CONTRACTING ORGANIZATION CHART
Contracts Manager
Proposals Manager
Operations Manager
Salim Yusuf Wagle
Project Managers
Facilities Management Team
QA / QC Team
Chairman
Tendering Team
Sr. Estimator-Electrical Srinivasa Raju
Estimator – Electrical
Manivannan
Drafting Team
AutoCad Draftsman
Purchase Engineer
Sundar R
Purchase Officer Thata Rao
Contracts Administrator
Contracts Engineer
Planning Manager
Mukesh Thimwani
Planning Engineer Mithun Mannil
Foremen
Site Engineers
CEO JVN Prakash Rao
Project Engineers
Un-Skilled Work men
Skilled Workmen
Facilities Manager
Transport
Eqpt. Mechanics/ Technician
Finance & Accounts Ramesan
HR, Admin, Legal & PR Ameer Balool
Exec. Secretary Winna O.
HSE Team
Doha Climate Control
Nandakumar Achan
Exec. Secretary
Monica C.
QS of Various Sites
Procurement Exec
Swamy
Estimator (HVAC/Plumbing)
Shaikh Minhaj
Construction Managers
Drafting Team
Auto Cad Draftsman
Operations Secretary Wingie P.
Planning Engineer
Kannadasan
Accts Executive Vangie R.
Accountant Ifthiqaar
Total Manpower Strength
Complete Solutions
for Construction Industry
RESOURCES
SI No
Designation
Total
1 General Manager 1
2 Divisional Manager 1
3 Operations Manager 1
4 Group Finance Controller 1
5 Commercial Manager 1
6 Head of Legal & Public Affairs 1
7 Maintenance Manager 1
8 Project Managers 4
9 Assistant Project Managers 4
10 Assistant Manager – Accounts & Admin.
1
11 Assistant Maintenance Manager 1
12 Business Development Manager 1
13 Sales Engineers 2
14 Pre-Sales Managers 2
15 Senior Electrical Engineers 4
16 Senior Mechanical Engineers 6
17 Fire Fighting Manager 1
18 Senior Civil Engineers 4
19 Pre Sales Engineer 2
20 Sales Engineers 2
MANPOWER
SI No
Designation
Total
21 Plumbing Engineers 10
22 Planning Engineers 2
23 IT Engineers 3
24 Electrical Engineers 10
25 Mechanical Engineers 12
26 Fire Fighting Engineers 6
27 Estimation Engineers 4
28 QA/QC Engineers 16
29 Design Engineers 2
30 BMS Engineer 1
31 Project Engineers 22
32 Logistic Coordinator 1
33 Trainee Engineers 8
34 Quantity Surveyors 4
35 HSE Manager 1
36 Safety Officer/ Engineers 12
37 Draftsmans 19
38 PRO 1
39 Executive Secretary 1
40 Secretaries 3
RESOURCES MANPOWER
SI No
Designation
Total
41 Admin Assistants 3
42 HR Assistants 6
43 Camp Boss 3
44 Purchase Manager 1
45 Purchase Assistants 3
46 Senior Accountants 2
47 Accountants 6
48 Receptionists 2
49 Workshop Coordinator 1
50 Document Controllers 5
51 Supervisors 15
52 Foremans 32
53 Chargehand / Leadman 41
54 Electricians 252
55 Fire Fighting Technicians 5
56 Plumbers 95
57 Ductman 47
58 A/C Technicians 20
59 Riggers 13
60 Insulators 17
SI No
Designation
Total
61 Welder 12
62 Pipe Fitter 25
63 Duct Erector 65
64 Duct Fabricator 45
65 Gypsum Board Worker 28
66 Carpenter 17
67 Steel Fixer 35
68 Mason 60
69 Store Keeper 8
70 Security 4
71 Drivers 45
72 Office Boy 10
73 Helper 250
74 Cook 7
75 Assistant Cook 7
76 Cleaners 30
TOTAL 1396
Projects In Qatar
Complete Solutions
for Construction Industry
DIPLOMAT GROUP WLL
1 Carrefour at Villagio Mall MAF Hypermarkets LLC Completed
4
Design, Supply, installation, testing and
commissioning of HVAC works for HMC
Center for Correction of Facial
Deformation
Arabian Engineering and
Contracting Company Completed
5
Relocation of Repeater Station at
Sumaishma Al Muftah Contracting Completed
6
Detail Engineering and Preperation of
Shop Drawings for Cultural Village
Project MEP works Thinet International Completed
7
EPIC of the Rationalisation of the Power
Distribution in the Fahahil Area
Substation Air Conditioning Voltage Engineering Completed
8
Electro Mechanical Works for New Amiri
Flight Hangar (External Works) Clearspan Australia Pty Ltd Completed
9
Preparatory School for Boys at
Musharib HKH Contracting Co. Completed
10 Inflight Catering Expansion Works
Gulf Housing and
Construction Company WLL Completed
Major Current & Completed Projects in Qatar
S.No Project Details Client Consultant End User Contract Value in
QAR Remarks
MGB
MAF Hypermarkets
LLC 26,500,000.00
2
HVAC for Rebult Mosque at Fareq
Ishaq
Arabian Engineering and
Contracting Company
Building Engineering
Department AWQAF 1,750,000.00 Completed
3
HVAC Works for Substation in Ain
Ahmed & Abu Samra Voltage Engineering
Development Consultants
Pvt Ltd Kahramaa 1,450,000.00 Completed
Consulting Engineering
Group(CEG)
Hamad Medical
Corporation 4,320,000.00
QDC Qatar Petroleum 2,400,000.00
Maunsell
Cultural Village
Committee,
Government of State of
Qatar 1,500,000.00
Electrovatt Qatar Petroleum 5,500,000.00
ATKINS Qatar Airways 5,658,000.00
BED / CEG
Ministry of Education
BED School 8,500,000.00
Dar Al Handasah
Doha International
Airport 12,500,000.00
S.No Project Details Client Consultant End User Contract Value in
QAR Remarks
MGB
MAF Hypermarkets
LLC 26,500,000.00 11 Andy Steven's Villa & External Works
Gulf Housing and
Construction Company WLL Completed
12 Commercial Bank Branches
Gulf Housing and
Construction Company WLL Completed
13 Production facility for Bateel Bakers Green Oasis Group Completed
14 Sarai Restaurant McNally Design Completed
15
Chemical Stores at Ras Laffan
Industrial City ARCON Completed
16
Elementary School for Girls at Duhail
North (School No 14), Secondary
School for Boys at Muaither West
(School No 20) NICC Completed
17
Elementary School for Girls at West Bay
(School No 21) GENCO Completed
18 Ahli Bank Branches Gulf Housing Completed
19
Multi-purpose Sports Hall for Boys
Elementary School at Al Kaaban & Girls
Preparatory & Secondary School at Al
Karaana Construction Enterprises Co Completed
20 Woqod Petrol Station at Naeeijah Al Muftah Contracting Completed
21 Al Rayyan Municipality Building Gulf Lights Completed
22 Ware House in Raslaffan For Anadarko Arab United Contracting Completed
23 G+12 Building Qatar & Gulf Enterprises Completed
24 Al Mirqab Twin Tower Al Majal Contracting Co Completed
25
New Western District Hospital at
Dukhan Package I & 2 Al Huda Engineering Completed
Arab Engineering Bureau Andy Steven's Villa 1,100,000.00
WS Atkins & Partners
Overseas Commercial Bank 7,500,000.00
Doha Designs Green Oasis Group 1,800,000.00
Sarai Restaurant 1,100,000.00
DIWAN EMIRI
Consultants Qatar Petroleum 3,500,000.00
QEA
Ministry of Education
BED School 24,500,000.00
CEG
Ministry of Education
BED School 8,800,000.00
GEIC Ahli Bank 2,200,000.00
ACE
Ministry of Education
BED School / Ashgal 8,800,000.00
Woqod
Woqod Petrol Station
at Neeijah 3,500,000.00
Arab Engineering Bureau Ashghal 8,650,000.00
Anardako Ras Laffan 1,200,000.00
Al Saad Consultants Real Estate 12,500,000.00
South West Architecture
Al Mirqab Investment
Co 29,500,000.00
Qatar Petroleum Qatar Petroleum 205,000,000.00
S.No Project Details Client Consultant End User Contract Value in
QAR Remarks
MGB
MAF Hypermarkets
LLC 26,500,000.00 26 Akis Primary School at Al Khor Al Huda Engineering Completed
27 Woqod Office Tower at West Bay Al Madar Group Completed
28 3B+G+M+14+PH at Old Salata Al Madar Group Completed
29 Lusail Marina Car Parks QDVC Completed
30
Doha West Sewage Treatment Works
Extension 3 Gulf Contracting Completed
31
Al Noor Tower (2B+G+F+S+22 Floors)
at West Bay Al Madar Group Completed
32
MEP Works for Khalifa Street Buildings
at Ras Laffan Al Muftah Contracting Completed
33 Electrical Works for Silhoutte Tower QEMG Completed
34
Mechanical Works at Barwa
Commercial Avenue Type 4
Gulf Lights Electrical
Engineering Completed
35
Electro-Mechanical Works for Scania
Workshop Al Madar Group Completed
36
Electrical Works for Campus Bldg @
Ras Laffan emergency & Safety College Blue Star Completed
37
Construction, Completion and
Maintenance of Civil, Architectural and
MEP Works for Anti-Doping Laboratory
for Aspire Zone, Doha Al Balagh Trading & Cont. Co Completed
38
Fire Fighting Works for New Traffic &
Patrol Dept Head Quarters Bldg at
Madinath Khalifa (South) for Private
Engineering Office Al Balagh Trading & Cont. Co Completed
39
Fire Fighting & Fire Alarm Works for
Khalifa Tennis & Squash Complex -
Phase III for Qatar Olympic Committee Al Balagh Trading & Cont. Co Completed
40
Complete Interior Works World Trade
Center Phase 1 & 2 Arabtec Construction Co. Completed
Qatar Police Dept.
Qatar Design Consortium
MZ & Partners
Qatar General
Insurance 41,560,000.00
Nespak 4,400,000.00
Ras Gas Ras Gas 58,000,000.00
Romatre Al Madar Group 48,000,000.00
Design & Consultant
Bureau Al Madar Group 24,000,000.00
A.C.E.
Qatari Diar Real Estate
Investment Co. 125,000,000.00
Marubeni 18,700,000.00
GHD Al Madar Real Estate 6,380,000.00
Qatar Petroleum Qatar Petroleum 8,500,000.00
Shaker Intercontinental Group 47,500,000.00
Aecom Barwa 90,000,000.00
AEB
Arabian Agencies
Company 4,120,000.00
Interspace Global Qatar Petroleum 4,300,000.00
Contract International Aspire Logistics 32,500,000.00
Qatar Tennis
Federation 4,900,000.00
S.No Project Details Client Consultant End User Contract Value in
QAR Remarks
MGB
MAF Hypermarkets
LLC 26,500,000.00 41
Complete Eletro-Mechanical Works for
Supreme Educatiion Council HQ Al Huda Engineering
Suspended and
Restarted
42
Electrical & Fire Fighting works for
Qatar University - Student Housing Blue Star In Progress
43
EPIC of Phase I of New NGL Support
Campus at Mesaieed Qatar Petroleum In Progress
44
Fit-out Works for Carrefour at Ezdan
Mall, Gharaffa MAF Hypermarkets LLC Completed
45
Electro Mechanical Works for State
Audit Bureau Office & Residential Tower
at West Bay SEG Handing Over Stage
46
Construction of (3) New Schools around
Doha and Villages of New Schools
Gulf Lights Electrical
Engineering In Progress
47
Container and Vehicle Inspection
System Project at Abu Samra Ministry of Interior In Progress
48
Electro-Mechanical Works for Steel
Structure for Openyard at KM
Warehouse. ARCON In Progress
49
Construction of 2 New Schools at Doha
& Villages, Stage 10A, Phase 1 ARCON In Progress
50
Mechanical, Electrical and Plumbing
Facilties Package of JW Marriott Hotel
Doha-Qatar
Harinsa Contracting Company
Qatar In Progress
51
New VIP & Visitors Pavilion and Parade
Ground for ABM Military College -
Phase 2, Doha-Qatar ARCON In Progress
52
Fit-out to Carrefour Market at Al Mirqab
Mall, Doha-Qatar MAF Hypermarkets LLC In Progress
28,000,000.00
KEO
Hamad Ali Hamad
Abdullah Al-Attiyah 78,563,543.00
CEG
TBA Qatar Armed Forces 2,750,000.00
ASTAD Consultant 195,000,000.00
Supreme Education
Council
Qatar PetroleumWorley Parsons 464,560,000.00
Al Gazeerah Consulting
Engineering
MAF Hypermarkets
LLC 4,400,000.00
Qatar UniversityQDC
COWI Ministry of Interior 5,452,350.00
Ashghal
MZ & Partners
Sheikh Mohamed
Khaled Al Thani 160,000,000.00
18,000,000.00
Public Works Authority
(Ashghal) 19,200,000.00
Total Value of the Orders 1,893,113,892.00
United Consultant Kahramaa 5,600,000.00
Katib & Alami
DARA Engineering
Consultant / S.Mehboob &
Company Consulting
Engineers
MAF Hypermarkets
LLC 3,999,999.00
Photographs of
Completed Projects
Complete Solutions
for Construction Industry
TOWERS
Woqod Office Tower, Doha-Qatar
Al Madar Tower At Old Salata, Qatar
Al-Mirqab Twin Tower, Doha-Qatar
Silhoutte Tower, West Bay
New Western District Hospital at Dukhan Phase 1
HOSPITALS
Emergency Hospital at Jumeiliyah, Qatar
New Western District Hospital Nurse Accommodation – Phase 2
Model School at Muaither West (School No. 20)
Akis Primary School at Al Khor Doha-Qatar
SCHOOLS
Elementary School for Girls at North Duhail (School No. 14)
Elementary School for Girls at West Bay (School No 21)
Irish Pub at Sheraton Hotel Doha-Qatar
Fitness First at City Center Doha-Qatar
FIT-OUT WORKS
Eversendai Doha, Qatar
Carrefour at Villagio Mall Doha-Qatar
Sarai Restaurant at Villagio Mall, Qatar
Relocation of Repeater Station At Sumaisma, Qatar
Olefins Project at Ras Laffan
INDUSTRIAL PROJECTS
Amiri Hanger, Qatar
Woqod Petrol Station at Naeeijah, Qatar
Re-Build Mosque at Feriq Isshak
Commercial Banks of Qatar
OTHERS
Lusail Marina Car Parks (Car Parks 1,2,3 & 4)
OTHERS
Barwa Commercial Avenue Phase 4
Khalifa Tennis Stadium
New Traffic & Patrol Dept. Head Quarters Bldg
at Madinath Khalifa (South)
Scania Workshop
Anti-Doping Laboratory at Aspire Zone
Photographs of
On-going Projects
Complete Solutions
for Construction Industry
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
Supreme Education Council Head Quarters Building
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
Qatar University
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
NGL Support Campus at Mesaieed
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
State Audit Bureau, West Bay
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
General Manager
Doha Climate Control
Maintenance Division Santhanam
S
Group
General Manager
General Manager
Contracting
Y. Phani Kumar
General Manager
Switchgear
Subramanian
Subn
Group Purchase Manager
N. Radhakrishnan
Group
Finance Manager
R. Krishnan
R. Krishnan
Progressive Trading &
Contracting
KRG Pillai
General Manager
Diplomat Art & Decor
Syed Habeeb
Mc Nally Design
International
Group
HR / Admin Manager
Md Ameer Baloul El-Faki
JW Marriott Hotel, Doha, Qatar