4
DIPL.-ING. LIDOMIR TEKLIĆ AUTHORIZED REPRESENTATIVE 1/4 MAJOR FIELDS Construction management Construction supervision Claim management FIDIC Contracts Tendering EDUCATION 1999 - 2006 Technische Universität Berlin Degree: Dipl.-Ing. Civil Engineer ADDITIONAL QUALIFICATION 2010 2010 FIDIC Dispute Adjudicator, Association of Consulting Engineers (VBI) & Nestor GmbH Health & Safety Coordinator, Construction Academy (BauAkademie) EMPLOYMENT RECORD since 2017 KREBS+KIEFER International GmbH & Co. KG, Darmstadt Authorized Representative 2010 - 2017 KREBS+KIEFER International GmbH & Co. KG, Darmstadt Project Director 2007 - 2010 KREBS+KIEFER International GmbH & Co. KG, Darmstadt Project Engineer 2007 Krebs und Kiefer Beratende Ingenieure GmbH, Darmstadt Project Engineer 2005 2006 Krebs und Kiefer Beratende Ingenieure GmbH, Darmstadt Assistant

DIPL.-ING. LIDOMIR TEKLIĆ - VBI · Client: Elektrodistribucija ad Pale 2007 - 2008 Croatian railways: Modernisation of the Vb corridor Rehabilitations on the Section Zagreb -Rijeka

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DIPL.-ING. LIDOMIR TEKLIĆ - VBI · Client: Elektrodistribucija ad Pale 2007 - 2008 Croatian railways: Modernisation of the Vb corridor Rehabilitations on the Section Zagreb -Rijeka

DIPL.-ING. LIDOMIR TEKLIĆAUTHORIZED REPRESENTATIVE

1/4

MAJOR FIELDSConstruction managementConstruction supervisionClaim managementFIDIC ContractsTendering

EDUCATION1999 - 2006 Technische Universität Berlin

Degree: Dipl.-Ing. Civil Engineer

ADDITIONALQUALIFICATION2010

2010

FIDIC Dispute Adjudicator, Association of Consulting Engineers (VBI) &Nestor GmbHHealth & Safety Coordinator, Construction Academy (BauAkademie)

EMPLOYMENT RECORDsince 2017 KREBS+KIEFER International GmbH & Co. KG, Darmstadt

Authorized Representative2010 - 2017 KREBS+KIEFER International GmbH & Co. KG, Darmstadt

Project Director

2007 - 2010 KREBS+KIEFER International GmbH & Co. KG, DarmstadtProject Engineer

2007 Krebs und Kiefer Beratende Ingenieure GmbH, DarmstadtProject Engineer

2005 – 2006 Krebs und Kiefer Beratende Ingenieure GmbH, DarmstadtAssistant

Page 2: DIPL.-ING. LIDOMIR TEKLIĆ - VBI · Client: Elektrodistribucija ad Pale 2007 - 2008 Croatian railways: Modernisation of the Vb corridor Rehabilitations on the Section Zagreb -Rijeka

DIPL.-ING. LIDOMIR TEKLIĆAUTHORIZED REPRESENTATIVE

2/4

REFERENCESSince 2019 Supervision of Design and Construction of motorway on Corridor Vc

through Republic of Srpska from Interchange Johovac (Tovira) toInterchange Rudanka (Kostajnica), FIDIC Yellow Book 1999 1st. Ed.,70 MEURActivities performed: FIDIC Engineer, Design review, Constructionsupervision, Contract administration, Claim management and andpreparing detailed reports to the Bank (EBRD)Client: EBRD/JP Autoputevi RS (PC Motorways Republic of Srpska, BiH)

2014-2018 Construction of Banja Luka – Doboj Motorway, Section Banja Luka –Prnjavor, Design and Construction, FIDIC Yellow Book 1999 1st. Ed.,200 MEUR2+2 lane motorway (with central median and emergency lanes) km00+000to km35+300, local roads of 23 km and following main works, •Activities performed: FIDIC Engineer, Design review, Constructionsupervision, Contract administration, Claim management and andpreparing detailed reports to the Bank (EIB)Client: EIB/JP Autoputevi RS (PC Motorways Republic of Srpska, BiH)

2012 - 2014 Croatian Roads Rehabilitation II – Phase B ,10 MEURSection no. 20 on State Road D 205: Risvica – Dubrovčan, 10,4kmActivities performed: FIDIC Engineer’s Delegate (Supervision of works,Project management), Contract administration incl. Risk and Claimmanagement, Scheduling, Reporting to Employer and EIB, Monitoringprogress and costClient: EIB/Hrvatske Ceste d.o.o.

2012 - 2014 Road Rehabilitation Project in the Federation BiH, 105 MEURActivities performed: Technical Implementation Assistance, Adviceconcerning the use of the FIDIC Conditions of Contract, Risk and Claimmanagement, Reporting on progress and expenditure to the procuringentity, EIB and EBRDClient: EBRD/EIB/JP Ceste Federacije BiH (Roads directorate of FederationBiH)

2010 - 2012 Mahovljani Motorway Interchange on the motorway Banja Luka - GradiškaFIDIC Red Book, 22 MEURca. 2,2 km road construction (including relating roads) 8 bridges of lengthsfrom 22 m to 580 m,Activities performed: FIDIC Engineer, Design review, Constructionsupervision, Contract administration, Claim management and TIA includingreporting on project progress and preparing detailed reports to the Bank(EBRD)Client: EBRD/EU/JP Autoputevi RS (PC Motorways Republic of Srpska, BiH)

Page 3: DIPL.-ING. LIDOMIR TEKLIĆ - VBI · Client: Elektrodistribucija ad Pale 2007 - 2008 Croatian railways: Modernisation of the Vb corridor Rehabilitations on the Section Zagreb -Rijeka

DIPL.-ING. LIDOMIR TEKLIĆAUTHORIZED REPRESENTATIVE

3/4

2007-2017 Corridor Vc - Motorway projectsConstruction of Sarajevo Bypass, 3 lots, 16,7km total length, 120 MEURActivities performed: Technical Implementation Assistance, Support for theclient in: Organization, information management, Coordination anddocumentation, Project monitoring / Controlling, Risk management,Reporting on project progress and preparing detailed reports to thefinancing bodies (EBRD, EIB, OPEC financed) FIDIC ContractsClient: EBRD/EIB/OPEC/ JP Ceste Federacije BiH (Roads directorate ofFederation BiH)

2010 - 2011 Alte Oper in Frankfurt / MainFacade restoration under protection of monumentsActivities performed: Construction supervision, Health & SafetyCoordinationClient: City of Frankfurt am Main/Civil Engineering Department Frankfurtam Main

2010 Research Laboratory in Oran, AlgeriaActivities performed: Preparation of tender documents, coordination ofspecialised designersClient Orascom Construction Industries Sonatrach

2010 Contract Negotiations with HE BistricaHydropowerplants B1, B2a and B3 at river BistricaActivities performed: Review of RWE’s General and TechnicalSpecifications, Preparation of Employer’s Requirements for the Contractwith HE Bistrica for HPPs B1, B2a and B3Client: RWE Innogy GmbH

2007 - 2009 4 Hydropower plants on the Bistrica and Janjina river in Bosnia andHerzegovina (locations B-1, B2a, B-3 und J-1)Activities performed: Project management, Establishing of a projectinformation system, Design of hydro mechanical equipment andFeasibility Study, Scheduling, Reporting, Preparing tender documents,Support to the Employer during Tendering processClient: Elektrodistribucija ad Pale

2007 - 2008 Croatian railways: Modernisation of the Vb corridorRehabilitations on the Section Zagreb -RijekaActivities performed: Establishing of a project information system(Document management, Reporting, Scheduling), Determination ofowners, cooperation with authorities and data base maintenance,Design review Tendering, Tender review, Tender evaluation and Sitemonitoring (FIDIC Contract)Client: EIB/Hrvatske Željeznice (HŽ, Croatian Railways)

2008 Apartment Building Obertshausen, Overall planningActivities performed: Structural design calculation, Sound insulationproof, Thermal insulation calculation, Reinforcement drawings,

Page 4: DIPL.-ING. LIDOMIR TEKLIĆ - VBI · Client: Elektrodistribucija ad Pale 2007 - 2008 Croatian railways: Modernisation of the Vb corridor Rehabilitations on the Section Zagreb -Rijeka

DIPL.-ING. LIDOMIR TEKLIĆAUTHORIZED REPRESENTATIVE

4/4

Preparing tender documents, Supervision of worksClient: Gaspar - privately financed

2007 PPP-Project Federal Motorway A5 Section Baden-Baden – Offenburg41,5 km motorway extension from 4 to 6 lanesActivities performed: : Preparing tender documents (bill of quantities),Quantity determination, specifications and risk analysisClient: Eurovia and Hochtief

2007 Upgrading of tunnels on high-speed railway lines Hannover -Würzburg and Mannheim – Stuttgart ,66 tunnelsActivities performed: Preparing tender documents (bill of quantities),quantity determination, designClient: DB AG

2007 PPP-Project Federal Motorway A1 Section Hamburg – Bremen72,5 km motorway extension from 4 to 6 lanesActivities performed: Preparing tender documents (bill of quantities),quantity determination, specifications and risk analysisClient: Eurovia and Hochtief

2007 Relaying of National Road St 2229, BavariaActivities performed: Preparing tender documents (bill of quantities),quantity determination, designClient: Roads Directorate of Bavaria

2006 Croatian railways: Modernisation of the Vc corridorSections Hungarian Border – Vinkovci and Ploce - MetkovicActivities performed: Assistance in document management, reporting,scheduling, tendering

Client: EIB/ Hrvatske Željeznice (HŽ, Croatian Railways)

2006 Palais Quartier - ZeilforumShopping mall, site area : 17. 400 m², total area 226.000 m²Activities performed: Structural calculations, Quantitiy determination,Assistance in preparing tender do-cuments and coordination ofConsultantsClient: Bouwfonds MAB Development GmbH, Frankfurt am Main

2005 Mother Teresa International Airport, New terminal building and cargocenter, TiranaTerminal: 12.500 m², Cargo Centar: 1.100 m²Activities performed: Assistance in design review of steel workClient: Tirana Airport Partners