Page 1: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Diminished Drillpipe Capacity Diminished Drillpipe Capacity Due to Slip CrushingDue to Slip Crushing

Drilling Engineering Association (DEA)A Research Operations Forum

Page 2: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

What We KnowWhat We Know

Reaching (Exceeding?) Limits– Materials– Equipment

Page 3: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

W. ReinholdW. ReinholdWH SpiriWH Spiri(World Oil, Oct. 1959)(World Oil, Oct. 1959)

Page 4: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Hydraulic SlipsHydraulic Slips

Hydraulic Controlled Slips

Page 5: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Conventional SlipsConventional Slips

Conventional Drop in 3 Man SlipsModified to enhance integrity at high loads

Page 6: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Strain Gage PlacementStrain Gage Placement

Strain Gages Placed at Critical Load/Stress Points on Modified Conventional Slips

Page 7: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Wedding CakeWedding Cake

ID Measuring System3 sensors at 120°phase separation

Page 8: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

1.6 MM Pound Load Frame1.6 MM Pound Load Frame

Sample Loaded in Load Frame

Page 9: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

ResultsResults

Dimensional LocationsStrain Gage LocationsEvaluate Shape and Diameters Before and After Testing

Page 10: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

ResultsResults

Slip Die Bite Marks at Toe of Slips

Page 11: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Landing StringsLanding StringsOD ID PPF WALL5 3.574 32.67 0.7135 3.500 34.01 0.750

5 1/2 4.000 38.01 0.7505 7/8 4.375 41.05 0.7506 5/8 5.625 32.67 0.5006 5/8 5.581 34.01 0.5226 5/8 5.375 40.00 0.6256 5/8 5.345 40.90 0.6406 5/8 5.125 47.05 0.7506 5/8 4.999 50.46 0.8136.906 5.000 60.59 0.953

Page 12: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

New 6 5/8 DrillpipeNew 6 5/8 Drillpipe

Hexagonal IDMill Process

Page 13: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Neck down of ODNeck down of OD

OD DeformationMidway up the toe of the slips

Page 14: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Neckdown Neckdown of Drillpipeof Drillpipe

As Weight is Hung Off Plastic Deformation Occurs

Page 15: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Change in Internal Diameter by Load CycleChange in Internal Diameter by Load Cycle

-0.80%

-0.70%

-0.60%

-0.50%

-0.40%

-0.30%

-0.20%

-0.10%

0.00%850 900 1000 1050 1100 1150 1250 1300 1350 1400

Load Cycle Maximum (kips)

% C

hang

e in

ID

Page 16: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Cumulative Change in Internal DiameterCumulative Change in Internal Diameter

-4.00%

-3.50%

-3.00%

-2.50%

-2.00%

-1.50%

-1.00%

-0.50%

0.00%

800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 1400 1450Load (kips)

% C

hang

e in

ID

DRIFT

Page 17: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

What We ThinkWhat We Think

This problem should not be ignoredIf the string needs to be held for a length of time, plastic deformation will cause the drillpipe to neckdown just below the slipsThe reduction in area will eventually weaken the drillpipe causing the pipe to part just below the slips

Page 18: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

What Needs to be DoneWhat Needs to be Done

Comprehensive Studies to Better Define– Material Degradation– Material Limits– Equipment Operating Limits

Test validity of Spiri-Reinhold EquationPossible solutions– Mitigate Risks– Improve Cost Effectiveness

Page 19: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

How?How?

Develop a study protocol that does not have the objective of qualifying a productStrain Gage OD and ID of Drill Pipe– ID Problematic

Precise, Repetitive, and Accurate Placement– Technically Difficult

Page 20: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Establish Control ValuesEstablish Control Values

Limit Scope– Limit variables– Establish baseline values

Determine generic damage to drill pipe

Page 21: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Limit Initial Study Limit Initial Study 66--12 Months12 Months

1 pipe vendor– Before tool joint

10 foot lengths– 5”– 5 ½”– 6 5/8”

Page 22: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

2 Slip Styles– Narrow Column Inserts– Wide Column Inserts

Page 23: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

New Solid Bowl inside new bushing – Establish control values– Split bowls more popular

Less consistentMore variance

Page 24: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Future Efforts Future Efforts –– Phase IIPhase II

Determine correlation between laboratory conditions vs rig conditions

Page 25: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Future Efforts Future Efforts –– Phase IIIPhase III

1 Drill Pipe vs Split Bowl vs Bushing– Split Bowl vs Bushing Condition Matrix

New x NewNew x Mid API SpecNew x Max API SpecMid API Spec x NewMax API Spec x NewMid API Spec x Mid API SpecMid API Spec x Max API SpecEtc.

Page 26: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Future Efforts Future Efforts –– Phase IVPhase IV

Establish Realistic Range– Coefficient of Friction

Water Base Mud vs Oil Base Mud– Insert Die and Slip Body– Slip Body and Bowl

Define Critical Damage to Drill Pipe– Inspection Criteria

Effect of Instantaneous Loading

Page 27: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Projected Cost Projected Cost –– Phase IPhase I

Lab and Engineering 100,000$ Drill Pipe 20,000$ Slips and Bowls Rental 10,000$ Bushing Rental 10,000$

TOTAL 140,000$

Page 28: Diminished Drillpipe Capacity Due to Slip Crushingdea-global.org/wp-content/uploads/2009/11/DEA-150-Slips.pdf · Diminished Drillpipe Capacity Due to Slip Crushing. ... weaken the

Safe and TroubleSafe and Trouble--free Operationsfree Operations