CAMERON FINAL DIMENSION & VISUAL INSPECTION REPORTStack B / STC4- Final Visual Dimensional Inspection
SR. NO. DESCRIPTION REQUIRED (mm) ACTUAL (mm) REMARKS1 OUTSIDE CIRCUMFERENCE 9475 94782 SHELL INTERNAL DIAMETER 3000 30003 FLANGE OUTSIDE DIAMETER 3251 32514 OVER ALL LENGTH 11475 11473
OVERALL INSPECTION RESULTS
"A" (REQ. 11475 mm)AT ACTUAL AT ACTUAL
11474 1147411473 270 11473
"B" ( REQD: 3200 mm)
AT ACTUAL AT ACTUAL33 - 213 3201 123 - 303 320269 - 249 3202 159 - 339 3202
" A "ROUNDNESS / OVALITY READINGS
REQ. ID = 3000 MM MAX. ALLOWED OUT OF ROUNDNESS :30 mm
AT 0 - 180 45 - 225 90 - 270 135 - 315TOP 3000 3002 2999 2997BOTTOM 3017 2983 2987 3021
AT CS-1 CS-2 CS-3 CS-4"B" 1 2 1 2 1 2 1 20 50 50 48 48 54 53 51 52 5
90 52 52 54 54 54 54 52 52 2180 52 52 53 48 50 50 48 48 4270 52 52 52 52 48 48 50 50 4
NOTE:
SISCO QC SABIC - HADEED REMARKNAME NORMAN MORALES
SIGNATUREDATE
NAME OF PROJECT : UPGRADTION OF OF POWER STACK FANS IN DR MODULE A & BCLIENT : SAUDI IRON AND STEEL COMPANY - HADDEDLOCATION : JUBAIL NDUSTRIAL CITY, AL-JUBAIL, KINGDOM OF SAUDI ARABIA PROJECT NUMBER : AF-1221089
0 18090
OUT OF ROUNDNESS
ALIGNMENT READINGS ref. 51mmOUT OF
ALIGNMENT
Sheet1