16
Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA) M.Sc. in IT - Year 1 Semester II - 2012

Digital Transmission Lecture o5 Advanced Computer Networks (ACN) 545

Embed Size (px)

DESCRIPTION

Mr. Thilak de Silva. BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA). Digital Transmission Lecture o5 Advanced Computer Networks (ACN) 545. Today's Agenda. A brainstorming session Concept Paper. Session Outcomes. - PowerPoint PPT Presentation

Citation preview

Mr. Thilak de Silva.BSc. Eng., MSc, CEng, FIE(SL), FIET(UK), CITP(UK), MBCS(UK), MIEEE (USA)

M.Sc. in IT - Year 1 Semester II - 2012

A brainstorming sessionConcept Paper

M.Sc. in IT - Year 1 Semester II - 2012

At the end of this session you will understand the requirements of setting up a Network for a new company, budgeting and creation of Concept Paper.

M.Sc. in IT - Year 1 Semester II - 2012

Analyze the requirements of the company.

Allocated budget.

Geographical locations of the network.

Technical capabilities of the staff of the company.

Number of sub-networks

Security of the Network

M.Sc. in IT - Year 1 Semester II - 2012

Selection of the venders and service providers.

Type of data/information transported through the network.

Bandwidth Requirements.

Type of organization - academic/commercial

Routing Protocols used. Company's future plans.

M.Sc. in IT - Year 1 Semester II - 2012

IPV4 or IPV6

Is VPN required?

Centralized or De-Centralized?

What is the Back-up plan?

Required time line.

M.Sc. in IT - Year 1 Semester II - 2012

Step 1 : Identify automation areas.

Web portal , E-mailOther applicationsBilling, Inventory control, HR,

Finance, VOIP, vedio conferencing or ERP

M.Sc. in IT - Year 1 Semester II - 2012

Step 2 : Physical locations to be networkedWAN , LAN

For example identify, Switches for each floor of the building

Fiber connections Structured caballing L3 switches for VLANs

M.Sc. in IT - Year 1 Semester II - 2012

Source : http://www.google.lk/search?hl=en&gbv=2&tbm=isch&sa=X&ei=podET5OuLo-srAfihqHTDw&ved=0CDoQBSgA&q=Lan,+Wan+setup&spell=1&biw=1366&bih=673

Step 3 : Can connect other existing systems

For example identify, Number of users per application

Step 4 : Methodology of maintaining the network – Network Management System

M.Sc. in IT - Year 1 Semester II - 2012

Step 5 : Draw Network diagram For Example, Identify number of buildings and number of floors per each

location.

Example :- An organization has,Headquarters with 4 buildings and 5 floors eachProvincial offices.BranchesRegional officersRemote officersCustomer service points.

M.Sc. in IT - Year 1 Semester II - 2012

Different number of buildings and floors

Example :- Headquarters has,

For each level get a generic model, because finding buildings, floors and users in every office is time consuming.

M.Sc. in IT - Year 1 Semester II - 2012

Building

Floor Users

1 1 20

1 2 30

.. .. ..

Step 6 : List the physical devices

For example identify, 24 port L2 switches, L3 switches Router per center Firewall Servers for web portal , e-mail DNS server, DHCP server Virus guard server Network management server

M.Sc. in IT - Year 1 Semester II - 2012

Step 6 : List the physical devices

For example identify, 24 port L2 switches, L3 switches Router per center Firewall Servers for web portal , e-mail DNS server, DHCP server Virus guard server Network management server

M.Sc. in IT - Year 1 Semester II - 2012

Step 7 : CaballingStructured caballing per floor

Step 8 : Identify software requirements Eg:- Software for servers, ITIL software

Step 9 : WAN connectivity

Step 10 : Identify operational cost Eg :- Software license cost Maintenance cost WAN fee

M.Sc. in IT - Year 1 Semester II - 2012

By taking these into consideration we prepare the budget.

Using it we prepare the concept paper. We can present the cost phase wise.

M.Sc. in IT - Year 1 Semester II - 2012

M.Sc. in IT - Year 1 Semester II - 2012