Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Digital Strategy

2020 – 2024

February 2020

Page 2: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Contents Slide

Introduction 3

Engaging with our staff and patients 4

Where we have come from, and where we are now

Our staff and patients want us to improve our ICT 6

The NHS Long Term Plan envisages ‘digitally-enabled care’ 7

We have ambitious plans for the NHS in South West London 8

The Trust’s 5-year strategy relies on digital improvements 9

The Trust’s plans in a range of other areas also rely on digital improvement 10

But historically, we have invested less in ICT than our peers 11

We face a range of strengths, weaknesses, opportunities, & threats – which drive where we go next 12

Where we go next

Our vision for 2024 is for staff and patients to have access to the digital technology and information they need, when and where they need it 14

We will make our infrastructure more robust 15

We will enable new models of care for our patients 16

We will enable new ways of working for our staff 17

To deliver this strategy, we will aspire to invest 4% of turnover in ICT each year 18

We will pursue a collaborative approach where it delivers demonstrable value 19

We will ensure appropriate central oversight of ICT 20

We will drive forward implementation of this strategy through the annual planning process 21

Digital Strategy, 2020 - 2024

Page 3: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Introduction

Digital Strategy, 2020 - 2024

Easier access to information, including through digital technology, is reshaping the way we live our lives, and the way we access and interact with services.

This strategy sets out our ambitions for building on that opportunity over the coming years.

Ensuring our staff and patients have access to the digital technology and information they need is a key part of our strategy for 2019 – 2024.

Page 4: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Engaging with our staff and patients

Digital Strategy, 2020 - 2024

In developing this strategy, we:

- Drew on messages we heard as part of developing the Trust’s overarching five-

year strategy, when we engaged with more than 500 staff and patients

- Undertook additional focused staff and public events with around 40 attendees

- Undertook a survey of our staff, receiving over 100 responses

The feedback we received helped shape our plans for the future.

Page 5: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Where we have

come from, and

where we are now

Digital Strategy, 2020 - 2024

St George’s University Hospitals NHS Foundation Trust

Page 6: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Our staff and patients want us to improve our ICT

Digital Strategy, 2020 - 2024

Public

• Engaging with patients in different ways (e.g. by text re appointments, or by phone/skype for consultations, one-stop-shop appointments).

• Enabling clinicians to work together differently (e.g. accessing patient data from other providers, using skype for MDTs)

• Infrastructure (slow computers, patchy WiFi, standardisation across different Trust

sites)

Staff

• Infrastructure (aging hardware, WiFi, slow computers)

• Business intelligence (improving reporting, use of data for performance, use of data for

research) • Supporting better/more efficient working:

(electronic systems to track patients, specimens, equipment; electronic systems for prescribing drugs/patient notes; use of tablets/mobile

devices; using technology in training); electronic management of clinic rooms/booking

• Importance of working collaboratively with partners and other trusts (including on improving/simplifying electronic referral, sharing

data, • Internal communication (new intranet) • Clinical Systems (better integration, new ways

of communicating with patients e.g. via patient portals, apps)

ICT staff

• Infrastructure• New models of care for patients (e.g. one-

stop-shop, use of videoconferencing for patients with long-term conditions)

• Single open system – where consultants, GPs have all the patients’ clinical history and when patients visit a hospital or GP they can see all the patients’ clinical information

• Supporting staff (e.g. Working voice recognition, more use of handheld and tablet devices)

A range of public/staff engagement events were held to develop the Trust’s clinical strategy, where feedback on ICT was a common theme.

Public and staff engagement events have also been held specifically to help develop the digital strategy. Key priorities for our stakeholders

included:

Page 7: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

The NHS Long Term Plan envisages ‘digitally-enabled care’

Digital Strategy, 2020- 2024

The NHS Long-Term Plan outlines the following key priorities on ‘digitally-enabled care’:

Priority Detail SGUH digital strategy therefore needs to…

Empowering people For instance: the NHS App will create a standard online way for people to access the

NHS; women will be able to access their maternity record digitally, support will be given

to the development of a range of apps to support particular conditions, patients with

long-term conditions will have access to their health record via the NHS app, patients

will be able to incorporate information into their own personal health records

• Support patient empowerment: e.g. enabling patients to access /

in some cases change their personal health records, or to

manage their conditions through apps

Supporting health and

care professionals

we will ensure that health and care professionals have the tools they need to efficiently

deliver safe and effective patient care – e.g. supporting staff to capture health & care

information digitally at the point of care.

• Continue the shift from paper to electronic systems

Supporting clinical care for instance, the NHS app and its browser-based equivalent will enable people to follow

a simple triage online to help them manage their own health needs or direct them to the

appropriate service; patients will have more access to ‘virtual’ GP and outpatient

appointments, helping to reduce face-to-face outpatient activity by 30%; and all

providers will be expected to advance to a “core level of digitisation” by 2024, covering

clinical operational processes across all settings, locations and departments, with

robust modern IT infrastructure services for hosting, storage, networks and cyber

security).

• Support the delivery of new models of care – particularly ‘virtual’

outpatient appointments

• Support the modernisation of IT infrastructure

Improving population

health

for instance, deploying population health management solutions to help Integrated

Care Systems understand the areas of greatest health need

• Support steps taken by the SWL system towards use of

population health management solutions

Improving clinical

efficiency and safety

for instance: pathology networks, exploiting the potential of artificial intelligence, leading

to quicker test turnaround times and improved access to more complex tests;

diagnostic imaging networks enabling the rapid transfer of clinical images from care

settings to the relevant specialist to interpret; protecting the NHS from cybercrime

• Ensure the Trust is well placed to benefit from the quality &

efficiency opportunities resulting from new technologies such as

AI

• Ensure the Trust meets national cyber security standards

Page 8: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We have ambitious plans for the NHS in South West London

Digital Strategy, 2020 - 2024

The draft SWL plan submitted to NHSE/I sets out a range of commitments on the use of technology, data and information:

Priority Examples of actions in SWL plan

1. Creating straightforward digital access to services; helping patients/carers managing their health

• Piloting SWL personal health record, allowing people in SWL to access their own care record – to be rolled out by 2021

• Create a personal health and care application so that people can manage their hospital appointments by 2021

2. Ensuring clinicians can access and interact with patient records/ care plans wherever they are

• Use digital technology to transform outpatients, reducing face-to-face visits by a third over 5 years

• Identify where digital process changes (e.g. machine learning) can improve pathways

3. Making data interoperable and accessible

• Deliver and make available whole systems intelligence so that the needs of our entire population can be predicted and met

• Expand the SWL population health management proof of concept to primary care and our four acute trusts

4. Improving system-wideinfrastructure, processes and roll-out of nationally required digital capabilities

• Secure investment to improve infrastructure • Plan/procure infrastructure as a system rather than individual organisations • Create a robust, common technical and application infrastructure, including core hospital

electronic patient record systems, across SWL

Page 9: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

The Trust’s 5-year strategy relies on digital improvements

Digital Strategy, 2020 - 2024

Section of SGUH strategy Digital strategy needs to…….

Strong foundations

(outstanding quality; improved performance; right workforce

model, skills & culture; financial improvement; estates

improvement)

1. Support efforts to improve efficiency

2. Support our ambitions on quality / safety (e.g. via interoperable clinical systems)

3. Support estates improvement & make the Trust a more attractive place to work (e.g. by enabling flexible / home

working)

Excellent local services

(planned care that fits around patients’ lives, using latest

technology; more same day emergency care)

4. Enable the Trust to deliver new models of care, built around patients’ lives (e.g. virtual consultations)

Closer collaboration

(work with partners to deliver care closer to home; work

with DGHs to rebalance specialist/DGH work across SWL;

work with partners to meet needs of ageing population)

5. Enable closer collaboration with the wider health system (e.g. through appropriate sharing of patient information, work

via the Acute Provider Collaborative joint IM&T projects)

Leading specialist healthcare

(main provider of specialist services for our region,

including as MTC; major centre for cancer, paediatrics and

neurosciences; pursue commercial opportunities;

innovation, research & training)

6. Support the appropriate sharing of information across our specialist networks (e.g. with Surrey and Sussex for tertiary

services; with the RMP Cancer Alliance for cancer)

7. Support the Trust’s research output (e.g. by enabling researchers to access appropriate patient data)

7 key implications for the digital strategy from the Trust’s 5 year strategy:

Page 10: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

The Trust’s plans in a range of other areas also rely on

digital improvement

Digital Strategy, 2020 - 2024

The Trust is currently developing a range of corporate strategies which also need to be reflected in our digital strategy:

Strategy Key implications for digital strategy

Research • Commits to rebuilding the datawarehouse in a way that makes it a resource for researchers

Workforce • Commits to building an environment more conducive to flexible working

Quality • Commits to better use of data and electronic systems to improve quality of care

Education • Commits to providing education in innovative ways, including through better use of technology

Outpatients • Involves a ‘menu’ of changes to outpatient services (e.g. self-care, improved referrals, enhanced virtual triage, phone clinics)designed to deliver vs the national ambition to reduce face-to-face attendances by 33%. Each item of this menu could require

different levels of ICT support.

Page 11: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

But historically, we have invested less in ICT than our peers

Digital Strategy, 2020 - 2024

Information technology is playing an increasingly important role in healthcare worldwide.

In the UK, NHS trusts are reflecting this in their spending despite a challenging financial environment. In the last decade, UK capital spending in

healthcare has been below the OECD average, falling as a percentage of GDP, and NHS trusts have seen significant fluctuation in capital budgets. Despite those relatively low levels of funding and significant fluctuation, capital spending on IT and intangible assets (mostly software

licenses) has steadily grown.

At St George’s, in recent years spending on IT has been below average, and spend on intangible assets has been ‘feast or famine’, as the graphs below illustrate. In 18/19 the Trust reversed some of these trends and c. 17% of capital additions were on IT and 6% on intangibles.

Capital additions on IT as a proportion of total

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

8.0%

9.0%

10.0%

2013/14 2014/15 2015/16 2016/17 2017/18

IT spend as % of total(SGUH)

IT spend as % of total (allNHS trusts).

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

2013/14 2014/15 2015/16 2016/17 2017/18

Spend on intangibles as %of total (SGUH)

Spend on intangibles as %of total (all NHS trusts)

Capital additions on intangibles as a proportion of total

(Source: Health

Foundation)

(Source: Health

Foundation)

Page 12: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We face a range of strengths, weaknesses,

opportunities & threats – which drive where we go next

Digital Strategy, 2020 - 2024

Strengths

• Staff capability / capacity: having moved away from heavily outsourced

approach, growing capability/capacity in IT department

• Range of newly installed systems: e.g. shift from paper to electronic systems in

inpatient & some outpatient areas; establishment of SWL Health Information

Exchange. Benefits are likely to be felt over course of coming five years as these

systems are embedded.

Weaknesses

• Capability/capacity: Trust recently moved away from heavily outsourced approach;

still building right mix of capability/capacity in IT department. Trust not ‘informatics/IT-

savvy’ as an organisation

• Infrastructure: ageing infrastructure, sometimes no longer supported, with limited

capacity

• Clinical systems: raft of specialist systems are not interoperable, leading to

inefficiencies and safety risks

• Non-clinical systems: email system has limited capacity and is not secure. Full

functionality of Microsoft Office not being used. Systems used by corporate teams (HR,

finance, estates etc) often old & unsupported, do not support SWL-wide working, and

do not interact with clinical systems.

• Communications & telephony: limited virtual MDT working, and fragmented use of

apps for communication between clinicians. Ownership of/responsibility for equipment

unclear. Old switchboard system with high risk to business continuity. Old intranet.

• Data collection / information management: data collection still partly paper-based.

IM primarily focused on monitoring ‘what has happened internally’ rather than future

/benchmarking vs others. Reactive approach to data quality, often responding to

commissioner challenge. Datawarehouse not built to deal with volume of data now

available and does not link to database in real time.

• Access to capital: likely to be a key constraining factor in coming years

• Resilience: related to ageing infrastructure and switchboard system.

Opportunities

• South West London-wide working: e.g. opportunities to enable clinicians

across SWL to access relevant patient data from other providers; opportunities

from economies of scale (joint procurement; SWL-wide approach to information

management); population health management approaches

• New ways of interacting with patients : e.g. consultations between patients and

clinicians by video, greater use of mobile devices, use of apps to help patients

manage their own health, with significant quality and financial benefits.

• New ways of working: e.g. greater use of virtual MDTs, use of machine learning,

technology to enable home working, voice recognition: with significant quality,

financial, estates and workforce benefits.

Threats

• Cyber security: a key national concern and the biggest growth area in criminal activity.

• Tertiary networks: risk that if the Trust’s systems do not support appropriate sharing of

information/referrals with tertiary networks (Surrey, Sussex, Cancer Alliance) that work

could come under threat

Page 13: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Where we

go next

Digital Strategy, 2020 - 2024

St George’s University Hospitals NHS Foundation Trust

Page 14: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

Digital Strategy, 2019 - 2024

• We will upgrade our IT infrastructure and telephony systems • We will upgrade and renew the systems that underpin clinical and non-clinical work within the Trust, and ensure

the different systems we use increasingly operate as one• We will strengthen our systems and processes for cyber-security

1. Robust infrastructure

To deliver on that vision, we will pursue three strategic priorities:

• We will use information technology to interact with our patients differently (phone, online, video), sparing them trips to hospital wherever possible

• Our approach to business intelligence will be proactive, outward-looking, and focused on enabling future improvement of our services

2. New models of care for our patients

• We will enable our clinicians to access the information they need from other NHS providers at the point of contact with a patient

• We will complete the shift from paper-based to efficient and effective electronic clinical systems• We will enable our staff to do more work remotely • We will use the latest technology and systems to help staff work efficiently and effectively – including making

use of big data and AI

3. New ways of working for our staff

Our vision for 2024 is for staff and patients to have access to the digital technology and information they need, when and where they need it.

Page 15: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We will make our infrastructure more robust

Digital strategy, 2020- 2024

When we surveyed staff on their key priorities as part of developing this strategy, the top priority was seen as upgrading our IT infrastructure (e.g.

network, VDI capacity, WiFi, Computers). Cyber crime is a national priority, and all NHS organisations will be required to undertake a range of

measures to protect themselves against this growing threat.

Building a robust IT infrastructure is therefore one of our key strategic priorities, and one that will enable our other ambitions to deliver new models of

care for our patients, and support new ways of working for our staff.

We will upgrade our IT infrastructure and telephony

systems

We will upgrade and renew the systems that underpin

clinical and non-clinical work within the Trust, and

ensure the different systems we use increasingly

operate as one

We will strengthen our systems and processes for cyber-

security

• virtual desktop infrastructure (VDI) upgrade,

• Replacing network to be fit for the future• data centre upgrade,

• conversion of most telephony to voice over internet

• new staff intranet. • Improved use of digital platforms in education/training

• New electronic systems in specialties such as

maternity and theatres• Update/replacement of key non-clinical systems (e.g.

Windows 10, Office 365).

• Implementation of secure email

• Implementation of ‘demilitarised zone’

Key deliverablesObjectives

Page 16: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We will enable new models of care for our patients

Digital strategy, 2020- 2024

We will use information technology to interact with our

patients differently (phone, online, video), sparing them

trips to hospital wherever possible

Our approach to business intelligence will be proactive,

outward-looking, and focused on enabling future

improvement of our services

• Re-build of data warehouse, including to enable better

use of data by researchers across the Trust• Build capability/capacity for more proactive approach

to information management

• Specialty-level development of iClip to enable more

virtual outpatient clinics / fewer face-to-face attendances, starting with some prioritised specialties

in 20/21

• Development of ‘patient portal’, enabling patients to

access and amend their health records

Key deliverablesObjectives

Strong information management is an essential foundation to the Trust’s desire to improve the care we offer our patients. Access to linked and

searchable clinical, radiological and pathological datasets is also a key enabler to the Trust’s desire to develop new treatments via research, as set

out in the Trust’s 2019-24 research strategy.

Better use of information technology will also underpin our ability to interact with our patients differently, particularly for outpatient consultations. This

is a key priority nationally, for our local commissioners and for the Trust itself, and has been a consistent part of the feedback from our staff and

public engagement.

Page 17: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We will enable new ways of working for our staff

Digital strategy, 2020- 2024

ICT has a major impact on the working lives of our staff – causing frustration at its worst, and improving staff experience and productivity at its best.

Improving our infrastructure will have a significant impact here, with staff able to use faster, more responsive and more integrated ICT. But above and

beyond that, we also want to make it easier for our clinicians to work across sites and organisational boundaries, and to make use of the latest technology.

We will enable our clinicians to access the information

they need from other NHS providers at the point of

contact with a patient

We will enable our staff to do more work remotely

We will use the latest technology and systems to help

staff work efficiently and effectively – including making

use of big data and AI

• Optimise use of Health Information Exchange

• Interoperable clinical systems with key partners across South West London / specialist networks

• Embed tools that enable virtual/cross-site/home

working (e.g. document sharing, videoconferencing), to support the Trust’s workforce strategy

• iClip optimisation to support Trust quality priorities (e.g. deteriorating patients)

• Support assessment and introduction of diagnostic AI where appropriate• Develop & deliver effective training via multiple platforms

Key deliverablesObjectives

We will complete the shift from paper-based to efficient

and effective electronic clinical systems• Roll-out of iClip across outpatient services

• Optimising inpatient systems to reduce use of paper

Page 18: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

To deliver this strategy, we will aspire to invest 4% of

turnover in ICT each year

Digital Strategy, 2020 - 2024

Historically, St George’s has tended to invest between 2% and 3% of its turnover on ICT. This has often been below average for NHS trusts, and

below average for the health care industry. It has also followed a pattern of ‘feast or famine’, with high spending one year followed by low spend the

next, making it hard to plan. We now face the challenge of gaining lost ground as a result of historic underinvestment, as well as investing to deliver

our ambitions for the future.

The amount we spend on ICT is not entirely within our control, as capital spending is partly dependent on national decision-making. That said, over

2020-24 our planning assumption is that we need to invest 4% of turnover on ICT, and we will work with our system partners to seek to deliver that.

Capital additions on IT as a proportion of total

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

IT spend as %of total(SGUH)

IT spend as %of total (allNHS trusts).

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

Spend onintangibles as% of total(SGUH)

Spend onintangibles as% of total (allNHS trusts)

Capital additions on intangibles as a proportion of total

Source: Health Foundation Source: Health Foundation

Page 19: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We will pursue a collaborative approach where it

delivers demonstrable value

Digital Strategy, 2020 - 2024

St George’s faces a range of significant ICT-related challenges and risks, many of them particular to us as a Trust, and requiring us to seek solutions at maximum possible speed. In these instances we are likely to need to pursue individual solutions, rather than seeking to collaborate with other NHS organisations whose priorities and need to act at pace may be

different.

However, elsewhere we will seek to deliver elements of this strategy in collaboration with our partners, particularly via the

South West London Acute Provider Collaborative (APC). Our collaborative effort will particularly focus on our strategic objective to enable our clinicians to access the information they need from other NHS providers at the point of contact with a patient.

For instance:

• We will continue collaborating with other Trusts on the Health Information Exchange, enabling clinicians in one provider to access relevant patient data from another

• As we continue the shift from paper-based to electronic, and upgrade our existing systems, we will work with other

providers to maximise interoperability between our clinical systems • We will jointly procure new technology/systems where appropriate (e.g. building the Acute Provider Collaborative’s joint

procurement of a picture archiving and communication system or PACS in radiology)

Page 20: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We will ensure appropriate central oversight of ICT

Digital Strategy, 2020 - 2024

The Trust’s 9,000 staff use hundreds of clinical and non-clinical systems, and hundreds of PCs and other devices.

We want our staff to be able to adopt new systems and equipment, but we also need to ensure that any new systems are interoperable, and that any new systems or equipment can be appropriately maintained, developed and protected in terms of cyber security.

We will therefore adopt clear corporate standards, policies, supportive pathways for innovation and governance structures that give individual services the flexibility to be innovative and adopt new technology, whilst ensuring interoperability and capacity for maintenance across the Trust.

Management of any such new assets will therefore sit with corporate ICT, and there will be a centrally-driven programme of gradually ensuring all existing systems are interoperable (which may include some services being required to move to a new system).

Page 21: Digital Strategy 2020 – 2024 · The NHS Long Term Plan envisages ‘digitally-enabled care’ Digital Strategy, 2020- 2024 The NHS Long-Term Plan outlines the following key priorities

We will drive forward implementation of this strategy

through the annual planning process

Digital Strategy, 2020 - 2024

Work is already underway to deliver some of the objectives set out in this strategy.

Each year, an implementation plan will be produced to set out actions to deliver on the ambitions set out in this strategy, and reflected in the Trust’s annual business plan – for instance via corporate objectives, and the annual capital plan.

The Information Governance Group, Trust Executive Committee, and Finance and Investment Committee will track progress against the strategy on a quarterly basis. Finance and Investment Committee will regularly provide assurance to Trust Board

that appropriate progress is being made.

Whilst the action set out here will reduce a range of risks that the Trust currently faces (e.g. in relation to running multipleclinical systems that are not interoperable), the scale and complexity of those risks mean that they will not be eliminated

overnight. The Trust will need to continue managing IT-related risks via its established risk management processes and governance.

Delivering our ambitions will also require different ways of working and culture change within the organisation, and we will

build provision for that into our approach to project implementation.