Digital transformation
www.snh-group.ruGroup
Group
SNH Group 2
Shavaleev, Damir Akhatovich
CEO of SNH Group
PhD in Chemistry
Lead Researcher of TIPS RAS
Associate Professor of Ufa State Petroleum
Technical University (USPTU)
Vaganov, Alexey Ivanovich
CEO of SNH Project
Khafizov, Evgeny Uralovich
CEO of SNH MeisterSoft
2018 - CEO of SNH MeisterSoft
2017 - Head of the Management of Tinkoff Bank, JSC
2016 - Head of Quality Assurance
Kaspersky Lab JSC
2015 - Head of the Department of Automation and
Information Technologies in Orgneftekhim-Holding
2014 - Lead Developer, Kaspersky Lab JSC
2013 - Senior Developer, Kaspersky Lab JSC
2010 - Programmer, Banking Information Systems JSC
2018 - General Director of the SalavatneftekhimproektDesign Institute
2014 - Director of the Orgneftihimproekt Design Institute
2012 - Director of the Salavatgoneftekhimproekt Design Institute
2010 - Technical Director of the SalavatgoneftekhimproektDesign Institute
2008 - Chief Engineer at the SalavatgoneftekhimproektDesign Institute
2003 - First-Class Design Engineer at Salavatnefteorgsintez JSC
2000 - Benzene Production Engineer at Salavatnefteorgsintez JSC
1999 - Grade-Six Pyrolysis Unit Operator, shop No. 55 of Salavatnefteorgsintez JSC
1997 - Design Engineer at Salavatnefteorgsintez JSC
2018 - General Director of SNH Group of Companies
2016 - Advisor to the General Director of Tatneft
PJSC
2014 - Chairman of the Board of Directors of
Orgneftekhim-Holding
2005 - General Director of Gazprom Neftekhim
Salavat LLC
2003 - 2005 Vice-President for Product Sales, Head
of Polymers, Rubbers and Synthetic Fibers, AK
SIBUR OJSC
− Pre-engineering works
− Oil-refining and Petrochemistry Production Design
− Commissioning
− Equipment Supply Management
Acrilkhimproekt, Dzerzhinsk
SNH Group 3
− Pre-engineering works
− Engineering
− Design of safety declarations
− Design of process procedures
− Software development
− Technical Support
− System integration
− IT consulting
− Staff training
− Software Quality Assurance
− Support, configuration and maintenance of IT
infrastructure
Moscow
− School
− Staff training
− Advanced Training
Salavat
Salavatneftekhimproekt, Salavat
Group
Atyrau
− Pre-engineering works
− Engineering
SNH Group | SNH Project 4
Salavatneftekhimproekt, Salavat Acrilkhimproekt, Dzerzhinsk
9
23
42
10
17
25
16
17
97
7
13
10
Chief Project Engineers Department
Chief Technologist Department
Piping and Process Department,
including the mechanical engineering team Equipment
Department
Automation and Inspection Department
Electrical Engineering Department,
including the communication network team
Plumbing Department
Budget Team
Construction Department
Geoinformation Department,
including the Master Plan team
3D-Modeling Department
CAD System Department Engineering Department and Design Release Division
Commissioning team
Auxiliary services 59
Chief Project Engineers Office 2
Piping and Process Department,
including the mechanical engineering team 14
Automation and Inspection Department 5
Electrical Engineering Department,
Automation and Inspection Department 5
Plumbing Department 6
Budget Team 4
Construction Department,
including the Master Plan team 7
Auxiliary services 10
TEAM NUMBER: 353 people, 636,000 man-hours per year.
51
5
Skills
Design of investment feasibility study and selection of project
implementation model
Choosing a licensor
Design drafting and preparation of detailed
designs
Finalization of detailed designs, construction and installation, and start-up
Equipment procurement and supply
Post-investment monitoring
Baseline design maintenance and
elaboration ofits separate sections
– Feasibility study design:
• market analysis;
• justification of theproject's conformance tothe company's strategy;
• process design solutions;
• preliminary assessmentof CapEx (by peers);
• timeline assessment
– Independent ofEPC/EPCM-aided designof project implementationmodel
– Development of ToR andapproval thereof bylicensor
– Utility, feedstock andinfrastructure availabilitystudy
– Detailing of investmentfeasibility assumptionsincluding the economicsand costs
– Obtaining properauthorities fromlicensors for baselinedesign monitoring
– Detailing ofprocessing/product salesplan
– Selection of licensor andstudy of baseline data orbaseline design
– Selection of processsequence and obtainingapproval for criticalequipment
– Creating of potentialvendor and contractorlist
– Baseline designmaintenance,including:
• filling outquestionnaires;
• clarification;
• regular monitoring ofthe licensor’s work.
– CapEx analysis andobject budgeting forpeers and projectcost analysis
– Design of level 3projectimplementation'smaster plan
– Design of start-upfacilities,commissioning
– Reporting andsupervision of theproject implementationprogress
– Assistance forGlavgosexpertizaState Expert BoardReview
– Design drafting and detailed designs forproduction buildings and structures
– Design of project report for specialequipment
– Project engineering for buffer zones,maximum permissible emissions, wastegeneration standards and waste disposallimits
– Optimization of engineering solutions
– Design of operating documentation: oil spillresponse plans, accident response plans,and process procedures
– Ensuring project targets andelaboration of propermeasures for efficiencyimprovement
– Monitoring and assessmentof facility operation efficiency
SNH Group | SNH Project
EXPERIENCE IN PROJECT IMPLEMENTATION FOR LEADING RUSSIAN OIL REFINING AND PETROCHEMISTRY COMPANIES
6
Facility
Sulfur production unit 2018
Design of baseline data documentation for AM-76 Revamp for Achievement of 1,750 t/d Daily Capacity project
WIP
Preliminary hydrotreatment unit L-35/11-1000 WIP
Replacement of 11 tanks in technical and storage center 2017
Construction of new P-2 furnace at the refinery GO-4 unit 2017
PPF and BBF supply and shipment at UZhG 2018
Construction of cooling tower for workshops 58 and 47 and processing and storage center at Monomer plant
2018
Hydrogen unit 2017
PSA unit 2016
Revamping of discharge rack (unit item 706) in the refinery's processing and storage center with the construction of CCR building
2015
High-density polyethylene unit (U&IO, interconnecting utilities) 2009
Conversion of the rack (unit item 715) for light oils loading 2006
Viscosity breaking plant (U&IO, interconnecting utilities) 2005
Feasibility study
General design activities Year
Const-ruction super-vision
Detailed design
Baseline design
✓ ✓✓
✓ ✓ ✓
✓ ✓ ✓ ✓
✓
✓
✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓
✓
✓
✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓✓✓
SNH Group | SNH Project
EXPERIENCE IN PROJECT IMPLEMENTATION FOR LEADING RUSSIAN OIL REFINING AND PETROCHEMISTRY COMPANIES
7
Facility
Detailed design of oil-loading unit at the processing and storage center (unit item 715 area B)
2004
Automated on-spot loading unit for loading light oils into railway tanks 2004
Ethyl benzene and styrene unit (U&IO, interconnecting utilities) 2004
CDU/VDU-4 plant for processing Karachaganak natural gas liquids (U&IO, interconnecting utilities)
2000
Light oils loading unit for truck tanks 1999
VDU-4 expansion with CDU construction 1991
Ammonia unit (U&IO, interconnecting utilities) 1990
EP-300 unit (U&IO, interconnecting utilities) 1985
Omsk Oil Refinery: Catalyst unit construction WIP
Amur GPP: U&IO (KM grade) 2019
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓
✓
✓ ✓ ✓
✓
✓
✓ ✓
✓
✓
✓
✓
✓
SNH Group | SNH Project
Feasibility study
General design activities Year
Const-ruction super-vision
Detailed design
Baseline design
WIPDevelopment of a pilot industrial plant for special petroleum pitches and cokes
Omsk Oil Refinery: Combined atmospheric-vacuum unit AVT-10 (ELOU-AVT-6M) WIP✓ ✓
EXPERIENCE IN PROJECT IMPLEMENTATION FOR LEADING RUSSIAN OIL REFINING AND PETROCHEMISTRY COMPANIES
8
SIBUR-Tobolsk LLC: Development of new production of maleic anhydride (MAN)with a capacity of 45 thousand tons per year on the site of LLC SIBUR-Tobolsk
в работе
SIBUR-Tobolsk LLC: Construction of a new production of dioctyl terephthalate witha capacity of 100 thousand tons per year on the site of Sibur-Khimprom JSC
2018
ZapSibNeftekhim LLC: Polyethylene unit. HVAC 2017
RN-Tuapse Refinery LLC: Air compressor plant 2014
RN-Tuapse Refinery LLC: Nitrogen plant 2015
Novokuybishev Refinery JSC: Revamping of VDU-9 2015
Permnefteorgsintez: Alkylate discharge rack 2019
Slavneft-YANOS JSC: Sulfide-containing waste recuperation unit в работе
Novoil: Sulfuric acid alkylation unit 2013
Novoil: Sulphuric acid recuperation unit 2012
Ufaneftekhim, Ufa Refinery, Novoil: Automobile gasoline mixing в работе
Novoil: Construction of tanks No. 149 and 150 (V = 5,000 cub.m., kerosene) 2017
Novoil: Hydrogen unit 2015
Ufaneftekhim: Hydrogen unit 2009
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓ ✓
✓ ✓
✓ ✓
✓
✓
✓✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓
✓ ✓ ✓
✓
SNH Group | SNH Project
✓ ✓
✓
FacilityFeasibility
studyGeneral design activities Year
Const-ruction super-vision
Detailed design
Baseline design
TECHNICAL EQUIPMENT ALLOWS WORKING WITH PROJECTS OF ANY DIFFICULTY
9
The main software products used in the design process
3D computer-aided design of industrial sites
The system of three-dimensional design of steel structures and concrete products
AVEVA PDMS/E3D
Tekla Structures
EPLAN p8 Modular solution for electrical engineering
Design programs NTP Truboprovod
Calculation of pipelines, vessels and devices, safety valves, insulation materials
Design programs Environmental design program framework
Autodesk AutoCAD CAD system
SAP 2000 Structural Calculation
IDEA Statica Design and calculation of steel structure connections
VectorSafeSpot
Time management systemEngineering Data Management System
SNH Group | SNH Project
Calculation and design of steel and reinforced concrete structures
Design system of functional and engineering diagramsSmartPlant P&ID
Architecture Engineering & Construction Collection
A set of BIM tools for the design of industrial and civil facilities, including the design of plot plans, engineering systems and other systems
SCAD Office
CAESAR IICalculation of pipelines for static and cyclic strength, vibration in accordance with international standards
EXPERIENCE IN PROJECTS IMPLEMENTATION FOR LEADING RUSSIAN COMPANIES
10
Facility Year
Const-ruction super-vision
Detailed design
Baseline design
DALHIM LLC: Tetrakis (dimethylamido) titanium production facility WIP
Norkem Polyesters LLC: Conversion revamping of the 2nd alkyd varnishes process line for the production of hydraulic fluid. Rebinding of existing tanks for receiving and storing hydraulic fluid
WIP
Norkem Polyesters LLC: Conversion revamping of the 3rd alkyd varnishes process line for the production for the production of esters (EIT)
WIP
Norkem Polyesters LLC: Revamping of the processing line of alkyd varnishes. Warehouse for polyester production raw materials and finished products. Retraining existing containers for receiving and storing products
WIP
Synthanols Plant LLC: Revamping of the synanols and sulfoethoxylates production site. Unit 300. Synthesizing using DMC catalyst
WIP
Installation of process and heat engineering pipelines of ТК and ТС brands under the project of all-equipment economy of a new cryogenic air separation plant. Construction of an interdepartmental communications overpass
WIP
Antipinsky Oil Refinery JSC: Reconstruction of a liquefied hydrocarbon gas warehouse with a truck tanks loading point
2017
Dow Izolan OOO: Revamping of hazardous production facilities 2017
General production facilities of Monomer Acrylic Acid Production Plant2016
Installation of equipment for the production of composite materials. Production base of CTH Diascan, JSC, Lukhovitsy. Revamping
2015
FSUE Research Institute of Chemistry and Polymer Technology named after academician V.A. Kargin with pilot plant: Revamping of the production facilities of butyl methacrylate, polyvinyl alcohol, polyvinyl butyral, polyvinyl ethyl, polyvinyl formalmal ethyl, polyvinyl butyralfurfural, n-aminobenzoic acid, barbituric acid
2012
✓
✓
✓
✓
✓
SNH Group | SNH Acryl
✓
✓
✓
✓✓
✓
✓✓
✓
✓
✓
✓
EXPERIENCE IN PROJECTS IMPLEMENTATION FOR LEADING RUSSIAN COMPANIES
11
Facility
Stavrolen LLC: Reconstruction of the liquefied hydrocarbon gas warehouse with an increase of the discharge and processing volume to conform to the effective rules and regulations
2005
Revamping of the 266 m railway deadlock at the Shatkovsky section of the Arzamas oil depot
2008
The expansion of the acrylate production plant. Production of acrylic emulsions and copolymer AKMASON
2010
Increased production of acrylic polymeric acid 2014
Revamping of the loading points for methyl acrylate, ethyl acrylate, acrylic acid. Workshop No. 102, building 425, truck loading dock
2014
Designing automated fire alarm, intrusion detection and outdoor surveillance systems for the oil pumping station.
2010
Khiminvest LLC: Liquid detergent manufacturing facility 2006
Nizhny Novgorod plant for processing rubber LLC: Deployment of a crumb rubber production company
2006
Finisp-Cargo CJSC: Liquid chemical storage 2007
Korund LLC: Revampng of PVC production plant 2007
Lega LLC: Production of hydrogen peroxide with a capacity of 2,000 tons/year 2008
Reconstruction of liquid chemical storage 2006
✓ ✓
✓
✓
✓
✓
✓
SNH Group | SNH Acryl
✓
✓
✓
✓
✓✓
✓
✓✓
✓
Year
Const-ruction super-vision
Detailed design
Baseline design
SNH Group | SNH MeisterSoft 12
Skills
Client-server development
Mobile applications
Desktop applications
Cloud technologies
Working with large amounts of data
Fail-proof systems
Microservice architecture
Machine learning, neural networks
Virtual reality
3D technology
Distributed registry technology, blockchain
Automatic recognition of complex objects
DIGITAL TRANSFORMATION OF INDUSTRY
Drafting and design of
documentationConstruction Supervision Operation
SNH Group | BIMeister 13
− Single data storage.
− Storage of 3D models on the
same scene.
− Attaching documentation to
primitive 3D models,
equipment.
− Measurement of linear
dimensions on the 3D scene.
− Automation of design
processes.
BIMeister allows a more efficient management of company's life cycle.
− Design of a construction
plan.
− Management of
construction stages.
− Linking the 3D model
states to the
construction stages.
− Acceptance of the
construction stages.
− Automatic collision
search.
− Possibility of linking the
indicators of the automated
process control system to 3D
primitives and the display of
telemetry.
− MRO management.
− Predictive analysis.
− Development of rules for
informing employees about
exceeding critical indicators.
− Display of abnormal
situations on the 3D scene.
− Comparison of a point
cloud with a 3D model on
a single scene.
− Automatic collision
search.
− Rapid access to project
documentation.
− Virtual reality
BIMeister
DIGITAL TRANSFORMATION OF INDUSTRY
SNH Group | BIMeister 14
Before commissioning
1. Cross platform
2. Shared information space
3. Quick access to relevant information
4. Project snapshots
5. Automation of design processes
6. Construction planning
7. Construction control
8. Designer's supervision
9. Automatic collision search
10.Virtual reality
BIMeister
DIGITAL TRANSFORMATION OF INDUSTRY
SNH Group | BIMeister 15
After commissioning
1. Automatic collection of equipment
condition
2. Display of abnormal situations
3. Predictive analysis of equipment failure
4. Keeping statistics
5. Building production metrics
6. MRO process automation
BIMeister
Efficient storage of documentation
SNH Group | SafeSpot EAMS 16
Structure, order, safety...
1. Document, group and type life-cycle
management
2. Document grouping
3. Attribute Information Management
4. Associative links with paper documents
5. Storage of original data formats
6. Differentiation of access rights
7. Storing employee statistics
8. Storage of program-specific files, for
example, virtual machines, backup
copies, etc.
SafeSpot EAMS
Fast access to information
SNH Group | SafeSpot EAMS 17
Reducing staff costs
1. High-speed search regardless of the
amount of data
2. Asynchronous search does not block the
system
3. Search for documents by keywords
4. Search by attributes
5. Search for documents with expiration,
custom requests
6. Request Management
7. Bulk upload of search results to hard
disk
SafeSpot EAMS
Document upload
SNH Group | SafeSpot EAMS 18
From scanner directly to SafeSpot EAMS
1. Loading documents from hard disk.
2. Stream scanning and automatic loading
of documents.
3. Scaning with a mobile phone camera.
4. Automatic text recognition.
5. Automatic classification of documents,
for example, by barcode.
SafeSpot EAMS
Effective project management
SNH Group | Vector 19
Convenient planning of parallel projects
1. Project Planning
2. Ability to download from MS Project
3. Automatic resource allocation
4. Extraordinary situations notifications
5. Automatic postponement of the timing of
related work
6. Automatic calculation of processing
Vector
Task management and control
SNH Group | Vector 20
You will always be aware of the work load and quality of employees
1. Automating the process of acceptance of
work performed
2. Work Control
3. Integration with SafeSpot EAMS
4. Employees work history
Vector
Automatic calculation of financial indicators
SNH Group | Vector 21
1. Automatic calculation of financial
indicators
2. Real-Time Planned and Actual
Monitoring
3. Convenient analytical platform
4. Forecasting budget deficit
5. Integration with 1C, SAP
Information on project profit indicators is always at hand.
Vector
Centralization and management of the test cycle
SNH Group | testIT 22
We reduce all testing processes into a single information space.
1. Centralized storage of test
documentation (test scripts, test lists,
test plans, results)
2. Project management for the separation
of software testing processes
3. Flexible management of work items,
their parameters, attachments, sets
and hierarchy
4. Managing custom tags and search by
them
5. Selection of common work item blocks
for reuse in work items
6. Quick search of work items based on
structured queries.
test IT
Centralization and management of the test cycle
SNH Group | testIT 23
Timely and complete informing on the quality of software products
1. Managing the distribution and execution
of test tasks using test schedules
2. Flexible reporting on the main metrics
of the testing process
3. Automatic notification and information
policy management
4. Integration with automated test run
systems
5. Integration with project management
systems
6. Storing and displaying work item
change history
test IT