Diavik Wind FarmNWT Chamber of Commerce

4th April 2012

Page 2: Diavik  Wind Farm NWT Chamber of Commerce

Location

Page 3: Diavik  Wind Farm NWT Chamber of Commerce

Diavik

Page 4: Diavik  Wind Farm NWT Chamber of Commerce

Diavik

Page 5: Diavik  Wind Farm NWT Chamber of Commerce

5

• Diavik is completely dependent on diesel for all site power needs.• Hybrid power options sought to reduce cost and decrease GHG emissions.

Why Wind Power?

Page 6: Diavik  Wind Farm NWT Chamber of Commerce

6

• Reduced power generation costs.• ~ $30 million investment with 8 year

payback.

• ~ 10% reduction in diesel power generation.

• > 4 million litres reduction in diesel usage per year.• Equates to around 100 truckloads per

year.

• 12,000 tonnes reduction in CO2 emissions per year.

• 6% overall reduction in GHG emissions.

What will Wind Power deliver?

Page 7: Diavik  Wind Farm NWT Chamber of Commerce

7

• Four Enercon E70 generators.• 9.2 Megawatt installed capacity

• 2.1 to 6 Megawatt online capacity.

• 17 GWh power produced annually.

• Designed to operate to -40oC.

Diavik Wind Farm• Tower height 65m• Blade length 35m• Total height 100m• Generator weight 55 tonnes

Page 8: Diavik  Wind Farm NWT Chamber of Commerce

8

• 2008 Commence wind data collection.

• 2010 Analysis of wind data and project feasibility study.

• 2011 Project approval / contract negotiations.

Generators ordered and commenced

construction.

Site geotech. drilling / construction commenced.

Generator components shipped to Canada.

• 2012 Generator components transported to site via the Winter

Road.

Complete site construction and erection of wind

turbines.

Power generation commences.

Timeline

Page 9: Diavik  Wind Farm NWT Chamber of Commerce

9

Timeline

Page 10: Diavik  Wind Farm NWT Chamber of Commerce

10

• First large scale wind farm installed at a remote operating mine.

• Largest remote wind-diesel power generation installation.

• Application of technology designed for arctic conditions.

Innovation

Page 11: Diavik  Wind Farm NWT Chamber of Commerce

11

• Demonstrate wind power as a viable

component of power generation in the

North.

• Provide support to future wind power

initiatives and develop northern

capability.

• Weather tower donated to Det’on Cho

Earth Energy Giant Mine study.

Benefits beyond Diavik…

Page 12: Diavik  Wind Farm NWT Chamber of Commerce

12

Questions?