15
Séminaire sur la thématique de la rénovation des tunnels 11.02.2020 Seminar over het thema tunnelrenovatie Diagnostic des tunnels SPW Diagnose van tunnels SPW Sabine Stassart & Rudi Noël 1 Rudi NOEL, Head of Service DIAGNOSIS, ANALYSIS AND ACTION PLAN TO UPGRADE THE TUNNELS OF THE W ALLOON REGION Service public de Wallonie – Mobilité & infrastructure Séminaire sur la thématique de la rénovation des tunnels du 11 février 2020 19/02/2020 2 Service public de Wallonie infrastructures routes bâtiments Road administration in Wallonia 2020-02-11 2

DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 1

Rudi NOEL, Head of Service

DIAGNOSIS, ANALYSIS AND ACTION PLAN

TO UPGRADE THE TUNNELS OF THE

WALLOON REGION

Service public de Wallonie – Mobilité & infrastructure

Séminaire sur la thématique de la rénovation des tunnels du 11 février 2020

19/02/2020

2

Service public de Wallonie infrastructures routes bâtiments

Road administration in Wallonia 2020-02-11

2

Page 2: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 2

? Tunnels ?

• What is a tunnel ?

No official definition

Directive 2004/54/CE : 500 m + RTE

France : 300 m

• SPW-MI : Need for specific EM/CE equipment :

daylight, pump, ventilation, exit, fire equipement, …

Minimum length : 25 m

56 tunnels with very different characteristics

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

3

Tunnels in Wallonia

1

3

9

934

Length

1000 m <

500-1000 m

300-500 m

100-300 m

< 100 m

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

4

Page 3: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 3

Tunnels in Wallonia

14

22

19

1

Section type

Two tubes

One tube/2 directions

One tube/1 direction

Three tubes

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

5

Département d’Exploitation des infrastructuresDirection de l’exploitation des tunnelsAvenue des Tilleuls, 62 B-4000 Liège

Page 4: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 4

E40-E25 Link

• Connections E40 – E25

• 5 tunnels (one of 1639 m)

• Open in 2000

• 80 000 veh/day (2 ways)

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

7

E40-E25 Link

• Design was performed before

– Mont-Blanc tunnel fire : 1999

– Directive 2004/54/EC on minimum safety requirements for

tunnels in the Trans-European Road Network

• But security was already an important

concern during conception :

– a trafic center including tunnels management

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

8

Page 5: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 5

What about other tunnels in Wallonia

• Mainly 40 years old

• 2 separate management

• Civil Engineering part Management regulations like for bridges

But access difficulty: ideal being off traffic (at night)

• Electromechanical part Cross-view for some tunnels

Different regulations according to tunnels

Case-by-case management for the majority of tunnels

Wish for a coherent vision of all our tunnels

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

9

Master plan of renovation - Objectives

Levels of service of the ideal tunnel

CE and EM inspection of each tunnel

Elements to renovate or

upgrade Ideal => Realistic

Budget programming

Prioritization of rehabilitations

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

10

Page 6: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 6

Renovation master plan - Requirements

User safety ;

The visual aspect of the installations and the services to the users ;

Management in the framework of ITS (Intelligent Transport System) and intelligent routes with a centralization of information and control ;

Compliance with European standards and applicable legislation ;

Good maintenance practices ;

The sustainability of the infrastructure ;

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

11

Study contract

• BG, Lombardi

• 27 april 2017 - 26 october 2018

• 4 parts :

Part 1 : tunnel of Frasnes (Couvin) during the project ;

Part 2 : tunnels of the urban motorway link E40-E25 (5) ;

Part 3 : tunnels of the structuring network (29) ;

Part 4 : tunnels of the non-structuring network (21) ;

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

12

Page 7: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 7

General strategy

• Establish a categorization of tunnels in the R.W. 1. - The tunnels of the links A602 (A26) / E25 (Cointe – Kinkempois - …)

2. - 500 to 1000 m tunnels of the structuring network

3. - 300 to 500 m tunnels of the structuring network

4. - Less to 300 m tunnels of the structuring network

5. - 500 to 1000 m tunnels of the non-structural network

6. - 300 to 500 m tunnels of non-structural network

7. - Less than 300 m tunnels of the non-structural network

• Functional Analysis Framework Infrastructure, equipements CE & EM

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

13

General strategy

• Operational functions Security features

o Prevent incidents

o Limit the consequences of an incident

o User safety

o Favor the intervention of emergency

Traffic Management Functions

o At the beginning, during the incident management

o Inspection of infrastructure and equipment

o Put back into service

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

14

Page 8: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 8

General strategy

• Associated means to ensure security Technical means (CE & EM equipment)

Human resources (internal and external to SPW)

Organizational means (procedures - Emergency response plan)

Additional resources (Fire résistance CE & EM)

• Analysis of current tunnels Comparison procedure (compliance - deviations)

Cross analysis with inspections actions budget

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

15

• Visual examination

• Hammer sounding

• Cover + carbonation : 1/100 m , sidewalls and roof

• No dismounting of cladding

• Off traffic inspection, so at night

Structure Inspection

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

16

Page 9: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 9

Structure Inspection

• Report with defects and pictures

• Sketches : scrolled map

2020-02-11

17

Page 10: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 10

Electromechanical inspection

• Preliminary analysis by tunnel Material and historical inventory of equipment

Comparison with expected service levels

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

19

Service public de Wallonie – Mobilité & infrastructure

20

Page 11: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 11

Electromechanical inspection

• On-site inspection Visual examination of equipment

Functional test of equipment

Performance test (lighting, ventilation)

Test of the command chain

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

21

Page 12: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 12

Deliverable

• Global deliverable General strategy = Tunnel definition « high level »

Master plan of exploitation

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

24

Page 13: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 13

Deliverable

• Individual deliverable by tunnel Descriptive sheet

Diagram of required functions

Master plan of subsequent intervention file

Inspection report

Advantages / disadvantages analysis

of technical / financial solutions

Priority Report - Action Plan

Budget plan

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

25

Next step

• Base on

– Budget estimation (about 200 M €)

– Prioritization proposal

• Prepare specific tunnel rehabilitation project

– Combining civil engineering and electromechanical works

– Proposal :

• 5 for the next 5 years

• 30 M €

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

26

Page 14: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 14

Structure rehabilitation project

• Transversal structure for all the structures

- Remote management / supervision – automation

- High voltage protection / distribution

• Vertical structure by structure

- Tunnel lighting - TGBT - ventilation - detection - pumping ...

- Fire security equipement, …

- CE

2020-02-11

Service public de Wallonie – Mobilité & infrastructure

27

As a conclusion in a European context

• Define an european common

– Tunnel definition, regarding different environment (urban,

mountain, highways, …)

• Need in a specific electromechanical equipement ?

– Vision of the ideal tunnel

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

28

Page 15: DIAGNOSIS ANALYSIS AND ACTION PLAN TO UPGRADE THE …. STASSART... · Sabine Stassart & Rudi Noël 3 Tunnels in Wallonia 14 22 19 1 Section type Two tubes One tube/2 directions One

Séminaire sur la thématique de la rénovation des tunnels

11.02.2020Seminar over het thema tunnelrenovatie

Diagnostic des tunnels SPWDiagnose van tunnels SPW Sabine Stassart & Rudi Noël 15

Tunnel XX Réseau non structurant < 300m - Urbain/non urbain

Dispositions Moyens attendus Conformités

Trottoirs A atteindre

Issues de secours Non concerné

Niches de sécurité Non concerné

Niches incendie Non concerné

Garages Non concerné

Alimentation électrique A atteindre selon spécificités localesVentilation sanitaire et désenfumage / capteurs associés Non concerné

Eclairage A atteindre 75 m et + (de base) sauf guidage

Postes de secours A atteindre 200 m et +

Extincteurs / bornes incendie A atteindre 200 m et +

Détection incendie / hors gabarit DI Non concerné / HG à atteindre

Signalisation de police / dynamique Non concerné

Indications de secours A atteindre 200 m et +

Barrières et feux Non concerné

Réemission radios / GSM / e call Non concerné - e call 200 m et +

Vidéosurveillance / DAI Non concerné

Structures : N0 à N3 A atteindre selon environnement

Equipements : alimentation électrique Non concerné

Degré D1 au minimum A atteindre selon spécificités locales

Patrouille A atteindre selon spécificités locales

Résistance au feu

Exploitation

Equipements

Génie civil

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

29

Thank you for your attention

Service public de Wallonie – Mobilité & infrastructure

2020-02-11

30