INTERNSHIP REPORT INTERNSHIP REPORT DG KHAN CEMENT KHAIRPUR PLANT A REPORT ON: Electrical(components & instruments) Motors,Power Generators, Programmable Logic Control(PLC) system,Preheater & Cooler,Kiln,Cement mill and paking plant. MADE BY YASIR HAROON YASIR HAROON (BCE-SP08-090) ELECTRICAL (COMPUTER) ENGINEERINGPage 1

Dg Cement Internship Report

Embed Size (px)

Citation preview

Page 1: Dg Cement Internship Report

INTERNSHIP REPORT

INTERNSHIP REPORT

DG KHAN CEMENT

KHAIRPUR PLANT

A REPORT ON: Electrical(components & instruments) Motors,Power Generators, Programmable Logic Control(PLC) system,Preheater & Cooler,Kiln,Cement mill and paking plant.

MADE BY

YASIR HAROON

Reg # BCE-SP08-090

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 1

Page 2: Dg Cement Internship Report

INTERNSHIP REPORT

DEPARTMENT OF ELECTRICAL ENGINEERING INSTITUTE OF INFORMATION TECHNOLOGY LAHORE CAMPUS

TABLE OF CONTENTS

Description Page No.

Introduction …………………………………………………………………………………………. 05

Nishat’s Founder ………………………………………………………………………………….. 06

Chairman ……………………………………………………………………………………………... 06

Chairman Message ……………………………………………………………………………….. 07

Block Diagram ……………………………………………………………………………………….. 07

Power Plant …………………………………………………………………………………………… 09

Quarry and Lime stone crusher ……………………………………………………………… 09

Storage Yard ………………………………………………………………………………………….. 11

Raw mill feed area,Raw Mill & conditioning tower ………………………………… 12

Labortories …………………………………………………………………………………………….. 14

Coal stroage yard,Coal mill …………………………………………………………………….. 15

CF silo ,Low bin,Preheater cyclone …………………………………………………………. 16

Gas Analyser ………………………………………………………………………………………….. 18

Kiln, Kiln motors, Clinker silo ………………………………………………………………….. 18

Cement mill feed area, Gypsum Crusher ………………………………………………… 20

Cement mills and Cement Silo ………………………………………………………………… 21

Packing Plant ………………………………………………………………………………………….. 22

Programe Able Logic Control(PLC) ………………………………………………………….. 22

Refused Derived Fuel(RDF) …………………………………………………………………….. 23

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 2

Page 3: Dg Cement Internship Report

INTERNSHIP REPORT

Conclusion & Refrences ………………………………………………………………………….. 23

ACKNOWLEDGEMENT:

My greatest thanks to ALLAH Almighty who bestowed me with the ability and potential to complete this Internship. Before I go into depth of the things, I would like to add a few deepest words and also says thanks for the people who were part of this report in numerous ways… people who gave unending support right from the stage the internship was assigned. Particularly I also wish to thank the managerial staff at DG Cement especially Mr.Safdar Kamal, Mr.Hafiz Sajid and Mr.Sarfarz Ahmad who helped me to gain a lot of information regarding the company and cement industry and also who provide me an opportunity to learn and understand the working of organization as an internee. I am also thankful to Mr.Najam ,Mr.Rashid, Mr.Malik Saleem and Mr.Faheem who played a role of polar star for me in the organization and whose experience taught me a lot about the industry and the organization.

Except the support of these peoples may I will be not to able to got deep knowledge about the plant, Mr. Sarfaraz Ahmad form E&I workshop helped me a lot and solve each and every one of my problem at every step of my difficulties. Mr.Faheem AJM also helps me to understand the working principle of motors and transformers used at plant. Mr. Captain Khubaib the SDM of stores also helps me to understand the chain of command of Nishat industry and also encourage me to go for my internship in strong way. Most of all I am very much thankful to Mr. Safdar Kamal who selected me for internship and to give me opportunity to improve my industrial skills that will help me in my future.

And finally deepest and warmest appreciation to the whole team of DG Khan Cement Company

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 3

Page 4: Dg Cement Internship Report

INTERNSHIP REPORT

EXECUTIVE SUMMARY:

Dera Ghazi Khan Cement Company Limited (KhairPur Plant) a unit of NISHAT group is a strategic business unit of Nishat Group, which is the largest and most growing industrial group in Pakistan. D.G. Khan Cement Co. is market leader with respect to market share with about 11.4% market share. Apart from its competitors; its product is high priced yet it has highest market share because of good quality. Its plant is situated in Dera Ghazi Khan and Khair Pur and head office is situated at Lahore. Factory site Unit 1and 2 that is situated in very remote area of Punjab, yet it proved a blessing for the company. Because it has all three basic raw materials i.e. Lime stone, Shale, and Gypsum at one place.

It has three plants working two in D.G. khan and one in Khair Pur. First plant is old one and it is Japanese plant. The other two plants are of F.L.Smidth Denmark. Khair pur plant is made by FLS a DENMARK company Khairpur plant has capacity of 6700TPD(Tons Per Day) but the Khairpur plant has prodeuced 1400 TPD(Tons Per Day) on average.Presently the company is also exporting the cement to Afghanistan, Iraq, India,UAE, D.G.khan cement has also contract with ELEPHANT cement at SriLanka.

Now a day’s D.G.Khan cement (KhairPur) plant is stepping forward to clean the area from garbage, a new plant which is in process called RDF (Refused Derived Fuel) which will use the garbage and after processing its process which will be discuss later the garbage will be thrown into KILN which will be used as fuel this will also decrease the use of coal which is expensive and also helps to clean the city and economy of company will increase.

The Power plant of D.G.KHAN cement (Khairpur) producing 32.3 MV of energy that are fulfilling the requirment of energy for company. D.G.Khan cement (Khairpur) also have Paper Mill that is producing the cement bags not for DG cement but as well as for BESTWAY cement and PAKISTAN cement Paper Mill producing round about 16 lac bags per day which is very good rate in a countary like Pakistan.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 4

Page 5: Dg Cement Internship Report

INTERNSHIP REPORT

INTRODUCTION:

ishat is playing a significant role in the private sector by adding value to cotton

and the cotton based economy, Nishat Group ranks among the top five business

houses in Pakistan terms of sales and assets.

NNishat Mills Limited started out as a weaving unit with 500 semi automatic looms, later

on 10,000 spindles were added, laying the foundation of nation’s biggest textile

composite project. Today, Nishat Mills Limited is largest vertically integrated unit of

Pakistan. It comprises of 270,000 spindles, 740 state of the art shuttles-less and air jet

looms, a processing capacity of three million meters and stitching capacity of more than

one million meters per month, supported by a power generation plant with a capacity of

33.6 MW. Nishat Mills Limited is awarded the President of Pakistan’s Trophy for

Exports, being a Pakistan’s largest exporter in any category. Nishat Mills is also certified

with ISO 9001 certification and these awards reflect the quality of service available

under one roof.

Since its inception in 1951, the group has grown from a cotton house into a premier

business group. After almost half a century of undaunted success, the group has its

roots firmly planted into four core businesses i.e. Textiles, Banking, Cement and Power

Generation.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 5

Page 6: Dg Cement Internship Report

INTERNSHIP REPORT

NISHAT’S FOUNDER:

Yahya was born in 1918 in Chiniot. In 1947 when he was A man of vision, courage and integrity, Mian Mohammad running a leather business in Calcutta, he witnessed the momentous changes that swept the Indo-Pak sub-continent and culminated in the emergence of Pakistan. Like many of his contemporaries, he also migrated to the new country to help establish its industrial base; his is a story of success through sheer hard work and an undaunted spirit of enterprise. Beginning with a cotton export house, he soon branched out into ginning, cotton and jute textiles, chemicals and insurance. He was elected Chairman of All Pakistan Textile Mills Associated (APTMA), the prime textile body in the country. He died in 1969, at the age of 51 having achieved so much in so short a time.

CHAIRMAN:

Today, Mian Mohammad Mansha, the Chairman of Nishat Group, like

his father, continue the spirit of entrepreneurship and has led the

Group to become a multi dimensional corporation, with wide ranging

interests.

Nishat has grown from a cotton export house into the premier business group of the

country with 5 listed companies, concentrating on 4 core businesses; Textile, Cement,

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 6

Page 7: Dg Cement Internship Report

INTERNSHIP REPORT

Banking and Power Generation. Today, Nishat is considered to be at par with

multinationals operating locally in terms of its quality products and management skills.

CHAIRMAN MESSAGE:

Firmly believing in “Growth Through Professional Management” our corporate culture

is based on decentralization, delegation of authority, encouraging the acceptance of

responsibility and inculcating quality consciousness. It is our conviction that every

successful organization is a reflection on the commitment, dedication, and team spirit of

its employees, and Nishat is no exception. Our people are all imbued with this spirit, a

fact manifested in our rapid growth and low employee turnover.

We continue to strive to be a better group today than what we were yesterday, for our

clients, for our shareholders, for our investors, for the environment, for the community

and for our employees, for it is with them that we have achieved what we have. It is

with them that we will continue to surpass our past achievements.

Mian Mohammad Mansha

BLOCK DIAGRAM:

Block diagram of cement manufacturing in DG khan cement is given below the decription of each and every part is given below the diagram.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 7

Page 8: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 8

Coal Mill

Coal Mill Feed Area

Limestone

CRUSHER Machine

CF Silo

Preheaters and preclain

Kiln

Kiln Motors

Clinker Silo

EP Cooler

Cement Mill Feed Area

Gypsum Crushers

Cement Silo

Cement Mill

Paking Plant

Weigh Bridge

Storage Yard

Operation of Stacker

Raw Mill feed area

EP &Conditioning Tower

Page 9: Dg Cement Internship Report

INTERNSHIP REPORT

POWER PLANT:

For continuous and smooth operations of the plant uninterrupted power supply is very

crucial. The company has its own power generation plant along with WAPDA supply. The

Company power plant consists of two Generators, these are dual nature generators that

can be run on GAS as well as on Diesel depends upon availability of fuel. In case if any of

supporting engine fails to work the company has Turbine Engine of CATERPILLARS so

that there is no load shedding at all. The two generators combine produce 32.2MV of

energy one generator produce 16.1MV and other one also of 16.1MV. Maintenance of

generators is made by staff of WARTSILLA.

QUARRY and LIMESTONES CRUSHER:

QUARRYQuarry is the place from where raw material in extracted. Drilling and

blasting is done to extract the material. A hole of about 10-15 m is drilled and

ammonium nitrate in filled as an explosive in these holes. When this explosive is ignited

the rocks are broken into pieces of different sizes. These pieces are then loaded on the

dumper trucks and using conveyor belt to the crusher. It is located about 3-4 Km from

the plant. The motors that are used for moving the conveyor belt are INDUCTION

motors of 6 Kw of power.

RAW MATERIALSThe raw materials used for making of cement are given as follows

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 9

Page 10: Dg Cement Internship Report

INTERNSHIP REPORT

Limestone

Is owend by company itself in DG Khan cemecnt, 95% of limestone is used for the making of cement at plant. This limestone is extracted by nearby Quarry and has the highest composition in cement.

Additive Materials

The additive materials that are mixed with limestone at raw mill feed area are CLAY, IRON, BAUXITES and SILLICA SAND.

Gypsum

The remaining 5% of material is gypsum which is mixed with Klinker material at cement mill and be ready for paking plant.

LIMESTONE CRUSHER:The limestone crusher has capacity of 1500 tons/hour to crush. Supplier of machinery is FL Smidth. Limestone and raw material’s are dumped into hopper of capacity 1500 t/h by the dumper trucks. Inside the crusher machine hammers are used each hammer has weight of 100 to 102 kg that is enough to crush any material. Also in crusher the Squirral Cage Induction motors are used to rotate the hammers and rotatry speed of motors is 1200 to 1300 rpm(Revolution Per Minute) so hammers will rotate with approximately rotatery speed of 1300 rpm.

Then by using conveyor belts the crushed material from limestone crusher transferred to the storage yard where it will be feed to CF silo by raw mill feed process.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 10

Page 11: Dg Cement Internship Report

INTERNSHIP REPORT

MAGNETIC particles such as iron etc if found in crushed material on conveyor belts then before this material stores in yard the iron and all other related materials are attrcted by a magnet pole which is placed on end terminal of conveyor belt.

STORAGE YARD:Now the material form conveyor belt will be stored in storage yard. The crushed

material is stored in the form of piles in the storage yard. There are 6 piles in the storage

yard. Characteristics of all piles in storage yard are given as follows

2 Mixed piles (limestone & clay)

2 High grade (pure limestone)

Iron ore (additive)

Bauxite (additive)

STACKER

A stacker is a device which forms conical piles of the crushed material. Feed is conveyed

to the stacker through conveyor belts. This stacker then moves too an fro to make a

pile. The stacker belt is called “Jib” in engineering terms.

Now, for conveying this material from piles to the conveyor following equipment used

are as follows:

Side scrapper(Picks the crushed feed from the piles through its feed belt called “Hoist”)

Reclaimer(Used to throw feed down from the pile and has two arms called ‘’HARROWS’’)

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 11

Page 12: Dg Cement Internship Report

INTERNSHIP REPORT

RAW MILL FEED AREA:

The raw mill feed area has of 4 feed hoppers:

Mixed feed hopper

Pure limestone hopper

Bauxite hopper

Iron ore hopper

The capacity of first two hoppers is 800 tons while the

other two hoppers have a capacity of 600 tons. The feed from each pile is conveyed to

the hoppers through conveyor belts in relevant hoppers. Each hopper has 4 load cells.

Load Cells

These are sensing devices which tells the load being put on the hopper by the

feed. From these hoppers, the feed in required proportions are transferred by the belt

conveyor to the Raw Mill. A lot of dust is produced during the conveying of material, to

avoid this problem Bag Filters are installed. A Magnetic separator is also installed to

remove metal impurities.

RAW MILL:

The raw mill have total capacity of 500 tons/hour and the motors that are used in raw mill are INDUCTION motors and have power of 4.3KW supplier of motors are FL Smidth. There are three sections of raw mill that are described as follows,

Table with three rollers

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 12

Page 13: Dg Cement Internship Report

INTERNSHIP REPORT

Bottom scrapper

Separator

TABLE

The raw feed from the belt conveyor directly falls on the rotating table of the raw

mill. The table contains three crushing rollers. The raw fed is crushed to fine powder

with these rollers. The coarse particles are collected at the bottom of raw mill and

are sent to the vibrator from where they are sent to the raw feed belt conveyor and

again recycled to the ram mill for re crushing. The vibrator is use to handle the

quantity of the material being put on the belt.

SEPARATOR

At the top of the raw mill, there is separator section. Hot

gases from the kiln come from the bottom of the raw mill

and lift very fine particles with it. A suction fan with motor

power of 4500 Kw produces suction and sends dusty air

into the cyclones at the top. Here the dusty air rotates and

particles are separated from the air. These particles are

collected at the bottom of the cyclone and sent to the CF

silo with the help of air slides. The air which still contains

dust particles are separated in Conditioning tower and Electrostatic precipitator.

BOTTOM SEPARATOR

Some fine particles from raw feed fall on the table, these particles are collected by

means of a bottom scrapper and sent to the CF silo.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 13

Page 14: Dg Cement Internship Report

INTERNSHIP REPORT

CONDITIONING TOWERThe air from the cyclones still contains the dust particles which must be

separated before the air is exhausted to the atmosphere. Air from the separator is

passed through conditioning tower. In conditioning tower, water is sprinkled through

very fine nozzles. The particles in the air get wet and settle down. These particles are

then conveyed to the CF silo via screw conveyor.

CLEANING OF THE (EP) ELECTROSTATIC PRECIPITATOR

In order to remove particles from the electrode. A “Wrapping” device is used. This

device hits the electrode as a hammer and particles fall down from it. These particles

are collected and conveyed to the CF silo via screw conveyor and this screw conveyors

runs by SQUIRRL CAGE Induction Motor.

LABORTARIES:There are different laboratories for the determination of quality and strength of the cement.

1:- Sample preparation Lab (Check samples of material used in kiln)

2:- Press Mill (Pressure exerted of 150 KN on dye which have material)

3:- X-ray Analysis (X-ray analysis check determine the composition)

4:- Chemical testing lab (It determines the time of consuming process)

5:- Physical testing lab (Determine strength of cement samples)

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 14

Page 15: Dg Cement Internship Report

INTERNSHIP REPORT

COAL STORAGE YARD:Coal yard is the area where coal is stored which is used for burning purposes in KILN.

There are different piles for the storage of local and imported coal. The coal is imported

from South Arica, and Indonesia. The coal is handled by a loader, the loader picks up the

coal and throws on a sieved net which separates bigger pieces of coal and stones form

it, before it goes to the tunnel.

From the tunnels the coal is placed on the belt conveyor which takes it to the coal mill

feed area. Pet Cole which is hard is also used in the coal feed.

COAL MILL FEED AREA

After the impurities are removed from the coal, it is chatted on the belt conveyor .A bag

filter is employed which sucks the coal dust and thus prevents the coal from being

wasted. The coal is then shifted to the coal storage hoppers.

COAL STORAGE HOPPERS

There are three hoppers for the storage of coal. Two hoppers are for the storage of local

coal and the other is for the imported coal. All the three hoppers have a capacity of 250

tons. The coal required in different proportions is chatted on the belt conveyor from the

hoppers. A bag filter is employed to remove coal dust. A magnetic separator is

employed to remove metal impurities. This belt conveys the raw coal to the raw coal

mill.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 15

Page 16: Dg Cement Internship Report

INTERNSHIP REPORT

COAL MILLCoal mill at DG Khan cement has capacity of 52 tons/hour (in case of mixed coal) and 26 tons/hour (in case of pet coal), the total capacity of motors used in coal mill are 600KW and these are all INDUCTION motors supplied by FL Smidth.

Coal mill has three sections these are given below

1:- Table

2:- Roller

3:- Bottom Scraper

The function of these section is approximately same as described in raw mill.

CF (CONTINUES FLOW) SILO:

The fine particles from the conditioning tower and

electrostatic precipitator and the powdered feed from

the raw mill are conveyed to the bucket elevator. The

bucket elevator picks this feed and takes it to the top

of the CF silo and then throws it in CF silo.

Specifications of a CF silo

Length = 54 m Diameter = 22.4 m Capacity =

25,500 tons

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 16

Page 17: Dg Cement Internship Report

INTERNSHIP REPORT

AIR CIRCULATION

After the feed is stored in the silo bin. Now for the movement of feed in the bin, air is

blown from the bottom through different points in CF silo. These points are located at

the base of the CF silo.

Due to air circulations, fine particles are sent to air slides from where they are

transferred to Low bin (Loss of weight bin). The capacity of low bin is 118 tons. The feed

from the low bin is sent to a bucket elevator which lifts it to the preheater.

PRE HEATER

The bucket elevator puts the material on the top of second cyclone. The hot gases from

the kiln flow with very high velocity in countercurrent direction. The hot gasses lift the

particles from the particles from the top of 2nd cyclone and put it on the top of the 1sr

cyclone. From there the material falls on the top of the 3rd cyclone and sends it into the

2nd cyclone. Then the material falls on the top of 4th cyclone and hot gases take it into

the 3rd cyclone. Then the material falls on the top of the 5 th cyclone and hot gases take it

into the 4th cyclone and finally into the 5th cyclone preheater.

During this complete cycle, the hot gases foe in the countercurrent direction. These

cyclones serve the purpose of preheating the feed material with hot gases of kiln.

There are total 10 cyclone preheaters. 5 are on the right side of the precalciner and 5 on

the left of the precalciner. The temperature of feed increases as the feed flows

downwards the preheaters.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 17

Page 18: Dg Cement Internship Report

INTERNSHIP REPORT

PRE CLAINERThe feed from the 5th cyclone preheater falls into the precalciner which has burner with

a supply of coal and furnace oil. Here the calcinations of feed material take place due to

burning. Exchange of heat also takes place in the precalciner. CO2 is evolved and

exhausted in the atmosphere and the feed is entered into the kiln riser at high

temperature. Some of the feed directly goes to the kiln without going to the precalciner

through separate pipes.

GAS ANLYSER:Gas analyser is basically a sub station in preheaters. It is located at 1st floor of preheater cyclone’s. In gas analyser there are basically three analyser three tunes, or you can say three cylinders which have CO2,O2,S02& B respectively in each cylinder. Main purpose of this gas analyser is to clean the gases before sending them to the KILN for burning process and for cleaning the gases we send NH2 nitrogen into cylinders one by one to obtain (0,0,0) value so that gas is free from dust etc and safe to send to KILN. Three analyser machines are used manufactured by ABB are used.

KILN: The preheated feed from the kin and the preheaters enter into the kiln riser. From the kiln riser the feed enters into the kiln. The material that comes out from KILN is called Clinker.

SPECIFICATION’S

The kiln has length of 66 meters, diameter of 5.5 meters, its rotatry speed depends upon the feed into kilnif there will be more feed kiln rotate little bit fastly and if the feed is not so much its rotatry speed may goes down. Inner part of kiln has refractory type so that it prevents the outside envoirment from high

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 18

Page 19: Dg Cement Internship Report

INTERNSHIP REPORT

temperature. Outside material also protect the envoirment, on outside there are induced draft fans that sense temperature and if temperature rises from a limit the fans will turns on automatically and if temperature not exceed this limit the fans will remain off there main function is to keep outside temperature down.

KILN MOTORS

There are two base ends of KILN and motors are installed on these bases which tends to rotate the kiln, these are large INDUCTION motors that have very high starting TORQUE so that kiln moves.

KILN BURNER

One end of the kiln have huge burner having a supply of coal, furnace oil and air. The

burner emits a flame which is prolonged with high pressure air. The flame burns the

material and the product is formed.

KILN HOOD

The very hot material from kiln falls into kiln hood which has an angular sieve,when material passes through the kiln hood it becomes CLINKER and now this CLINKER will sent to the clinker cooler.

CLINKER COOLER

Clinker cooler is used to down the temperature of Clinker. The Induction fans take air from atmosphere and send it to clinker cooler and the conveyor belt at the bottom takes this cool clinker and send it to the clinker crusher.

A suction fan is installed which sucks the product dust from the cooler and send it to the electrostatic precipitator. In EP dust is removed and clean air is exhausted to the atmosphere through a chimney. The dust particles are to the deep pan conveyor by a screw conveyor.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 19

Page 20: Dg Cement Internship Report

INTERNSHIP REPORT

CLINKER CRUSHER

When the cool clinker falls into clinker crusher then the big stones of clinker are crushed into small pieces and this material now send to the clicker silo.

CLINKER SILO

Clinker silo is 60 m high and its width is 46 m. There are 3 gates at the bottom of the clinker storage from where the clinker is the clinker from the deep pan conveyor is stored in the clinker storage. Its capacity is 110,000 tons. Its length is sent to cement mill through belt conveyor. Besides the main clinker storage bin, there is a temporary clinker storage hopper with a capacity of 1400 tons. If the temporary hopper is also full then the clinker is removed from the hopper and dumped into clinker storage yard.

CEMENT MILL FEED AREA:There are two cement mills at the plant and there are total six (6) hoppers in cement mills (3 for each mill) in feed area.

The 1st hopper contains the clinker which is major constituent of the cement. The cement contains 95 % clinker which is conveyed through weigh feeder to the main belt conveyor which takes it to the cement mill.

Remaining 5% material is (GYPSUM+ADDITIVE MATERIAL).

MIXING OF GYPSUM & ADDITIVE MATERIALS

The crushed gypsum from a separate crusher is conveyed by belt conveyor to the cement mill. It is mixed in the clinker while crushing. Gypsum is added to about 4 – 5 %.

Its purpose is to increase the settling time of the cement. The additive which is pure limestone is also added in the cement mill. It’s added to about 2 %. Its function is to increase strength of cement.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 20

Page 21: Dg Cement Internship Report

INTERNSHIP REPORT

CLEANING PROCESS

To clean cement from stones or metal particles there are sensors in cement mills before Paking that allows to comes out only cement not stones etc, and also a metal detector also installed that attract every metallic particle and the pure cement goes to cement mill silo.

CEMENT MILLS:

There are two cement mills at the plant and each of them has capacity of 175 tons/hour and the motors that are used in cement mills are of 4300KW of power and manufactured by FL Smidth. The feed which is free from impurities falls on the table of cement mill which contains three rollers. Each roller has weight of 35 tons and the clearance between table and rollers is 0.5 mm. These rollers move hydraulically using nitrogen gas as hydraulic fluid. The rollers crush the feed to a very fine powder. The air slides convey the ground product to the bucket elevator which lifts it to enter into the 1st storage silo.

CEMENT SILO

There are 3 cement storage silos in which crushed cement is stored until packing. To convey the cement to the other 2 silos air slides are used. From these silos the cement enters air slides by air circulations through blowers. Now these air slides take the cement to the packing plant.

Capacity of storage silos is 21,000 tons, length is 45 meters

and diameter is 22.4 meters.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 21

Page 22: Dg Cement Internship Report

INTERNSHIP REPORT

PACKING PLANT:

The packing plant comprises of 6 packers and 12 terminals. Each packer has a capacity of 100 tons/hr. The cement bags are attached manually to the rotating packer which fills the cement bag. When the bag is filled up to the required weight, it automatically falls on the conveyor belt which takes the bags to the roller conveyor. From these rollers the bags slide to different channels and finally cement bags are loaded on the trucks for dispatch.

WEIGH BRIDGE

Every truck or loader of cement that comes out from packing plant have to go for weight if the weight exceed than a limit loader will be turned back for accuracy, so weigh bridge also plays an important role.

PROGRAM ABLE LOGIC CONTROL (PLC):

Program Able Logic Control (PLC) is the main controlling area of the plant. Plant is

controlled by CCR (Computerized Control Room) which have different sections like IT

Dept., Exchange, Laboratories, Control Room, and PLC. PLC Dept. have to look after that

while every component in plant is working properly or not if there will be any fault

according to Automation they have to remove that. Plant has ten (10) major PLC’s main

controlling PLC port is of SEIMENS Co Ltd. Signals send to control room by underground

wiring of cable Fiber optics also used for long distances.

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 22

Page 23: Dg Cement Internship Report

INTERNSHIP REPORT

REFUSED DERIVED FUEL (RDF) :

Refused Derived Fuel (RDF) is the under construction project at DG Cement Plant. I

would like to briefly explain its features,

RDF indirectly will clean the city from garbage all the garbage from nearby cities will

bring to RDF and a CRUSHER which using a SQUIRRL CAGE (INDUCTION MOTOR) low

starting torque producer will cut-off the garbage into small pieces that will be conveyed

by conveyor belts to storage yard and from there it will be cleaned from stones and

metallic materials using same technology as discussed before in cement mills. From

preheaters this garbage will be thrown into KILN for burning purposes.

RDF have 6 motors that I have seen during my stay in DG Cement these all are SQUIRRL

CAGE motors that will move the conveyor belts and each motor have 4300KW of power.

REFRENCES:

www.google.com

www.wikepedia.com

www.sick.com/.../cement/Pages/cement.aspx

www.siamrefractory.com/cement_cyclone.php

www.freepatentsonline.com

www.lwbref.de/en/markets/cement-lime-industry/

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 23

Page 24: Dg Cement Internship Report

INTERNSHIP REPORT

CONCLUSION:

Now at the end I would like to conclude my experience in industry. That was my first

ever industrial tour and this was such a great experience I gain lot of knowledge about

industries that will be helpful for me in future. Being an engineer I simply got a direction

for my future by this internship.

Finally I would like to thanks all staff of DG Cement (Khairpur) plant for such a kindness,

each and every person at factory site help me in every possible way without any kind of

hesitation.

Engr. YASIR HAROON

Reg # BCE-SP08-090

BATCH 13, SECTION B

COMSATS Lhr

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 24

Page 25: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 25

Page 26: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 26

Page 27: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 27

Page 28: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 28

Page 29: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 29

Page 30: Dg Cement Internship Report

INTERNSHIP REPORT

YASIR HAROON (BCE-SP08-090)ELECTRICAL (COMPUTER) ENGINEERING Page 30