  • 1. PROJECT COST IS NEAR ABOUT 200 CRORE2. NINE TOWER (RESIDENTIALBUILDING,HOSPITAL)3. EACH TOWER HAVE G+18 FLOOR

  • CPWD &NATIONAL BUILDING CODE ISI 456-2000

  • Area is bounded by GI sheet A temporary layout by the help of lime within area

  • Help of JCB machine at the required depth(1300mm from ground surface)Levelling of excavated soil surface

  • 100mm thicknessGrade M10(1:4:8)Use of machine mixingPlacing as well as leveling

  • Concrete (M40, grade)Steel (Fe 500 grade)Water( used for curing , mixing , soil compaction, grouting)

  • Column layout on pcc by the help of total station According to drawing

  • This foundation are used in following cases-

    1. When the bearing strength of soil is very low2. Characteristics of soil changeable3. Soil strata should be loose like as marchland4. Avoiding the differential settlement of building It is more economical and simple as compare to pile foundation.

  • THE MAIN BAR & DISTRIBUTION BAR HAVE 30MM DIA AT BOTTOM NET.AS THE PROCESS FOR TOP NET & FOR SEPRATION THESE NET CHAIRS ARE USEDCHAIR IS THE STEEL BAR THAT USED TO SEPRATED THE TOP AND BOTTOM NET.

  • FIXED THE COLUMN REINFORCEMENT AT THE POSITION OF COLUMNS AND BOUNDED BY THE 24GAUGE WIRE.COLUMN HAVE 16 NOS. @ 30MM DIA.LAP LENGTH OF COLUMN 50D OF BAR.(IN CASE OF USED DIFFERENT DIA OF BAR LAP LENGTH IS PROVIDED ACCORDING TO GREATER DIA OF BAR.)VERTICAL TIESE PROVIDED 10MM @150MM C/C.

  • AFTER MIXING THE CONCRETE FROM CONCRETE PLANT , IT SOULD PLACED ON SITE WITH HELP OF PIPE LINE.FOR COMPACTING USED NEEDLE VIBRATOR 1MIN. AT A PLACE .GENERALLY VIBRATOR HAVE 4000CYCLE/MIN.DIA OF VIBRATOR NEEDLE HAVE 60MM.

  • Layout of columnReinforcement (according to drawing)Shuttering Checking of shuttering in inclination with help of plumb-bobTesting of material at site(cube test, slump test)Concreting Needle vibrator used max 1 min. in a place

  • Slump test used to check the workability of concrete .Slump test have some appratus- 1. mould- Bottom dia 20cm & upper dia 10cm Height 30cm 2. tamping rod 16mm dia & length 60cm In slump test material have filled in 4 layer. Each layer tamping 25th times.

  • CUBE USED TO CHECK THE COMPRESSIVE STRENGTH OF CONCRETESIZE OF CUBE 15CM 15CM 15CMAFTER 28 DAYS CURING OF CUBE, FIXED IN THE COMPRESSION MACHINE AND CHECK THE COMPRESSIVE STRENGTH.

  • SUTERING OF SLAB AND BEAM DONE AT SAME LEVAL.GENERALLY SUTTERING HAVE USED OF PLYWOOD , STEEL PLATE, MATELIC PROP.

  • PROVIDED 8MM @150MM C/C IN SLAB.PROVIDED 3NOS.20MM IN TENSION ZONE & 2NOS. IN COMPRESSION ZONE IN BEAM.PROVIDED EXTRA REINFORCEMENT AT EACH END OF SPAN TO RESIST THE SHEAR FORCE.(3NOS. 16MM @ LENGTH L/7)PROVIDED VERTICAL STRRIPS AT 150MM C/C IN BEAM.AFTER REINFORCEMENT USED THE CONCRETING PROCESS.

  • Lap length 47 time of main bar dia.Column cover 40mm 1/3 bars to be overlapped at one locationTie bars dia.- 12mmSpacing at beam column connection joint- 100m c/cColumn will not be cast much than 2m height.

  • **