19
Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for insert GWD applications David Martin Caledyne Limited

Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

  • Upload
    others

  • View
    4

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Gas Well Deliquification WorkshopAdams Mark Hotel, Denver, Colorado

February 25 - 27, 2008

Developments in DHSV technology for insert GWD applicationsDavid MartinCaledyne Limited

Page 2: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

2

Agenda

Insert Down hole Safety Valves• Opening up new opportunities• Possible configurations• A Joint Industry Project• Torus insert DHSV for GWD applications• Current projects• Future developments• Q&A

Page 3: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

3

Economics

Workover well• install full scale artificial lift/water removal• High Capex, low producer = Poor Economics

Thru Tubing (Retrofit) solution• no workover requirement• Lower Capex = Improved Economics

Page 4: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

4

Opening up new opportunities

Wells with TRSCSSVs• Insert string compromises the existing valve

DHSV unable to function

Page 5: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

5

Opening up new opportunities

Capillary string• Wells with a requirement for a DHSV.Gas lift• Insert gas lift GWD system with a DHSV.Insert Plunger lift• Take plunger to wellhead in well with DHSV.

Insert DHSV is an “enabling technology”

Page 6: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

6

00

Possible configurations

“Dual string” design• Exists for capillary string applications• Uses existing proven DHSV• Injection via upper string or through TRSSV line

Valve body

Production bore

Existing insert valve-next size down

Capillary string

Page 7: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

7

Possible configurations

“Concentric string” design 1 - flapper• Exists for coil tubing gas lift• Uses single flapper for barrier• Gas injection via central conduit

00

Valve body

Production bore Insert valve-standard size

CT string

Flapper

Thru flapper disconnect

Page 8: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

8

Possible configurations

“Concentric string” design 2 - sleeve• Exists for capillary, CT gas lift, PCP applications• Large flow area• Valve independent of type of penetration• animation

Page 9: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

9

Joint Industry Project > Torus SV

JIP• Set up via UK’s Industry Technology Facilitator (ITF)• Major operator sponsorship• 3.813” 5k insert valve, plus modules• Currently at prototype test stage

Page 10: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

10

Torus SV

Concept• Standard module for

production barrier• Capillary string module• PCP rotary seal module• Plunger conduit

Lock MandrelIndustry standard lock to locate insert Torus valveTwo trip installation

Caledyne Self-SetLock MandrelSingle trip installation

Capillary String Lower Sub

PCP Rod String Lower Sub

Plunger Lift Lower Sub

3.813” Caledyne Insert Torus Valve

Capillary string latch system

Page 11: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

11

Torus Valve > design

Key design features• Minimal pressure drop via independent CFD

analysis• 2 trip installation of central conduit• Single trip versions currently being tested• Standard pre-installation techniques

– Lock open TRSCSSV– Communicate to TRSCSSV control line

Page 12: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

12

Torus Valve > pressure drop

Page 13: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

13

Torus Valve > pressure drop

Page 14: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

14

Torus valve > test regime

API 14A test programme• 2.313” insert valve• Response times met• Zero leakage when valve closed on all cycles

Page 15: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

15

Torus valve > current projects

Current development projects• Installation of PCPs offshore, 3.813” valve• UKCS, insert scale injection system with DHSV,

5-1/2 tubing• UKCS, capillary string, foam injection 3.813”

valve• Offshore Europe, Insert gas lift system

Page 16: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

16

Future developments

Modules• Electrical penetrator/disconnect for TTESPs• Fibre-optic penetrator/disconnect for insert DTS• Electrical penetrator/disconnect for PT gaugeValve designs• Tubing mounted valve• Ancillary tools

Page 17: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

17

Q&A

David MartinCaledyne Limited

Developments in DHSV technology for insert GWD applications

Any questions?

Page 18: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

18

CopyrightRights to this presentation are owned by the company(ies) and/orauthor(s) listed on the title page. By submitting this presentation to the Gas Well Deliquification Workshop, they grant to the Workshop, the Artificial Lift Research and Development Council (ALRDC), and the Southwestern Petroleum Short Course (SWPSC), rights to:

– Display the presentation at the Workshop.– Place it on the www.alrdc.com web site, with access to the site to be

as directed by the Workshop Steering Committee.– Place it on a CD for distribution and/or sale as directed by the

Workshop Steering Committee.Other uses of this presentation are prohibited without the expressed written permission of the company(ies) and/or author(s) who own it and the Workshop Steering Committee.

Page 19: Developments in DHSV technology for insert GWD …...Gas Well Deliquification Workshop Adams Mark Hotel, Denver, Colorado February 25 - 27, 2008 Developments in DHSV technology for

Feb. 25 - 27, 2008 2008 Gas Well Deliquification Workshop Denver, Colorado

19

DisclaimerThe following disclaimer shall be included as the last page of a Technical Presentation or Continuing Education Course. A similar disclaimer is included on the front page of the Gas Well Deliquification Web Site.The Artificial Lift Research and Development Council and its officers and trustees, and the Gas Well Deliquification Workshop Steering Committee members, and their supporting organizations and companies (here-in-after referred to as the Sponsoring Organizations), and the author(s) of this Technical Presentation or Continuing Education Training Course and their company(ies), provide this presentation and/or training material at the Gas Well Deliquification Workshop "as is" without any warranty of any kind, express or implied, as to the accuracy of the information or the products or services referred to by any presenter (in so far as such warranties may be excluded under any relevant law) and these members and their companies will not be liable for unlawful actions and any losses or damage that may result from use of any presentation as a consequence of any inaccuracies in, or any omission from, the information which therein may be contained.The views, opinions, and conclusions expressed in these presentations and/or training materials are those of the author and not necessarily those of the Sponsoring Organizations. The author is solely responsible for the content of the materials.The Sponsoring Organizations cannot and do not warrant the accuracy of these documents beyond the source documents, although we do make every attempt to work from authoritative sources. The Sponsoring Organizations provide these presentations and/or training materials as a service. The Sponsoring Organizations make no representations or warranties, express or implied, with respect to the presentations and/or training materials, or any part thereof, including any warrantees of title, non-infringement of copyright or patent rights of others, merchantability, or fitness or suitability for any purpose.