1 TBILISI, 12-13 DECEMBER 2019 Development of transport infrastructure of the Republic of Kazakhstan A joint OSCE – UNECE workshop on “Strengthening security and inter-operability along Euro-Asian inland transport corridors”

Development of transport infrastructure of the Republic of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Development of transport infrastructure of the Republic of

1

TBILISI, 12-13 DECEMBER 2019

Development of transport infrastructure

of the Republic of Kazakhstan

A joint OSCE – UNECE workshop on “Strengthening security and inter-operability along

Euro-Asian inland transport corridors”

Page 2: Development of transport infrastructure of the Republic of

more than 400 thousand.

2014 y. 2019 y.

The volume of transit containers, an increase of 3 times

825 000

TEU271 000 TEU

2014 y. 2019 y.

250 thousand

passengers

1 000thousand

passengers

Air passenger transit, growth by 4 times

New workplaces

1.7 times

Productivity of transport

1.8 million

tons

1.3 million

tons

Transit by road, an increase of 1.5 times

Share of transport in GDP

7,9% 8,3%

EFFECTS FROM THE IMPLEMENTATION OF THE STATE PROGRAM "NURLY ZHOL" 2015-2019

2

Page 3: Development of transport infrastructure of the Republic of

RESULTS OF THE STATE PROGRAM "NURLY ZHOL" 2015-2019

3 000 km of roads (built and reconstructed)

1400 km new railways

27 million tons port facilities in the Caspian sea

The number of international air routes increased to 99

6 runways upgraded

ITC Western Europe-Western China. Road sections: Astana-Karaganda, Almaty-Taldykorgan, Kokshetau-

Petropavlovsk, Aktau-Beineu, Uralsk-Kamenka, bypass of Kordai pass, Beineu-Akzhigit-border of Uzbekistan

The following lines were put into operation: Zhezkazgan-Beineu, Arkalyk-Shubarkol, Borzhakty-Ersay, the second

tracks on the Shu-Almaty section

Kuryk port (capacity - 6 million tons), Northern extension of Aktau port (capacity - 3 million tons) were put into

operation)

Airports: Uralsk, Petropavlovsk, Almaty, Semey, Kostanay, Balkhash

New destinations: Hong Kong, Tokyo, Ulaanbaatar, Prague

3400 km engineering networks

3

Page 4: Development of transport infrastructure of the Republic of

92

32

38

122

170

215

123

169

42

129

164

59

330

137

INTRODUCTION OF TOLL ON ROADS OF NATIONAL IMPORTANCE

Until 2015 – 1 paid area:

1) "Nursultan-Shchuchinsk" (211 km)

In 2019 – 4 toll plots (682 km):

1) "Nursultan-Shchuchinsk" (211 km)

2) "Nursultan-Temirtau" (134 km)

3) "Almaty-Kapshagay "(42 km)

4) " Almaty-Khorgos" (295 km)

Fees increased 4 times

The number of objects of roadside service – 1 822 units.

Brought into line with the NAT.

Standard – 1000 units.

Built new facilities – 71 units.

380483

618

804

1000

0

200

400

600

800

1000

1200

2015 2016 2017 2018 2019

DEVELOPMENT OF ROADSIDE SERVICE FACILITIES (RSF)

1 - Number of RSF by region 4

Page 5: Development of transport infrastructure of the Republic of

Guangzhou

Hong Kong

Shenzhen

Alyat

Chengdu

Xian

Wuhan

LianyungangZhengzhou

Batumi

Akhalkala

ki

Kars

Constanta

Yiwu

Lanzhou

Hamburg

Nurnberg

Duisburg

Istanbul

Hefei

Ningbo

Putian

Chongqing

Kunming

Almaty

Kuryk

Moscow

Izov

Ilichevsk

Актобе

BrestLodz

Kartaly

Tashkent

Altynkol

Dostyk

Aktau

Madrid

BerlinWarsaw

Vienna

Budapest

Milan

Rotterdam

Lyons

Pardubice

AntwerpLondon

ASHGABAD

Bandar Abbas

Saint Petersburg

Klaipeda

Kotka

Korl

a

Shikhezi

Urumqi

Dushanbe

Paris

Suzhou

Hakata

Tehran

Mundra

Serahs

Mazari

Sharif

Saksaulskaya

Shymkent

Dubai

ASTANA

DEVELOPMENT OF TRANSIT POTENTIAL OF KAZAKHSTAN

Dynamics of container transit,

thousands TEU

2014 2019

271

825

5

Page 6: Development of transport infrastructure of the Republic of

Гуанчжоу

Гонконг

Шеньжень

Алят

Аркалык

Чэнду

Сиань

Ухань

Ляньюнган

Чжэнчжоу

АСТАНА

СЭЗ Хоргос ВВ

Батуми

Ахалкалаки

Карс

Констанца

Amirabad

Иу

Ланьчжоу

Корла

Гамбург

Нюрнберг

Дуйсбург

Стамбул

Хэфэй

Нинбо

Путянь

Чунцин

Куньмин

Шымкент

Шихези

Урумчи

Шалкар

Актобе

Алматы

Достык

Курык

Бейнеу

Узень

Жезказган

Шубаркуль

Саксаульская

Алтынколь

Актау

Изов

Ильичевск

Клайпеда

SYNERGY OF LOGISTIC INFRASTRUCTURE ON

THE ROUTE

Participants: railway and maritime administrations of China, Kazakhstan, Azerbaijan,

Georgia, Turkey, Ukraine and Romania

10 seaports

40 maritime fleet (ferries and vessels)

70 000 railway rolling stock

10 000 km of railway network

2 000 000 sq. m. of storage facilities

6

TRANS CASPIAN INTERNATIONAL TRANSPORT ROUTE

Ahalhalaki

Kars

Page 7: Development of transport infrastructure of the Republic of

Guangzhou

Hong Kong

Shenzhen

Алят

Ченгду

Вухан

Ляньюнгань

Батуми

Ахалкалаки

Карс

Константа

Yiwu

Ланжоу

Гамбург

Нюрнберг

Дуйсбург

Стамбул

Хефей

Ningbo

Putian

Чунцин

Kunming

Урумчи

Изов

Ильичевск

БрестЛодзь

Ташкент

Мадрид

Берлин

Париж

Венна

Будапешт

Милан

Роттердам

Лион

Пардубице

АнтверпенЛондон

Тегеран

Болашак

Мазари Шариф

Кабул

Росток

Ust-LugaKotka

Рига

Вентспилс

Минск

Стокгольм

Варшава

Акина

Ашхабад

Херат

Бандер Аббас

Палдиски

Актау

Актобе

Атырау

Караганды

Корла

Шихези

Zabaykalsk

Наушки

Ulan UdeСлюданка

Достык

Суджоу

Шу

Москва

Клайпеда

Алтынколь

Санкт-Петербург

Мундра

Курык Далян

СианьЖенгжоу

Елян

Terminal at Lianyungang Port

Commissioned: 2014

Total area: 21.6 ha

Power: 500 thousand TEU

Commissioned: 2017

Estimated freight traffic: 6.1 million tons per year

railway - 4.1 million tons per year;

cars - 2 million tons per year.

Ferry complex in the village of Kuryk

TLC in Nur-Sultan

Commissioned: 2015Total area: 51 Ha

Warehouse capacity: 300 thousand tons Container terminal powerа: 4 000 TEU

TLC in Shymkent

Commissioned: 2017

Total area: 34 ha

Warehouse capacity: 300 thousand tons

Terminal Power: 1,620 TEU

Астана

Шымкент

SEZ "Khorgos-East Gate"

Commissioned: 2016

Total area: 579.1 ha

Forecasted cargo flow: 4.4 million tons

Commissioned: 2017

Capacity: 3 million tons including:

Cereals - 1.5 million tons

General cargo - 1.5 million tons

Northern expansion of Aktau port

ICBC "Khorgos"

Commissioned: 2012Total area: 492 haVisa-free regime: up to 30 days

Алматы

Усть-Каменогорск

Development of transport and logistics infrastructure at key points of distribution of cargo flows

7

Page 8: Development of transport infrastructure of the Republic of

AKTAU

KURYK

TURKMENBASHI

ASTRAKHAN

ОЛЯ

MAHACHKALA

BAKU

ALYAT

BENDER-ENZELLI

NOUSHAHRAMIRABAD

in mln. tons

Port Aktau

➢3 dry cargo terminals with the capacity

of 3 million tons were built in the port of

Aktau

increase in the capacity of seaports from

16.5 to 19.5 million tons

Port Kuryk

Phase 1: Railways ferry terminal

Capacity - 4 million tons

Put into operation - December 2016.

Transported: 3 million tons of cargo

increase in the capacity of seaports

from 17.5 to 27 million tons

Phase 2: Autopark terminal

Capacity-2 million tons

Commissioning in 2018.

WESTERN GATE OF KAZAKHSTAN

8

Page 9: Development of transport infrastructure of the Republic of

PROJECTS IMPLEMENTED from 2015 to 2019

Construction of the station complex

"Nurly Zhol"

Commissioned: 2017

9

Construction of the passenger terminal

“International Airport

Nursultan Nazarbaev"

Commissioned: 2017

Page 10: Development of transport infrastructure of the Republic of

Wuhan

Zhengzhou

Chongqing

Chengdu

CHINATURKEY

Dubai

Shanghai

EUROPE

Days Cost 40 ft ($)

Almaty

Nur-Sultan

RUSSIA

IRAN

INDIA

Central Asia

1010

CREATING OF A NEW STATE PROGRAM FOR INFRASTRUCTURE DEVELOPMENT

“NURLY ZHOL” for 2020-2025

Comfortable living environment

Accessibility to infrastructure Increased population mobility

Labor productivity growthDevelopment of highways of the local

network, airports, regional aviation

and other infrastructures

EFFECT

Page 11: Development of transport infrastructure of the Republic of