DEVELOPMENT OF FLEXIBLE ASSEMBLY LINE WITH LIMITED SPACE
ALLOCATION FOR MANUFACTURING COMPANY
NOOR AISHAH BINTI ABD MAJID
A project report submitted in partial fulfilment of the
Requirement for the award of the degree of
Master of Engineering (Industrial Engineering)
Faculty of Mechanical Engineering
Universiti Teknologi Malaysia
JUNE 2014
iii
Alhamdulillah praise to Allah S.W.T for blessing me and giving
me the strength to complete this project in time without facing any
difficulty.
To my beloved parents, family and friends,
For their endless love, encouragement sacrifices and support.
iv
ACKNOWLEDGEMENT
First and foremost, I would like to thank to my supervisor Professor Dr. Syed
Ahmad Helmi Bin Syed Hassan for the valuable guidance and advice of my master
study and research. He inspired me greatly to work in this project and his willingness
to motivate me contributed tremendously to my project. I could not have imagined
having a better advisor and mentor for my master study.
Besides, we would like to thank the authority of University Technology
Malaysia (UTM) for providing me with a good environment and facilities such as
UTM library database for me for searching references in order to complete this
project.
Finally, an honorable mention goes to our families and friends for their
understanding and supports on me in completing this project. Without support from
those who are, I would face many difficulties while doing this final project and
might be this report can’t be completed on time.
v
ABSTRACT
Space is an important asset for contract manufacturing to compete with other
companies. In order to compete that, manufacturing company must have industrial
knowledge before developing assembly line and flexible assembly line is one of the
factors contributed to the optimization of space. Then, in order to remain competitive
and increase the output and optimize the man powers used, Assembly line balancing
(ALB) must be identified and solved. Ultimately, the better line balancing will gives
better impression on the space. Furthermore, single model assembly lines are not
popular. Aim for this study is developing flexible assembly line with limited space
allocation for manufacturing company. From here, flexible assembly line is able to
save a space for manufacturing company and the significance of having a well-
structured multi product assembly line in terms of resource reduction. At the first
step, the first model (model A) demand, operation hours, number of man powers,
method time measurement (MTM), equipment selection, process and activities are
studied. In the second steps, based on the TAKT time calculation, line for model A is
balanced. Model A and model B is studied using same approach. Flexible assembly
line is introduced for model A and model B because of the process is almost same.
Equipment selection has been introduced by changing conveyor to the pipe and
concept to implement U-shaped assembly line to more further to optimize the space.
Based on the result of space, man powers and line efficiency is showing that U-
shaped assembly line has brought great savings to the company. Ultimately, the
results shows that by implementing line balancing using TAKT time calculation,
MTM, flexible multi model, manpower on line are reduced to 6 man powers, space
reduced from 350sq ft to 238sq ft while line efficiency is increased until 77%.
vi
ABSTRAK
Ruang adalah merupakan asset yang penting bagi pengilangan kontrak untuk
bersaing dengan syarikat lain. Dalam usaha untuk bersaing, syarikat pembuatan
mesti ada pengetahuan industri sebelum membangunkan barisan pemasangan dan
barisan pemasangan fleksibel adalah salah satu faktor yang menyumbang kepada
pengoptimuman ruang. Kemudian, untuk kekal berdaya saing dan meningkatkan
pengeluaran dan mengoptimumkan penggunaaan operator pengeluaran, pemasangan
yang seimbang (ALB) dikenalpasti dan diselesaikan. Pengimbangan talian yang baik
akan memberikan gambaran yang baik pada ruang. Pengimbangan talian bagi model
tunggal tidak begitu popular. Kajian ini untuk membangunkan pemasangan fleksibel
dengan peruntukan ruang yang terhad untuk syarikat pembuatan. Barisan
pemasangan fleksibel dapat menjimatkan ruang untuk syarikat pembuatan dan
kepentingan mempunyai pelbagai barisan pemasangan produk berstruktur dengan
baik dari segi pengurangan sumber. Pada langkah pertama, model pertama (model
A) permintaan, waktu operasi, bilangan operator pengeluaran, pengukuran masa
kaedah, pemilihan peralatan, proses dan aktiviti yang dikaji. Dalam langkah kedua,
berdasarkan pengiraan masa takt, talian bagi model A adalah seimbang. Model A
dan model B dikaji menggunakan pendekatan sama. Barisan pemasangan fleksibel
model A dan model B diperkenalkan kerana proses adalah hampir sama. Untuk
mengoptimumkan ruang, pemilihan peralatan telah diperkenalkan dengan menukar
penghantar ke paip dan konsep untuk melaksanakan pemasangan talian berbentuk U.
Berdasarkan kepada keputusan ruang, operator dan kecekapan menunjukkan
pemasangan talian berbentuk U telah membawa penjimatan besar kepada syarikat.
Akhirnya, keputusan menunjukkan bahawa dengan melaksanakan pengimbangan
talian menggunakan pengiraan masa takt, MTM, model multi fleksibel, operator
dikurangkan kepada 6, ruang dikurangkan daripada350kakipersegi kepada 238kaki
persegi manakala kecekapan talian dinaikkan meningkat sehingga 77%.
vii
TABLE OF CONTENTS
CHAPTER TITLE PAGE
DECLARATION ii
DEDICATION iii
ACKNOWLEDGEMENT iv
ABSTRACT v
ABSTRAK vi
TABLE OF CONTENTS vii
LIST OF TABLES xi
LIST OF FIGURES xii
LIST OF ABBREVIATION xiv
LIST OF APPENDICES xv
1 INTRODUCTION
1.1 Introduction 1
1.2 Background 1
1.3 Problem Statement 3
1.4 Research Objectives 4
1.5 Scope of the Study 4
1.6 Significance of Findings 7
1.7 Organization of Thesis 8
1.8 Conclusion 11
2 LITERATURE REVIEW
2.1 Introduction 12
2.2 Essential Terms 12
viii
2.2.1 Space Requirements 13
2.2.2 Straight Assembly Line 14
2.2.3 Flexible Assembly Line 16
2.2.3.1 General Assumptions for Flexible Assembly Line 17
2.2.4 Material Supply Movement 18
2.2.5 Time Study 19
2.2.5.1 Predetermined Time Systems 19
2.2.5.2 Assembly Line Balancing 20
2.2.6 Ergonomic Implementation for Efficient Assembly
Line Design 22
2.2.7 Simulation on Space Optimization 23
2.3 Summary of Related Literature Review 24
2.3.1 Space Optimization 24
2.3.2 Assembly Line 26
2.3.3 Line Balancing Problem 27
2.3.4 Ergonomics in Assembly Line 28
2.4 Conclusion 29
3 METHODOLOGY
3.1 Introduction 31
3.2 Research Framework 32
3.3 Data Collection 33
3.3.1 Observation 35
3.3.2 Interviews with Contract Manufacturing's Engineer 35
3.3.3 Understand the Company Documentation before
Develop Flexible Assembly Line 36
3.3.3.1 Assembly Drawing 38
3.3.3.2 Process Flow 38
3.3.3.3 Predetermined Time System 38
3.3.3.4 Demand 41
3.3.3.5 Space Available 42
3.3.3.6 Precedence Diagram 43
3.4 Designing Industrial Layout Using AutoCAD Software 45
3.5 Conclusion 45
ix
4 DATA GATHERING AND ANALYSIS
4.1 Introduction 46
4.2 Case Study 47
4.3 Current State 48
4.3.1 Current State Process Flow 49
4.3.2 Conducting Predetermined Time System @ MTM 48
4.3.3 Demand and Line Balancing 52
4.3.4 Equipment Selection 53
4.3.5 Current State of Assembly Line for Model A using Excel 54
4.3.6 Space Requirements and Visual Management 55
4.4 Balanced State 57
4.4.1 Demand and Line Balancing 57
4.4.2 Precedence Diagram for Model A 60
4.4.3 Equipment Selection 61
4.4.4 Balanced State Assembly Line using AutoCAD 64
4.4.5 Space Requirements and Visual Management 65
4.5 Flexible Multi Product Assembly Line 69
4.5.1 Process Flow for Model B 69
4.5.2 Conducting Predetermined Time System @ MTM for
Model B 70
4.5.3 Demand and Line Balancing for Model B 72
4.6.3.1 Balanced State for Model B 74
4.5.4 Precedence Diagram for Current State Model B 75
4.6.4.1 Precedence Diagram for Balanced State Model B 76
4.5.5 Equipment Selection for Model B 77
4.5.6 Future Flexible Assembly Line using AutoCAD 77
4.5.7 Space Requirements and Visual Management for Model A
and Model B 80
4.6 Conclusion 81
5 RESULT AND DISCUSSION
5.1 Introduction 83
x
5.2 Flexible Manufacturing System 84
5.3 U-Shaped Assembly Line Compared to Straight Assembly Line 85
5.4 Floor Area Reduction 86
5.5 Fixed Conveyor and Pipe and Joint Concept 87
5.6 Discussion 88
5.6.1 Performance Measure 88
5.6.2 Significance of Study 90
5.6.3 Findings 90
5.6.4 Limitations of the Project 91
5.7 Application 91
5.8 Conclusion 92
6 CONCLUSION
6.1 Introduction 95
6.2 Challenges 95
6.3 Recommendation for Future Study 97
6.3.1 Ergonomics 97
6.3.2 Material Handling 99
REFERENCES 101 Appendices A – C 105
xi
LIST OF TABLES
TABLE NO. TITLE PAGE
2.1 Literature review related with space optimization 25
2.2 Literature review related with assembly Line 27
2.3 Literature review related with line balancing problem 28
2.4 Literature review related with ergonomics 29
3.1 Research objectives 33
3.2 Space information 43
3.3 Details information for model A 44
4.1 Balanced state detail information for model A 60
4.2 Current state detail information for model B 73
4.3 Balanced state detail information for model B 74
5.1 Efficiency comparison 89
xii
LIST OF FIGURES
FIGURE NO. TITLE PAGE
1.1 Flow of problem statement 6
1.2 Organization of thesis 11
2.1 Straight assembly line 15
2.2 U-shaped assembly line 17
2.3 U-shaped assembly line 21
3.1 Research framework 32
3.2 Systematic layout planning 37
3.3 Process flow 37
3.4 Sample of method time measurement 39
3.5 Line balancing for model A 42
3.6 Precedence diagram for model A 44
4.1 Process flow for model A 51
4.2 Current state assembly line for model A 56
4.3 Visual management implementation on model A 56
4.4 Balanced state line balancing for model A 59
4.5 Balanced state precedence diagram for model A 61
4.6a Workstation with the frontal loading concept 62
4.6b Material used to make a workstation 63
4.6c Side workbench 63
4.6d Pipe and Joint trolley 64
4.7 Future layout for balanced state assembly line model A 67
4.8 Visual management for balanced state assembly line model A 68
4.9 Process flow for model B 71
xiii
4.10 Current state line balancing for model B 73
4.11 Balanced state line balancing for model B 75
4.12 Precedence diagram for current state model B 75
4.13 Precedence diagram for balanced state model B 76
4.14 Future Flexible Assembly Line for model A and model B 79
4.15 Visual management for flexible assembly line for model A and
model B 80
5.1 The application for the development of flexible assembly line with
limited space allocation for manufacturing company 94
6.1 Relationship between product, process and logistics 96
6.2 Ergonomic principles 98
xiv
LIST OF ABBREVIATION
1. ALB - Assembly Line Balancing
2. BOM - Bills of Material
3. FAL - Flexible Assembly Line
4. JIT - Just – In - Time
5. MTM - Method Time Measurement
6. NPI - New Product Introduction
7. SAL - Straight Assembly Line
8. SOP - Standard Operation Procedures
9. TPS - Total Production System
10. PTS - Predetermined Time System
11. WIP - Work in Process
xv
LIST OF APPENDICES
APPENDIX TITLE PAGE
A Master Project 1 105
B Method Time Measurement for Model A 106
C Method Time Measurement for Model B 109
1
CHAPTER 1
INTRODUCTION
1.1 Introduction
This chapter explains on the introduction on the development of flexible
assembly line with limited space allocation for manufacturing company located at
Tampoi, Johor Bahru. Due to space constraints, the manufacturing company needs to
change their assembly design from the straight assembly line to the U-shaped
assembly line and ultimately change to flexible assembly line because has 2models
involved in order to optimize the space. When the workers comfortable doing their
task given, productivity will increase through ergonomic approach. Next, the
problem statement, objectives and scope are defined.
1.2 Background
Nowadays, many types of production line had been introduced and
implemented to optimize and fully utilized the production space especially for the
manufacturing company that doesn’t has enough space to run the process until
2
complete in the one assembly line or in the lean manufacturing approach this is
called as one piece flow production flow. There are few types of layout can be
implemented in order to solve space problem such as straight assembly line, u-
shaped assembly line and also flexible assembly line. Furthermore, layout is an
arrangement of the space and facilities according to the type and size of activities to
be carried out, convenience of operations, efficiency, productivity, economy and
safety of the facilities and the users.
As a contract manufacturing company, to provide a space allocation as
required by the main manufacturing for assembly activities is important for them.
Sometimes there need to implement flexible assembly line due to not enough space
and to ensure whole process can be perform in same floor in order to reduce the
resources required likes man power, equipment and space as well. The world
“flexible” is associated with such a system since it is able to manufacture a large
number of different part types. The components of a flexible manufacturing system
are processing equipment, the material handling equipment and also the computer
control equipment. The computer control equipment is used to track parts and
manage the overall flexible manufacturing system [1].
Groover [1] lists the following manufacturing situations for which a flexible
manufacturing system might be appropriate:
• Production of families of work parts
• Random launching of work parts onto the system
• Reduced manufacturing lead time
• Increased machine utilization
• Reduced direct and indirect labor
• Better management control
In order to ensure the production is running in efficient and effective manner,
ergonomic principles or human factor engineering need to be implemented and
3
practiced as well in order to avoid absenteeism and finally will impact on the
productivity. Generally, principles for workspace design is considering during the
development of designing the flexible of assembly line. The reason of putting this
manner into designing of line layout is to reduce human error, increase productivity,
and enhance safety and comfort. All the measurement of the work space height,
work surface depth and work space inclination must be considered in order to
achieve the successful of ergonomics.
The study identifies limited space allocation is one of the problem for the
manufacturing company which is located at Tampoi, Johor Bahru. Furthermore, due
to constraints on process design, one piece flow approach needs to be performed.
And because of this, large space is required to perform this activity. AutoCAD
software is used to visualize the development of flexible assembly line before setup
into the real assembly line. Therefore, with the identification of problem and the
source that were provided in this study, production system and processing can be
improved and optimized in this manufacturing company. Other than that, this study
also helps manufacturing company and others organization as well that flexible
assembly line can gives biggest impact on the space of production floor.
1.3 Problem Statement
Space must be provided by the contract manufacturing once received a
business from the main manufacturing or so called customer. But the problem is,
when line has been designed by the customer, contract manufacturing don’t has
enough space as per required and stated in main manufacturing’s assembly line
design.
4
In order to solve this, main manufacturing need to change their layout based
on the space available at contract manufacturing and main manufacturing need to
design again the layout based on the space available not based on the space
requirements. This task is not efficient where engineer need to design the assembly
line two times due to space constraints.
However, it can be solved when main manufacturing has a using all the
technical and manufacturing knowledge for designing the layout with the minimum
space by considering material supply movement, material transport equipment,
equipment selection and also ergonomics in order to ensure line has been designed
with the minimum space. Furthermore, AutoCAD software will helps them to solve
this problem also where contract manufacturing and main manufacturing can viewed
design layout on the paper before transform it into actual production floor. The
details flow of the problem statement has been shown in figure 1.1.
1.4 Research Objectives
The objective of this project is to design a new and efficient assembly line
with limited space provided by the contract manufacturing. And also to implement
flexible assembly line for two models due to space limitation at contract
manufacturing.
1.5 Scope of the Study
The scopes of the study for this project are as below;
5
i. This study is done in assembly line of the contract manufacturing
company.
ii. A single model, U-shaped assembly line is selected as a main focus of
the study using AutoCAD Software.
iii. Balancing loss, process flow, method time measurement, task
distribution and material supply movement also considered in order to
improve the assembly line.
iv. Considered ergonomics principles during developing of assembly line.
6
Main manufacturing received orderfrom their customer
Layout/ assembly line design designed by main manufacturing
(Manufacturing engineer)
Space Requirements
Line Setup
Space
Available
Send to the contract manufacturing
Demand for the product has beenidentified
Product designed by main manufacturing
Figure 1.1 Flow of problem statemen
7
1.6 Significance of Findings
The result of this project is essential as it is able to provide an optimum
solution for the manufacturing company to solve on the limited space allocation for
complete assembly process by implementing the flexible assembly line. This
optimum solution was achieved by comparing the straight line assembly with the
flexible line assembly by implementing U-shaped assembly line, line balancing,
material supply movement and selection equipment to more reducing the space used
and also ergonomics.
The significance of this project can be shown through space where two
models can be running in the same production floor. Space is fully utilize
eventhough demand is not higher because of this model is still new and under new
product introduction stage.
Therefore, following advantages are expected to be obtained while studying
and developing the flexible assembly line;
i. Assembly line is designing based on demand.
ii. Minimizing resource consumption (manpower, machines, number of
workstation) through material supply movement such as one piece flow
and kanban.
iii. Maximizing company’s total profit in the NPI stage via space, manpower
and machines optimization.
iv. Assigned task on man power using precedence diagram.
v. Efficient material supply movement.
vi. Better productivity through ergonomics principles.
8
1.7 Organization of Thesis
This thesis is divided into six chapters which are introduction, literature
review, methodology, data gathering and analysis, result and finally is a conclusion.
The detail explanation on thesis structure as below;
Chapter 1: Introduction
Chapter 1 is an introduction to the project which explains the background of
the study, statement of the problem, research objectives, scope of the study,
significance of findings, organization of thesis and conclusion. Furthermore,
statement of the problem explained on the differentiation between straight line and
the flexible line.
Chapter 2: Literature Review
The literature review of the project is being discussed in the second chapter.
It contains several related issues found in the book, internet and also actual situation
in the assembly line at the manufacturing company. Definition, principles and
approach used in conducting the research. Broad areas has been discussed beginning
from the assembly drawing, assembly chart, time study and predetermined time
study has been used for line balancing since this product is still in the new product
introduction (NPI) stage.
Types of assembly line, balancing loss and material supply movement and
ergonomics has been covered in this chapter in order to develop efficient flexible
assembly line even though space allocation is limited provided by contract
manufacturing. The purpose is to study what have been studied before on this topic
and find the gaps to more practical solutions regarding the nature of the problem.
9
However, ergonomics is not fully covered in this project but it is useful to increase
the productivity.
Chapter 3: Methodology
The methodology of the research is discussed in the third chapter. Concept
and problem solving tools used during the research process are described in this
chapter. Case study, data collection method, conceptual framework, process
mapping, line balancing and line design suite to knows on the effective of the
flexible line design without actual line is being setup. Material supply movements
have been considered in order to simply the process and ultimately reduce the space
allocation. AutoCAD software to design industrial layout had been discussed also in
order to ensure project can be running smoothly when start installing because this
project is a new layout for new product.
Chapter 4: Data Gathering and Analysis
Main focus for this chapter is on the case study related with data gathering
and analysis. We have studied why straight assembly line is not efficient in order to
optimize the production space. We have chosen U-shaped assembly line in order to
optimize the production space where it is also suitable for the flexible assembly line.
On this chapter, all the current and future documents had been studied to
achieve the objective of this project which is to develop flexible assembly line with
limited space allocation at contract manufacturing. The data related such as demand,
MTM, line balancing, drawing are required as a main documents to develop a
flexible assembly line with limited space allocation by contract manufacturing. On
this chapter, there are two models has been studied and analyse and this two models
will used same assembly line which is called as flexible assembly line due to
demand for both models is lower.
10
Chapter 5: Result and Discussion
On the discussion stage, this project mentioned why U-shaped assembly line
had been selected during developing flexible assembly line and it also helps to solve
a space problem on the manufacturing company. Result had been achieved to
optimize the production space through equipment selection, line balancing, material
supply movement and also U-shaped assembly line. This chapter also includes
discussion on performance measure, significance of study, findings and limitations
of the project.
Chapter 6: Conclusion
This chapter includes the conclusion of the study, challenges when
developing flexible assembly line with limited allocation and some recommendation
for future study such as more examples related on ergonomics or human factors
engineering and material handling. Briefly, ergonomics is important in order to
reduce absenteeism among workers and ultimately able to increase the productivity.
The organization of thesis is summarized in Figure 1.1 below;
11
Figure 1.2 Organization of thesis
1.8 Conclusion
This chapter explained a general introduction about the entire research
beginning from the introduction then follow by the background, problem statement,
research objectives, scope of the study, significance of the findings, organization of
thesis and end by the conclusion. In the beginning, space is a problem for the
contract manufacturing when get a business from main manufacturing. However, it
can be solved by developing the flexible assembly line design by considering few
factors such as demand, line balanc8ing, equipement selection and so on. The next
chapter need to be focus is a literature review.
Introduction
Methodology
Literature Review
Data gathering and Analysis
Result and Discussion
Conclusion
101
REFERENCES
James A. Tompkins, John A. White, Yavuz A. Bozer, J.M.A. Tanchoco. Facilities
Planning. 4th edition. January 2010, ©2010
Wickens, C.D., J.D. Lee, Y. Liu, and S.E. Gordon Becker (2004). An Introduction
to Human Factors in Engineering, 2nd edition. Upper Saddle River, NJ:
Pearson Prentice Hall.
M. Yoshimura, S. Yoshida, Y. Konishi, K. Izui and T.Inagaki (2006). A Rapid
Analysis Method for Production Line Design 44(6): 1171-1192
Yuval Cohen (2012). Absenteeism as a Major Cause of Bottlenecks in Assembly
Lines. Israel: The Open University, Tel-Aviv
Francesco Longo, Giovanni Mirabelli, and Enrico Papoff. (2006). Effective Design
of An Assembly Line Using Modeling and Simulation. Calabria: Winter
Simulation Conference
Mr. Gurunath V Shinde et al. (2012). Ergonomic Analysis of An Assembly
Workstation to Identify Time Consuming and Fatigue Causing Factors Using
Application of Motion Study.
Meyers, F.E. and Stewart, J.R.. Motion and Time Study for Lean Production. 3rd
edition. New Jersey: Prentice Hall. 2002.
Falkenauer,e. Line Balancing in the Real World. International Conference on
Product Lifecycle Management. 2005.
Michal Marton, Iveta Paulova. One Piece Flow – Another View on Production Flow
in The Next Continuous Process Improvement. Trnava: Institute of Industrial
Engineering. 2012.
Eida Nadirah Roslin, Ong Gee Seang, and Siti Zawiah Md. Dawal. A study on
Facility Layout in Manufacturing Production Line Using WITNESS. Malaysia:
University of Malaya, Kuala Lumpur. 2008.
102
Nuchsara Kriengkorakot and Nalin Pianthong. The U-line Assembly Line Balancing
Problem. KKU Engineering Journal., Ubon Rajathanee University. 2007,
34(3), 267-274.
Wang, Q.Owen, G.W.Mileham. Comparison Between Fixed and Walking-Worker
Assembly Lines. PreQuest Central. Institution of Mechanical Engineers, 2005,
219, 845.
Nguyen, D. M. Empirical Manufacturing Line Designs in Japanese Automobile
Plants. Original Scientific Paper. Nagoya University, Japan, 2009, 8, 69-80.
Assembly Line Design: A Survey
Kursad Agpak, M. Fatih Yegu and Hadi Gokcen. Two-sided U-type Assembly Line
Balancing Problem. International Journal of Production Research, 2012, 50,
5035-5047. University Ankara, Turkey.
Yakup Kara. Line Balancing and Model Sequencing to Reduce Work Overload in
Mixed-Model U-line Production Environments. Engineering Optimization,
Vol. 40, No. 7, July 2008, 669–684.
Mohammad Kamal Uddin and Jose Luis Martinez Lastra. Assembly Line Balancing
and Sequencing. Tampere University of Technology, Finland. 2011.
James M. Wilson. Henry Ford vs. Assembly Line Balancing. Adam Smith Business
School, University of Glasgow, Scotland, UK. 2013.
M.M. Dessouky, S. Adiga and K. Park. Design and Scheduling of Flexible Assembly
Lines for Printed Circuit Boards, 1995, Vol. 33, No. 3, 757 - 775.
Jia Zhenyuan, LU Xiaohong and Wang Wei. Design and Implementation of Lean
Facility Layout System of a Production Line. International Journal of Industrial
Engineering, 2011, 18(5), 260 – 269.
Tarek AIGeddawy and Hoda EIMaraghy. Design of Single Assembly Line for the
Delayed Differentiation of Product Variants, 2010, Vol. 22, 163 – 182.
Jay Heizer and Barry Render. Operation Management –Sustainability and Supply
Chain Management. 11th Edition. Published by Pearson Education, Inc., 2014.
Anjos, M. F., and Vannelli, A., “A New Mathematical-Programming Framework for
Facility Layout Design, “INFORMS Journal on Computing, vol. 18,no. 1, pp.
111-118, 2006.
Mikell P. Groover,”Design of A Conveyorized Production Line, “ Professor of
Industrial and Manufacturing Systems Engineering Lehigh University.
103
Hytrol, “Ergonomic considerations for designing conveyor system workstations,
“HY-LITES Journal, vol. 455, Sept 2005.
Daniel Lartey. Planning a layout design for the washing line of Parker Hannifin Oy,
Universiy of Applied Sciences. 2011.
Naresh Paneru. Implementation of Lean Manufacturing Tools in Garment
Manufacturing Process Focusing Sewing Section of Men’s Shirt. Oulu
University of Applied Sciences. 2011.
Tee Chun Teck. Productivity Improvement for Furniture Industry by Using Witness
Simulation Software. Universiti Malaysia Pahang, Malaysia. 2010.
Zhuling Chen. Production System Improvement: Floor Area Reduction and Visual
Management. Massachusetts Institute of Technology, China. 2012.
Frazelle, E. H., “Material Handling: A Technology for Industrial Effectiveness,”
Material Handling Research Center Technical Report, Georgia Institute of
Technology, Atlanta, April 1986
Mr. Gurunath V Shinde, “Ergonomics analysis of an assembly workstation to
identify time consuming and fatigue causing factors using application of
motion study, vol 4, Sept 2012.
LouisJ. Plebani and Sihua Chen. Balancing U-Shaped Assembly Lines with Parallel
Stations. Lehigh University.
Ronnachai Sirovetnukul and Parames Chutima., “The impact of walking time on U-
shaped Assembly Line Worker Allocation Problems”,.Vol. 4. April 2010.
Cecil Bozarth and Pedro M. Vilarinho. “Analyzing the Impact of Space Utilization
and Production Planning on Plant Space Requirements – A Case Study and
Methodology”, International Journal of Industrial Engineering, Vol 13 (1),
pp.81-89. 2006.
Rea Kook Hwang a , Hiroshi Katayama a & Mitsuo Gen b. U-shaped assembly
line balancing problem with genetic algorithm. Waseda University. 2008.
.Venkataramani Narayanan. Design of Hybrid Layouts for Large Size Facility Layout
Problems, Degree Thesis, Bharathiar University, India. 2004.
Shahram Taj and Lismar Berro. “Application of Constrained management and lean
manufacturing in developing best practices for productivity improvement in an
auto-assembly plant”, Emeraldinsight, Vol 55, pp.332. 2006.
104
Razman Bin Tahar, Ali A. J Adham. “Multi-objectives and Simulation Models for
Develop Production Line in Automobiles Manufacturing System”, Chinese
Business Review, Vol. 10, No. 7, 553-558. 2011.
D. Rossetti, R. R. Hill, B. Johansson, A. Dunkin and R. G. Ingalls, eds. Assembly
Line Design Principles Using Six Sigma and Simulation. Winter Simulation
Conference. 2009.
A.S. Simaria a , M. Zanella de Sá a & P.M. Vilarinho. “Meeting demand variation
using flexible U-shaped assembly lines”, University of Aveiro , Aveiro,
Portugal. 2009.
Yossi Bukchin and Russell D. Meller. “A Space Allocation Algorithm for Assembly
Line Components”, IEE Transaction, Vol 37, pp.51-61. 2005.