DEVELOPMENT APPLICATION D-2019/001384 APPLICANT: D Webster PROPOSAL: Temporary Access Road & Earth Works LOCATION: 672 East Derwent Highway & Lantana Road, RISDON VALE RELEVANT PLANNING SCHEME: Clarence Interim Planning Scheme 2015 ADVERTISING EXPIRY DATE: 31 July 2019 In addition to the Application Form(s), Certificate of Title(s) and any associated consent documents the following information is available on request: Planning Report The relevant plans and documents can be inspected at the Council offices, 38 Bligh Street, Rosny Park, during normal office hours until 31 July 2019. Any person may make representations about the application to the General Manager, by writing to PO Box 96, Rosny Park, 7018 or by electronic mail to [email protected]. Representations must be received by Council on or before 31 July 2019. To enable Council to contact you if necessary, would you please also include a day time contact number in any correspondence you may forward. Any personal information submitted is covered by Council’s privacy policy, available at www.ccc.tas.gov.au or at the Council offices.

DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

DEVELOPMENT APPLICATION

D-2019/001384

APPLICANT: D Webster

PROPOSAL: Temporary Access Road & Earth Works

LOCATION: 672 East Derwent Highway & Lantana Road, RISDON

VALE

RELEVANT PLANNING SCHEME: Clarence Interim Planning Scheme 2015

ADVERTISING EXPIRY DATE: 31 July 2019

In addition to the Application Form(s), Certificate of Title(s) and any associated

consent documents the following information is available on request:

• Planning Report

The relevant plans and documents can be inspected at the Council offices, 38 Bligh

Street, Rosny Park, during normal office hours until 31 July 2019.

Any person may make representations about the application to the General Manager,

by writing to PO Box 96, Rosny Park, 7018 or by electronic mail to

[email protected]. Representations must be received by Council on or before

31 July 2019.

To enable Council to contact you if necessary, would you please also include a day

time contact number in any correspondence you may forward.

Any personal information submitted is covered by Council’s privacy policy, available

at www.ccc.tas.gov.au or at the Council offices.

Page 2: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

U

U

U

U

DESIGNED BY

PLOT DATE

PLOT DETAILS

DRAWN BYSCALES @ A3 PROJECT NO.

REVISIONDWG NO.

TITLEPROJECTAccepted

This document must be signed “Approved” by JMG to authorise it for use. JMG accept no liability whatsoever for unauthorised or unlicensed use.

DO NOT SCALE. Use only figured dimensions. Locations of structure, fittings, servicesetc on this drawing are indicative only. CONTRACTOR to check Architects & other projectdrawings for co-ordination between structure, fabric, fixtures, fittings, services etc.CONTRACTOR to site check all dimensions and exact locations of all items. JMG accepts noresponsibility for dimensional information scaled or digitally derived from this document.

The recipient client is licensed to use this drawing for itscommissioned purpose subject to authorisation per note above.Unlicensed use is prohibited. Unlicensed parties may not copy,reproduce or retransmit or amend this document or any part of thisdocument without JMG's prior written permission. Amendment ofthis document is prohibited by any party other than JMG. JMGreserve the right to revoke the licence for use of this document.

Copyright © All rights reserved. This drawing and its intellectualcontent remains the intellectual property of JOHNSTONE McGEE &GANDY PTY LTD (JMG).

Date

Approved Date

Accepted

Date

(Team Leader)

(Discipline Head)

(Group Manager)

07/03/2019

J185108SH PLANS-ROADS & SW.DWG49-51 Elizabeth Street, Launceston, Tas

ACN 009 547 139

117 Harrington Street, Hobart, Tas  (03) 6231 2555

(03) 6334 5548

www.jmg.net.au [email protected] [email protected]

REMARKDATEREV

Johnstone McGee & Gandy Pty. Ltd.

ABN 76 473 834 852

NOT FOR CONSTRUCTION

TENDER ISSUE

Engineers & Planners

SAFETY IN DESIGN REPORTIn accordance with the Workplace Health & Safety Acts and Regulations JMGhave considered the potential hazards and risks that are specific to this design.

The following risks which are unique tothis design have been identified:

This report does not relieve contractors from their responsibilities under the Act to identify,report, mitigate and manage all aspects of risk and safety.

C. PURDON

C. PURDON

G. ATHERTON

T1

1:500 B. LOCKEB. LOCKE

C02

J185108SHGENERAL ARRANGEMENTTEMPORARY ACCESS ROAD

EARLY WORKSSOUTHERN REMAND CENTRERISDON PRISON

NIL

THIS IS A COLOR A3 DRAWING AND

MUST BE REPRODUCED IN COLOR

AT ALL TIMES

1100

BEFORE YOU DIG

DIAL

www.dialbeforeyoudig.com.au

·····

AutoCAD SHX Text
P1
AutoCAD SHX Text
6.02.2019
AutoCAD SHX Text
ISSUED FOR ABORIGINAL HERITAGE
AutoCAD SHX Text
T1
AutoCAD SHX Text
7.03.2019
AutoCAD SHX Text
TENDER ISSUE
AutoCAD SHX Text
NEW TEMPORARY 15m LONG CLASS 8 DN900 POLYPROPYLENE STORMWATER CULVERT. EXTEND PAST EXISTING AERIAL SEWER CROSSING AND BACKFILL WITH FULL DEPTH BASE A. PROVIDE 10m2 NOM 150 DIAMETER ROCK PITCHING TO OUTLET. CULVERT TO BE REMOVED AT COMPLETION OF WORKS
AutoCAD SHX Text
NOM 150 DIA ROCK PITCHING ON ROAD BATTER TO FORM AND CHANNEL CULVERT INLET
AutoCAD SHX Text
LANTANA ROAD
AutoCAD SHX Text
EXISTING POST AND WIRE FENCE TO BE REMOVED AND CONSTRUCT NEW TEMPORARY POST AND WIRE FENCE TO MATCH EXISTING
AutoCAD SHX Text
2 NO. 1.2m HIGH GALVANISED RURAL STYLE GATES
AutoCAD SHX Text
EXISTING SEWER MANHOLE
AutoCAD SHX Text
EXISTING SEWER AERIAL CROSSING
AutoCAD SHX Text
EXISTING SEWER MANHOLE
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE 1:500
AutoCAD SHX Text
m
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
15
AutoCAD SHX Text
20
AutoCAD SHX Text
25
AutoCAD SHX Text
0.5m DEEP TABLE DRAIN
AutoCAD SHX Text
TEMPORARY ACCESS ROAD TYPICAL SECTION SCALE 1:100
AutoCAD SHX Text
EXISTING SURFACE
AutoCAD SHX Text
2:1 BATTERS (TYPICAL)
AutoCAD SHX Text
NOTE: SPOIL AND STRIPPING TO BE STOCK PILED ON SITE FOR SURFACE REHABILITATION AT COMPLETION OF TEMPORARY ROAD REMOVAL
AutoCAD SHX Text
EXTEND TABLE DRAIN TO WATER COURSE
AutoCAD SHX Text
PROVIDE EARTHWORKS AND COMPACTED SUB-BASE TO TO TRANSITION ROADWAY TO NATURAL SURFACE
Page 3: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

DESIGNED BY

PLOT DATE

PLOT DETAILS

DRAWN BYSCALES @ A3 PROJECT NO.

REVISIONDWG NO.

TITLEPROJECTAccepted

This document must be signed “Approved” by JMG to authorise it for use. JMG accept no liability whatsoever for unauthorised or unlicensed use.

DO NOT SCALE. Use only figured dimensions. Locations of structure, fittings, servicesetc on this drawing are indicative only. CONTRACTOR to check Architects & other projectdrawings for co-ordination between structure, fabric, fixtures, fittings, services etc.CONTRACTOR to site check all dimensions and exact locations of all items. JMG accepts noresponsibility for dimensional information scaled or digitally derived from this document.

The recipient client is licensed to use this drawing for itscommissioned purpose subject to authorisation per note above.Unlicensed use is prohibited. Unlicensed parties may not copy,reproduce or retransmit or amend this document or any part of thisdocument without JMG's prior written permission. Amendment ofthis document is prohibited by any party other than JMG. JMGreserve the right to revoke the licence for use of this document.

Copyright © All rights reserved. This drawing and its intellectualcontent remains the intellectual property of JOHNSTONE McGEE &GANDY PTY LTD (JMG).

Date

Approved Date

Accepted

Date

(Team Leader)

(Discipline Head)

(Group Manager)

07/03/2019

J185108SH PLANS-ROADS & SW.DWG49-51 Elizabeth Street, Launceston, Tas

ACN 009 547 139

117 Harrington Street, Hobart, Tas  (03) 6231 2555

(03) 6334 5548

www.jmg.net.au [email protected] [email protected]

REMARKDATEREV

Johnstone McGee & Gandy Pty. Ltd.

ABN 76 473 834 852

NOT FOR CONSTRUCTION

TENDER ISSUE

Engineers & Planners

SAFETY IN DESIGN REPORTIn accordance with the Workplace Health & Safety Acts and Regulations JMGhave considered the potential hazards and risks that are specific to this design.

The following risks which are unique tothis design have been identified:

This report does not relieve contractors from their responsibilities under the Act to identify,report, mitigate and manage all aspects of risk and safety.

C. PURDON

C. PURDON

G. ATHERTON

T1

1:500 B. LOCKEB. LOCKE

C03

J185108SHROAD ALIGNMENT PROFILETEMPORARY ACCESS ROAD

EARLY WORKSSOUTHERN REMAND CENTRERISDON PRISON

NIL

AutoCAD SHX Text
T1
AutoCAD SHX Text
7.03.2019
AutoCAD SHX Text
TENDER ISSUE
AutoCAD SHX Text
0.00
AutoCAD SHX Text
0.90
AutoCAD SHX Text
2.40
AutoCAD SHX Text
8.96
AutoCAD SHX Text
10.00
AutoCAD SHX Text
11.46
AutoCAD SHX Text
13.96
AutoCAD SHX Text
15.66
AutoCAD SHX Text
20.00
AutoCAD SHX Text
20.66
AutoCAD SHX Text
25.66
AutoCAD SHX Text
30.00
AutoCAD SHX Text
31.33
AutoCAD SHX Text
33.72
AutoCAD SHX Text
40.00
AutoCAD SHX Text
41.33
AutoCAD SHX Text
50.00
AutoCAD SHX Text
51.33
AutoCAD SHX Text
55.74
AutoCAD SHX Text
60.00
AutoCAD SHX Text
60.74
AutoCAD SHX Text
65.74
AutoCAD SHX Text
70.00
AutoCAD SHX Text
72.16
AutoCAD SHX Text
75.00
AutoCAD SHX Text
80.00
AutoCAD SHX Text
85.00
AutoCAD SHX Text
90.00
AutoCAD SHX Text
98.62
AutoCAD SHX Text
100.00
AutoCAD SHX Text
103.62
AutoCAD SHX Text
108.62
AutoCAD SHX Text
110.00
AutoCAD SHX Text
114.20
AutoCAD SHX Text
120.00
AutoCAD SHX Text
130.00
AutoCAD SHX Text
130.64
AutoCAD SHX Text
CHAINAGE
AutoCAD SHX Text
29.927
AutoCAD SHX Text
29.927
AutoCAD SHX Text
29.858
AutoCAD SHX Text
29.522
AutoCAD SHX Text
28.758
AutoCAD SHX Text
28.725
AutoCAD SHX Text
28.680
AutoCAD SHX Text
28.686
AutoCAD SHX Text
28.706
AutoCAD SHX Text
28.756
AutoCAD SHX Text
28.763
AutoCAD SHX Text
28.725
AutoCAD SHX Text
28.693
AutoCAD SHX Text
28.691
AutoCAD SHX Text
28.697
AutoCAD SHX Text
28.262
AutoCAD SHX Text
28.039
AutoCAD SHX Text
29.303
AutoCAD SHX Text
29.356
AutoCAD SHX Text
29.663
AutoCAD SHX Text
30.156
AutoCAD SHX Text
30.183
AutoCAD SHX Text
30.347
AutoCAD SHX Text
30.563
AutoCAD SHX Text
30.677
AutoCAD SHX Text
30.677
AutoCAD SHX Text
30.677
AutoCAD SHX Text
30.827
AutoCAD SHX Text
31.090
AutoCAD SHX Text
31.236
AutoCAD SHX Text
31.409
AutoCAD SHX Text
31.683
AutoCAD SHX Text
31.728
AutoCAD SHX Text
31.848
AutoCAD SHX Text
32.157
AutoCAD SHX Text
32.248
AutoCAD SHX Text
32.504
AutoCAD SHX Text
32.504
AutoCAD SHX Text
32.504
AutoCAD SHX Text
32.925
AutoCAD SHX Text
33.579
AutoCAD SHX Text
33.623
AutoCAD SHX Text
33.623
AutoCAD SHX Text
33.623
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
29.920
AutoCAD SHX Text
29.970
AutoCAD SHX Text
29.970
AutoCAD SHX Text
29.773
AutoCAD SHX Text
29.739
AutoCAD SHX Text
29.682
AutoCAD SHX Text
29.558
AutoCAD SHX Text
29.463
AutoCAD SHX Text
29.265
AutoCAD SHX Text
29.242
AutoCAD SHX Text
29.137
AutoCAD SHX Text
29.096
AutoCAD SHX Text
29.084
AutoCAD SHX Text
29.072
AutoCAD SHX Text
29.150
AutoCAD SHX Text
29.186
AutoCAD SHX Text
29.591
AutoCAD SHX Text
29.679
AutoCAD SHX Text
29.983
AutoCAD SHX Text
30.260
AutoCAD SHX Text
30.304
AutoCAD SHX Text
30.577
AutoCAD SHX Text
30.789
AutoCAD SHX Text
30.896
AutoCAD SHX Text
31.038
AutoCAD SHX Text
31.269
AutoCAD SHX Text
31.467
AutoCAD SHX Text
31.647
AutoCAD SHX Text
31.958
AutoCAD SHX Text
32.010
AutoCAD SHX Text
32.176
AutoCAD SHX Text
32.471
AutoCAD SHX Text
32.563
AutoCAD SHX Text
32.843
AutoCAD SHX Text
33.230
AutoCAD SHX Text
33.896
AutoCAD SHX Text
33.939
AutoCAD SHX Text
SURFACE
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
-0.007
AutoCAD SHX Text
+0.112
AutoCAD SHX Text
+0.448
AutoCAD SHX Text
+1.015
AutoCAD SHX Text
+1.014
AutoCAD SHX Text
+1.002
AutoCAD SHX Text
+0.872
AutoCAD SHX Text
+0.757
AutoCAD SHX Text
+0.509
AutoCAD SHX Text
+0.479
AutoCAD SHX Text
+0.412
AutoCAD SHX Text
+0.403
AutoCAD SHX Text
+0.393
AutoCAD SHX Text
+0.375
AutoCAD SHX Text
+0.888
AutoCAD SHX Text
+1.147
AutoCAD SHX Text
+0.288
AutoCAD SHX Text
+0.323
AutoCAD SHX Text
+0.320
AutoCAD SHX Text
+0.104
AutoCAD SHX Text
+0.121
AutoCAD SHX Text
+0.230
AutoCAD SHX Text
+0.226
AutoCAD SHX Text
+0.219
AutoCAD SHX Text
+0.211
AutoCAD SHX Text
+0.179
AutoCAD SHX Text
+0.231
AutoCAD SHX Text
+0.238
AutoCAD SHX Text
+0.275
AutoCAD SHX Text
+0.282
AutoCAD SHX Text
+0.328
AutoCAD SHX Text
+0.314
AutoCAD SHX Text
+0.315
AutoCAD SHX Text
+0.339
AutoCAD SHX Text
+0.305
AutoCAD SHX Text
+0.317
AutoCAD SHX Text
+0.316
AutoCAD SHX Text
CUT/FILL
AutoCAD SHX Text
Sag Ch 33.723 RL 29.072
AutoCAD SHX Text
R.L. 18.000
AutoCAD SHX Text
I.P. 29.920
AutoCAD SHX Text
5.50%
AutoCAD SHX Text
I.P. 29.970
AutoCAD SHX Text
0.00%
AutoCAD SHX Text
I.P. 29.970
AutoCAD SHX Text
-3.00%
AutoCAD SHX Text
I.P. 29.698
AutoCAD SHX Text
-5.58%
AutoCAD SHX Text
5.00
AutoCAD SHX Text
I.P. 29.184
AutoCAD SHX Text
-0.94%
AutoCAD SHX Text
10.00
AutoCAD SHX Text
I.P. 28.990
AutoCAD SHX Text
6.89%
AutoCAD SHX Text
20.00
AutoCAD SHX Text
I.P. 30.328
AutoCAD SHX Text
4.98%
AutoCAD SHX Text
10.00
AutoCAD SHX Text
I.P. 31.287
AutoCAD SHX Text
3.60%
AutoCAD SHX Text
10.00
AutoCAD SHX Text
I.P. 32.138
AutoCAD SHX Text
6.67%
AutoCAD SHX Text
10.00
AutoCAD SHX Text
Profile ALN-Temporary Access Road From 0.000 To 130.642
AutoCAD SHX Text
Scales: (H) 1:500 (V) 1:250
AutoCAD SHX Text
Inv 27.771
AutoCAD SHX Text
Inv 29.327
AutoCAD SHX Text
EXISTING SEWER PIPE
AutoCAD SHX Text
NEW STORMWATER CULVERT. BACKFILL WITH FULL DEPTH BASE A
Page 4: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

DESIGNED BY

PLOT DATE

PLOT DETAILS

DRAWN BYSCALES @ A3 PROJECT NO.

REVISIONDWG NO.

TITLEPROJECTAccepted

This document must be signed “Approved” by JMG to authorise it for use. JMG accept no liability whatsoever for unauthorised or unlicensed use.

DO NOT SCALE. Use only figured dimensions. Locations of structure, fittings, servicesetc on this drawing are indicative only. CONTRACTOR to check Architects & other projectdrawings for co-ordination between structure, fabric, fixtures, fittings, services etc.CONTRACTOR to site check all dimensions and exact locations of all items. JMG accepts noresponsibility for dimensional information scaled or digitally derived from this document.

The recipient client is licensed to use this drawing for itscommissioned purpose subject to authorisation per note above.Unlicensed use is prohibited. Unlicensed parties may not copy,reproduce or retransmit or amend this document or any part of thisdocument without JMG's prior written permission. Amendment ofthis document is prohibited by any party other than JMG. JMGreserve the right to revoke the licence for use of this document.

Copyright © All rights reserved. This drawing and its intellectualcontent remains the intellectual property of JOHNSTONE McGEE &GANDY PTY LTD (JMG).

Date

Approved Date

Accepted

Date

(Team Leader)

(Discipline Head)

(Group Manager)

07/03/2019

J185108SH PLANS-ROADS & SW.DWG49-51 Elizabeth Street, Launceston, Tas

ACN 009 547 139

117 Harrington Street, Hobart, Tas  (03) 6231 2555

(03) 6334 5548

www.jmg.net.au [email protected] [email protected]

REMARKDATEREV

Johnstone McGee & Gandy Pty. Ltd.

ABN 76 473 834 852

NOT FOR CONSTRUCTION

TENDER ISSUE

Engineers & Planners

SAFETY IN DESIGN REPORTIn accordance with the Workplace Health & Safety Acts and Regulations JMGhave considered the potential hazards and risks that are specific to this design.

The following risks which are unique tothis design have been identified:

This report does not relieve contractors from their responsibilities under the Act to identify,report, mitigate and manage all aspects of risk and safety.

C. PURDON

C. PURDON

G. ATHERTON

T1

1:500 B. LOCKEB. LOCKE

C04

J185108SHCROSS SECTIONS SHEET 1TEMPORARY ACCESS ROAD

EARLY WORKSSOUTHERN REMAND CENTRERISDON PRISON

NIL

AutoCAD SHX Text
RL23m
AutoCAD SHX Text
Ch 0.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-5.91
AutoCAD SHX Text
-5.17
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.50
AutoCAD SHX Text
-0.62
AutoCAD SHX Text
0.00
AutoCAD SHX Text
0.85
AutoCAD SHX Text
4.50
AutoCAD SHX Text
5.00
AutoCAD SHX Text
5.22
AutoCAD SHX Text
7.38
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
29.972
AutoCAD SHX Text
29.753
AutoCAD SHX Text
29.786
AutoCAD SHX Text
29.794
AutoCAD SHX Text
29.817
AutoCAD SHX Text
29.992
AutoCAD SHX Text
29.927
AutoCAD SHX Text
29.837
AutoCAD SHX Text
29.792
AutoCAD SHX Text
29.786
AutoCAD SHX Text
29.783
AutoCAD SHX Text
29.757
AutoCAD SHX Text
29.726
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
29.79
AutoCAD SHX Text
29.87
AutoCAD SHX Text
29.92
AutoCAD SHX Text
29.92
AutoCAD SHX Text
29.92
AutoCAD SHX Text
29.90
AutoCAD SHX Text
29.78
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL22m
AutoCAD SHX Text
Ch 10.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-7.53
AutoCAD SHX Text
-6.69
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.49
AutoCAD SHX Text
4.50
AutoCAD SHX Text
5.00
AutoCAD SHX Text
7.23
AutoCAD SHX Text
7.26
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
28.877
AutoCAD SHX Text
28.857
AutoCAD SHX Text
28.843
AutoCAD SHX Text
28.813
AutoCAD SHX Text
28.804
AutoCAD SHX Text
28.725
AutoCAD SHX Text
28.638
AutoCAD SHX Text
28.623
AutoCAD SHX Text
28.616
AutoCAD SHX Text
28.584
AutoCAD SHX Text
28.583
AutoCAD SHX Text
28.560
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
28.84
AutoCAD SHX Text
29.69
AutoCAD SHX Text
29.74
AutoCAD SHX Text
29.74
AutoCAD SHX Text
29.74
AutoCAD SHX Text
29.71
AutoCAD SHX Text
28.58
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL22m
AutoCAD SHX Text
Ch 20.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-5.97
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.50
AutoCAD SHX Text
-3.83
AutoCAD SHX Text
-3.12
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.83
AutoCAD SHX Text
4.50
AutoCAD SHX Text
5.00
AutoCAD SHX Text
5.35
AutoCAD SHX Text
6.04
AutoCAD SHX Text
6.76
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
28.882
AutoCAD SHX Text
28.864
AutoCAD SHX Text
28.855
AutoCAD SHX Text
28.850
AutoCAD SHX Text
28.844
AutoCAD SHX Text
28.837
AutoCAD SHX Text
28.756
AutoCAD SHX Text
28.657
AutoCAD SHX Text
28.640
AutoCAD SHX Text
28.627
AutoCAD SHX Text
28.617
AutoCAD SHX Text
28.585
AutoCAD SHX Text
28.550
AutoCAD SHX Text
28.504
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
28.86
AutoCAD SHX Text
29.35
AutoCAD SHX Text
29.40
AutoCAD SHX Text
29.38
AutoCAD SHX Text
29.26
AutoCAD SHX Text
29.16
AutoCAD SHX Text
29.13
AutoCAD SHX Text
29.10
AutoCAD SHX Text
28.58
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL22m
AutoCAD SHX Text
Ch 30.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.84
AutoCAD SHX Text
-4.46
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.69
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
29.030
AutoCAD SHX Text
29.054
AutoCAD SHX Text
28.923
AutoCAD SHX Text
28.898
AutoCAD SHX Text
28.871
AutoCAD SHX Text
28.693
AutoCAD SHX Text
28.637
AutoCAD SHX Text
28.631
AutoCAD SHX Text
28.623
AutoCAD SHX Text
28.587
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
28.92
AutoCAD SHX Text
29.15
AutoCAD SHX Text
29.20
AutoCAD SHX Text
29.10
AutoCAD SHX Text
28.99
AutoCAD SHX Text
28.97
AutoCAD SHX Text
28.62
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL21m
AutoCAD SHX Text
Ch 40.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-7.63
AutoCAD SHX Text
-7.16
AutoCAD SHX Text
-6.16
AutoCAD SHX Text
-4.91
AutoCAD SHX Text
-4.12
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
-1.89
AutoCAD SHX Text
0.00
AutoCAD SHX Text
1.81
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
5.24
AutoCAD SHX Text
7.28
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
28.428
AutoCAD SHX Text
28.332
AutoCAD SHX Text
28.244
AutoCAD SHX Text
28.125
AutoCAD SHX Text
27.977
AutoCAD SHX Text
27.823
AutoCAD SHX Text
27.847
AutoCAD SHX Text
27.951
AutoCAD SHX Text
28.120
AutoCAD SHX Text
28.262
AutoCAD SHX Text
28.392
AutoCAD SHX Text
28.394
AutoCAD SHX Text
28.397
AutoCAD SHX Text
28.400
AutoCAD SHX Text
28.589
AutoCAD SHX Text
28.539
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
28.13
AutoCAD SHX Text
29.20
AutoCAD SHX Text
29.25
AutoCAD SHX Text
29.15
AutoCAD SHX Text
29.04
AutoCAD SHX Text
29.02
AutoCAD SHX Text
28.40
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
Inv 27.801
AutoCAD SHX Text
RL23m
AutoCAD SHX Text
Ch 50.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-5.51
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.02
AutoCAD SHX Text
3.50
AutoCAD SHX Text
3.87
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.45
AutoCAD SHX Text
6.88
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
29.448
AutoCAD SHX Text
29.403
AutoCAD SHX Text
29.394
AutoCAD SHX Text
29.375
AutoCAD SHX Text
29.366
AutoCAD SHX Text
29.303
AutoCAD SHX Text
29.381
AutoCAD SHX Text
29.327
AutoCAD SHX Text
29.284
AutoCAD SHX Text
29.273
AutoCAD SHX Text
29.234
AutoCAD SHX Text
29.028
AutoCAD SHX Text
28.972
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
29.40
AutoCAD SHX Text
29.15
AutoCAD SHX Text
29.65
AutoCAD SHX Text
29.70
AutoCAD SHX Text
29.59
AutoCAD SHX Text
29.49
AutoCAD SHX Text
29.46
AutoCAD SHX Text
29.23
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
Inv 28.680
AutoCAD SHX Text
RL23m
AutoCAD SHX Text
Ch 60.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-5.94
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.07
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
-1.31
AutoCAD SHX Text
0.00
AutoCAD SHX Text
1.73
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.52
AutoCAD SHX Text
6.32
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
30.356
AutoCAD SHX Text
30.285
AutoCAD SHX Text
30.252
AutoCAD SHX Text
30.220
AutoCAD SHX Text
30.217
AutoCAD SHX Text
30.191
AutoCAD SHX Text
30.080
AutoCAD SHX Text
30.156
AutoCAD SHX Text
29.960
AutoCAD SHX Text
29.903
AutoCAD SHX Text
29.887
AutoCAD SHX Text
29.871
AutoCAD SHX Text
29.813
AutoCAD SHX Text
29.729
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
30.28
AutoCAD SHX Text
29.81
AutoCAD SHX Text
30.31
AutoCAD SHX Text
30.36
AutoCAD SHX Text
30.26
AutoCAD SHX Text
30.15
AutoCAD SHX Text
30.13
AutoCAD SHX Text
29.87
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
Inv 29.319
AutoCAD SHX Text
RL24m
AutoCAD SHX Text
Ch 70.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.07
AutoCAD SHX Text
-5.24
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.51
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.38
AutoCAD SHX Text
7.51
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
30.935
AutoCAD SHX Text
30.878
AutoCAD SHX Text
30.854
AutoCAD SHX Text
30.825
AutoCAD SHX Text
30.767
AutoCAD SHX Text
30.744
AutoCAD SHX Text
30.721
AutoCAD SHX Text
30.563
AutoCAD SHX Text
30.487
AutoCAD SHX Text
30.476
AutoCAD SHX Text
30.468
AutoCAD SHX Text
30.400
AutoCAD SHX Text
30.372
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
30.88
AutoCAD SHX Text
30.34
AutoCAD SHX Text
30.84
AutoCAD SHX Text
30.89
AutoCAD SHX Text
30.79
AutoCAD SHX Text
30.68
AutoCAD SHX Text
30.66
AutoCAD SHX Text
30.47
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
Inv 29.957
AutoCAD SHX Text
RL24m
AutoCAD SHX Text
Ch 80.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.69
AutoCAD SHX Text
-5.97
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.62
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
31.402
AutoCAD SHX Text
31.335
AutoCAD SHX Text
31.311
AutoCAD SHX Text
31.279
AutoCAD SHX Text
31.242
AutoCAD SHX Text
31.219
AutoCAD SHX Text
31.090
AutoCAD SHX Text
30.892
AutoCAD SHX Text
30.864
AutoCAD SHX Text
30.828
AutoCAD SHX Text
30.637
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
31.31
AutoCAD SHX Text
30.82
AutoCAD SHX Text
31.32
AutoCAD SHX Text
31.37
AutoCAD SHX Text
31.27
AutoCAD SHX Text
31.16
AutoCAD SHX Text
31.14
AutoCAD SHX Text
30.83
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
Inv 30.588
AutoCAD SHX Text
RL25m
AutoCAD SHX Text
Ch 90.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.22
AutoCAD SHX Text
-6.07
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.86
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
31.878
AutoCAD SHX Text
31.746
AutoCAD SHX Text
31.738
AutoCAD SHX Text
31.680
AutoCAD SHX Text
31.626
AutoCAD SHX Text
31.599
AutoCAD SHX Text
31.409
AutoCAD SHX Text
31.177
AutoCAD SHX Text
31.144
AutoCAD SHX Text
31.089
AutoCAD SHX Text
30.884
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
31.74
AutoCAD SHX Text
31.20
AutoCAD SHX Text
31.70
AutoCAD SHX Text
31.75
AutoCAD SHX Text
31.65
AutoCAD SHX Text
31.54
AutoCAD SHX Text
31.52
AutoCAD SHX Text
31.09
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL25m
AutoCAD SHX Text
Ch 100.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.66
AutoCAD SHX Text
-6.16
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.97
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
32.290
AutoCAD SHX Text
32.181
AutoCAD SHX Text
32.147
AutoCAD SHX Text
32.068
AutoCAD SHX Text
32.000
AutoCAD SHX Text
31.966
AutoCAD SHX Text
31.728
AutoCAD SHX Text
31.492
AutoCAD SHX Text
31.460
AutoCAD SHX Text
31.397
AutoCAD SHX Text
31.200
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
32.15
AutoCAD SHX Text
31.57
AutoCAD SHX Text
32.07
AutoCAD SHX Text
32.12
AutoCAD SHX Text
32.01
AutoCAD SHX Text
31.91
AutoCAD SHX Text
31.88
AutoCAD SHX Text
31.40
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL25m
AutoCAD SHX Text
Ch 110.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.43
AutoCAD SHX Text
-6.29
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
4.46
AutoCAD SHX Text
5.23
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
32.891
AutoCAD SHX Text
32.775
AutoCAD SHX Text
32.763
AutoCAD SHX Text
32.651
AutoCAD SHX Text
32.565
AutoCAD SHX Text
32.526
AutoCAD SHX Text
32.248
AutoCAD SHX Text
31.949
AutoCAD SHX Text
31.906
AutoCAD SHX Text
31.867
AutoCAD SHX Text
31.816
AutoCAD SHX Text
31.633
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
32.76
AutoCAD SHX Text
32.12
AutoCAD SHX Text
32.62
AutoCAD SHX Text
32.67
AutoCAD SHX Text
32.56
AutoCAD SHX Text
32.46
AutoCAD SHX Text
32.43
AutoCAD SHX Text
31.82
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
T1
AutoCAD SHX Text
7.03.2019
AutoCAD SHX Text
TENDER ISSUE
Page 5: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

DESIGNED BY

PLOT DATE

PLOT DETAILS

DRAWN BYSCALES @ A3 PROJECT NO.

REVISIONDWG NO.

TITLEPROJECTAccepted

This document must be signed “Approved” by JMG to authorise it for use. JMG accept no liability whatsoever for unauthorised or unlicensed use.

DO NOT SCALE. Use only figured dimensions. Locations of structure, fittings, servicesetc on this drawing are indicative only. CONTRACTOR to check Architects & other projectdrawings for co-ordination between structure, fabric, fixtures, fittings, services etc.CONTRACTOR to site check all dimensions and exact locations of all items. JMG accepts noresponsibility for dimensional information scaled or digitally derived from this document.

The recipient client is licensed to use this drawing for itscommissioned purpose subject to authorisation per note above.Unlicensed use is prohibited. Unlicensed parties may not copy,reproduce or retransmit or amend this document or any part of thisdocument without JMG's prior written permission. Amendment ofthis document is prohibited by any party other than JMG. JMGreserve the right to revoke the licence for use of this document.

Copyright © All rights reserved. This drawing and its intellectualcontent remains the intellectual property of JOHNSTONE McGEE &GANDY PTY LTD (JMG).

Date

Approved Date

Accepted

Date

(Team Leader)

(Discipline Head)

(Group Manager)

07/03/2019

J185108SH PLANS-ROADS & SW.DWG49-51 Elizabeth Street, Launceston, Tas

ACN 009 547 139

117 Harrington Street, Hobart, Tas  (03) 6231 2555

(03) 6334 5548

www.jmg.net.au [email protected] [email protected]

REMARKDATEREV

Johnstone McGee & Gandy Pty. Ltd.

ABN 76 473 834 852

NOT FOR CONSTRUCTION

TENDER ISSUE

Engineers & Planners

SAFETY IN DESIGN REPORTIn accordance with the Workplace Health & Safety Acts and Regulations JMGhave considered the potential hazards and risks that are specific to this design.

The following risks which are unique tothis design have been identified:

This report does not relieve contractors from their responsibilities under the Act to identify,report, mitigate and manage all aspects of risk and safety.

C. PURDON

C. PURDON

G. ATHERTON

T1

1:500 B. LOCKEB. LOCKE

C05

J185108SHCROSS SECTIONS SHEET 2TEMPORARY ACCESS ROAD

EARLY WORKSSOUTHERN REMAND CENTRERISDON PRISON

NIL

AutoCAD SHX Text
RL26m
AutoCAD SHX Text
Ch 120.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.49
AutoCAD SHX Text
-6.38
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
5.35
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
33.387
AutoCAD SHX Text
33.528
AutoCAD SHX Text
33.521
AutoCAD SHX Text
33.397
AutoCAD SHX Text
33.304
AutoCAD SHX Text
33.257
AutoCAD SHX Text
32.925
AutoCAD SHX Text
32.593
AutoCAD SHX Text
32.545
AutoCAD SHX Text
32.424
AutoCAD SHX Text
32.191
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
33.53
AutoCAD SHX Text
32.78
AutoCAD SHX Text
33.28
AutoCAD SHX Text
33.33
AutoCAD SHX Text
33.23
AutoCAD SHX Text
33.12
AutoCAD SHX Text
33.10
AutoCAD SHX Text
32.42
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL27m
AutoCAD SHX Text
Ch 130.00 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.44
AutoCAD SHX Text
-6.38
AutoCAD SHX Text
-5.46
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
5.30
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
34.303
AutoCAD SHX Text
34.171
AutoCAD SHX Text
34.166
AutoCAD SHX Text
34.103
AutoCAD SHX Text
34.055
AutoCAD SHX Text
33.956
AutoCAD SHX Text
33.908
AutoCAD SHX Text
33.579
AutoCAD SHX Text
33.274
AutoCAD SHX Text
33.230
AutoCAD SHX Text
33.117
AutoCAD SHX Text
32.882
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
34.17
AutoCAD SHX Text
33.45
AutoCAD SHX Text
33.95
AutoCAD SHX Text
34.00
AutoCAD SHX Text
33.90
AutoCAD SHX Text
33.79
AutoCAD SHX Text
33.77
AutoCAD SHX Text
33.12
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
RL26m
AutoCAD SHX Text
Ch 130.64 m
AutoCAD SHX Text
-8.00
AutoCAD SHX Text
-6.43
AutoCAD SHX Text
-6.04
AutoCAD SHX Text
-5.22
AutoCAD SHX Text
-5.00
AutoCAD SHX Text
-4.00
AutoCAD SHX Text
-3.50
AutoCAD SHX Text
0.00
AutoCAD SHX Text
3.50
AutoCAD SHX Text
4.00
AutoCAD SHX Text
5.30
AutoCAD SHX Text
8.00
AutoCAD SHX Text
OFFSET
AutoCAD SHX Text
34.343
AutoCAD SHX Text
34.211
AutoCAD SHX Text
34.177
AutoCAD SHX Text
34.121
AutoCAD SHX Text
34.098
AutoCAD SHX Text
33.998
AutoCAD SHX Text
33.950
AutoCAD SHX Text
33.623
AutoCAD SHX Text
33.318
AutoCAD SHX Text
33.274
AutoCAD SHX Text
33.162
AutoCAD SHX Text
32.926
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
34.21
AutoCAD SHX Text
33.49
AutoCAD SHX Text
33.99
AutoCAD SHX Text
34.04
AutoCAD SHX Text
33.94
AutoCAD SHX Text
33.83
AutoCAD SHX Text
33.81
AutoCAD SHX Text
33.16
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
T1
AutoCAD SHX Text
7.03.2019
AutoCAD SHX Text
TENDER ISSUE
Page 6: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

S

S

S

S

S

S

S

S

S

S

S

SS

SS

SS

SS

SS

SS

SS

SS

OH/E

LEC

OH/E

LEC

OH/E

LEC

OH/E

LEC

OH/E

LEC

SWSW

SWSW

SW

S

S

SS

SS

SS

SS

SS

SS

SWSW

SW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SW

34

36

38

40

42 42

NEW TEMPORARY ACCESS ROAD CONSTRUCTED DURING PRELIMINARY WORKS

NEW SOUTHEN REMAND CENTRE COMPOUND

MARY HUTCHINSON WOMEN'S PRISON

RPC

GATEHOUSE &SALLY PORT

3.4m HIGH ELECTRIFIED FENCE

1.5m HIGH CYCLONE FENCE

RON BARWICK

KEERIA ROAD

LANTANA ROAD

EAST DERWENT HIGHW

AY

GRASSTREE

HILL ROAD

LOCATION AALL TOPSOIL REMOVED FROM AREA 1 AND AREA 2 FOR THE NEW SOUTHERN REMAND CENTRE SITE TO BE LOCATED HERE

PRELIMINARY

SCALE @ A1

CHECKED

DRAWN

DATEJOB NUMBER

PROJECT ADDRESS

PRINCIPAL

PROJECT TITLE

DRAWING

REVISIONS

KEYPLAN

1 : 1000

PRELIMINARY WORKS LOCATIONPLAN

1875

DEPARTMENT OF JUSTICE

FEB 2019

KM

ANA000

EAST DERWENT HIGHWAYRISDON VALE TAS 7016

SOUTHERN REMAND CENTREPROGRAM

0 50m10 20 30 40

1 : 1000

PRELIMINARY WORKS - LOCATION PLAN01

Page 7: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full

S

S

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

S

OH/E

LEC

OH/E

LEC

OH/E

LEC

OH/E

LEC

OH/E

LEC

SWSW

SW

SWSW

S

S

S

S

S

S

S

S

S

S

S

S

S

S

SWSW

SW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SWSW

SW

34

36

38

40

42 42

EXIS

TING

ELE

CTRI

C FE

NCE

TYPE

E46

EXIS

TING

PER

IMET

ER S

ECUR

ITY

FENC

E TY

PE P

B

EXIS

TING

DEM

ARCA

TION

FEN

CE T

YPE

D1

EXIS

TING

ELE

CTRI

C FE

NCE

TYPE

E30

EXISTING ELECTRIC FENCE TYPE E45

EXISTING DEMARCATION FENCE TYPE CW24

NEW TEMPORARY ACCESS ROAD. REFER TO CIVIL ENGINEER'S DRAWINGS

SEWERMANHOLE

ELEC. PIT

ELEC. TURRET

CLEAR EXISTING PLANTINGTO MAKE WAY FOR NEW ACCESS ROAD

NEW SOUTHEN REMAND CENTRE COMPOUND

MARY HUTCHINSON WOMEN'S PRISON

RPC

GATEHOUSE

SALLY PORT

KEERIA ROAD

LANTANA ROAD

EXISTING 3.4m HIGH ELECTRIFIED FENCE TO REMAIN. MAINTAIN FENCE INTEGRITY WHEN REMOVING TOPSOIL

EXISTING 1.5m HIGH CYCLONE FENCE TO REMAIN. MAINTAIN FENCE INTEGRITY WHEN REMOVING TOPSOIL

3.4m HIGH ELECTRIFIED FENCE

1.5m HIGH CYCLONE FENCE

EXISTING ROADWAY TO REMAIN.

REMOVE TOPSOIL FROM HATCHED AREA TO A DEPTH OF 400mm. RELOCATE TOPSOIL TO LOCATION A ON DRAWING A000

AREA 1

REMOVE TOPSOIL FROM HATCHED AREA TO A DEPTH OF 400mmRELOCATE TOPSOIL TO LOCATION A ON DRAWING A000

AREA 2

0 25m5 10 15 20

PRELIMINARY

SCALE @ A1

CHECKED

DRAWN

DATEJOB NUMBER

PROJECT ADDRESS

PRINCIPAL

PROJECT TITLE

DRAWING

REVISIONS

KEYPLAN

1 : 500

PRELIMINARY WORKS SITEPLAN

1875

DEPARTMENT OF JUSTICE

FEB 2019

KM

ANA001

EAST DERWENT HIGHWAYRISDON VALE TAS 7016

SOUTHERN REMAND CENTREPROGRAM

1 : 500

PRELIMINARY WORKS - SITE PLAN01

Page 8: DEVELOPMENT APPLICATION · 2019-07-16 · new temporary 15m long class 8 dn900 polypropylene stormwater culvert. extend past existing aerial sewer crossing and backfill with full