Statewide Conference on Local BridgesSyracuse, New York
Thursday, October 26, 2006
Developing a Bridge Developing a Bridge Maintenance Work PlanMaintenance Work Plan
““ZenZen”” and the Art of Bridge Maintenanceand the Art of Bridge Maintenance
Ricky D. Hunkins, P.E.NYSDOT, Region 7 Bridge Maintenance
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 22
OutlineOutline……
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 33
OutlineOutline……..
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 44
Bridge Maintenance ConceptBridge Maintenance Concept
Who is Responsible?Who is Responsible?Designer Designer –– Inspector Inspector -- Maintenance Engineer? Maintenance Engineer?
What are They Responsible For?What are They Responsible For?Stability Stability –– Safety Safety –– Performance Performance –– Economy?Economy?
Where Does BM Occur?Where Does BM Occur?Which Bridge Which Bridge –– Task?Task?
When Does BM Occur?When Does BM Occur?Point in Bridge Life Point in Bridge Life –– Cyclical Cyclical –– Responsive? Responsive?
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 55
The The ENDEND of the of the BeginningBeginning(Deterioration vs. Time)(Deterioration vs. Time)
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 66
OutlineOutline……..
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 77
Hong Kong:14” of Rain and Not a Puddle
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 88
ExpectationsExpectations (All of (All of ‘‘em)em)
Bridge LawBridge Law (Federal and State)(Federal and State)
•• Oriented toward Bridge SafetyOriented toward Bridge SafetyAsset ManagementAsset Management (Federal (Federal State $$$)State $$$)
•• Oriented toward Economical PerformanceOriented toward Economical PerformanceCorridor/System Class PerformanceCorridor/System Class Performance•• May Prescribe Minimum StandardsMay Prescribe Minimum StandardsAgency and Local GoalsAgency and Local Goals……Public (Media) ExpectationsPublic (Media) Expectations……
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 99
Bridge Law Bridge Law ““101101””(Where the Buck Stops Starts)(Where the Buck Stops Starts)
Federal LawFederal Law•• GenesisGenesis-- 1968 Federal Highway Act1968 Federal Highway Act•• Currently NBIS (Nat. Bridge Insp. Standards) Currently NBIS (Nat. Bridge Insp. Standards) StateState (Uniform Code(Uniform Code-- 17 NYCRR, Part 165)17 NYCRR, Part 165)
•• Bridge Inspection (Condition)Bridge Inspection (Condition)•• Structural Integrity, Safety Rating (Potential)Structural Integrity, Safety Rating (Potential)•• Load Capacity (Level 1, Level 2, Level 3)Load Capacity (Level 1, Level 2, Level 3)•• Filing of Bridge Design (P.E. Required)Filing of Bridge Design (P.E. Required)
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1010
Asset ManagementAsset Management(The New Buzz Word(The New Buzz Word……))Concept per FHWA WebsiteConcept per FHWA Website•• Economic and Engineering Based Economic and Engineering Based
““Business ProcessBusiness Process””•• Needs are Increasing Needs are Increasing ---- Available Resources Available Resources
are Shrinking.are Shrinking.•• Considers Considers ““Time HorizonTime Horizon”” or Life Cycle Costor Life Cycle Cost•• Increasing Public Expectations for Increasing Public Expectations for
Performance & Performance & ‘‘ReliabilityReliability’’•• Summary: Make it Last Summary: Make it Last ---- EconomicallyEconomically
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1111
OutlineOutline……..
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1212
Use Use AllAll Available DataAvailable Data
Inspection Reports Inspection Reports (NYSDOT)(NYSDOT)
Load Rating Load Rating (NYSDOT= Level 2 Only)(NYSDOT= Level 2 Only)
BSA BSA ((NYSDOT= Hydraulic OnlyNYSDOT= Hydraulic Only))
SystemicSystemic-- Postings, Clearances, etcPostings, Clearances, etcCapitol Program Capitol Program (NYSDOT & Local Funds)(NYSDOT & Local Funds)
Preventative Maintenance CyclesPreventative Maintenance CyclesSpecial AttentionSpecial Attention
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1313
NYSDOT Bridge InspectionNYSDOT Bridge Inspection
Inspection ReportInspection ReportDiving InspectionDiving Inspection (Water >6(Water >6’’))InventoryInventory (Static Description Info)(Static Description Info)Load RatingLoad Rating (Level 2 = Automated)(Level 2 = Automated)Bridge Inspection Bridge Inspection ““FlagsFlags””•• Structural (Red, Yellow)Structural (Red, Yellow)•• SafetySafety•• Prompt Interim Action (PIA)Prompt Interim Action (PIA)-- 24 hour Fix24 hour Fix
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1414
KEY Inspection ConceptsKEY Inspection Concepts
Existing Condition Existing Condition -- Original DesignOriginal DesignRating for Individual ElementsRating for Individual ElementsPhotos and NotesPhotos and Notes(Only Location (Only Location ““Rate Worst OfRate Worst Of”” Described)Described)
Condition RatingCondition Rating•• Weighted Average of Major ComponentsWeighted Average of Major Components•• Heavy = Substructure, SuperstructureHeavy = Substructure, Superstructure•• Light = Bridge Seats, Bearings, JointsLight = Bridge Seats, Bearings, Joints
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1515
Bridge Safety EvaluationBridge Safety Evaluation
Overall Safety Against FailureOverall Safety Against FailureVulnerability = Vulnerability = PotentialPotential (not Actual)(not Actual)
NYSDOT: NYSDOT: Bridge Safety AssuranceBridge Safety Assurance (BSA)(BSA)1.1. HydraulicHydraulic (Specific In Law) (Specific In Law) DOT Does AllDOT Does All2.2. Steel Details Steel Details (Fatigue in Code >1980(Fatigue in Code >1980’’s)s)3.3. Concrete DetailsConcrete Details4.4. OverloadOverload5.5. CollisionCollision6.6. Seismic (Earthquake)Seismic (Earthquake)
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1616
ACTUAL (Insp.) vs. POTENTIAL (BSA)Guiyang, Guizhou Province
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1717
OutlineOutline……..
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1818
““NeedsNeeds”” IdentificationIdentification
NetworkNetwork--Level ApproachLevel Approach•• Automated, Data Generated, Logic BasedAutomated, Data Generated, Logic Based•• ““BirdsBirds--EyeEye”” ViewView•• Networks, Regions, Corridors, etc.Networks, Regions, Corridors, etc.
BridgeBridge--Level ApproachLevel Approach•• All Data for a Single BridgeAll Data for a Single Bridge•• ““MicroscopicMicroscopic”” ViewView
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 1919
OutlineOutline……..
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2020
Work Work ““SelectionSelection”” (The Plan)(The Plan)
Objective & ScopeObjective & Scope•• Preventive, Corrective, ImprovementPreventive, Corrective, ImprovementEvaluation & PrioritizationEvaluation & Prioritization•• Not Not allall Low Ratings = Real Low Ratings = Real ““NeedNeed””•• ONLY Initial TriggerONLY Initial Trigger-- Must Evaluate & FilterMust Evaluate & FilterMeans of AccomplishmentMeans of AccomplishmentPreliminary Estimate (Hours, $$$)Preliminary Estimate (Hours, $$$)TrackingTracking
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2121
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2222
Preventive MaintenancePreventive Maintenance
PM Extends Useable Life at Low CostPM Extends Useable Life at Low CostNot Intended to Raise CRNot Intended to Raise CR•• Often PM Items not Heavily Weighted in CR Often PM Items not Heavily Weighted in CR
Some Tasks areSome Tasks are CyclicalCyclical•• i.e. Washing, Sealing Concrete, Painti.e. Washing, Sealing Concrete, Paint
Other Tasks are Other Tasks are As NeededAs Needed•• i.e. Joint Replacement or Repairsi.e. Joint Replacement or Repairs
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2323
Corrective MaintenanceCorrective Maintenance
Usually Intended to Raise RatingsUsually Intended to Raise RatingsIndividual Individual ““BadBad”” Element(s)Element(s)Focused TreatmentFocused Treatmenti.e. i.e. ““Vertical Vertical –– DownDown””, , ““55--7 Program7 Program””, etc., etc.Many Many ““BadBad”” Elements = DeficientElements = DeficientBased on Condition Rating (Weighted Avg.)Based on Condition Rating (Weighted Avg.)If Extensive = If Extensive = ““RehabilitationRehabilitation””Sometimes to Correct DesignSometimes to Correct Designi.e. Fatigue Prone Details, Strengthening, etc. i.e. Fatigue Prone Details, Strengthening, etc.
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2424
AlsoAlso……
PrioritizationPrioritizationI Use a simple I Use a simple ““LowLow””, , ““MediumMedium””, , ““HighHigh””Preliminary (very) EstimatePreliminary (very) EstimateMeans of AccomplishmentMeans of Accomplishment•• State Crews (Summer Only)State Crews (Summer Only)•• Capitol ConstructionCapitol Construction•• Maintenance By ContractMaintenance By Contract•• Unscheduled Work (State & Contract)Unscheduled Work (State & Contract)
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2525
Develop Actual PlanDevelop Actual Plan
List Work, Means, & PriorityList Work, Means, & PriorityI use a simple spreadsheetI use a simple spreadsheetOther Tools are EvolvingOther Tools are Evolving
Juggle to fit Available ResourcesJuggle to fit Available ResourcesSimple spreadsheet manipulation, sortingSimple spreadsheet manipulation, sorting
Assign Work Orders to CrewsAssign Work Orders to CrewsPopulate DOTPopulate DOT’’s Work Reporting Toolss Work Reporting Tools
Recommendations to Capitol ProgramRecommendations to Capitol ProgramRecycle Process and ReRecycle Process and Re--Juggle if NecessaryJuggle if Necessary
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2626
RISK MANAGEMENTGuiyang, Guizhou Province
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2727
OutlineOutline……..
1.1. Bridge Maintenance ConceptBridge Maintenance Concept2.2. Expectations and RequirementsExpectations and Requirements3.3. Data and Available InfoData and Available Info4.4. Needs IdentificationNeeds Identification5.5. Work SelectionWork Selection6.6. Follow UpFollow Up
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2828
Manage Unmet NeedsManage Unmet Needs(Subsequent Years)(Subsequent Years)
Sovereign ImmunitySovereign Immunity-- Abolished in NYSAbolished in NYSCAN sue the King. (Court of Claims Act CAN sue the King. (Court of Claims Act §§8)8)Qualified ImmunityQualified Immunity--Responsible for risks to the extent of Responsible for risks to the extent of resources under our control within the resources under our control within the context of a context of a ““QualifiedQualified”” decision.decision.Manage BacklogManage Backlog-- We Have Liability!We Have Liability!
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 2929
Management ToolsManagement Tools
Demonstrates the Demonstrates the ““QualifiedQualified”” DecisionDecisionReduces Chance for Lost IssuesReduces Chance for Lost IssuesAppropriate Prioritization of Appropriate Prioritization of ““OldOld””Undone Work with Undone Work with ““NewNew”” WorkWorkSize SpecificSize Specific (Increasing Complexity)(Increasing Complexity)•• Paper ListsPaper Lists•• ““NormalNormal”” Office ProgramsOffice Programs
Spreadsheets, Text Lists, DatabasesSpreadsheets, Text Lists, Databases•• ““CustomCustom”” Management ProgramsManagement Programs
10/23/0610/23/06 Bridge Maint PlanBridge Maint Plan-- Ricky D. Hunkins, P.E.Ricky D. Hunkins, P.E. 3030
Questions?Questions?