SUMMARY
R&D and Consultancy services since A.Y. 2016-17 to A.Y. 2018-19
S.N. Activity Agency Amount
(Lacs)
Numbers
Ongoing Completed
1 R&D Projects AICTE 34.33 2 1
2 Consultancy - 62.58 0 193
R&D and Consultancy services in current A.Y. 2019-2020
S.N. Activity Agency Amount
(Lacs)
Numbers
Ongoing Completed
1 R&D Projects AICTE 21.58 2 0
2 Consultancy - 10.13 0 45
R&D Projects Submitted in current A.Y. 2019-2020
S.N. Activity Agency Amount
(Lacs)
Numbers
1 R&D Projects AICTE/ MODROB/ IRS 50.17 5
2
DETAILS OF R&D AND CONSULTANCY ACTIVITIES
(A) R&D ACTIVITY
One externally funded project was completed and two new projects were awarded in the academic year
2018-2019. The details of completed and awarded projects are given below
Details of completed R&D project
S.
No. Title of project
Sponsoring
Agency
Year of
completion PI/CO-PI
Amount
released
(lacs)
Status
1.
Construction
time-cost trade off analysis using
optimization
techniques
AICTE
(RPS) 20.10.2018
Dr. R. Kansal
(PI) 12.75 Completed
Total Amount Rs 12.75 lac
Details of ongoing R&D projects
S.
No. Title of project
Sponsoring
Agency
Year of
Funding (Duration)
PI/CO-PI
Amount
released
(lacs)
Status
1.
Nonlinear
Mechanics of Elasto-Flexible
Cables using
Placement Model
AICTE
(NPIU-CRS)
18.06.2019
(1 year)
Dr. Pankaj Kumar
(PI), Dr. S. K. Jain (Co-PI), Dr.
Sanjay Tiwari
(Co-PI)
10.58 Ongoing
2.
Development of optimum Front for
TIME-Cost –
Tradeoff in Construction
Project
AICTE
NDF (RPS)
13.03.2019
(2 years)
Dr. M. K. Trivedi
(PI) 11.00 Ongoing
Total Amount Rs 21.58 lac
3
Details of Submitted R&D projects
S.
No. Title of project
Sponsoring
Agency
Year of
submission
PI/
CO-PI
Amount
(lacs)
1.
Chemical Characterization of Particulate Matter (PM 2.5 &
10)
AICTE
(MODROB) 2019 Dr. M. K. Trivedi 20
2.
Thermal Stresses for Composite Box Girder
Bridges in India
AICTE
(RPS) 2019 Dr. S. Tiwari 25
3.
Multi-Objective Optimization
in Construction Projects using NSGA-III
TEQIP-III
(IRS) 2020
Dr. M.K. Trivedi
(PI) 1.17
4.
A Supervised Real time
algorithm of receptor
modelling of Particulate matter for source
identification using artificial
neural network with Python programming.
TEQIP-III
(IRS) 2020
Prof. A. K. Saxena
(PI)
2.0
5. Development of Rationalized Water Quality Index
TEQIP-III (IRS)
2020
Prof. A. K.
Agrawal
(PI)
2.0
Total Amount Rs 50.17
lacs
4
(B) CONSULTANCY PROJECTS:
Year wise details of consultancy work completed since A.Y. 2016-2017 are provided below.
Consultancy work carried out in the A.Y. 2016-2017
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
1 05/1005
Additional
Commissioner Gwalior Municipal
Corporation
Third Party
technical
inspection report
390000 8/11/2016 T04005
2 05/842 CMO, Mho, Distt. Bhind
Checking of
design &drawing of water supply
scheme
159600 3/9/2016 T03869
3 05/769
M/S Sarthik
Construction 102 Dream Apartment
Jivaji Nagar Thatipur
Gwalior
Checking of
design and
drawing of water supply scheme
154000 26/7/2016 T03796
4 06/186 The Commissioner Nagar Palika Nigam
Morena
Checking of
design &drawing
of LIG ,EWS &
MIG housed
140000 24/3/2017 T04199
5 06/34 CMO Nagar Parishad Shahpura Distt.
Dindori
Checking of
design & drawing
of water supply system
125000 29/12/2016 T04047
6 05/845
CMO,Nagar
Parishad, Indergarh,
Datia
Checking of
design of water
supply scheme
112000 16/09/2016 T03872
7 05/968 CMO. Nagar Palika Parishad Ambah
Morena
Checking of
distribution
system and water
supply scheme
95200 8/11/2016 T03996
8 06/239 CMO Nagar Palika
Parishad Chhaterpur Crust design 84000 28/2/2017 T04251
9 06/144
CMO , Nagar
Parishad Mau, Bhind
(MP)
Checking of
design and drawing of
building
58170 2/3/2017 T04157
10 06/77 EE , PWD, Shivpuri Dbm mix design & rc
57120 19/1/2017 T04090
11 06/152 M/S Awn associates Architecture
Crust design of C-C road
42000 1/3/2017 T04165
5
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
construction Planning
B-5/86,New Delhi
12 05/676 AE, NCR Gwalior Mix design-m35-
7&28 days 41850 22/3/2016 T03702
13 05/677 AE, NCR Gwalior Mix design-m40-
7days 41850 22/3/2016 T03703
14 05/718 AE, NCR Gwalior Mix design -m25-
7days 41800 22/3/2016 T03744
15 05/719 AE, NCR Gwalior Mix design-m30-
7days 41800 22/3/2016 T03745
16 05/653 AE ,IIDC Gwalior
M.P Mix design 29295 24/5/2016 T03678
17 06/172
HSCC Limited, Site
Office JA Hospital Near Kamlanagar
Hospital ,Gwalior
Cement 7 days 28701 15/2/2017 T04185
18 05/963
AE, Water supply
Nagar Nigam Moti Jheel, Gwalior
Checking the
quality of water 28000 22/11/2016 T03990
19 05/964 E.E PWD , Gwalior
Technical
suggestion for back filling
28000 22/11/2016 T03991
20 06/145
Secretary Krishi Upaj
Mandi Lashkar
Gwalior
Inspection report of mandi campus
28000 23/1/2017 T04158
21 06/295 EE, Water resource
division , Sheopur
Mix Design M15
and M10-7days 28000 13/2/2017 T04307
22 05/831 Registrar Jiwaji
University Gwalior
Remedial
measures for repair the cracks
27900 1/9/2016 T03858
23 05/705
Depti General
Manager MP Jal Nigam maryadit PIU
Gwalior
Mix Design-M25&M30-7days
22400 9/6/2016 T03731
24 05/806 CMO Nagar
Parishad,Damoh Crust design 21000 21/07/2016 T03833
25 06/125 CMO , Ambah ,Distt.
Morena
Checking of crust
design of ambah 21000 23/2/2017 T04138
26 06/238
CMO Nagar Palika
Parishad Kakerhati Distt. Panna
Crust design 21000 23/2/2017 T04250
27 06/209
CMO, Nagar
Parishad Mehgaon ,
Distt Bhind
Design of toe wall 21000 24/3/2017 T04222
6
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
28 05/727 CMO Nagar parishad
Daboh Bhind
Mix Design-
M25&M30-7days 19600 20/6/2016 T03753
29 06/26
E.E, Industrial
Infrastructure
Development corporation Gwalior
Checking of
design &drawing of office building,
overhead water
tank sump well
18200 30/12/2016 T04039
30 05/894
C.M.O. Nagar palika
parishad ambah
morena
Job mix 14000 19/09/2016 T03921
31 05/897 A.E ,Shivpuri (ITBP) Sub division, CPWD,
Shivpuri
Mix Design M25-
7days 14000 29/09/2016 T03924
32 05/924
AE ,Sub division
jhansi CPWD, Gwalior road Jhansi
Mix Design M25-
7&28days 14000 16/09/2016 T03951
33 05/925 EE, CPWD,Shastri
nagar Gwalior
Mix Design M25-
7days 14000 21/09/2016 T03952
34 05/926 EE, CPWD,Shastri nagar Gwalior
Mix Design M25-7days
14000 21/09/2016 T03953
35 05/927
EE,Gwalior Project
Sub Division CPWD, shastri Nagar
Gwalior
Mix Design M25-7days
14000 21/09/2016 T03952
36 05/967 Nagar Palika Nigam,
Gwalior
Checking and
design of sump well
14000 16/11/2016 T03993
37 05/1008
Chief Engineer
Bridge N.C Railway,
Jhansi central
Checking of
Design &drawing 14000 15/12/2016 T04008
38 05/1010 AE Gwalior ,Sub
division I PWD
Mix Design M25-
7&28days 14000 5/10/2016 T04010
39 05/1011 AE Gwalior, Sub
division II PWD
Mix Design M25-
7&28days 14000 5/10/2016 T04011
40 05/1012 AE Gwalior, Sub
division III PWD
Mix Design M25-
7&28days 14000 5/10/2016 T04012
41 06/04 AEEC (CIVIL) AGE BIR R-II Maharajpur
Gwalior
Mix design m25-
7days 14000 19/11/2016 T04018
42 06/52
MIS Pathak
Architectural Associate Pvt.Ltd.
First floor ,Vijay
Lakshmi Gwalior
Checking of
Design &
Drawing of Houses
14000 24/1/2017 T04065
7
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
43 06/76
A.E , Jhansi central
Sub Division CPWD,
NRCAF, Jhansi
Mix Design M25-7&28days
14000 16/12/2016 T04089
44 06/83 EE, PWD, Bridge Gwalior
Mix design m30-7days
14000 28/12/2016 T04096
45 06/84 EE, PWD, Bridge
Gwalior
Mix design m30-
7days 14000 28/12/2016 T04097
46 06/85 A.E Lok Nirma Vibhag Tekanpur
central
Mix Design M25-
7&28days 14000 19/12/2016 T04098
47 06/257 NC railway jhansi Mix design m20-7&28days
14000 4/3/2017 T04269
48 06/103
E.E ,PWD , Bridge
Construction
Division Gwalior
Mix Design M30-7&28days
14000 28/12/2017 T04116
49 06/112
Nagar Parishad
Officer, District
Chatarpur
Mix design m40-7days
14000 6/2/2017 T04125
50 06/124
EE, PHE ,Division
No-2 Motijheel Gwalior
Estimation of discharge from
rectangular gate
of tighra
14000 14/10/2016 T04137
51 06/164 EE water resources division , sheopur
(M.P)
Mix Design M15-
7&28days 14000 23/1/2017 T04177
52 06/165 EE water resources division , sheopur
(M.P)
Mix Design M15-
7&28days 14000 23/1/2017 T04178
53 06/166
EE water resources
division , sheopur (M.P)
Mix Design M10-
7&28days 14000 23/1/2017 T04179
54 06/167 CMO Nagar parishad
Bijawar Chatarpur
Mix Design M40-
7&28days 14000 6/2/2017 T04180
55 06/336 EE, Water resouce division , Sheopur
Mix Design M20-7&28days
14000 13/2/2017 T04348
56 06/296 EE, Water resouce
division , Sheopur
Mix Design M20-
7days 14000 13/2/2017 TO4308
57 06/08
Project Manager ,L&T, Construction ,
water effluent
treatment IC Tikamgarh Gwalior
Mix Design M20-7days
12600 11/11/2016 T04022
58 06/09
Project Manager
,L&T, Construction ,
water effluent
Mix Design M25-7&28days
12600 11/11/2016 T04023
8
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
treatment IC
Tikamgarh Gwalior
59 06/32
Project Manager
,L&T, Construction ,
water effluent
treatment IC Tikamgarh Gwalior
Mix Design M20-7&28days
12600 11/11/2016 T04045
60 06/33
Project Manager
,L&T, Construction , water effluent
treatment IC
Tikamgarh Gwalior
Mix Design M25-
7&28days 12600 11/11/2016 T04046
61 06/01 Municipal Corporation Nagar
Nigam ,Bhind
Mix design m30-
7days 11400 19/11/2016 T04015
62 05/755
CMO Nagar Parishad
Noori Dist. Tikamgarh
Checking of
distribution pipe 11200 27/7/2016 T03782
63 05/759 EE Nagar Palika
Nigam Morena
Checking of
design and drawing of pulia
11200 1/8/2016 T03786
64 05/792
AE Shivpuri Kendria
Upmandal Cpwd
Shivpuri
Mix design m25-7&28days
11200 28/6/2016 T03819
65 06/120 EE, IIDC Plaza 39, City center Gwalior
Checking of
design & drawing
of sump well
11200 16/2/2017 T04133
66 05/665 C.C.E (r&d) Central Rao Tula Ram Marg
Delhi
Mix design-m25-
7days 11160 11/5/2016 T03690
67 05/666
C.C.E (r&d) Central
Rao Tula Ram Marg Delhi
Mix design -m40-
7days 11160 11/5/2016 T03691
68 05/815
C.C.E (r&d) Central
Rao Tula Ram Marg Delhi
Mix designm40-
7&28 days 11160 27/05/2016 T03842
69 05/728
EE MP State krishi
vipran board
technical department Sambhag morena
Mix Design-M30-
7days 10501 1/6/2016 T03754
70 05/641
Shr AB sharma EE
water resource
devision sheopur
Mix Design-7
DAYS 10463 26/5/2016 T03665
9
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
71 05/732 CMO Nagar Palika Radhogarh Vijaypur
Checking of
design and
drawing
9800 21/7/2016 T03758
72 05/640
EE MP State Krishi Vipran Board
Technical
Department Gwalior
Mix Design -
M30-7days 9765 3/5/2016 T03664
73 05/922
CMO, Nagar
Parishad
Mehgaon,Distt Bhind
Mix design m30-
7&28 days 9765 25/02/2016 T03949
74 05/748
Project Engineer MP Police Housing
Corporation Limited
Gwalior
Remediation of
toilet 7000 22/7/2016 T03775
75 06/148
M/S AWNW Associates B-5/86
Paschim vihar New
Delhi
Soil 5600 14/2/2017 T04161
76 05/800 EE,ELM ,Water
Resource Department
Checking of paint
thickness 4200 25/07/2016 T03828
77 05/795 AE GSPD-III CPWD
Gwalior
Cement 7&28
days 4046 27/5/2016 T03822
78 06/86
Assistant Division
Engineer N.C
Railway Mathura
junction
Aggregate 3640 10/2/2017 T04099
79 06/87
Assistant Division
Engineer N.C
Railway Mathura junction
Aggregate 3640 10/2/2017 T04100
80 06/88
Assistant Division
Engineer N.C
Railway Mathura junction
Aggregate 3640 10/2/2017 T04101
81 05/938
C.M.O. Municipal
council Dabra,
Gwalior
Cement 3221 17/09/2016 T03964
82 05/611 AE CSD2, CPWD,
Tekanpur
Mix design- m25-
7days 1395 17/5/2016 T03631
83 05/612 AE CSD2, CPWD,
Tekanpur
Mix design- m10-
28days 1395 17/5/2016 T03632
TOTAL 2532637
10
Consultancy work carried out in the A.Y. 2017-2018
S.N
o
Record
Registratio
n No.
Agency Type of
Consultanc
y
Amount Date Institute
Hologram
No.
1 06/491 E E Municipal Corporation
Morena
TPQM
Report
295000 T04565
2 06/216 CMO Nagar parishad GOHAD BHIND
crust design 54600 3/4/2017 T04229
3 06/415 AE M.P Housing &Infra Div
Board Sheopur
structure
design and
drawing of general
facilities
53200 11/9/2017 T04478
4 06/246 M/S Techno consultant
Pvt.Ltd Chatarpur
crust design 44800 12/4/2017 T04258
5 06/325 CMO Nagar Palika Parishad
Distt. Ashok Nagar
Chatarpur
crust design 42000 9/5/2017 T04337
6 06/376 M/S Asha Techno
Consultant, Chhatarpur
crust design 40040 12/9/2017 T0439
7 06/410 Sh. S D Arya General
Manager NBCL Gwalior
Mix Design
M25-7&28days
29500 4/9/2017 T04473
8 06/411 Sh. S D Arya General
Manager NBCL Gwalior
Mix Design
M30 -
7&28days
29500 4/9/2017 T04474
9 06/474 EE IIDC (G)MP Ltd.39 city
center Gwalior
checking and
verification
of design and drawing
29500 18/9/2017 T04537
10 06/326 CMO Nagar palika parishad
Rehli & Deori
crust design 28000 12/5/2017 T04338
11 06/358 CMO NAGAR Palika Parishad, Chandla District
Chhatarpur
crust design 21450 30/08/2017 T04421
12 06/359 CMO NAGAR Palika
Parishad, Lovenish Nagar Chatarpur
crust design
of C-C road
21450 7/9/2017 T04422
13 06/245 Sh. S.K construction
engineer D.D Nagar
,Gwalior
crust design
of C-C road
21000 11/4/2017 T04257
14 06/248 CMO Nagar Palika Parishad
Bhilawar Distt. Gwalior
crust design 21000 20/4/2017 T04260
15 06/249 CMO Nagar palika nigam
Distt. Bhind
crust design 21000 T04261
16 06/262 CMO Nagar Palika Mau
Distt. Bhind
crust design 21000 24/4/2017 T04274
11
S.N
o
Record
Registratio
n No.
Agency Type of
Consultanc
y
Amount Date Institute
Hologram
No.
17 06/270 CMO Nagar Parishad
Banmore
crust design 21000 24/4/2017 T04282
18 06/356 Sh Gulam Abbas AGE ,BIR
P-II Gwalior
Mix Design
M25-7days
14750 24/8/2017 T04418
19 06/364 Sub Division Officer Water
Resource Sub No. 7, Gohad
Bhind
Mix Design
M20-
7&28days
14750 4/8/2017 T04427
20 06/484 Nishu Agrawal cricket outfield & pitch D-12 ,
Harishankarpur
Mix Design M20-7days
14750 8/11/2017 T04557
21 06/485 AE Jhansi central sub
division ,NRCAF, Campus CPWD,Gwalior
Mix Design
M25-7&28days
14750 11/10/2017 T04558
22 06/487 General Manager MP Jal
Nigam Maryadit Gwalior
Mix Design
M30-7 & 28days
14750 12/10/2017 T04560
23 06/488 A E Jhansi central sub
division NRCAF CPWD
Gwalior road Jhansi
Mix Design
M25-7days
14750 9/11/2017 TO4561
24 06/500 A E Jhansi central sub
division NRCAF Campus
PWD Jhansi
Mix Design
M25-
7&28days
14750 9/11/2017 T04574
25 06/525 Vikas nigam A.E Anupam Nagar Gwalior
Mix Design M25-7 &28
days
14750 17/11/2017 T04599
26 06/526 Vikas nigam A.E Anupam
Nagar Gwalior
Mix Design
M25-7 &28 days
14750 17/11/2017 T04600
27 06/594 A E GCSD 1 CPWD
Gwalior
Mix Design
M25-7 days
14750 15/01/2018 T04669
28 06/217 CMO Nagar Parishad Esagarh Ashok Nagar
crust design of C-C road
14000 7/4/2017 T04230
29 06/258 Chief Engineer construction
Gwalior
Mix Design
M30-7days
14000 12/4/2017 T04270
30 06/291 AXEN/C/Gwalior N.C. Railway C.E
Mix Design M30-
7&28days
14000 12/4/2017 T04303
31 06/292 AE N.C Railway Gwalior Mix Design M30-
7&28days
14000 3/4/2017 T04304
32 06/332 AE N.C Railway Gwalior Mix Design
M35-7&28days
14000 6/5/2017 T04344
33 06/333 AE , GCD, CPWD Gwalior Mix Design
M25-7days
14000 27/5/2017 T04345
12
S.N
o
Record
Registratio
n No.
Agency Type of
Consultanc
y
Amount Date Institute
Hologram
No.
34 06/349 AE,GCD,CPWD,GWALIO
R
Mix Design
M25-7days
14000 27/5/2017 T04361
35 06/357 Er. J K sonija consultancy
and planner gwalior
checking of
crust design
11440 8/9/2017 T04420
36 06/423 CMO Nagar parishad Distt.
Bhind
crust design
of C-C road
11440 4/10/2017 T04486
37 06/424 CMO Nagar parishad Distt.
Bhind
crust design
of C-C road
11440 4/10/2017 T04487
38 06/622 CMO NAGAR parishad
gormi
crust design 11440 7/12/2017 t04697
39 06/623 E E PWD division no. 1 near
RTO office Padav
crust design 11440 TO4698
40 06/674 Mukesh prasad general
manager civil RITES LTD.
Noida
6049 26/03/2018 T04749
41 MPRRDA PMGSY Works
106236 25/4/2018
TOTAL 1209025
13
Consultancy work carried out in the A.Y. 2018-2019
S.N.
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
1 07/129
Supt. Engineer
nagar nigam Gwalior
analysis of smart junction box
construction
municipal
corporation Gwalior
215287 25/2/2019 T05148
2 06/916
m/ S KCC devicon ,
128 Radio colony residency area
Indore
Checking of design
& drawing of
overhead tank
73632 7/12/2018 T05004
3 07/125
EE , PHE
DEPARTMENT DIVISION
GWALIOR
Checking of design
& drawing of
overhead tank
53690 5/2/2019 T05144
4 06/898 E E Nagar Palika
Nigan , Morena Crust design 46020 3/11/2018 T04976
5 07/122 EE , PHE Department Shivpur
Checking of design
& drawing of
overhead tank
41418 13/2/2019 T05141
6 06/743 EE PHE Department
Gwalior
checking of design and drawing of
150kl overhead
water tank
36875 30/5/2018 T04818
7 06/650
Executive Engineer
Municipal
Corporation Ms
Road Morena
Checking of design
& drawing 35400 4/4/2018 T04725
8 06/789
E E ,IIDC CGJ M.P
LTD. , 11 DC
PLAZA 39 City Centre Gwalior
Checking & verification of
intake well
30680 14/08/2018 T04867
9 07/102
EE Irrigation
Department Nagar
Palika Nigam Gwalior
STRENGTH OF
WATER TANK
TO BE DEMOLISHED
30680 13/2/2019 T05121
10 06/798
E.E PHE , Shanti
Bash Colony
Gwalior
consultancy 29500 24/07/2018 T04876
11 07/163 EE , PHE Morena Checking of design
& drawing of 28533 28/12/2018 T05183
14
S.N.
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
overhead tank
12 06/799 EE PHE , Shivpuri consultancy 23600 25/07/2018 T04877
13 06/795 EE PHE , Ashok Nagar
consultancy 23010 14/08/2018 T04873
14 06/800 Nagar Palika
Parishad , Bhind crust design 23010 11/9/2018 T04878
15 06/836 EE PHE Dept.
Ashok Nagar
Checking of design & drawing of
overhead tank
23010 14/09/2018 T04914
16 06/838 EE PHE Dept.
Gwalior
Checking of design
& drawing of overhead tank
23010 27/9/2018 T04916
17 06/857 EE PHE Dept.
Ashok Nagar
Checking of design
& drawing of overhead tank
23010 17/10/2018 T04935
18 06/858 EE PHE Dept. Ashok Nagar
Checking of design
& drawing of
overhead tank
23010 17/10/2018 T04936
19 06/859 EE PHE Dept. Ashok Nagar
Checking of design
& drawing of
overhead tank
23010 17/10/2018 T04937
20 06/899 EE Nagar Palika Nigan , Morena
Crust design 23010 29/10/2018 T04977
21 06/918 EE ,PHE Division
Morena
Checking of design
& drawing of
overhead tank
23010 16/11/2018 T05006
22 06/930 EE PHE, Morena
Checking of design
& drawing of
overhead tank
23010 18/12/2018 T05018
23 07/01
EE, M.P State
Agriculture
Marketing Board
Tech-Division Morena
CRUST DESIGN 23010 19/12/2018 T05019
24 07/123 EE , HHED, Morena
Checking of design
& drawing of
overhead tank
23010 14/12/2018 T05142
25 07/150
EE Maintenance
Division PHE
Department Nagar Nigam Gwalior
Analysis of
demolished
overhead water tank
23010 14/3/2019 T05170
26 07/197 EE, PHE
Department
Checking of design
& drawing of 23010 27/3/2019 T05217
15
S.N.
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
Division Gwalior overhead tank
27 07/194
Deen Dayal Tiwari
Jai Vilas Parisar Gwalior
Checking of design
& drawing of overhead tank
23010 28/3/2019 T05214
28 06/796
E E PHE , Division
Guna near hanuman
Guna
consultancy 23000 11/9/2018 T04874
29 07/164 EE PHE Department
Division Shivpuri
Checking of design
& drawing of
overhead tank
21476 10/1/2019 T05184
30 06/828 E E PPHE Dept.
Shivpuri
Checking of design & drawing of
overhead tank
19942 19/09/2018 T04906
31 06/837 E.E PHE dept.
GWALIOR
Checking of design
& drawing of overhead tank
19942 20/09/2018 T04915
32 06/826
E.E Public Health
Engineering Dept. , Division Morena
Checking of design
& drawing of overhead tank
19175 4/9/2018 T04904
33 06/827
E.E Public Health
Engineering Dept. ,
Division Morena
Checking of design
& drawing of
overhead tank
19175 4/9/2018 T04905
34 07/148 EE PHE Division Shivpuri
Checking of design
& drawing of
overhead tank
18048 23/2/2019 T05168
35 06/797 E.E PHE , Shanti Bash Colony
Gwalior
consultancy 17700 1/8/2018 T04875
36 06/825 E.E PHE Dept.
Division Gwalior
Checking of design
& drawing of overhead tank
17700 25/07/2018 T04903
37 07/115 EE , PHE
Department Morena SOIL 17582 1/2/2019 T05134
38 07/116
Sh. Mahakal Structure Near Kalpi
Bridge Morena
Gwalior
SOIL 17582 7/2/2019 T05135
39 06/860 EE PHE Dept. Gwalior
Checking of design
& drawing of
overhead tank
16874 18/10/2018 T04938
40 07/162 AE, PHE
Department Gwalior
Checking of design & drawing of
overhead tank
16874 4/1/2019 T05182
16
S.N.
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
41 06/845 Rohit Shiv Prakash ,
Thatipur Gwalior
Mix Design M25-7
& 28 days 15340 6/9/2018 T04923
42 06/846 A.E CPWD ,
Shivpuri
Mix Design M25-7
& 28 days 15340 5/9/2018 T04924
43 06/897
Ashok Kumar Dixit,
8 Rambagh Colony
Shinde Ki Chawni Gwalior
Mix design M20- 7
& 28 days 15340 29/9/2018 T04975
44 06/917 A.E PHE Sub
Division, Datia
Checking of design
& drawing of overhead tank
15340 5/12/2018 T05004
45 06/926 A.E PHE Sub
Division, Datia
Checking of design
& drawing of 125
KL overhead water tank
15340 14/11/2018 T05014
46 07/07
AE ,M.P Housing
&Infrastructure
Development , Sub Division Bhind
Mix design M25- 7
days 15340 13/12/2018 T05025
47 07/08
AE ,M.P Housing
&Infrastructure Development , Sub
Division Bhind
Mix design M20- 7 days
15340 13/12/2018 T05026
48 07/23
AE ,M.P Housing
&Infrastructure Development Board
Division No. DD
Nagar Gwalior
Mix design M25- 7
&28 days 15340 7/12/2018 T05041
49 07/24
AE ,M.P Housing &Infrastructure
Development Board
Division No. DD Nagar Gwalior
Mix design M20- 7 &28 days
15340 7/12/2018 T05042
50 07/31 AE, GCS D-I
,CPWD Gwalior
Mix design M25- 7
&28 days 15340 6/1/2019 T05049
51 07/44 AE, M.P Housing Board Bhind
Mix design M25- 7 &28 days
15340 13/12/2018 T05062
52 07/45 AE, M.P Housing Board Bhind
Mix design M20- 7 &28 days
15340 13/12/2018 T05063
17
S.N.
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
53 07/78
A.E ,M.P Housing
& Infrastructure Development
Gwalior
Mix design M25- 7 &28 days
15340 20/12/2018 T05097
54 07/109 AE PHE , Morena Mix design M25- 7
days 15340 10/1/2019 T05128
55 07/117
Tata Power Mohan
Kumar Bodhik Shivpur
Mix design M25- 7
&28 days 15340 14/1/2019 T05136
56 07/118
Tata Power Mohan
Kumar Bodhik
Shivpur
Mix design M30- 7 &28 days
15340 14/1/2019 T05137
57 07/124
E.E Water Supply
Cell Nagar Nigam
Gwalior
Checking of design
& drawing of
overhead tank
15340 22/1/2019 T05143
58 07/144 AE PHE Department,
Morena
Mix design M25- 7
&28 days 15340 10/1/2019 T05164
59 07/145 AE PHE
Department, Morena
Mix design M30- 7
&28 days 15340 30/1/2019 T05165
60 07/149 EE PHE Department
Ashok Nagar
Checking of design
& drawing of overhead tank
15340 4/1/2019 T05169
61 07/158
Project Manager
/PKG-I Lea Associate Pvt.Ltd
Agra
Mix design M45- 7 &28 days
15340 12/2/2019 T05178
62 07/175 EE PHE Department
Datia
Checking of design
& drawing of overhead tank
15340 18/3/2019 T05195
63 07/216
Sh. N.Kartikyan
Tata Project Ltd
Bhind
Mix design M20- 7
&28 days 15340 26/3/2019 T05236
64 07/217
Sh. N.Kartikyan
Tata Project Ltd
Bhind
Mix design M25- 7 &28 days
15340 26/3/2019 T05237
65 07/159
Sh. M.K Verma General Manager
Road Development
Bhind
Mix design M40- 7
&28 days 15340 21/2/2019 T05179
66 07/154 Chief Muncipal
Officer Nagar Palika crust design 14752 31/3/2018 T05174
18
S.N.
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
Parishad Sabalgarh
67 06/658
General Manager
MP Rural Developement
Authority Project,
Shivpuri
Mix design M30-7
days 14750 6/4/2018 TO4733
68 06/673 Officer Nagar Parishad Vijawar,
Dist. Chhatarppur
Mix design M30-7
days 14750 12/4/2018 T04748
69 06/724
A.E, M.P housing ,
Anupam Nagar Gwalior
Mix Design M25-7
&28 days 14750 25/5/2018 T04795
70 06/776
H & S Contractor &
Suresh Nagar , Thatipur Gwalior
Job mix 14750 12/4/2018 T04853
71 06/742 EE PHE Department
Gwalior
checking of design
and drawing of
100kl overhead water tank
14300 4/5/2018 T04817
72 06/782
General Manager
MP Jal Nigam
Gwalior
Mix Design M25-7 days
5900 30/7/2018 T04860
73 06/783
General Manager
MP Jal Nigam
Gwalior
Mix Design M30-7 days
5900 30/07/2018 TO4861
74 06/784 General Manager MP Jal Nigam
Gwalior
Mix Design M25-7
days 5900 30/07/2018 T04862
75 06/785 General Manager MP Jal Nigam
Gwalior
Mix Design M30-7
days 5900 30/07/2018 T04863
76 MPRRDA PMGSY Works 81910 28/03/2019
77 MPRRDA PMGSY Works 704532 08/01/2019
TOTAL 2517129
19
Consultancy work carried out in the A.Y. 2019-2020 till date
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
1 07/402
Chief Muncipal Officer Nagar
Palika Parishad
Dabra
Checking of design of various
compound of water
suppply system
245500 19/11/2019 T05427
2 07/315
Astiva Architech
&Asso. 104
Esskey Plaza
Gwalior
Checking of design
& drawing 59000 1/6/2019 T05336
3 07/428
Prabhat Murthy
Kala Kendra,
Gram Ganga
Motijheel, Gwalior
Checking & verification of pile
foundation
46020 01/11/209 T05453
4 07/223 LLP Tanya Palace Datia
Checking of design
& drawing of
overhead tank
35282 21/5/2019 T05243
5 07/228
MR. M.K Trivedi
Ae (Civil) Age Ir ,
Mes Gwalior
Job mix 30680 21/5/2019 T05248
6 07/187 EE PHE Department
Sheopur
Checking of design & drawing of
overhead tank
24544 16/4/2019 T05207
7 07/195
EE PHE
Department Ashok Nagar
Checking of design
& drawing of overhead tank
23010 5/4/2019 T05215
8 07/196
EE PHE
Department Ashok Nagar
Checking of design
& drawing of overhead tank
23010 5/4/2019 T05216
9 07/207
EE, M.P ,DC,
Regional Officer
Gwalior
Velting of sewage
network of plastic
pank
20709 12/4/2019 T05227
10 07/174
EE PHE
Department Sub
Division Gwalior
Checking of design
& drawing of
overhead tank
18408 9/4/2019 T05194
11 07/221 Girriji Construction C/O
Ajit Singh Morena
Checking of design & drawing of
overhead tank
16874 11/4/2019 T05241
12 07/222
EE PHE
Department Division Morena
Checking of design
& drawing of overhead tank
16874 26/4/2019 T05242
13 07/422
EE PHE
Department Division Morena
Checking of design
& drawing of overhead tank
16864 19/11/2019 T05447
14 07/330 EE PHE
Department
Checking of design
& drawing of 16107 7/9/2019 T05351
20
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
Division Bhopal overhead tank
15 07/376
EE PHE
Department Division Bhind
Checking of design
& drawing of overhead tank
16107 21/10/2019 T05401
16 07/468 EE PHE Dept. Division Bhind
Checking of design
& drawing of
overhead tank
16107 7/1/2020 T05493
17 07/226
A5GPSD-III ,
CPWD Near KV-5
Shastrinagar Gwalior
Mix design M25- 7
&28 days 15340 15/4/2019 T05246
18 07/239
Arvind Singh ,
Manager Civil
NTPC Auriya Gas Power Plant
Mix design M25- 7
&28 days 15340 18/4/2019 T05260
19 07/240
Arvind Singh ,
Manager Civil
NTPC Auriya Gas Power Plant
Mix design M30- 7
&28 days 15340 18/4/2019 T05261
20 07/256
General Manager
,MP Jal Nigam Piu Gwalior
Mix design M25- 7
&28 days 15340 18/4/2019 T05277
21 07/258
General Manager,
MP Jal Nigam
Gwalior
Mix design M30- 7 &28 days
15340 18/4/2019 T05279
22 07/259
General Manager
M.P Rural Road
Development
Shivpur
Mix design M30- 7
&28 days 15340 20/5/2019 T05280
23 07/272
Ms. KCC Devcon
128,Radio Colony
Indore
Checking of design
& drawing of
overhead tank
15340 26/4/2019 T05293
24 07/339 SHRI.MK Dixit Tikamgarh
Mix design M20- 7 &28 days
15340 5/8/2019 T05385
25 07/340 Shri.Mk Dixit
Tikamgarh
Mix design M20- 7
&28 days 15340 5/8/2019 T05386
26 07/348
Ae M.P Housing &Infra
Development
Board Gwalior
Mix design M30- 7
days 15340 28/8/2019 T05369
27 07/448 M/S KATIA LTD.
Gwalor Mix DLC 15340 21/11/2019 T05473
28 07/495 EE PHE dept.
Morena
Checking of design
& drawing of overhead tank
15340 21/01/2020 T05520
21
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
29 07/329
EE PHE
Department Division Bhopal
Checking of design
& drawing of overhead tank
14573 11/9/2019 T05350
30 07/375
EE PHE
Department Division Morena
Checking of design
& drawing of overhead tank
14573 1/10/2019 T05400
31 07/314
EE, PHE
Department
Tikamgarh
Checking of design
& drawing of
overhead tank
13806 20/8/2019 T05335
32 07/316
AE PHE
Department Sub
Division Seondha
Datia
Checking of design
& drawing of overhead tank
13806 20/8/2019 T05337
33 07/331
AE PHE
Department Sub
Division Seondha Datia
Checking of design & drawing of
overhead tank
13806 7/9/2019 T05352
34 07/370
EE PHE
Department
Division Bhind
Checking of design
& drawing of
overhead tank
12880 16/10/2019 T05395
35 07/237 EE PHE
Department Datia
Checking of design
& drawing of
overhead tank
12272 24/5/2019 T05258
36 07/238 EE PHE
Department Datia
Checking of design & drawing of
overhead tank
12272 24/5/2019 T05259
37 07/429 EE PHE Dept.
itawah road, bhind
Checking of design
& drawing of overhead tank
12272 25/11/2019 T05454
38 07/430
C/O Tanya Palace
Hotel, Civil Lines Datia
Checking of design
& drawing of water tank
12272 3/12/2019 T05455
39 07/492 EE PHE Dept. Division Bhind
Checking of design
& drawing of
overhead tank
11046 28/01/2020 T05517
40 07/368
EE PHE
Department
Division Bhind
Checking of design
& drawing of
overhead tank
11045 15/10/2019 T05393
41 07/369 EE PHE Department
Division Bhind
Checking of design & drawing of
overhead tank
11045 16/10/2019 T05394
42 07/465 EE PHE dept.
division Bhind
Checking of design
& drawing of water tank
10838 13/01/2020 T05490
43 07/464 EE PHE dept.
division Sheopur
Checking of design
& drawing of water 9204 7/1/2020 T05489
22
S.No
Record
Registration
No.
Agency Type of
Consultancy Amount Date
Institute
Hologram
No.
tank
44 07/466 EE PHE dept.
division Bhind
Checking of design
& drawing of water tank
9204 13/01/2020 T05491
45 07/496 EE PHE dept. Morena
Checking of design
& drawing of
overhead tank
9204 27/01/2020 T05521
TOTAL 1013294