27
Est. cost crores Agency LOI Sch comp Survey Foundation Erection Stringing 1 400 kv s/s Gonda (PPP I) 220 kv dc Gonda400- Gonda220 DC inter- connector 13.45 11.17 Trading Engineers 13.45 03/46 0/46 0/13.45 11.6 1. Stubs & Templates delivered at site. 2. 03 nos. FDN gang to be deployed shortly. The proposed date of complition is 31.03.16. 2 400kV Hardoi Road(Lucknow) 400kV Hardoi Road(Lucknow) S/s- 220kV Hardoi Road DC Interconnector 9.25 7.4 18.07.14 22.07.14 26.07.14 5.18 Unitech Comp 0/35 0/35 0/9.25 10 profile submitted for approval.The proposed date of complition is 22.06.16. 1 220 kv s/s Tanda (RNNSAS) 220 kv DC Sohawal(400) -Tanda TD- 329 113.24 72.47 PNC 16.09.10 15.09.11 Comp 336/348 217/ 348 12/ 113.24 69.3 FDN, ROW at 10 locs loc no- 11,12,23,29,157,183,190,248, 249,250 Er ROW at loc no 145, Str ROW at loc no.-92, crop compensation cases paid. The proposed date of complition is 31.10.15. 132 kv sc Tanda220- Tanda132 TD- 348 11.8 2.42 Aster 06.04.11 05.04.12 Comp 50/54 45/54 7.92/ 11.8 86.6 As per local representative ROW at loc 8/0 & 6/1 for Erection and at loc 8/0 to 13 for Stringing work and EE, ETD, Faizabad to meet DM today, 01 no Erection gang working at site at loc 12 & 13 WIP, 01 no Stringing gang working at Tanda Gantry & Dead End Tower WIP, Stringing work at loc 3-4 completed, Foundation work could not be started due to standing sugarcane & paddy crop. Foundation work likely to start by next week. The proposed date of complition 12.10.15. 2 220 kv s/s Nighasan (RNNSAS) Work Progress ED % Prog. DETAILS OF ONGOING LINES UNDER TRANSMISSION CENTRAL Sl. No. Name of work Tend. No. Length Km. TWC BOD ETF Loan (in Cr.) Remarks

DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Embed Size (px)

Citation preview

Page 1: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

1400 kv s/s Gonda

(PPP I)

220 kv dc Gonda400-Gonda220 DC inter-

connector13.45 11.17

Trading Engineers

13.45 03/46 0/46 0/13.45 11.6

1. Stubs & Templates delivered at site. 2. 03 nos. FDN gang to be deployed shortly.

The proposed date of complition is 31.03.16.

2400kV Hardoi

Road(Lucknow)400kV Hardoi

Road(Lucknow) S/s- 220kV Hardoi Road DC Interconnector

9.25 7.4 18.07.14 22.07.14 26.07.14 5.18 Unitech Comp 0/35 0/35 0/9.25 10profile submitted for

approval.The proposed date of complition is 22.06.16.

1220 kv s/s Tanda

(RNNSAS)

220 kv DC Sohawal(400) -Tanda

TD-329

113.24 72.47 PNC 16.09.10 15.09.11 Comp 336/348 217/ 34812/

113.2469.3

FDN, ROW at 10 locs loc no- 11,12,23,29,157,183,190,248, 249,250 Er ROW at loc no 145,

Str ROW at loc no.-92, crop compensation cases paid. The

proposed date of complition is 31.10.15.

132 kv sc Tanda220-Tanda132

TD-348

11.8 2.42 Aster 06.04.11 05.04.12 Comp 50/54 45/54 7.92/ 11.8 86.6

As per local representative ROW at loc 8/0 & 6/1 for Erection and

at loc 8/0 to 13 for Stringing work and EE, ETD, Faizabad to meet DM today, 01 no Erection gang working at site at loc 12 & 13

WIP, 01 no Stringing gang working at Tanda Gantry & Dead End Tower WIP, Stringing work at

loc 3-4 completed, Foundation work could not be started due to standing sugarcane & paddy crop. Foundation work likely to start by next week. The proposed date of

complition 12.10.15.

2220 kv s/s Nighasan

(RNNSAS)

Work ProgressED

% Prog.

DETAILS OF ONGOING LINES UNDER TRANSMISSION CENTRAL

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

Page 2: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

220 kv sc Sitapur-Nighasan

TD-329

110 55 15.19 SEW 23.03.10 22.09.11 Comp 335/336 317/ 33681.92/

11092.4

Row in Foundation at loc no. 84, under court case. River xing work to be taken up after receeding of

water.S/s Ready.The proposed date of complition 31.12.15.

220 kv sc Shahjahanpur-

Nighasan

TD-329

121 60.5 SEW 23.03.10 22.09.11 Comp 368/369 358/ 369104.18/

12195.9

ROW at 1location -32/2, matter in court ,River xing work to be

taken up after receeding of water..S/s Ready.The proposed

date of complition 31.12.15.

LILO of 132 kv Lakhimpur-Pallia line

@ Nighasan

TD-348

1.15 0.32 Aravali 06.04.11 05.01.12 WIP 04/8 0/8 0/1.15 18.5

No gang working at site since last one month,in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed

date of complition 30.09.15

132 kv sc Nighasan-Dhaurahra

TD-329

23.4 7.25 PNC 28.04.10 27.04.11 Comp 75/75 75/75 21/ 23.4 97.4

The work is held up due to crossing of LILO of Lakhimpur-

Palia at Nighasan being constructed by M/s Aravali who

have started the work. The proposed date of complition is

31.10.15.

132 kv sc Nanpara-Dhaurahra

TD-348

50.94 15.79 Aravali 06.04.11 05.04.12 Comp 139/153 89/153 0/50.94 64.4

Soil investigation report submitted, Rly proposal

submitted, Pile fdn to be built on River crossing, No gang working at site since last one month, in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed date of

complition 28.02.16

132 kv sc Nighasan-Gola

TD-348

50.11 15.54 Aravali 06.04.11 05.04.12 Comp 90/168 41/168 0/50.11 48.3

No gang working at site since last one month, in the review

meeting dt 23.09.15 firm assured to start the work earliest. The proposed date of complition

31.03.16

Page 3: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

3220 kv s/s Kanpur

Road(GIS)

LILO of 22o kV DC Sarojini Nagar (400kV)- Unnao Line at 220 kV

GIS Kanpur Road

5

REC-047-2011-4811

(7153.7)

Turn Key UPRNN

2.10.11 702 Km cable laying work

completed out of 5 Kms.

4 220 kv s/s Bahraich

220 kv dc Gonda400-Bahraich

74.29 24.61 09.07.08 03.02.09 Varrsana 04.02.14 03.02.15 Comp224/ 234

148/ 234

0/74.29 66.6

Erection WIP at loc 94 & 12, Fdn WIP at loc 109. The proposed date of complition

29.02.16.

132 kv dc Bahraich220-Nanpara

40.58 13.44 09.07.08 03.02.09REC 047-

2009-3058

ECI 15.02.14 14.02.15 Comp 21/130 0/130 0/40.58 20Fondation WIP. The proposed date of complition 31.03.16.

132 kv LILO Gonda-Bahraich @ 220Kv

Bahraich17.56 3.67 09.07.08 03.02.09

REC 047-2009-3058

ECI 15.02.14 14.02.15 Comp 22/58 0/58 0/17.56 35.5

Re-survey done between location 50-60, profile submitted in the

division not approved so for. The proposed date of complition

31.12.15.

5220 kv s/s Kursi Road

(RNN III)

220 kV dc Lko PGCIL(400)-Kursi Rd

TD-348

12.89 8.12 Hythro/

Jyoti23.12.11 23.12.12 Comp 66/66 13/66 0/12.89 58.9

Erection work in progress, 01 no Erection gang working at

site..The proposed date of complition 31.12.15.

6 220 kv s/s Pilibhit

220 kv sc Baikunthpur (Bareilly)(400) - Pilibhit

(on dc tower) 58 20.62 21.5.12 18.7.12 12.12.12 Accord 03.07.16 0/180 0/180 0/58

Route alignment approved, Profile submitted, under

checking, firm debared for a period of one year.

7 220kV S/s Barabanki220 kV DC

Sohawal(400) PGCIL -Barabanki(220) Line at

Barabanki S/s

69 45 18.07.14 22.07.14 26.07.14 31.5 Unitech Comp 8/225 0/225 0/69 10Fdn WIP at 2 loc. The proposed date of complition is 22.12.16

1 132 kv s/s Jalalpur

Page 4: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

132 kv sc Kadipur-Jalalpur

TD-348

46.4 8.82 Aster 24.12.11 23.12.12 comp 60/151 0/151 0/46.4 39.9Work to be taken after Tanda-

Tanda line.The proposed date of complition 31.03.16.

2 132 kv s/s Bhinga

132 kv sc Nanpara-Bhinga

TD-348

50.05 9.51 Aster 06.04.11 05.04.12 Comp 79/165 33/165 0/50.05 46

Firm has submitted work schedule to complete the line by

Feb, 2016, 03 no Foundation gang working Fdn at loc-91,92,93 &158. WIP. The proposed date of

complition 28.02.16.

3132 kv s/s

Utraula(Dept)

132 kv sc Dumariaganj-Utraula

TD-329

39.95 12.38 PNC 09.11.10 31.07.11 Comp 108/114 107/ 114 32/ 39.95 92.5

FdnWIP,Fdn ROW at Loc-32 shall be resolved by month end, under

court case, anchor tower excavation work will start on

15.10.15. The proposed date of complition is 31.10.15.

4 132 kv s/s Nindura

132 kV SC Kursi Road LKO(220)-

Piparsand(Nindura)

TD-348

26.49 8.21Hythro/

Jyoti23.12.11 23.12.12 Comp 79/103 18/103 0/26.49 52.7

Tower material reached at site.Work to start shortly.The proposed date of complition

15.01.16.

5 132 kv S/S Bikapur

132 kv sc Bikapur-Sohawal

TD-348

23.15 4.74 Aster 06.04.11 05.04.12 Comp 0/89 0/89 0/23.15 0

Survey Work complited and to be submitted to concerned divison

by month end, S/s ready & charged by LILO of Sultanpur-Darshan nagar. The proposed date of complition 31.03.16.

6132 kv S/S Shahabad

(RNN)

132 kv sc Shahjahanpur-

Shahabad

TD-329

51.18 15.86 PNC 28.04.10 27.04.11 Comp 135/135 131/ 13533.50/ 51.18

90.8

Er & stringing work under progress, 01 no. gang for each

activity is deployed, Er ROW at 05 locs:- loc no.1,2,3,4 & 5 Str ROW at 4 locs:- loc no. 47,52,53& 65.

7 132 kv s/s Baghauli

132 kv LILO Hardoi-Shahabad@ Baghauli

TD-329

22.5 8.78Aravali/

Jyoti15.10.11 14.10.12 Comp 72/72 33/72 0/ 22.50 64.2

Erection work under progress, 01 no. gang working at site.

Page 5: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

8132 kv s/s Biswan

(TKSAS)CM

132 kv 2 Ph. 220 Kv S/s Sitapur-Hempur Rly

TSS24.99 7.7 RS INFRA 20.07.12 19.07.13 Comp 93/93 93/93

24.99/ 24.99

100Line completed gantry at Rly end

not ready.

9132 kv s/s Laharpur

(TK NKG)

132 kV SC Lakhimpur-Laharpur

TD-348

32.23 9.99Hythro/

Jyoti23.12.11 23.12.12 Comp 86/95 27/95 0/ 32.23 58.3

Approval of 1no. of rly xing is awaited. No work at present.The

proposed date of complition 23.12.15.

10132 kv s/s

Goshaisinghpur (Dept)

132 kv sc Tanda220-Goshaisghpr

TD-348

29.4 5.95 Aster 06.04.11 05.04.12 Comp 94/99 76/99 0/29.4 69.1Work to be taken up shortly & 1 stringing gang to be deployed by

month end.

11 132 kv s/s TilharLILO of

Shahanjahanpur-Badau at Tilhar

8.76 3.42Aravali/

JyotiComp 19/30 0/30 0/ 8.76 45.8

Survey work under progress.The proposed date of complition

31.12.15.

12132 kv s/s

Chakalbanshi (Dept)

132 kv sc Sonik-Chakalvanshi

TD-313

29.75 9.22 Jyoti 04.09.08 03.09.09 Comp 98/104 90/10429.07/ 29.75

95.3

2 rly xing one already approved & one under approval.2 loc forest clearence required, on line NOC applied to forest department for approval.The proposed date for

the complition is 31.10.15.

13 132 kV Neri (Sitapur)

132 kv LILO of Sitapur-Shahjahanpur@Neri

4 1.95 06.07.12 18.07.12 12.12.12

REC 047-2012-6596 1.75

Local 12th Plan

14 132 kV s/s Bandaa

Page 6: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

132 kV SC Puwanyan - Bandaa

20 6.202 Aravali

Land finalized, no work yet started, in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed date

of complition is 31.03.2016.

133 kV SC Gola - Bandaa

45 13.955 Aravali

Land finalized, no work yet started, in the review meeting dt 23.09.15 firm assured to start the work earliest. The proposed date

of complition is 31.03.2016.

15 132 kv s/s Haidargarh

132 kv LILO of sc jagdishpur-Haidergarh

Sugar Mill @ Haidergarh

20 6.59 30.4.11 18.7.12

REC 047-2012-6631 05.93

Accord 03.07.16 0/62 0/62 0/20

Route survey completed, profile approved, no gang present at

site, firm debared for a period of one year.

132 kv dc Sultanpur Rd. Lko (400)-

Haidergarh 30 9.89 30.4.12 18.7.12

REC 047-2012-6631 08.90

Accord 03.07.16 0/93 0/93 0/30On hold,firm debared for a

period of one year.

16132 kv s/s

Mahmudabad

132 kv sc (on dc towers) Sidhauli-

Mahmudabad 32 19.87 6.7.12 18.7.12 12.12.12 Accord 03.07.16 0/99 0/99 0/32

Route survey completed, profile approved, no gang present at

site, firm debared for a period of one year.

132 kv bay @ Sidhauli

17 132KV Sareni S/s

132KV Dalmau(Raebareilly)-

Sareni30 10.05 13.02.14 10.05.14 Accord 03.07.16 0/93 0/93 0/30

Route survey defective re-route survey in progress, firm debared

for a period of one year.

132KV Bighapur (Unnao)-Sareni

40 13.34 13.02.14 10.05.14 Accord 03.07.16 0/124 0/124 0/40Route survey defective re-route survey in progress, firm debared

for a period of one year.

18 132 kv s/s Bisalpur

Page 7: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

132 kv sc Pilibhit-Bisalpur

35 8.03 09.07.08 Accord 03.07.16 0/109 0/109 0/35

Profile approved, 01 excuation done after that no gang at site,

firm debared for a period of one year.

132 kv sc Barreily II-Bisalpur

40 9.17 09.07.08 Accord 03.07.16 0/124 0/124 0/40Route survey in progress,firm

debared for a period of one year.

4*132kv bays

132 kv sc Aonala-Bisauli

25 8.33Archon/

EMC4.03.15/3

1.07.1530.06.16

Route survey to start form 01.11.15. The proposed date of

competion is 30.06.16

19 132 kv s/s Alapur

132 kv sc New Tanda(Akbarpur 220KV) -Alapur

35 8.03 21.11.11 18.7.12 Accord 03.07.16 0/109 0/109 0/35Due to wrong survey re-survey

started by firm,firm debared for a period of one year.

132 kv sc Koilsa (Azamgarh) -Alapur

15 3.44 21.11.11 18.7.12 Accord 0/47 0/47 0/15On hold,firm debared for a

period of one year.

20 132 kv S/s Colonelganj

132kV DC Gonda (400) - Colonelganj Line at

132kV S/s Colonelganj30.36 8.76 18.07.14 22.07.14 26.07.14

Trading Engineers

30.36 0/101 0/101 0/30.36 10

1. Stubs & Templates delivered at site. 2. 03 nos. FDN gang to be deployed shortly.

The proposed date of complition is 30.04.16.

21 132 kV S/s Salon132kV DC Amawan (Raebareilly) - Salon

Line at 132kV S/s Salon

40.84 21 18.07.14 22.07.14 26.07.14 14.7 Unitech Comp 0/149 0/149 0/40.84 10

Profile approved on 18.09.15, work will start shortly.The

proposed date of complition is 22.09.16.

22132 kV S/s

Begampur(Sohrwa)

LILO of Cons 132kV SC Bahraich(220kV) -

Nanpara Line at 220kV S/s Begampur

0.4 4.6 18.07.14 22.07.14 26.07.14 3.22 Unitech Comp 0/3 0/3 0/0.4 10

Only 3 tower required in this line. The proposed

date of complition is 22.06.16.

23132KV Maurawan

(Unnao) S/s2x20

Page 8: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

132KV Bighapur-Maurawan

35 11.718 10.12.13 10.05.14

24 132 kv s/s Jalalabad

LILO of 132 kv Shahjanpur- Usawan

line @ Jalalabad18 7.57 21.11.11 18.7.12

REC 047-2012-6591 6.81

Accord 03.07.16 0/56 0/56 0/18On hold,firm debared for a

period of one year.

1 220 kv dc Roza-DohnaTD-329

108.07 74.52 SEW23.03.10

/ 19.10.10

22.09.1118.04.11

Comp 340/340 340/ 340107.87/ 108.07

100Line completed OPGW work

under progress.

2220 kv dc Dohna-CB

ganj secTD-329

24 12 SEW 23.03.11 22.03.12 Comp 92/92 82/92 14.55/ 24 88

Rly xing approval pending for loc 26-27, Crop compensation cases pending, work stop at loc. No. 61 &25 due to crop compensation

not paid.

3132 kv sc SGPGI-

Utrathiya Rly LineTD-304

10.62 2.09 Pioneer Apr-08 Oct-08 Comp 44/44 32/44 5/ 10.44 81.2

ROW at 11 loc(14-21,24,42 & 43) 9 loc at kali pashim & 2 loc at

SGPGI), matter being taken up at higher level with Distt admin.

Held up.

4132 kv sc 2ph

Ramsanehighat-Budwal

TD-313

44.27 13.72 Unitech 20.1.08 20.01.09 Comp 139/146 139/ 14639.48/ 44.27

95.1

Letter written by EE to DM,Joint survey with Rly. done on 18.08.15,

meeting was held with Rly & estimate of cable has been sent to Railways

5132 kv dc Shyam Fert-

Shahjahanpur15.3 Kribhco Comp 68/68 68/68

15.31/ 15.31

Work being carried out by M/S Kribhco Shyam Fertilizers

themselves.

6132 kv Maqsoodpur

Sugar Mill-Shahajanpr220

TD-350

46.05 20.09 Hythro 31.12.10 30.06.11 Comp 138/139 127/ 13913.67/ 46.05

80.5

Notice has been surve to M/s Hythro & SE, ETC Bareilly taking

action to get the work done through a debitable agency.

7

132kV Loc-12 of Maqsoodpur -

Shahjahanpur (220kV) Line - Shahjahanpur

(132kV)

8.62 7.56 Hythro 8.62 30/33 28/33 0/8.62 69.7

Notice has been surve to M/s Hythro & SE, ETC Bareilly taking

action to get the work done through a debitable agency.

Page 9: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli

Est. cost

crores Agency LOI Sch comp Survey Foundation Erection Stringing

Work ProgressED

% Prog.

Sl. No.

Name of workTend. No.

Length Km.

TWC BOD ETFLoan

(in Cr.)Remarks

8

LILO of 132 kV Sonik(unnao) -

Bighapur @ Maurawan S/s

22.69 4.74 Varrsana 03.09.14 02.09.15 Comp 74/78 1/78 0/22.69 40

Fdn-casting in progress at loc no 14 B, Er under progress at loc 19 A, 20 C+0 (material shifted). The

Target date of completion 15.11.15

9220 Kv Hardoi rd.-132 kv Hanuman setu (GIS)

U/G Cable107.8

14815.87 (In Lac)

11.11.11REC-047-

2011-5719

UPRNN 88

New site for S/s identified but couldn't handed over yet. The

proposed date of completion is 31.12.15.

10

220 KV dc Sohawal (220 KV)-

Muzzafrapur,Faizabad(400 KV PGCIL)

30 21.99 10.09.12 11.12.12 ECI 15.04.15 14.04.16 1/82 0/82 0/30 10

Foundation WIP, firm to immediately take action for starting erection work. The propsed date of complition

31.03.16.

11

Replacement of HTLS conductor & other

works of following SC lines:-

i)132kv Chinhat-

Gomtinagar SC line13.9 29.08.14 Apar 14.08.15 13.08.16 NA NA

LOI issued on 14.08.15. The proposed date of

complition is 13.08.16.

ii)132kv Chinhat-

Barabanki SC line19.05 29.08.14 Apar 14.08.15 13.08.16 NA NA

LOI issued on 14.08.15. The proposed date of

complition is 13.08.16.

iii)132kv Hardoi Rd.-NKN

SC line10.05 29.08.14 Apar 14.08.15 13.08.16 NA NA

LOI issued on 14.08.15. The proposed date of

complition is 13.08.16.

iv)132kv Gonda-Bahriach

SC line65 29.08.14 Apar 14.08.15 13.08.16 NA NA

LOI issued on 14.08.15. The proposed date of

complition is 13.08.16.

v)132kv Dohna-

Bareilly(I) SC line21 29.08.14 Apar 14.08.15 13.08.16 NA NA

LOI issued on 14.08.15. The proposed date of

complition is 13.08.16.

50.5

Page 10: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 11: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 12: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 13: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 14: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 15: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 16: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 17: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 18: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 19: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 20: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 21: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 22: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 23: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 24: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 25: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 26: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli
Page 27: DETAILS OF ONGOING LINES UNDER … sugarcane & paddy crop. ... 132 kv S/S Bikapur 132 kv sc Bikapur-Sohawal. TD-348 ... 7 132 kv s/s Baghauli 132 kv LILO Hardoi-Shahabad@ Baghauli