Sr. No. Name fo District Name of Taluka Name of Substation Tentative RE integration (in MW) Name of EHV Source S/S Remark 1 Bharuch Valiya 66KV Daheli 2 Bharuch Valiya 132KV Valiya 3 Bharuch Netrang 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Mauza (Chasvad) 6 Narmada Dediapada 66KV Dediapada 7 Narmada Dediapada 66KV Saddapani 8 Narmada Dediapada 66KV Chikda 9 Narmada Dediapada 66KV Bal (Mozda) 10 Bharuch Ankleshwar 66KV A'war GIDC -A 50-70 11 Bharuch Ankleshwar 66KV Ankleshwar GIDC 50-70 12 Bharuch Ankleshwar 66KV Ankleshwar (Urban) 13 Bharuch Hansot 66KV Hansot 14 Bharuch Ankleshwar 66KV Panoli GIDC 15 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 16 Surat Palsana 66KV Niyol (Kadodara-2) 30-40 17 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 18 Surat Choryasi 66KV Bhagwati 19 Surat Choryasi 66KV Bhestan(Eklera) 20 Valsad Dharampur 66KV Dharampur 21 Valsad Dharampur 66KV Nani Vahiyal 22 Valsad Valsad 66KV Atak Pardi (Valsad) 23 Valsad Dharampur 66KV Piprol 24 Valsad Valsad 66KV Valandi (Navera) 25 Valsad Valsad 66KV Gundalav GIDC 26 Valsad Pardi 66KV Khadki Dungri 27 Valsad Pardi 66KV Kolak 28 Valsad Valsad 66KV Valsad City 30-40 29 Valsad Umargam 66KV Umargam 30 Valsad Umargam 66KV Sarigam GIDC 31 Valsad Umargam 66KV Sanjan 32 Valsad Umargam 66KV Vangam(Umargam-II) 33 Valsad Umargam 66KV Palgam 34 Valsad Umargam 66KV Bhilad 30-40 35 Dang Vaghai 66KV Waghai 36 Dang Ahwa 66KV Ahwa 37 Dang Ahwa 66KV Saputara 38 Navsari Chikhli 66KV Tankal 39 Navsari Vansda 66KV Vansda 40 Navsari Vansda 66KV Ankalachh 41 Navsari Vansda 66 KV Mahuwas (Kevadi) 42 Navsari Chikhli 66KV Chikhli 43 Navsari Khergam 66KV Khergam 44 Navsari Chikhli 66KV Fadvel (Matwad) 45 Navsari Chikhli 66KV Rankuwa (Manekpor) 46 Navsari Chikhli 66KV Rumla (Amadhra) 47 Navsari Vansda 66KV Bhinar 48 Valsad Valsad 66KV Dungri (Valsad) 49 Valsad Valsad 66KV Untadi(Malvan Bigri) 50 Navsari Chikhli 66KV Balwada (Wagaldhara) 30-40 220 KV Chikhli -- 30-40 30-40 30-40 220 KV Atul -- 30-40 30-40 220 KV Bhilad -- 132 KV Ankleshwar -- 50-70 132 KV Bhestan -- 30-40 Details of district wise substations for RE integration as on March-2018 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder. South Gujarat 50-70 132 KV Valia -- 30-40

Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Embed Size (px)

Citation preview

Page 1: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

1 Bharuch Valiya 66KV Daheli2 Bharuch Valiya 132KV Valiya3 Bharuch Netrang 66KV Netrang4 Bharuch Netrang 66KV Datt Nagar5 Bharuch Netrang 66KV Mauza (Chasvad)6 Narmada Dediapada 66KV Dediapada7 Narmada Dediapada 66KV Saddapani8 Narmada Dediapada 66KV Chikda9 Narmada Dediapada 66KV Bal (Mozda)

10 Bharuch Ankleshwar 66KV A'war GIDC -A 50-7011 Bharuch Ankleshwar 66KV Ankleshwar GIDC 50-7012 Bharuch Ankleshwar 66KV Ankleshwar (Urban)13 Bharuch Hansot 66KV Hansot14 Bharuch Ankleshwar 66KV Panoli GIDC15 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-4016 Surat Palsana 66KV Niyol (Kadodara-2) 30-4017 Surat Choryasi 66KV Govalak (Udhana-B) 30-4018 Surat Choryasi 66KV Bhagwati 19 Surat Choryasi 66KV Bhestan(Eklera)20 Valsad Dharampur 66KV Dharampur21 Valsad Dharampur 66KV Nani Vahiyal22 Valsad Valsad 66KV Atak Pardi (Valsad)23 Valsad Dharampur 66KV Piprol24 Valsad Valsad 66KV Valandi (Navera)25 Valsad Valsad 66KV Gundalav GIDC26 Valsad Pardi 66KV Khadki Dungri27 Valsad Pardi 66KV Kolak28 Valsad Valsad 66KV Valsad City 30-4029 Valsad Umargam 66KV Umargam30 Valsad Umargam 66KV Sarigam GIDC31 Valsad Umargam 66KV Sanjan32 Valsad Umargam 66KV Vangam(Umargam-II)33 Valsad Umargam 66KV Palgam34 Valsad Umargam 66KV Bhilad 30-4035 Dang Vaghai 66KV Waghai36 Dang Ahwa 66KV Ahwa37 Dang Ahwa 66KV Saputara38 Navsari Chikhli 66KV Tankal39 Navsari Vansda 66KV Vansda40 Navsari Vansda 66KV Ankalachh41 Navsari Vansda 66 KV Mahuwas (Kevadi)42 Navsari Chikhli 66KV Chikhli 43 Navsari Khergam 66KV Khergam44 Navsari Chikhli 66KV Fadvel (Matwad)45 Navsari Chikhli 66KV Rankuwa (Manekpor) 46 Navsari Chikhli 66KV Rumla (Amadhra) 47 Navsari Vansda 66KV Bhinar48 Valsad Valsad 66KV Dungri (Valsad)49 Valsad Valsad 66KV Untadi(Malvan Bigri)50 Navsari Chikhli 66KV Balwada (Wagaldhara)

30-40

220 KV Chikhli --

30-40

30-40

30-40

220 KV Atul --

30-40

30-40 220 KV Bhilad --

132 KV Ankleshwar --50-70

132 KV Bhestan --

30-40

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

South Gujarat

50-70

132 KV Valia --

30-40

Page 2: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

51 Surat Olpad 66KV Veluk52 Surat Olpad 66KV Olpad53 Surat Choryasi 66KV Pala54 Surat Choryasi 66KV SVNIT55 Surat Choryasi 66KV Gujarat Hira Bourse56 Surat Choryasi 66KV Pal57 Surat Choryasi 66KV Bhatha ( Pal-2)58 Surat Choryasi 66KV Variav59 Surat Choryasi 66KV Kosad (Amroli)60 Surat Choryasi 66KV Mora61 Surat Choryasi 66KV Ichhapore 30-4062 Surat Kamrej 66KV Kamrej63 Surat Kamrej 66KV Velanja64 Surat Kamrej 66KV Karjan 50-7065 Surat Mandvi 66KV Karanj66 Surat Mandvi 66KV Areth (Nogama)67 Surat Mandvi 66KV Umarkhadi (Maldha)68 Surat Mangrol 66KV Vankal69 Surat Mangrol 66KV Zankhvav70 Surat Mangrol 66KV Mosali (Mangrol)71 Surat Mangrol 66KV Palod (Kim)72 Surat Olpad 66KV Vadoli 73 Surat Olpad 66KV Mindhi74 Surat Mangrol 66KV Fair deal Text Park 30-4075 Surat Mangrol 66KV Palod-2 30-4076 Surat Bardoli 66KV Bardoli77 Surat Bardoli 66KV Sarbhon (Bardoli)78 Surat Bardoli 66KV Afva(Dungar) 79 Surat Mahuva 66KV Bamaniya80 Surat Mahuva 66KV Singod81 Surat Mahuva 66KV Mahuva82 Surat Bardoli 66KV Kadod83 Surat Bardoli 66KV Madhi84 Surat Mandvi 66KV Mandvi85 Surat Bardoli 66KV Mota 30-4086 Surat Kamrej 66KV Sampura 30-4087 Surat Kamrej 66KV Parab (Mankna) 50-7088 Tapi Vyara 66KV Vyara89 Tapi Vyara 66KV Borakhadi90 Tapi Vyara 66KV Rupwada91 Tapi Vyara 66KV Vyara-292 Tapi Valod 66KV Bhimpor (Kanjod)93 Tapi Valod 66KV Valod94 Tapi Valod 66KV Virpor (Pathakwadi)95 Tapi Valod 66KV Karanjkhed96 Tapi Vyara 66KV Dolvan97 Tapi Vyara 66KV Mangaliya (Chimer)98 Tapi Vyara 66KV Kalakva

30-40

220 KV Mota

(Bardoli)--

30-40

30-40

30-40

30-40

220 KV Kim --

30-40

15-20

30-40

30-40

220 KV Icchapore --

30-40

30-40

30-40

South Gujarat

Page 3: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

99 Navsari Gandevi 66KV Billimora100 Navsari Gandevi 66KV Gandevi101 Navsari Gandevi 66KV Amalsad102 Navsari Jalalpore 66KV Sultanpur(Dandi)103 Navsari Gandevi 66 KV Chhapar (Kotha)104 Navsari Jalalpore 66KV Eroo105 Navsari Navsari 66KV Chhapra (Navsari -B)106 Navsari Navsari 66KV Navsari city107 Navsari Jalalpore 66KV Maroli 30-40108 Navsari Navsari 66KV Vesma 30-40109 Surat Choryasi 66KV SUSM-1110 Surat Choryasi 66KV Bhatia111 Surat Choryasi 66KV Sachin -B112 Surat Choryasi 66KV Vanz (Susml)113 Surat Palsana 66KV Erthan (Lingad) 114 Surat Palsana 66KV GETP115 Navsari Jalalpore 66KV Mangrol 30-40116 Surat Choryasi 66KV Khajod (Magadalla)117 Surat Choryasi 66KV Jiyav (Bamroli)118 Surat Choryasi 66KV Vadod119 Surat Choryasi 66KV Vesu120 Surat Choryasi 66KV Veshu-2 (Magdalla)121 Surat Choryasi 66KV Pandesara122 Surat Choryasi 66KV Jiav (Pandesara-II)123 Surat Choryasi 66KV Sachin -A124 Surat Choryasi 66KV Sachin-D125 Surat Choryasi 66KV Sachin ‘C126 Valsad Dharampur 66KV Motaponda (Kakadkopar)

127 Valsad Pardi 66KV Paria128 Valsad Pardi 66KV Chival (Dhagadmal)129 Valsad Vapi 66KV Kocharava(Rata Koparali)

130 Valsad Kaparada 66KV Kaparada131 Valsad Kaparada 66KV Astol132 Valsad Kaparada 66KV Sutharpada133 Valsad Kaparada 66KV Shahuda134 Valsad Umargam 66KV Damanganga GIDC 30-40135 Valsad Vapi 66KV GIDC -Vapi 30-40136 Valsad Vapi 66KV GIDC Vapi -III rd. Ph.137 Valsad Vapi 66KV GIDC Vapi - IV th Ph.138 Valsad Vapi 66KV GIDC -Vapi Ph.-II 30-40139 Valsad Vapi 66KV Morai140 Valsad Vapi 66KV Morai-2141 Bharuch Wagra 66KV Dahej142 Bharuch Wagra 66KV Luna143 Bharuch Wagra 66KV Vadadala (Dahej)144 Bharuch Wagra 66KV Bhesali145 Bharuch Wagra 66KV Samatpore (Sambheti) 50-70146 Bharuch Wagra 66KV Galenda 50-70147 Bharuch Wagra 66KV Suva 30-40

220 KV Suva

(Rahiyad)--

30-40

220 KV Vapi --

30-40

30-40

30-40 220 KV Dahej --

30-40

220 KV Sachin

(Talangpore)

--

--

30-40

30-40

30-40

30-40

South Gujarat

30-40

220 KV Navsari --

30-40

30-40 220 KV Popda --

Page 4: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

148 Surat Kamrej 66KV Kosmada149 Surat Choryasi 66KV Godadara150 Surat Palsana 66KV Kadodara151 Surat Palsana 66KV Palsana152 Surat Palsana 66KV Tatithaiya153 Surat Palsana 66KV Jolva154 Surat Choryasi 66KV Punakumbharia155 Surat Kamrej 66KV Laskan156 Surat Kamrej 66KV Laskana -2157 Surat Kamrej 66KV Vav 30-40158 Surat Olpad 66KV Sivan (Sayan west)159 Surat Olpad 66KV Delad160 Surat Choryasi 66KV Sarthana 30-40161 Bharuch Wagra 66KV Vilayat162 Bharuch Bharuch 66KV Kukarwada163 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70164 Surat Mangrol 66KV Kosamba165 Surat Mangrol 66KV Kharach (Tarsali)166 Tapi Nizar 66KV Nizar167 Tapi Nizar 66KV Kelani (Kukarmunda)168 Tapi Nizar 66KV Balda/Nimbhora169 Tapi Uchchhal 66KV Rumkitalav170 Tapi Uchchhal 66KV Uchchhal171 Tapi Uchchhal 66KV Vadpada(Naranpur) 172 Tapi Songadh 66KV Borda173 Tapi Songadh 66KV Sagbara

174 Tapi Songadh 66KV Chikhali Bheshrot (Khodtalav)

175 Tapi Songadh 66KV Vadi Bhesrot176 Tapi Songadh 66KV Sisor (Panchpipla)177 Tapi Songadh 66KV Ukai178 Tapi Songadh 66KV Songadh179 Tapi Songadh 66KV Kavla180 Tapi Songadh 66KV Jamkhadi (Hindala)181 Dang Subir 66KV Subir

1 Chhota Udaipur Kawant 66KV Kawant2 Chhota Udaipur Kawant 66KV Bhekhadiya (Bhaka)3 Chhota Udaipur Sankheda 66KV Bhatpur4 Chhota Udaipur Sankheda 66KV Sankheda5 Chhota Udaipur Bodeli 66KV Kosindra6 Chhota Udaipur Bodeli 66KV Bodeli7 Chhota Udaipur Bodeli 66KV Uchapan8 Chhota Udaipur Pavi-Jetpur 66KV Vadoth9 Chhota Udaipur Pavi-Jetpur 66KV Pavi-Jetpur

10 Chhota Udaipur Pavi-Jetpur 66KV Dev Mori (Rangli chokdi)

11 Chhota Udaipur Chhotaudepur 66KV Vanar12 Chhota Udaipur Kawant 66KV Panvad13 Chhota Udaipur Chhotaudepur 66KV Lehvant (Rangpur Sadli) 30-40

Central Gujarat

30-40

132 KV Chhota Udepur

--30-40

30-40

30-40

220 KV Ukai Hydro --

30-40

30-40

30-40

30-40 220 KV Wagra --

400 KV Kosamba --30-40

South Gujarat

30-40

220 KV Vav --

30-40

30-40

30-40

Page 5: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

14 Dahod Dahod 66KV Kharedi (Chhapri)15 Dahod Dahod 66KV Kharod (Chhapari)16 Dahod Zalod 66KV Karath (Limdi)17 Dahod Dahod 66KV Kathala18 Dahod Zalod 66KV Zalod 19 Dahod Zalod 66KV Gultora20 Dahod Dahod 66KV Navagam21 Dahod Garbada 66KV Garbada (Nalvai)22 Dahod Garbada 66KV Vajelav (Jesavada)23 Vadodara Padra 66KV Samiyala (Tandalja)24 Vadodara Padra 66KV Padra25 Vadodara Padra 66KV Mahuvad26 Vadodara Vadodara 66KV Bhayli 50-7027 Vadodara Vadodara 66KV Koyali28 Vadodara Vadodara 66KV Sherkhi29 Vadodara Vadodara 66KV Vasana30 Vadodara Vadodara City 66KV Vidhyutnagar31 Vadodara Vadodara City 66KV Atladra32 Vadodara Vadodara 66KV Gotri-B33 Vadodara Vadodara City 66KV Subhanpura34 Vadodara Vadodara City 66KV Gorwa35 Dahod Devgadh Bariya 66KV Devgadh-Baria

36 Dahod Limkheda 66KV Mota Ambaliyara (Randhikpur)

37 Dahod Devgadh Bariya 66KV Piplod38 Dahod Devgadh Bariya 66KV Dabhwa (Fangiya)39 Dahod Dhanpur 66KV Singavali (Pipero) 30-4040 Dahod Limkheda 66KV Limkheda 30-4041 Kheda Kheda 66KV Kheda42 Kheda Kheda 66KV Matar43 Kheda Kheda 66KV Samadra44 Kheda Matar 66KV Limbasi45 Kheda Vaso 66KV Vaso46 Kheda Mehemdabad 66 KV Wathwadi 47 Kheda Mehmedabad 66KV Aklacha48 Kheda Mehmedabad 66KV Jinjar49 Kheda Mehmedabad 66KV Haldarwas50 Kheda Mehmedabad 66KV Varsola (Devki Vansol/Vamali)

51 Vadodara Desar 66KV Desar52 Vadodara Savli 66KV Savli53 Vadodara Savli 66KV Tundav54 Vadodara Savli 66KV Alindra(manjusar)55 Anand Anand 66KV Samarkha 30-4056 Kheda Galteshwar 66KV Vadad57 Kheda Nadiad 66KV Chaklasi 58 Kheda Nadiad 66KV Kamla (Nadiad City)59 Kheda Nadiad 66KV Malarpura (Chaklasi Party)

60 Kheda Nadiad 66KV Paliya61 Kheda Mehemdabad 66KV Sandhana 30-40

30-40

30-40 132 KV Manjusar --

132 KV Nadiad --30-40

50-70

30-40

30-40 132 KV Limkheda --

30-40

132 KV Mahemdab

ad--

30-40

30-40

Central Gujarat

50-70 132 KV Dahod --

30-40

50-70

132 KV Gotri --

50-70

50-70

Page 6: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

62 Vadodara Savli 66KV Rania (Moxi) GIDC 63 Vadodara Vadodara 66KV Nandesari64 Vadodara Savli 66KV Poicha65 Vadodara Vadodara 66KV Ranoli GIDC 30-4066 Ahmedabad Dascroi 66KV Barejadi67 Ahmedabad Dascroi 66KV Vinjol (Gatrad)68 Ahmedabad Dascroi 66KV Bhuvaldi69 Ahmedabad Dascroi 66KV Bilasiya70 Ahmedabad Dascroi 66KV Vehlal71 Ahmedabad Dascroi 66KV Kanbha72 Ahmedabad Dascroi 66KV Hirapur73 Ahmedabad Dascroi 66 KV Nenpur74 Ahmedabad Dascroi 66KV Jetalpur75 Ahmedabad Dascroi 66 KV Navagam76 Ahmedabad Dascroi 66KV Lambha (Kamod) 30-4077 Kheda Kheda 66KV Bidaj (Vanch) 30-4078 Anand Anand 66KV Vasad79 Anand Anand 66KV Sarsa80 Anand Anand 132KV Ode81 Anand Umreth 66KV Sureli 30-4082 Kheda Galteshwar 66KV Sevalia83 Kheda Thasara 66KV Thasra84 Mahisagar Balasinor 66KV Balasinor85 Kheda Thasara 66KV Rakhiyal 30-4086 Kheda Thasra 66KV Nesh 30-4087 Ahmedabad Ahmedabad 66KV Sarkhej (Shela)88 Ahmedabad Dascroi 66KV Bopal89 Ahmedabad Dascroi 66KV Bhadaj90 Gandhinagar Gandhinagar 66KV Adalaj 30-4091 Ahmedabad Ahmedabad City 66KV Traghad92 Ahmedabad Dascroi 66KV Khoraj (shaligram)93 Ahmedabad Dascroi 66 KV Goderej City94 Anand Cambay 66KV Cambay95 Anand Cambay 66KV Neja96 Anand Cambay 132KV Undel97 Anand Tarapur 66KV Khanpur 98 Anand Sojitra 66KV Limbali99 Anand Cambay 66KV Vatadara (Kalamsar)

100 Chhota Udaipur Bodeli 66KV Chalamali101 Chhota Udaipur Naswadi 66KV Naswadi102 Chhota Udaipur Naswadi 66KV Sengpur (Khanda)

103 Chhota Udaipur Naswadi 66KV Vaghach (Gadhboriyad)

104 Narmada Nandod 66KV Navagam105 Narmada Nandod 66KV Amadla (Nandod)106 Narmada Nandod 66KV Garudeshwar (Devaliya)

107 Narmada Tilakwada 66KV Limpura (Utavdi) 30-40108 Vadodara Dabhoi 66KV Chandod109 Vadodara Dabhoi 66KV Pisai (Sathod)110 Vadodara Sinor 66KV Simli (Segwa)

30-40 132 KV Undel --

30-40

132 KV Tilakwada --50-70

30-40

30-40

132 KV Ode --30-40

30-40

132 KV Sabarmati --

30-40

Central Gujarat

30-40 132 KV Nandesari --

30-40

132 KV Narol --

30-40

Page 7: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

111 Bharuch Zagadiya 66KV Rajpardi112 Bharuch Zagadiya 66KV Zagadia113 Bharuch Zagadiya 66KV Bhalod (Govali)114 Bharuch Zagadiya 66KV Panetha 30-40115 Narmada Nandod 66KV Rajpipla116 Narmada Nandod 66 KV Anijara (Lachhras)117 Narmada Nandod 66KV Bhacharwada118 Narmada Nandod 66KV Pratapnagar (Umalla)119 Narmada Nandod 66 KV Rajuwadiya120 Narmada Nandod 66KV Ori121 Ahmedabad Sanand 66KV Sanathal122 Ahmedabad Dascroi 66KV Visalpur123 Ahmedabad Sanand 66KV Chharodi124 Ahmedabad Viramgam 66KV Thuleta125 Ahmedabad Sanand 66KV Madhavnagar126 Ahmedabad Sanand 66 KV Shella127 Ahmedabad Sanand 66 KV Ambali128 Ahmedabad Sanand 66KV Sanand GIDC129 Ahmedabad Dascroi 66KV Bhat (Bavla)130 Ahmedabad Sanand 66KV Changodar131 Panchmahal Ghoghamba 66KV Ghoghamba 132 Panchmahal Ghoghamba 66KV Simaliya (Rinchhvani)133 Panchmahal Halol 66KV Shivrajpur134 Panchmahal Halol 66KV GIDC Halol B135 Panchmahal Halol 66KV Tarkhanda (Panchdevla)

136 Panchmahal Halol 66KV GIDC - Halol 30-40137 Panchmahal Kalol 66KV Madhwas 30-40138 Vadodara Savli 66KV Ankaliya (Nharpura)139 Panchmahal Halol 66KV Baska140 Panchmahal Halol 66KV KhaKharia141 Vadodara Padra 66KV Karkhadi142 Vadodara Vadodara 66KV Gavasad143 Vadodara Padra 66KV Mobha 144 Panchmahal Kalol 66KV Vejalpur145 Panchmahal Kalol 66KV Kalol146 Panchmahal Kalol 66 KV Bhadroli Khurd147 Panchmahal Godhra 66KV Lilesara 30-40148 Panchmahal Godhra 66KV Santroad149 Panchmahal Morvahadaf 66KV Rajayata 150 Panchmahal Godhra 66KV Jafrabad (Govindi)151 Panchmahal Godhra 66KV Timba152 Panchmahal Godhra 66KV Tuva(kankanapur)153 Panchmahal Morvahadaf 66KV Gokulpur (Morwa Raina)

154 Panchmahal Shehra 66KV Shehera155 Panchmahal Shehra 66KV Nandarva156 Bharuch Zagadiya 66KV Randedi 50-70157 Bharuch Zagadiya 66KV Dadheda (Zagadia GIDC) 30-40

220 KV Jhagadia --

50-70 220 KV Gavasad --

30-40

220 KV Godhra --30-40

30-40

30-40

30-40 220 KV Bhat --

30-40

30-40

220 KV Chandpura --

30-40

Central Gujarat

30-40

220 KV Achhalia --

30-40

50-70

Page 8: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

158 Vadodara Dabhoi 66KV Dabhoi 30-40159 Vadodara Vadodara 66KV Indrapuri160 Vadodara Vadodara City 66KV Waghodia Road161 Vadodara Vadodara 66KV Gajrawadi162 Vadodara Vadodara City 66KV Motibaug163 Vadodara Vadodara City 66KV Tarsali164 Vadodara Vadodara City 66KV Makarpura-GIDC-B165 Vadodara Vadodara City 66KV Makarpura GIDC-A166 Bharuch Amod 66KV Samni (Kurchan)167 Bharuch Bharuch 66KV Palej168 Bharuch Bharuch 66KV Zanor (Nabipur)169 Bharuch Wagra 66KV Muller170 Bharuch Bharuch 66KV Bharuch -B171 Bharuch Bharuch 66KV Bori (Hingala)172 Bharuch Wagra 66KV Wagra173 Bharuch Bharuch 66KV Panchbatti174 Bharuch Bharuch 66KV Kadod 30-40175 Bharuch Bharuch 66KV Haldarva 30-40176 Vadodara Karjan 66KV Rarod (Nareshwar)177 Vadodara Karjan 66KV Saring178 Kheda Kapadvanj 66KV Kapadwanj GIDC 30-40179 Kheda Kapadvanj 66KV Nirmali180 Kheda Kapadvanj 66KV Attarsumba181 Kheda Kapadvanj 66KV Hamirpura (Bhailakui)182 Kheda Kapadvanj 66KV Torna183 Kheda Kathalal 66KV Aral 184 Kheda Kathlal 66KV Chhipadi (Khalal)185 Kheda Kathlal 66KV Kathlal186 Kheda Mahutha 66KV Mahudha187 Kheda Kapadvanj 66KV Vyas Vasna188 Kheda Kathlal 66KV Apruji 189 Kheda Kathlal 66KV Anara 30-40190 Kheda Thasra 66KV Chetarsumba191 Kheda Mahutha 66KV Shehri (Alina)192 Mahisagar Balasinor 66KV Jorapura193 Mahisagar Balasinor 66KV Relia194 Bharuch Amod 66KV Sarbhan195 Bharuch Amod 66KV Amod196 Vadodara Karjan 66KV Bodka (Handod)

197 Vadodara Dabhoi 66KV Karvan (Kayavarohan)

198 Vadodara Karjan 66KV Simali199 Vadodara Sinor 66KV Sadhali200 Vadodara Sinor 66KV Sinor

201 Vadodara Karjan 66KV Kashipura (Ramangamdi) 30-40

202 Vadodara Karjan 66KV Lakodara 30-40

30-40

30-40

30-40

220 KV Karjan --30-40

30-40

220 KV Haldarwa --30-40

30-40

220 KV Kapadwanj --

30-40

30-40

30-40

Central Gujarat

220 KV Jambuva --

50-70

30-40

50-70

Page 9: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

203 Anand Anand 66KV Anand204 Anand Anand 66KV Gopalpura205 Anand Anand 66KV Boriavi (Jol)206 Anand Anand 66KV V.V. Nagar 30-40207 Anand Anand 66KV Vithal Udyognagar 30-40208 Anand Anand 66KV Karamsad 30-40209 Anand Anand 220KV Karamsad 210 Anand Anand 66KV Bhalej211 Anand Umreth 66KV Umreth212 Anand Anklav 66KV Anklav213 Anand Anklav 66KV Navakhal (Khedasa)214 Anand Borsad 66KV Borsad215 Anand Borsad 66KV Shinglav216 Anand Anklav 66KV Khadol (Haldari)217 Anand Borsad 66KV Ras218 Anand Petlad 66KV Virsad219 Anand Petlad 66KV Nar220 Anand Petlad 66KV Petlad221 Anand Petlad 66KV Mahelav222 Anand Petlad 66KV Changa223 Anand Sojitra 66KV Kasor 30-40224 Kheda Nadiad 66KV Uttarsanda225 Kheda Nadiad 66KV Akhdol226 Ahmedabad Dascroi 66KV Kuha227 Ahmedabad Dascroi 66 KV Bahiyal

228 Anand Anand 66KV Mogar 50-70 220 KV Mogar --

229 Ahmedabad Ahmedabad 66KV Naroda230 Ahmedabad Ahmedabad 66KV Odhav231 Ahmedabad Ahmedabad 66KV Kathvada232 Gandhinagar Gandhinagar 66KV Muthia 30-40233 Ahmedabad Dascroi 66KV Chandkheda234 Ahmedabad 66 KV Bhat235 Mahisagar Lunawada 66KV Lunawada236 Mahisagar Santrampur 66KV Movasa237 Mahisagar Lunawada 66KV Kothamba238 Mahisagar Lunawada 66KV Ved(vardhadari)239 Mahisagar Kadana 66KV Ditvas240 Mahisagar Khanpur 66KV Bakor (Lavana)241 Mahisagar Khanpur 66KV Motakhanpur242 Mahisagar Santrampur 66KV Santrampur

243 Mahisagar Santrampur 66KV Valakhedi (Gothib)Vaneda

244 Mahisagar Santrampur 66KV Sarasva245 Mahisagar Lunawada 66KV Budhajina Tekra 30-40

246 Mahisagar Santrampur 66KV Limda Muvadi (Moti Sarsan) 30-40

30-40

220 KV Savdasna

Mauda--

30-40

30-40 220 KV Khanpur --

30-40220 KV

Ranasan --

30-40

Central Gujarat

30-40

220 KV Karamsad --

30-40

30-40

30-40

30-40

30-40

30-40

Page 10: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

247 Ahmedabad Bavla 66KV Juval rupavati248 Ahmedabad Bavla 66KV Kerala249 Ahmedabad Sanand 66KV Zamp250 Ahmedabad Sanand 66KV Daduka (Rethal)251 Ahmedabad Bavla 66KV Bavla252 Ahmedabad Sanand 66KV Nani Devti253 Ahmedabad Sanand 66KV Rajoda254 Ahmedabad Sanand 66KV Moraiya255 Ahmedabad Sanand 66KV Vendor Park 256 Ahmedabad Sanand 66KV Bol-2(GIDC)257 Ahmedabad Sanand 66KV Sanand-2258 Ahmedabad Bavla 66KV Bol-1(GIDC)259 Ahmedabad Bavla 66KV Kalyangadh260 Ahmedabad Dholka 66KV Dholka City 30-40261 Ahmedabad Dholka 66KV Koth262 Ahmedabad Dholka 66KV Raipur263 Ahmedabad Dholka 66KV Simej264 Ahmedabad Dholka 66KV Walthera265 Ahmedabad Dholka 66KV Ingoli road266 Ahmedabad Dholka 66KV Dholka GIDC267 Ahmedabad Dholka 66KV Pisawada268 Ahmedabad Dholka 66 KV Shetra269 Kheda Kheda 66KV Shetra 30-40270 Kheda Nadiad 66KV Navagam (Nyka) 30-40271 Ahmedabad Detroj 66KV Kanz 30-40272 Ahmedabad Viramgam 66KV Jakhawada 30-40273 Panchmahal Halol 66KV Madar (Koprej) 30-40274 Vadodara Waghodiya 66KV Rustampura275 Chhota Udaipur Bodeli 66KV Surya276 Vadodara Vadodara 66KV Khatamba277 Vadodara Vadodara City 66KV Harni278 Vadodara Savli 66KV Khakhariya 30-40

279 Vadodara Savli 66KV Pratapnagar (Godampura)

280 Vadodara Waghodiya 66KV Asoj (Paldi)281 Vadodara Waghodiya 66KV Vyankatpura282 Vadodara Waghodiya 66KV Jarod283 Vadodara Vadodara 66KV Amaliyara 284 Vadodara Vadodara City 66KV Chhani-A285 Vadodara Vadodara City 66KV Chhani -B 286 Vadodara Vadodara City 66KV Sama

30-40 220 KV Waghodia --

400 KV Asoj --30-40

30-40

220 KV Viramgam --

220 KV Vyankatpur

a--30-40

Central Gujarat

30-40

220 KV Salejada --

30-40

30-40

Page 11: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

1 Gandhinagar Gandhinagar 66KV Unava2 Gandhinagar Dehgam 66KV Sadra

3 Gandhinagar Mansa 66KV Manekpur (Grambharti)

4 Gandhinagar Gandhinagar 66KV Shahpur 30-405 Gandhinagar Gandhinagar 66KV Dabhoda 30-406 Banaskantha Deesa 66KV Bhildi7 Banaskantha Deesa 66KV Lorwada8 Banaskantha Deesa 66KV Balodhar9 Banaskantha 66KV Manekpura

10 Banaskantha 66KV Juna Deesa11 Banaskantha 66KV Ranpur12 Banaskantha 66KV Kant13 Patan Harij 66KV Dunawada14 Patan Patan 66KV Anawada15 Patan Patan 66KV Kamliwada 30-4016 Patan Saraswati 66KV Kansa17 Patan Shihori 66KV Anganwada18 Banaskantha Vadgam 66KV Basu 19 Banaskantha Vadgam 66KV Kakoshi20 Banaskantha Vadgam 66KV Chhapi 30-4021 Mehsana Unjha 66KV Kahoda 30-4022 Patan Sidhpur 6KV Khali23 Patan Unjha / Mehsana 66KV Tundav24 Patan Sidhpur 66KV Mudana25 Patan Sidhpur 66KV Sujanpur26 Sabarkantha 66KV Prantij27 Sabarkantha 66KV D'Muvadi28 Sabarkantha 66KV Tajpur29 Sabarkantha Talod 66KV Harsol 30-4030 Banaskantha 66KV Rantila31 Banaskantha 66KV Lakhani32 Banaskantha 66KV Agathala33 Banaskantha 66KV Kuvana34 Banaskantha 66KV Del35 Banaskantha 66KV Soni36 Banaskantha 66KV Shergadh37 Banaskantha 66KV Kotda (D)38 Banaskantha 66KV Chekara39 Banaskantha Lakhani 66KV Motakapra 30-4040 Banaskantha Tharad 66KV Taruva 30-4041 Sabarkantha 66KV Dedhrota42 Sabarkantha 66KV Munpur43 Sabarkantha 66KV Hansalpur44 Sabarkantha 66KV Kali Dungar45 Sabarkantha 66KV Chandrani46 Sabarkantha 66KV Kaniyol47 Sabarkantha 66KV Hajipur48 Sabarkantha 66KV Dalpur

220 KV Agiyol --

Lakhani 30-40

Himmatnagar 30-40

Himmatnagar 30-40

Himmatnagar, Prantij 30-40

Prantij 30-40 132 KV Talod --

Lakhni, Deodar 30-40

220 KV Agathala --Deodar, Lakhani 30-40

30-40

15-20132 KV Patan --

15-20

30-40

132 KV Siddhpur --

30-40

30-40

North Gujarat

30-40 132 KV Chiloda --

30-40

132 KV Deesa --Deesa 30-40

Deesa

Page 12: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

49 Sabarkantha 66KV Himmatnagar-150 Sabarkantha 66KV Gadhoda51 Sabarkantha 66KV Nikoda52 Sabarkantha 66KV Gadhi53 Sabarkantha 66KV Gambhoi54 Sabarkantha 66KV Rupal55 Sabarkantha 66KV Himmatnagar-256 Patan Chanasma 66KV Maniyari57 Patan Bechraji / Mehsana 66KV Modhera58 Gandhinagar Kalol 66KV Pansar59 Gandhinagar Kalol 66KV Chhatral GIDC60 Gandhinagar Kalol 66KV Borisana61 Gandhinagar Kalol 66KV Vadsar62 Gandhinagar Kalol 66KV Kalol 30-4063 Gandhinagar Kalol 66KV Dhanot64 Mehsana Kalol 66KV Karannagar65 Mehsana Kadi 66KV Khavad66 Mehsana Kadi 66KV Sadra67 Mehsana Kadi 66KV Rangpurda (Nanikadi)68 Mehsana Kadi 66KV Nandasan69 Mehsana Kadi 66KV Rajpur70 Aravali Bhiloda, Vijaynagar 66KV Bhiloda71 Aravali Bhiloda, Vijaynagar 66KV Ubsal72 Aravali Bhiloda, Vijaynagar 66KV Torada73 Aravali Bhiloda, Vijaynagar 66KV Bhiloda74 Aravali Bhiloda, Vijaynagar 66KV Vijaynagar75 Aravali Bhiloda, Vijaynagar 66KV Dantod76 Aravali Bhiloda 66KV Shamlaji (Palla)77 Aravali Bhiloda 66KV Kheradi78 Sabarkantha 66KV Poshina79 Sabarkantha 66KV Golwada80 Sabarkantha 66 KV Makadchampa81 Sabarkantha 66KV Hingatiya82 Sabarkantha 66KV Khedbrahma83 Sabarkantha 66KV Kundala84 Sabarkantha 66KV Choriwad85 Sabarkantha 66KV Chitroda86 Sabarkantha 66KV Badoli87 Sabarkantha 66KV Sudarpur88 Sabarkantha 66KV Lai Ranasan89 Gandhinagar Gandhinagar 66KV Randheja90 Gandhinagar Gandhinagar 66KV Moti Adrej91 Gandhinagar Kalol 66KV Soja - II92 Gandhinagar Kalol 66KV Nardipur93 Gandhinagar Kalol 66KV Veda94 Gandhinagar Kalol 66KV Itla 30-4095 Mehsana 66KV Gozaria96 Mehsana 66KV Gozariya-297 Mehsana 66KV Kharna98 Mehsana 66KV Vasai99 Mehsana Visnagar 66KV Kada

220 KV Agiyol --

North Gujarat

30-40

Idar 30-40

30-40

220 KV Jamla --

30-40

Gozariya 30-40

30-40

30-40

220 KV Bhutiya --

30-40

Poshina, Danta, Khedbrahma 30-40

Vijaynagar, Vadali 30-40

Idar

15-20 220 KV Becharaji --

30-40

220 KV Chhatral --

30-40

30-40

30-40

Himmatnagar, Talod 30-40

Himmatnagar, Prantij 30-40

Himmatnagar 30-40

Page 13: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

100 Aravali Bayad, Dhansura 66KV Ambaliyara101 Aravali Bayad, Dhansura 66KV Akrund(Haripura)102 Aravali Bayad 66KV Demai103 Aravali Bayad 66KV Sangal (Vasnirel)104 Aravali Malpur, Dhansura 66KV Aniyor105 Aravali Malpur, Dhansura 66KV Khadol (Simali)106 Aravali Bayad 66KV Untarada107 Aravali Talod 66KV Rozad108 Sabarkantha 66KV Punsari109 Sabarkantha 66KV Bayal110 Aravali Modasa 66KV Modasa111 Aravali Modasa 66KV Tiintoi112 Aravali Modasa 66KV Medhasan113 Aravali Modasa 66KV Nani Isrol114 Aravali Malpur, Meghraj 66KV Malpur115 Aravali Malpur, Meghraj 66KV Limbodara116 Aravali Malpur, Meghraj 66 KV Ramgadhi117 Aravali Malpur, Meghraj 66KV Dugarwada (Kolikhad)118 Aravali Meghraj 66KV Meghraj119 Aravali Meghraj 66KV Relawada120 Aravali Meghraj 66KV Kasana121 Aravali Meghraj 66KV Rajpur (Ramghadi)122 Aravali Meghraj 66KV Navagam (isari) Kantalu123 Aravali Meghraj 66KV Lakshmanpura (Lusadiya)124 Banaskantha 66KV Sadarpur125 Banaskantha 66KV Samau126 Banaskantha 66KV Bhatsan127 Banaskantha 66KV Rasana128 Banaskantha 66KV Aseda129 Banaskantha 66KV Samdhi130 Banaskantha 66KV Sampra131 Banaskantha 66KV Umbari132 Banaskantha 66KV Kamboi133 Banaskantha Palanpur 66KV Gadh 30-40134 Patan Sarasvati 66KV Mesar 30-40135 Patan Sarasvati 66KV Dharusana 30-40136 Patan Saraswati 66KV Jangral 30-40137 Patan Saraswati 66KV Kimbuva 30-40138 Patan Sidhpur 66KV Kalyana 30-40139 Gandhinagar Dehgam 66KV Rakhiyal 30-40140 Gandhinagar Dehgam 66KV Halisa141 Gandhinagar Gandhinagar 66KV Chhala142 Gandhinagar Dehgam 66KV Dehgam143 Gandhinagar Dehgam 66KV Kadadar(Zak)144 Gandhinagar Dehgam 66KV Chiskari 30-40145 Gandhinagar Gandhinagar 66KV Kadjodra 30-40146 Gandhinagar Gandhinagar 66KV Bahial147 Gandhinagar Gandhinagar 66KV Kudasana(Koba)

30-40

Sihori 30-40

220 KV Khanpur --

30-40

30-40

30-40

30-40

220 KV Faredi --

30-40

30-40

Deesa 30-40

220 KV Jangral --

Deesa, Palanpur

North Gujarat

30-40

30-40

30-40

30-40

Talod 20

Page 14: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

148 Mehsana Kheralu 66KV Sakari149 Banaskantha Vadgam 66KV Panchada150 Banaskantha Vadgam 66KV Kodram151 Banaskantha Danta 66KV Ambaji152 Banaskantha Danta 66KV Gorad153 Banaskantha Danta 66KV Kuvarsi154 Banaskantha Danta 66KV Satalsana155 Mehsana 66KV Kheralu 30-40156 Mehsana 66KV Varetha157 Mehsana 66KV Sudasana (Umari)158 Mehsana 66KV Otalpur159 Mehsana Kheralu 66KV Mandali160 Mehsana Unjha 66KV Dasaj161 Mehsana 66KV Satlasana162 Mehsana 66KV Dharoi163 Mehsana Unjha 66KV Unjha164 Mehsana Unjha 66KV Karli165 Mehsana Visnagar 66KV Umta166 Mehsana Visnagar 66 KV Thalota167 Mehsana 66KV Vadnagar168 Mehsana 66KV Undhai (Pipaldhar)169 Mehsana 66KV Jantral170 Mehsana 66KV Sunderpur171 Mehsana 66KV Ladol172 Mehsana Vadnagar 66KV Khanpur173 Mehsana Vijapur 66KV Techava174 Patan Chanasma 66 KV Dhinoj175 Mehsana Becharji 66KV Motap176 Mehsana Mehsana 66KV Palavasna177 Mehsana Mehsana 66KV Nagalpur (Mehsana-II)178 Mehsana Visnagar 66KV Basna179 Mehsana Visnagar 66KV Udalpur180 Mehsana Visnagar 66KV Kamana 181 Mehsana Visnagar 66 KV Kherva182 Mehsana Visnagar 66KV Bhandu183 Mehsana Visnagar 66KV Valam184 Mehsana 66KV Asjol 30-40185 Mehsana Mehsana 66KV Balol 30-40186 Mehsana 66KV Suraj187 Mehsana 66KV Kasalpur (Jotana)188 Mehsana 66KV Mudarda 189 Mehsana Detroi / Ahmedabad 66KV Katosan190 Mehsana Mehsana 66KV Langhnaj191 Mehsana Mehsana 66KV Linch192 Mehsana Mehsana 66KV Mandali193 Mehsana Mehsana 66KV Akhaj

North Gujarat

220 KV Mitha --

Jotana 30-40

30-40

220 KV Mehsana --

30-40

30-40

30-40

30-40

Vadnagar

30-40Vijapur

30-40

30-40

30-40

220 KV Kheralu --

30-40

Kheralu

30-40Satlasana

30-40

Satlasana 30-40

Page 15: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

194 Banaskantha Amirgadh 66KV Amirgadh195 Banaskantha Amirgadh 66KV Iqbagadh 196 Banaskantha Amirgadh 66KV Hebatpur197 Banaskantha Amirgadh 66KV Bhayala198 Banaskantha Amirgadh 66KV Virampur199 Banaskantha Amirgadh 66KV Malan200 Banaskantha Amirgadh 66KV Vasan201 Banaskantha Amirgadh 66KV Palanpur-2202 Banaskantha Vadgam, Danta 66KV Moriya203 Banaskantha Vadgam, Danta 66KV Jalotra204 Banaskantha Vadgam, Danta 66KV Danta205 Banaskantha Vadgam, Danta 66KV Gangva206 Banaskantha Vadgam, Danta 66KV Gidasan207 Banaskantha Vadgam, Danta 66KV Vadgam208 Banaskantha Vadgam, Danta 66KV Pilucha209 Banaskantha Vadgam, Palanpur 66KV Kanodar210 Banaskantha Vadgam, Palanpur 66KV Lalwada211 Banaskantha Vadgam, Palanpur 66KV Gadalwada212 Banaskantha Dantiwada, Palanpur 66KV Bhakar213 Banaskantha Dantiwada, Palanpur 66KV Chandisar214 Banaskantha Dantiwada, Palanpur 66KV Dantiwada215 Banaskantha Dantiwada, Palanpur 66KV Bhutedi216 Banaskantha Palanpur 66KV Palanpur-1 30-40217 Banaskantha 66KV Khariya218 Banaskantha 66KV Un219 Patan Radhanpur 66KV Bhandhvad (Dev)220 Patan Kankrej 66KV Jakhel221 Patan Chanasma 66KV Chanasma222 Patan Chanasma 66KV Kamboi223 Patan Chanasma 66KV Ziliya (Keshani)224 Patan Patan 66KV Balisana225 Patan Patan 66KV Manud226 Patan Patan 66KV Norta (Mandotri)227 Patan Unjha / Mehsana 66KV Unava228 Banaskantha Bhabar, Vav 66KV Runi229 Banaskantha Bhabar, Vav 66KV Rampura230 Banaskantha Bhabar, Vav 66KV Tithgam231 Banaskantha Bhabar, Vav 66KV Balodhan232 Banaskantha Bhabar, Vav 66Kv Bhabar233 Banaskantha Suigam, Vav 66KV Jaloya234 Banaskantha Suigam, Vav 66KV Vav235 Banaskantha 66KV Kotarwada236 Banaskantha 66KV Makhanu237 Banaskantha 66KV Del238 Banaskantha 66KV Miyal239 Banaskantha 66KV Lavana240 Banaskantha 66KV Ghodasar241 Banaskantha 66KV Asodar242 Banaskantha 66KV Keshargam243 Banaskantha 66KV Rah244 Banaskantha 66KV Pathamda245 Banaskantha 66KV Bhoradu

220 KV Tharad --

North Gujarat

30-40

30-40

Deodar, Tharad 30-40

Lakhani, Tharad 30-40

220 KV Radhanpur --

30-40

15-20

30-40

30-40

30-40

30-40

30-40

Sihori, Kankrej 30-40

30-40

220 KV Palanpur --

30-40

30-40

Page 16: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

246 Banaskantha Tharad 66KV Tadav 30-40247 Banaskantha 66KV Piluda248 Banaskantha 66KV Dedarada249 Banaskantha 66KV Dudhva250 Banaskantha 66KV Tharad251 Banaskantha 66KV Jadiyali252 Banaskantha 66KV Nandala253 Banaskantha Tharad 66KV Duva 30-40254 Banaskantha Mera 66KV Mera255 Banaskantha Mera 66KV Mitha256 Banaskantha Mera 66KV Vadiya257 Banaskantha 66KV Ramvas258 Banaskantha 66KV Chamanpura259 Banaskantha 66KV Khimana260 Banaskantha 66KV Khoda261 Banaskantha 66KV Mithipaldi262 Banaskantha 66KV Vatam263 Banaskantha 66KV Kotda (F)264 Banaskantha Deodar 66KV Vakha 30-40265 Banaskantha Deodar 66KV Deodar 30-40266 Banaskantha 66KV Raiya267 Banaskantha 66KV Arniwada268 Banaskantha 66KV Jakhel269 Banaskantha 66KV Terwada270 Banaskantha 66KV Jalmor271 Banaskantha 66KV Sihori272 Banaskantha 66KV Padardi273 Banaskantha 66KV Dugrasan274 Banaskantha 66KV Thara275 Gandhinagar Kalol 66KV Moti Bhoyan 30-40276 Gandhinagar Kalol 66KV Khatraj277 Gandhinagar Kalol 66KV Santej278 Mehsana Kadi 66KV Kadi279 Mehsana Kadi 66KV Laxmipura280 Ahmedabad Detroj 66KV Katosan 30-40281 Mehsana Kadi 66KV Meda Adraj282 Mehsana Kadi 66KV Meda283 Mehsana Kadi 66KV Thol284 Gandhinagar Mansa 66KV Mansa285 Gandhinagar Mansa 66KV Lodra286 Mehsana Mansa 66 KV Vihar287 Sabarkantha 66KV Mau288 Sabarkantha 66KV Vasai289 Mehsana Vijapur 66KV Pilwai (Veda) 30-40290 Mehsana Vijapur 66KV Malosan291 Mehsana Vijapur 66KV Tatosan292 Mehsana Vijapur 66KV Vadasan 293 Mehsana Visnagar 66KV Bhalak (Transwad) 30-40294 Mehsana Vijapur 66KV Ranasan295 Mehsana Vijapur 66KV Hirpura

220 KV Tharad --

North Gujarat

30-40

220 KV Vijapur --

30-40Idar

30-40

30-40

30-40Sihori

Sihori 30-40

400 KV Vadavi --

30-40

30-40

30-40

Deodar, Lakhani 30-40

Shihori, Deodar 30-40

Sihori, Kankrej 30-40

30-40

Lakhani 30-40 220 KV Thavar --

30-40

220 KV Deodar (Vakha)

--

Kankrej, Deesa, Sihori, Deodar 30-40

Tharad

Page 17: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

296 Banaskantha Dantiwada, Deesa 66KV Jegol297 Banaskantha Dantiwada, Deesa 66KV Panthwada298 Banaskantha Dantiwada, Deesa 66KV Vithodar299 Banaskantha 66KV Devsari300 Banaskantha 66KV Pechhdal301 Banaskantha 66KV Nagfana302 Banaskantha 66KV Ramun303 Banaskantha 66KV Sherpura304 Banaskantha 66KV Dama305 Banaskantha 66KV Samsherpura306 Banaskantha 66KV Gadha307 Banaskantha 66KV Baiwada

1 Ahmedabad Dhandhuka 66KV Khasta (fedra) 30-402 Ahmedabad Dholera 66KV Dholera 30-403 Surendranagar Limbdi 66KV Panshina 30-404 Rajkot Upleta 66KV Arni 30-405 Rajkot Dhoraji 66KV Supedi6 Rajkot Jamkandorna 66 KV Khajurada7 Jamnagar Dhrol 66KV Liyara8 Jamnagar Jamjodhpur 66KV Sanosara9 Junagadh Junagadh 66KV Bilkha

10 Junagadh Mendarda 66KV Chiroda11 Junagadh Junagadh 66KV Bagdu (Prabhatpur)12 Junagadh Bhesan 66KV Chhodvadi13 Jamnagar Jamnagar 66KV Shapar (Baid)14 Jamnagar Jamnagar 66KV Lakha Baval 15 Jamnagar Jamnagar 66KV Lal Bangalow16 Jamnagar Jamnagar 66KV Bedeshwar17 Jamnagar Jamnagar 66KV Saatrasta18 Jamnagar Jamnagar 66KV Hapa GIDC 30-4019 Jamnagar Jamnagar 66KV Jamnagar-C 30-4020 Devbhumi Dwarka Jam-Khambhaliya 66KV Vadinar 30-40 132 KV Sikka --21 Gir Somnath Veraval 66KV Veraval22 Gir Somnath Veraval 66KV Moraj23 Gir Somnath Veraval 66KV Adri24 Gir Somnath Veraval 66KV Ghusia25 Rajkot Rajkot 66KV Punitnagar (Rajkot-B)26 Rajkot Rajkot 66KV Mavdi Rd. (Rajkot)27 Rajkot Rajkot 66KV Shastri medan 28 Rajkot Rajkot 66KV Laxminagar29 Rajkot Rajkot 66KV Mota Mava30 Rajkot Rajkot 66KV Kotharia31 Rajkot Rajkot 66KV Nilkanth32 Bhavnagar Mahuva 66KV Kalsar33 Bhavnagar Talaja 66KV Datha34 Bhavnagar Talaja 66KV Pithalpur35 Bhavnagar Talaja 66KV Mannar36 Bhavnagar Ghogha 66KV Navagam37 Bhavnagar Talaja 66KV Talaja38 Bhavnagar Mahuva 66KV Dudhal-239 Bhavnagar Mahuva 66KV Khuntvada40 Bhavnagar Mahuva 66KV Bila41 Bhavnagar Mahuva 66KV Belampur 30-40

North Gujarat

30-40 132 KV Vikram

Maximum 50-70 MW RE injection

feasible

30-40

30-40220 KV Mahuva (Otha)

Maximum 50-70 MW RE injection

feasible

30-40

30-40

132 KV Naghedi

Maximum 50-70 MW RE injection

feasible30-40

30-50 132 KV Talaja --

30-40 132 KV Dhrol --

30-40 132 KV Junagadh --

30-40

Saurashtra

132 KV Dhandhuka --

132 KV Bhayavadar --30-40

30-40

400 KV Kansari (Zerda)

--

Lakhani, Deesa 30-40

Deesa 30-40

Deesa 30-40

Deesa

Page 18: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

42 Gir Somnath Girgadhada 66KV Dhokadva43 Gir Somnath Girgadhada 66KV Gir Gadhada44 Gir Somnath Girgadhada 66KV Rabarika45 Gir Somnath Girgadhada 66 KV Navaugla46 Gir Somnath Una 66KV Samter (Una-II) 30-4047 Gir Somnath Una 66 KV Dandi 25-3048 Gir Somnath Girgadhada 66KV Bodidar49 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz50 Gir Somnath Una 66KV Vajadi 30-4051 Rajkot Gondal 66KV Vasavad52 Rajkot Gondal 66KV Moviya53 Rajkot Gondal 66KV Shrinathgadh54 Rajkot Jasdan 66KV Sanathali55 Jamnagar Jamnagar 66KV Aliabada56 Jamnagar Jamnagar 66KV Jam Wanthali57 Jamnagar Jamnagar 66KV Jamnagar-B58 Jamnagar Jamnagar 66KV Morkanda 59 Jamnagar Lalpur 66KV GIDC ph-III 60 Jamnagar Lalpur 66KV Lalpur61 Jamnagar Lalpur 66KV Pipli62 Jamnagar Lalpur 66 KV Haripar63 Jamnagar Lalpur 66 KV Mota Kadba (Vavdi)

64 Jamnagar Jamnagar 66KV Chandra gadh (Chela) (Changapatiya)

65 Rajkot Kotda-sangdi 66KV Shapar66 Rajkot Kotda-sangdi 66KV Siddheshwar (Shapar-II)

67 Rajkot Kotda-sangdi 66KV Veraval (Rajkot)68 Rajkot Rajkot 66KV Vavdi 30-3569 Junagadh Keshod 66KV Keshod 30-3570 Junagadh Mendarda 66KV Patrama (Khalipipli)71 Junagadh Keshod 66KV Ajab72 Junagadh Keshod 66KV Koylana73 Junagadh Maliya Hatina 66KV Amrapar74 Junagadh Keshod 66 KV Bhat Simroli75 Junagadh Keshod 66 KV Moti Ghasri76 Junagadh Mangrol 66 KV Mangrol77 Junagadh Keshod 66 KV Khirsara78 Junagadh Keshod 66 KV Ishara79 Junagadh Maliya Hatina 66KV Malia (Hatina)80 Junagadh Maliya Hatina 66 KV Kadaya81 Junagadh Maliya Hatina 66KV Chuldi82 Junagadh Maliya Hatina 66KV Chorwad (Gadu) 30-3583 Junagadh Maliya Hatina 66KV Mendarda84 Junagadh Maliya Hatina 66KV Nani Khodiyar85 Junagadh Maliya Hatina 66KV Budhecha 30-35

Saurashtra

220 KV Keshod

Maximum 50-70 MW RE injection

feasible

30-40

30-40

30-40

30-35

30-40

30-40

30-40

220 KV Jamnagar

Maximum 50-100 MW RE injection

feasible

30-40

30-40

50-70 220 KV Kangashiyal

i

Maximum 50-100 MW RE injection

feasible

30-40

220 KV Dhokadava

Maximum 50-70 MW RE injection

feasible

30-40

30-40 220 KV Gondal --

Page 19: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

86 Surendranagar Chuda 66KV Chuda87 Surendranagar Chuda 66 KV Khandiya (Kanthariya)

88 Surendranagar Chuda 66KV Ranpur89 Surendranagar Chuda 66KV Chokadi90 Surendranagar Wadhwan 66KV Vastadi91 Surendranagar Chuda 66KV Chachka92 Surendranagar Muli 66KV Muli93 Surendranagar Sayla 66KV Sayla94 Surendranagar Wadhwan 66KV Tuva (Timba) 30-4095 Surendranagar Wadhwan 66KV Surendranagar96 Surendranagar Wadhwan 66KV Wadhvan97 Surendranagar Muli 66KV Lakhtar98 Rajkot Lodhika 66KV Metoda99 Rajkot Lodhika 66KV Metoda GIDC-II

100 Rajkot Lodhika 66KV Central Metoda GIDC101 Rajkot Lodhika 66KV Khirsara102 Rajkot Paddhari 66KV PadadhriI103 Rajkot Paddhari 66KV Targhadi104 Rajkot Paddhari 66KV Mota Khijadia105 Rajkot Paddhari 66KV Nyara106 Rajkot Rajkot 66KV Ghanteshwar (Rajkot-D)

107 Rajkot Rajkot city 66KV University Rd.108 Rajkot Rajkot 66KV Raiyadher109 Junagadh Bhesan 66KV Mendpara110 Junagadh Junagadh City 66KV Junagadh (GIDC)111 Junagadh Junagadh City 66KV Zanzarda (JU. City)112 Junagadh Junagadh 66KV Choki113 Junagadh Junagadh 66KV Majevadi114 Junagadh Mendarda 66KV Arniyana 115 Junagadh Vanthali 66KV Mahobatpur (Navagam)116 Junagadh Vanthali 66KV Vadala117 Junagadh Manavadar 66KV Katakpara 30-40118 Junagadh Vanthali 66KV Shapur 30-40119 Junagadh Vanthali 66KV Kanza 30-40120 Gir Somnath Sutrapada 66KV Moradiya 30-50121 Gir Somnath Sutrapada 66KV Lodhwa (Singsar)122 Gir Somnath Sutrapada 66 KV Gorakhmadi123 Gir Somnath Kodinar 66KV Sindhaj124 Gir Somnath Sutrapada 66KV Kanjotar(Barda)125 Gir Somnath Sutrapada 66KV Singasar 30-40126 Gir Somnath Sutrapada 66KV Sutrapada127 Gir Somnath Veraval 66KV Veraval (GIDC)128 Gir Somnath Veraval 66KV Bhalka(GIS)129 Gir Somnath Veraval 66KV Prabhas Patan130 Gir Somnath Kodinar 66 KV Devli131 Gir Somnath Kodinar 66 KV Kodinar132 Gir Somnath Kodinar 66 KV Jantrakhadi133 Gir Somnath Kodinar 66 KV Advi134 Gir Somnath Veraval 66KV Bhetali 30-40135 Gir Somnath Talala 66KV Ankolwadi136 Gir Somnath Talala 66KV Jasadhar137 Gir Somnath Sutrapada 66KV Pranchi138 Gir Somnath Kodinar 66KV Ghantwad139 Gir Somnath Kodinar 66KV Alidar

Saurashtra

30-40

30-40

220 KV Shapur

Maximum 50-70 MW RE injection

feasible30-40

220 KV Timbdi

Maximum 50-70 MW RE injection

feasible

50-70

50-70

30-50

50-70

50-70

220 KV Nyara

Maximum 50-100 MW RE injection

feasible30-40

50-70

20-30

220 KV Limbdi --

15-20

30-40

30-40

Page 20: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

140 Bhavanagar Bhavnagar 66KV Tana141 Bhavanagar Ghogha 66KV Dihor142 Bhavanagar Bhavnagar 66KV Trapaj143 Bhavnagar Talaja 66KV Mannar144 Bhavnagar Ghogha 66KV Navagam145 Bhavnagar Talaja 66KV Talaja146 Bhavnagar Talaja 66KV Devalia147 Bhavanagar Ghogha 66KV Tamana148 Bhavanagar Palitana 66KV Gheti149 Bhavanagar Gariyadhar 66KV Mangadh150 Bhavnagar Gariyadhar 66KV Bhandariya151 Bhavanagar Bhavnagar 66KV Godidhal152 Amreli Bhavnagar 66KV Nonganvadar153 Bhavnagar Gariyadhar 66KV Mandvi154 Bhavanagar Palitana 66KV Palitana155 Bhavanagar Bhavnagar 66KV Bandar Road156 Bhavanagar Bhavnagar 66Kv Sardarnagar157 Bhavanagar Bhavnagar 66KV Sidsar158 Bhavanagar Ghogha 66KV Mamsa-2159 Bhavanagar Bhavnagar 66KV Bhumbhali160 Bhavanagar Ghogha 66KV Nathugadh161 Bhavanagar Bhavnagar 66KV Bhavnagar162 Bhavanagar Bhavnagar 66KV Valketgate163 Bhavanagar Bhavnagar 66KV Vartej-II (Chitra)164 Bhavanagar Bhavnagar 66KV Nari Road165 Bhavanagar Bhavnagar 66KV Desainagar 30-35166 Bhavanagar Ghogha 66KV Kharakdi (Samdhiyara)167 Bhavanagar Shihor 66KV Songadh168 Bhavanagar Shihor 66KV Sar169 Bhavanagar Bhavnagar 66KV Navagam (Kardej)170 Bhavanagar Shihor 66KV Shihor171 Bhavanagar Shihor 66KV Sihor-2172 Bhavanagar Shihor 66KV Nesda173 Bhavanagar Shihor 66KV Ghanghali174 Amreli Dhari 66KV Bhader175 Amreli Dhari 66 KV Vekariya176 Amreli Dhari 66KV Dalkhania177 Amreli Dhari 66KV Kagdadi (Hamapur)178 Amreli Dhari 66KV Kubda179 Amreli Dhari 66KV Dudhala180 Amreli Dhari 66KV Dhari181 Amreli Dhari 66KV Malsika

182 Junagadh Bhesan 66 KV Junidhari Gundali (Tadka Pipliya)

183 Junagadh Bhesan 66KV Chuda184 Junagadh Bhesan 66KV Bhesan185 Junagadh Visavadar 66KV Mota Kotda186 Junagadh Visavadar 66KV Dhebar187 Junagadh Visavadar 66KV Bhalgam188 Junagadh Visavadar 66KV Navihaliyad

220 KV Visavadar

Maximum 50-70 MW RE injection

feasible

30-40

30-40

30-40

30-40

220 KV Vartej

Maximum 50-70 MW RE injection

feasible

20-30

30-40

30-40

30-40

30-40

Saurashtra

20-30

220 KV Sagapara

Maximum 50-70 MW RE injection

feasible30-40

30-40

Page 21: Details of district wise substations for RE integration as ...getcogujarat.com/getco_new/pages/files/RNC/RE/66KV-Substations-RE... · Sr. No. Name fo District Name of Taluka Name

Sr. No. Name fo District Name of Taluka Name of Substation

Tentative RE integration (in

MW)

Name of EHV Source S/S Remark

Details of district wise substations for RE integration as on March-2018Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations.(2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed.(3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from 220 / 132 KV substation.(4) RE power integration at EHV level shall be finalized after detailed system study.(5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application.(6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest bidder.

189 Junagadh Visavadar 66KV Ratang (Magharadi)190 Junagadh Visavadar 66KV Baradia191 Junagadh Visavadar 66KV Khambhaliya (Ozat) 30-40192 Junagadh Visavadar 66KV Govindpara (Jetalvad) 30-40193 Junagadh Visavadar 66KV Kankchiyala 30-40194 Junagadh Visavadar 66KV Bhutdi 30-40195 Amreli Savarkundla 66 KV Badhada196 Amreli Khambha 66 KV Mota Samadhiyala197 Amreli Dhari 66 KV Devla198 Amreli Khambha 66 KV Khambha199 Amreli Khambha 66 KV Dedan200 Amreli Khambha 66 KV Tataniya201 Amreli Rajula 66KV Mota Agariya202 Amreli Rajula 66KV Rajula203 Amreli Rajula 66KV Barpatoli204 Amreli Khambha 66KV Mota Burman205 Amreli Rajula 66KV Kadiyali206 Amreli Rajula 66KV Dungar207 Bhavnagar Mahuva 66KV Vangar208 Amreli Dhari 66KV Chalala209 Amreli Dhari 66KV Sarambhada210 Amreli Bagasara 66KV Bagasara211 Amreli Bagasara 66KV Hadala212 Amreli Bagasara 66KV Kunkavav213 Amreli Dhari 66KV Hudali214 Amreli Amreli 66 KV Savarkundla 30-40215 Amreli Liliya 66 KV Liliya216 Amreli Liliya 66 KV Gundaran217 Amreli Amreli 66KV Chital218 Amreli Babara 66KV Kuwargadh (Chamardi)

219 Amreli Amreli 66KV Mota Ankadiya (Limbadia)

220 Amreli Kunka-vav 66KV Lunidhar221 Amreli Amreli 66KV Amreli - A222 Amreli Amreli 66KV Amreli - B223 Amreli Amreli 66KV Gavadka224 Amreli Kunka-vav 66KV Vadiya225 Amreli Kunka-vav 66KV Amrapar226 Amreli Kunka-vav 66KV Kukavav227 Amreli Kunka-vav 66KV Nava Ujala (Kajuri Pipaliya)

228 Amreli Kunka-vav 66KV Tori 229 Rajkot Dhoraji 66 KV Moti Parabdi (Toraniya) 30-40230 Rajkot Dhoraji 66KV Jamkandorna 231 Rajkot Jetpur 66KV Jetpur-A232 Rajkot Jetpur 66KV Mandlikpur233 Rajkot Jetpur 66KV Jetalsar234 Rajkot Jetpur 66KV Arab Timbadi235 Rajkot Jetpur 66KV Devki Galol236 Rajkot Jetpur 66KV Jetpur-B237 Rajkot Jetpur 66 KV Amrapar (Reshamadi Galol) 30-40238 Rajkot Rajkot 66KV Navagam (Rajkot - F)239 Rajkot Rajkot 66KV Dudhsagar 240 Rajkot Rajkot 66KV Aji-2241 Rajkot Rajkot 66KV Aji GIDC242 Rajkot Rajkot 66KV Popatpara 30-40

220 KV Visavadar

Maximum 50-70 MW RE injection

feasible

Saurashtra

50-70 400 KV Hadala

Maximum 50-100 MW RE injection

feasible

30-40

400 KV Jetpur

Maximum 50-70 MW RE injection

feasible30-40

30-40

30-40

30-40

400 KV Amreli

Maximum 50-70 MW RE injection

feasible

30-40

30-40

30-40

220 KV Savarkundl

a

Maximum 50-70 MW RE injection

feasible

20-25

30-40

30-35

30-40