    FIRST FLOOR - BED R

    S.NO DESCRIPTION OF WORK NOS L B

    A R.C.C CONCRETE 1 : 3: 4

    1 COLUMN 4 13 ' 4.5 " 0 ' 9 "

    2 LINTEL BEAM - 9" WALL 1 40 ' 0 " 0 ' 9 "

    3 LINTEL BEAM - 4.5" WALL 1 8 ' 10.5 " 0 ' 4.5 "

    4 SILL CONCRETE 1 5 ' 0 " 0 ' 9 "

    5 LOFT & SUNSHADE- 1'" WIDE 1 15 ' " 1 ' " ROOF SLAB 1 12 ' " 10 ' "

    S.NO DESCRIPTION OF WORK NOS L B

    B BRICK WORK - C.M 1:6

    1 9 " WALL 1 40 ' 0 " 0 ' 9 "

    2 4.5 " WALL 1 8 ' " 0 ' 4.5 "

    3 !ARA!ET 1 40 ' 0 " 0 ' 9 "

    DEDUCTION

    1 DOOR - 9" WALL 1 3 ' 0 " 0 ' 9 "

    2 DOOR - 4.5" WALL 1 2 ' " 0 ' 4.5 "

    3 WINDOW 1 3 ' " 0 ' 9 "

    4 ENTILATOR 1 2 ' 0 " 0 ' 9 "

    S.NO DESCRIPTION OF WORK NOS L B

    C PLASTERING WORK C.M 1:5

    1 INTERIOR WALLS

    BED ROOM 1 40 ' 0 " 0 ' 0 "

    BATHROOM - 4.5" WALLS 1 8 ' 10.5 " 0 ' 0 "DOOR CUTS 1 1# ' 0 " 0 ' 9 "

    DOOR CUTS 1 1# ' 0 " 0 ' 4.5 "

    WINDOW CUTS 1 1 ' 0 " 0 ' 9 "

    ENTILATOR CUTS 1 8 ' 0 " 0 ' 9 "

    2 E$TERIOR WALLS

    ALL AROUND WALL 1 43 ' 0 " 0 ' 0 "

    !ARA!ET WALL OUTSIDE 1 43 ' 0 " 0 ' 0 "

    !ARA!ET WALL INSIDE 1 40 ' 0 " 0 ' 0 "

    !ARA!ET WALL TO! 1 40 ' 0 " 0 ' 9 "3 LOFT 2 9 ' 0 " 1 ' "

    4 SUNSHADE 2 9 ' " 1 ' "

  • 7/26/2019 Detailed Estimate FOR BUILDING

    2/17

    DEDUCTION

    1 DOOR - 9" WALL 2 3 ' 0 " 0 ' 0 "

    2 DOOR - 4.5" WALL 2 2 ' " 0 ' 0 "

    3 WINDOW 2 3 ' " 0 ' 0 "

    4 ENTILATOR 2 2 ' 0 " 0 ' 0 "

    %

    S.NO DESCRIPTION OF WORK NOS L B

    D CEILING PLASTERING WORK C.M 1:3

    1 ROOF SLAB 1 11 ' 0 " 9 ' 0 "

    S.NO DESCRIPTION OF WORK NOS L B

    E SURKHI LIME CONCRETE 3" THK OER ROOF SLAB

    1 ROOF SLAB 1 11 ' 0 " 9 ' 0 "

    S.NO DESCRIPTION OF WORK NOS L B

    F WEATHERING TILES OER SURKHI

    1 ROOF SLAB 1 11 ' 0 " 9 ' 0 "

    S.NO DESCRIPTION OF WORK NOS L B

    G PAINTING WORK1 E$TERIOR WALLS 0 0 ' 0 " 0 ' 0 "

    2 INTERIOR WALLS 0 0 ' 0 " 0 ' 0 "

  • 7/26/2019 Detailed Estimate FOR BUILDING

    3/17

    3 WOOD WORS 0 0 ' 0 " 0 ' 0 "

    S.NO DESCRIPTION OF WORK NOS L B

    H TILES WORK

    1 BED ROOM - FLOORIN 1 11 ' 0 " 9 ' 0 "

    DEDUCTION - BATH ROOM 1 3 ' 4.5 " 5 ' 10.5 "

    SIDE WALL CUTTIN 1 40 ' 0 " 0 ' 0 "

    2 BATHROOM FLOORIN 1 3 ' 0 " 5 ' "3 BATHROOM WALL 1 3 ' 0 " 5 ' "

    S.NO DESCRIPTION OF WORK NOS L B

    ! WOOD WORK1 MAIN DOOR 0 0 ' 0 " 3 ' "

    2 DOOR - D1 1 0 ' 0 " 3 ' 0 "

    3 !C DOOR 1 0 ' 0 " 2 ' "4 WINDOW -W1 1 0 ' 0 " 3 ' "

    5 WINDOW -W2 1 0 ' 0 " 3 ' 0 "

    S.NO DESCRIPTION OF WORK NOS L B

    K REINFORCEMENT

    1 12MM ROD 0 ' 0 " 0 ' 0 "

    2 10MM ROD # 0 ' 0 " 0 ' 0 "

  • 7/26/2019 Detailed Estimate FOR BUILDING

    4/17

    4 MM ROD 15 0 ' 0 " 0 ' 0 "

    5 BINDIN WIRES 1 0 ' 0 " 0 ' 0 "

  • 7/26/2019 Detailed Estimate FOR BUILDING

    5/17

    OM ONLY

    D OLUME CFT#

    0 ' 9 " 30.09 0.85

    0 ' 4.5 " 11.25 0.320 ' 4.5 " 1.25 0.04

    0 ' 3 " 0.94 0.03

    0 ' 3 " 5.81 0.1

    0 ' 4.5 " 49.22 1.39

    $.%&

    CEMENT 15.$% BAS

    SAND 56.1' CFT

    3(4" )ALL* %4.&1 CFT

    H OLUME CFT#

    10 ' 0 " 300.00 8.50

    10 ' 0 " 31.88 0.90

    3 ' 0 " 90.00 2.55

    # ' 0 " 5.25 0.15

    # ' 0 " 2.3 0.0#

    4 ' " 3.38 0.10

    2 ' 0 " 1.50 0.04

    &.11

    CEMENT 14.(6 BAS

    SAND 1(3.4$ CFT

    BRIC 4556 NOS

    FL*ASH BRIC 1$%4 NOS

    H OLUME CFT#

    10 ' 0 " 1.00 0.45

    10 ' 0 " 3.55 0.100 ' 0 " 0.51 0.01

    0 ' 0 " 0.2 0.01

    0 ' 0 " 0.48 0.01

    0 ' 0 " 0.24 0.01

    10 ' 4.5 " 1#.85 0.51

    3 ' 0 " 5.1 0.15

    3 ' 0 " 4.80 0.14

    0 ' 0 " 1.20 0.030 ' 0 " 1.08 0.03

    0 ' 0 " 1 14 0 03

    OLUME M3#

    OLUME M3#

    OLUME M3#

  • 7/26/2019 Detailed Estimate FOR BUILDING

    6/17

    1.4'

    # ' 0 " 1.8 0.05

    # ' 0 " 1.40 0.04

    4 ' " 1.2 0.04

    2 ' 0 " 0.32 0.01

    (.13

    1.35

    CEMENT '.(& BAS

    SAND 4&.5' CFT

    H OLUME CFT#

    0 ' 0 " 3.9 0.11

    (.11

    CEMENT 1.(1 BAS

    SAND 3.%1 CFT

    T OLUME CFT#

    0 ' 3 " 24.#5 0.#0

    (.%(

    LIME 5.45 BASBRIC BALLAST $4.%5 CFT

    T OLUME SFT#

    0 ' 0 " 99.00 9.20

    &.$(

    CEMENT (.'1 BAS

    SAND 4.46 CFT

    W.TILES 16'.3( NOS

    T OLUME SFT#

    0 ' 0 " 444.00 41.2

    0 ' 0 " #18.25 .#5

    OLUME M3#

    OLUME M3#

    OLUME M$#

    OLUME M$#

  • 7/26/2019 Detailed Estimate FOR BUILDING

    7/17

    0 ' 0 " 233.00 21.5

    WALL CARE !UTT* 1.(4 BAS

    INTERIOR !RIMER $.$$ LITER

    E$TERIOR !RIMER &.5' LITER

    INTERIOR EMULSION 3.55 LITERE$TERIOR EMULSION &.5' LITER

    WOOD !RIMER $.(( LITER

    WOOD !AINTS $.(( LITER

    T OLUME SFT#

    0 ' 0 " 99.00 9.20

    0 ' 0 " 19.83 1.84

    0 ' " 20.00 1.8

    0 ' 0 " 1.50 1.53

    # ' 0 " 119.00 11.0

    25.50

    CEMENT 4.13 BAS

    SAND 13.5' CFT

    TILES

    2' + 2' - FLOOR TILE $6 NOS

    13" + 10" - WALL TILE 133 NOS

    10" + 10" - FLOOR TILE $5 NOS

    T OLUME CFT#

    # ' 0 " 0.00 0.00

    # ' 0 " 21.00 1.95

    # ' 0 " 1#.50 1.3

    4 ' " 15.#5 1.4

    3 ' 0 " 9.00 0.84

    5.88

    T WEIGHT KG#

    0 ' 0 " #4.83 .95

    0 ' 0 " 53.04 4.93

    OLUME M$#

    OLUME M$#

    OLUME M$#

  • 7/26/2019 Detailed Estimate FOR BUILDING

    8/17

    0 ' 0 " 43.01 4.00

    0 ' 0 " 0.00 0.00

    193.85 18.02

  • 7/26/2019 Detailed Estimate FOR BUILDING

    9/17

    BED ROOM - 11) * &) + B,/0 22

    DESCRIPTION

    1 R.C.C CONCRETE 1 , 3, 4 15.2# 5.18

    2 BRIC WOR - C.M 1, 14.0 103.42

    3 !LASTERIN WOR C.M 1,5 8.09 49.58

    4 CEILIN !LASTERIN WOR C.M 1,3 1.01 3.#1

    5

    WEATHERIN TILES OER SURHI 0.81 4.4

    # TILES WOR 4.13 13.58

    43.3% $3(.&3

    BAS CFT

    1%;34% %;3&(

    8 !AINTIN WOR

    WALL CARE !UTT* 1.(4 BAS

    INTERIOR !RIMER $.$$ LITER

    E$TERIOR !RIMER &.5' LITER

    INTERIOR EMULSION 3.55 LITER

    E$TERIOR EMULSION &.5' LITER

    WOOD !RIMER $.(( LITER

    WOOD !AINTS $.(( LITER

    TILES,

    2' + 2' - FLOOR TILE 2NOS

    SINO CEMENTBAGS# SANDCFT#

    SURHI LIME CONCRETE 3" TH OERROOF SLAB

  • 7/26/2019 Detailed Estimate FOR BUILDING

    10/17

    13" + 10" - WALL TILE 133NOS

    10" + 10" - FLOOR TILE 25NOS

    9 SUMMAR* OF REINFORCEMENT STEEL

    S/ 8

    W/67 6: 43.01 22.9

    10 WOOD WOR

    4" + 3" FRAME 3.83CFT

    3" + 1.5" FRAME 0.#5CFT

    !..C DOOR 1.00NOS

    READ*MADE DOOR 1NOS

  • 7/26/2019 Detailed Estimate FOR BUILDING

    11/17

    !AINTIN

    TILES

    WOOD

    TOTAL COST INCL

  • 7/26/2019 Detailed Estimate FOR BUILDING

    12/17

    13$.5 SFT 0,/0 27728/ 797#

    #4.91

    455 12#4

    5.45 24.#5

    18.30

    %4.&1 4556.(% 5.45 $4.%5 16'.3( 1$%4.43

    CFT NOS BAS CFT NOS NOS

    $;(&% $%;336 163 545 $;($( 5;%35

    1;('6

    311

    1;43%

    4&%

    1;43%

    34(

    1((

    5;6%4

    3

  • 7/26/2019 Detailed Estimate FOR BUILDING

    13/17

    5;445

    %&$

    10 12 1 20 T< W/67

    53.04 #4.83 0 0 193.85

    %;%54

    %;66%

    1;5((

    $;$((

    3;(((

  • 7/26/2019 Detailed Estimate FOR BUILDING

    14/17

    OTAL MATERIAL COST 1(1;'%4 %%$

    LABOUR COST 3$;'%5 $4'

    ELECTRICAL WOR 13;4%5 1($

    !LUMBIN WOR 13;4%5 1($

    OR - LABOUR COST %;5(( 5%

    OR - LABOUR COST 3;6&1 15

    LADDER 3;(((

    OR - LABOUR COST 4;&$( 1$(

    DIN 10; WASTAE 1&';'&1 1;5(1