Upload
vantu
View
217
Download
0
Embed Size (px)
Citation preview
Curriculum Vitae Essam Abdulbaky January, 2014
1
Essam ABDULBAKY
Business address:
Metito Overseas Qatar .,
Cellular phone : +974 33448151 E-mail ( business ) : [email protected]
E-mail ( personnel ): [email protected]
Personal Information:
Date of birth : 21- 09 -1964, Minya, Egypt.
Nationality : Egyptian
Religion : Moslem
Profile : A goal oriented lead team player with experience in preparing Basic & Detailed Engineering in the field of Water & Waste water Management,
Start up and commissioning of wastewater treatment facilities .
Strengths:
Well conversant in basic engineering of ; Domestic wastewater
treatment (EA ,BNR , SBR ,Oxidation ditches , MBR ,MBBR , Bioshaft )
, Industrial Wastewater Treatment , Oily Wastewater treatment (API,
CPI,DAF,DG,IAF,IGF) – O&G onshore , offshore -Grey wastewater
treatment , TSE polishing for reuse /recycling , Biochemicals
application and Sludge handling .
Self-motivated, proactive, technically competent, . Also possesses a
good negotiation skills.
Objective :
To acquire a challenging and responsible position in the engineering
field where my academic knowledge , accumulated experiences and
strong capabilities can be most fully utilized .
Major Subject : Chemical Engineering
Education: ( 1998-2000 - Bremen University , Germany )
Curriculum Vitae Essam Abdulbaky January, 2014
2
Scholarship , covers Post - Graduate Studies of Water and Wastewater Management,
Bremen University - Germany.
UNIVERSITY ( 1981-1986 )
B.A. Sc. in Chemical Engineering : Faculty of Engineering. Menya University.
Egypt. May 1986.
Previous Professional Stays Abroad for Training purposes and Academic
Studies :
2000 Bremen University - Germany
1999 Passavant Roediger Co. - Germany
1998 Seghers Co. - Belgium
1997 Seghers Co. - Belgium
1996 Seghers Co. - Belgium
1994 Seghers Co. - Belgium
Languages : Oral Comprehension Written
Arabic Mother Tongue
English Good very Good very Good
German Good very Good Good
Key qualifications and core skills :
1- Design Skills
Key qualifications and core skills :
- Analysis the contract specifications, process design and client
requirements and set up technical documentation for approval by the
consultant / client.
- Supervise the process package grounding (Process Flow Diagram
Process calculations , Mass / Water Balance , P& I Diagram, Hydraulic
calculations , Hydraulic Flow Diagram , Chemicals and Utilities
Consumption , Plant Hydraulics, Valve schedule , Equipment Material
Data Sheets , Cause and Effect matrix , Operation Control &
Curriculum Vitae Essam Abdulbaky January, 2014
3
Instrumentation Philosophy , Plants Pre commissioning and
commissioning , Plants start up etc.)
-Investigate interchange design and engineering perception to resolve
unique design problems
- Evaluate Technical Quotations of the suppliers within the contract
requirements .
- Conducting & handling technical Meetings with both Consultants and
Clients .
-Trouble Shooting Water & Waste Water Treatment plants.
-Attend HAZOP and CHAZOP workshop meetings .
- Leading group of Engineers and guiding the all remaining engineering
tasks .
-Provide a professional training courses for in house and client’s staff .
-Support Projects , Sales and Proposals team.
Filed of applications :
- Sewage Treatment Plants STPs. (with almost all proven
international treatment methodologies ; MBRs – Flat Sheet and Hollow
Fine Types – MBBR , Oxidation Ditches CARROUSEL , SBR Continuous ,
Batch , Static and Dynamic , EXTENEDED AEARTION , Bio Shaft - RBCs
, TRICKLING FILTERS ) .
- Oily Water Separation Units ( API, CPI , DAF , DGF & IAF / IGF)
- Industrial Wastewater Treatment Plants IWWTPs covering .
Organically .Chemically polluted wastewater , and Physically polluted
wastewater.
- TSE polishing .
- Grey water treatment systems for reuse either back to toilets
flushing or make up for cooling towers .
- Sludge Handling ( Stabilization , Thickening , Dewatering , Drying )
- Odor Control Systems ( Carbon Adsorber , Chemical Scrubber ,
Regenerative Thermo Oxidizer RTO , Biological film ) .
Clients :
- Oil and Gas .
Curriculum Vitae Essam Abdulbaky January, 2014
4
- Governmental and Private Sectors .
- Concessions .
Detailed & Basic Engineering Package is (but not limited to) :
Site Survey, Resources Evaluation, and Environmental Investigations.
Preparation of Block Flow Diagram (BFD)
Preparation of Process Flow Diagram (PFD)
Process Calculations, Material, Water & Heat Balance
Preparation of Piping & Instrumentation (PIDs)
Preparation of Lay - out & Plot plans.
Preparation of Site Piping Lay - out .
Preparation of Hydraulic Profile.
Material Selection.
Chemicals & Energy Consumption rates.
Hydraulic Profile Design Calculations.
General Arrangement GA’s.
Release of technical datasheets and Engineering Drawings Technical evaluation Providing design assistance and backup during erection and commissioning Design verification and validations Value engineering
2- Commissioning Skills :
Sewage Treatment Plants STPs.
Industrial Wastewater Treatment Plants IWWTPs
covering . Organically .Chemically and Physically
polluted wastewaters.
Oily Water Separation Units ( GOS, CPI , DAF ,IAF &
IGF )
2- Consultancy service skills :
Give Consultation services ( Water &
Wastewater management ) :
MASTER FOODS – JAFZA – UAE
Give a Technical Study for :
Curriculum Vitae Essam Abdulbaky January, 2014
5
Yanbu – Sadui Arabia
(Expanding IWTP Capacity from 35000 to
55000 m3/day)
Client: MARAFIQ
(Expanding STP Capacity from 28000 to
40000 m3/day)
Client: MARAFIQ
NOPWASD - Egypt
(Expanding of eight STPs Capacity from
10000 to 15 000 m3/day)
Client: NOPWASD
(Built of tow SBRs STPs Capacity 10000
m3/day)
(Built of one SBR STP Capacity 20000
m3/day)
Client: National Organization for Potable
Water and Sanitary Drainage (NOPWASD)
Give Detailed Consultation Services for
Wadi Eddwaser STP ( 28000 m3/day )
Client : MOWE
Affeef STP ( 5000 m3/day )
Client : MOWE
3 – Proposing & Tendering Skills.
Preparing of Technical & Priced offers for:
STP s of various Biological Techniques with different
capacities.
IWWTP s of various Biological & Physiochemical
Techniques with different capacities.
4 -Construction Follow-up & Start-up Skills .
5 -Technical and Commercial Discussions with Customers & Supplier Skills.
6 - Computer Skills: Windows 2000, 98, Office 2000 (Excel, Word, )
Curriculum Vitae Essam Abdulbaky January, 2014
6
Microsoft Out looks , Wrench .
7 - Teaching Skills Providing Training in the field of Water and Waste water treatment plant in-house within the company as well as for Client's/ Consultants staff.
8 – Special Skills Hardworking , Adoptable , Responsible and goal oriented.
.Professional Activities & References Employment Details:
“more than 20 years in the areas of Engineering , had successfully and
satisfactory completed a tremendous projects in the filed of wastewater
treatment “
Starting with the most recent firm:
1st. Company: METITO ( Overseas ) Qatar -Qatar
From November 2011 to Present.
Occupation : Manager – Process Design
Assigned Duties :- Undertake a Complete Design and Verification of pre-
designed Sewage Treatment Plants ( STPs) , TSE
Polishing
- Undertake of a Complete Design of Industrial
Wastewater Treatment Plants (IWWTPs )
- Undertake of a Complete Design of Oily Water
Separation Systems , Mineral , Edible and Animal types.
- Prepare a standardized calculations / GA drawings for
STPs and CPI oily separators
1- Sewage Treatment Plants (STP) :
Al Dhakhira PTP – Qatar
(Capacity 3200 m3/day ) phase -2
System Used : EA
Client: Ashgal – PWA
(Capacity 6400 m3/day ) Ultimate capacity
Client: Ashgal – PWA
Consultant : ECG .
Curriculum Vitae Essam Abdulbaky January, 2014
7
Al Shamal – Qatar
(Capacity 600 m3/day ) phase -2
System Used : MBBR
Client: Ashgal – PWA
Consultant : ECG .
Barwa STP –Alkor – Qatar
(Capacity 560 m3/day )
System Used : Bioshaft
Client: Groupe Trading & Contracting Co.
Consultant : MZP .
Al Dhakhira STP – Qatar (Proposal )
(Capacity 65000 m3/day )
System Used : SBR –CASS
Client: Ashgal – PWA
Alkhor STW Extension – Qatar
(Capacity 5210 m3/day ) phase -2
System Used : SBR –ICEAS
Client: Ashgal – PWA
(Capacity 10070 m3/day ) Ultimate capacity
Tertiary System Used : Dyna Sand Filters – UV
Client: Ashgal – PWA
Consultant : KHATIB & Alami .
Fish Market PTP – Qatar
(Capacity 86.4 m3/day )
System Used : DAF –MBR
Client: Ashgal – PWA
Consultant : PARSONS .
Industrial Area STF – Qatar
(Capacity 12000 m3/day ) phase -2
Curriculum Vitae Essam Abdulbaky January, 2014
8
System Used : SBR –CASS
Client: Ashgal – PWA
(Capacity 30000 m3/day ) Ultimate capacity
Tertiary System Used : Dinitrifying Filters – UF
Client: Ashgal – PWA
Consultant : Keo International .
Doha West Tankers facilty – Qatar
Oily Wastewater separators (Capacity 10000
m3/day )
System Used : CPI
Client: Ashgal – PWA
Consultant : NIPPON KOEI Co.
METITO ( Overseas ) LTD – UAE
from August 2006, till November 2011.
Occupation : Team leader – Process Design
Assigned Duties :- Undertake a Complete Design and Verification of pre-
designed Sewage Treatment Plants ( STPs) , TSE
Polishing
- Undertake of a Complete Design of Industrial
Wastewater Treatment Plants (IWWTPs )
- Undertake of a Complete Design of Oily Water
Separation Systems , Mineral , Edible and Animal types.
- Prepare a standardized calculations / GA drawings for
STPs and CPI oily separators
DIP East – Dubai
(Capacity 10000 m3/day ) phase -1
System Used : SBR
Client: Dubai Investment Park
Al Ruqai Border Centre STP – Saudi Arabia
Curriculum Vitae Essam Abdulbaky January, 2014
9
(Capacity 2000 m3/day )
System Used : MBR – Flat Sheet Membrane (
Hybrid Tech ).
Client: Sanam Contracting Co..
Bapco STP – Bahrain
(Capacity 1000 m3/day )
System Used : MBR – Hollow Fine Type ( Koch ).
Client: Habib Awachi .
End User : Pabco
Sharing with the short term emergency
program for the upgrading of the wastewater
facilities at Tubli – Bahrain .
(Capacity 200 000 m3/day )
System used : Extended Aeration .
Client: Ministry of Works
Consultant: p2mberiln
Design of :
Ghayaty STP –Abou Dhabi - UAE
(Capacity 5 000 m3/day )
System used : BNR – DynaSand Filtration
Client: ADSSC
Main Contractor : Al Naser
Consultant: ACE
Ghuweifat STP –Abou Dhabi - UAE
(Capacity 5 00 m3/day )
System used : Extended Aeration – Pressurized
Filtration
Client: ADSSC
Consultant: ACE
Al Areen STP – Manama - Bahrain ( On Hold )
(Capacity 2 x 6000 m3/day )
System Used : MBR – Flat Sheet Membrane .
Client:Olive VFM.
Mena Al Fajr Resort STP – Al Fujairah - UAE
Curriculum Vitae Essam Abdulbaky January, 2014
10
(Capacity 1 x 450 m3/day )
System Used : MBR – Hollow Fine Membrane .
Client: Mena Al Fajr Real State LLC.
Jebel Ali Construction Camp - Dubai - UAE (
On Hold )
(Capacity 4 x 600 m3/day )
System used : Extended Aeration – Pressurized
Filtration
Client: Al Naboodah Engineering
2nd Expansion of International City , Dubai -
UAE
(Capacity 1 x 7000 m3/day MBR )
System Used : MBR – Flat Sheet Membrane .
Client: Palm Water / Nakheel
DIP West Plot - Dubai - UAE .
(Capacity 1 x 10000 m3/day )
System Used : CARROUSEL .
Client: DIP
Consultant: Khatib & Alami
DIP East Plot - Dubai - UAE ( On Hold ).
(Capacity 5 x 17000 m3/day )
System Used : CARROUSEL .
Client: DIP
Consultant: Khatib & Alami
TIGER WOODS - Dubai - UAE ( ON HOLD )
(Capacity 21 000 m3/day TSE Polishing via
UF/RO )
Client: Qonfluence
Consultant: Khatib & Alami
TIGER WOODS - Dubai - UAE (ON HOLD )
(Capacity 3 000 m3/day MBR )
System Used : MBR – Flat Sheet Membrane
Client: Qonfluence
Consultant: Khatib & Alami
Curriculum Vitae Essam Abdulbaky January, 2014
11
ZAFRAN –Abou Dhabi - UAE ( Under
Commissioning )
(Capacity 15 000 m3/day MBR )
System Used : MBR – Flat Sheet Membrane
Client: ADSSC
Consultant: Maunsel
SAADYAT ISLAND –Abou Dhabi - UAE
(Capacity 11 000 m3/day expandable to 16500
m3/day MBR )
System Used : MBR – Flat Sheet Membrane
Client: LEIGHTON CONTRACTING (ABU DHABI) LLC
Consultant: PARSONS International
BUCCA STP – Basrah -Iraq
(Capacity 1 x 6 000 m3/day MBR )
System Used : MBR – Flat Sheet Membrane
Client: BUCCA
DS 150 Site labour camp , Dubai -UAE (On
Hold)
(Capacity 1 x 180 m3/day )
System Used : MBR – Flat Sheet Membrane
Client: Al Ahmadiah Aktor
Dakher -Al Ain - UAE
(Capacity 2 x 2500 m3/day )
System Used : MBR – Flat Sheet Membrane
Client: ADSSC
Consultant: Maunsell
PS1 -Al Ain - UAE
(Capacity 2 x 2500 m3/day )
System Used : MBR – Flat Sheet Membrane
Client: ADSSC
Consultant: Maunsell
W1 -Al Ain - UAE
(Capacity 2 x 2500 m3/day )
System Used : MBR – Flat Sheet Membrane
Curriculum Vitae Essam Abdulbaky January, 2014
12
Client: ADSSC
Consultant: Maunsell
International City , Dubai -UAE
(Capacity 1 x 5000 m3/day)
System Used : MBR – Flat Sheet Membrane
Client: Palm Water / Nakheel
Altuwaisa , Abu Dhabi -UAE
(Capacity 1 x 200 m3/day )
System Used : MBR – Flat Sheet Membrane
Client: Directorate of Military Works
DIP STP, Dubai -UAE
(Capacity 1 x 5000 m3/day )
System Used : MBR – Flat Sheet Membrane
Client: DIP
Consultant: Khatieb and Allami
Ramady STP, - Ramady-Iraq
(Capacity 2 x 1200 m3/day )
System used : Extended Aeration – Pressurized
Filtration
Client: Al Barih Contracting Co.
Riffa STP, - Bahrain
(Capacity 1 x 3600 m3/day )
System used : BNR– Pressurized Filtration
Client: Riffa Views
Consultant: mace
New Doha International Airport, Qatar,
(Capacity 28713 m3/day)
System used : Extended Aeration – Travelling
Bridge Filtration .
Client: Overseas Bechtel Inc
Consultant: Parsons.
Al KHOR Township - Qatar
(Capacity 5680 m3/day)
System used : SBR IECAS ITT–Dyna Sand Filtration
Curriculum Vitae Essam Abdulbaky January, 2014
13
Client: ASHGAL
Consultant: Parsons Intl.
AJESC, Qatar
(Capacity 2 x 800 m3/day)
System used : Extended Aeration – Pressurized
Filtration
Client: AJESC
STP at Jebel Ali – Dubai - UAE
(Capacity 2 x 400 m3/day)
System used : Extended Aeration – Pressurized
Filtration
Client: Al Naboudah Engineering
Verify design of :
Doha North STP-Qatar
Capacity 250 000 m3/day
Client: ASHGAL
Aldhakhirah STP-Qatar
Capacity 30 000 m3/day
Client: ASHGAL
Give Technical support and services for :
GREENS -Dubai - UAE
(Capacity 10 000 m3/day MBR )
Client: EMAAR
Consultant: PARSONS
Supervise commissioning of :
DIP STP – MBR ( 5000 m3/day )
International City – MBR ( 5000 m3/day )
Bucca STP – MBR ( 6000 m3/day )
Al Twaisah STP – MBR ( 200 m3/day )
Techno Park MOL Offices STP – MBR ( 50 m3/day )
Saadyat STP – MBR ( 11000 m3/day )
Zafran STP – MBR ( 15000 m3/day )
International City – MBR ( 7000 m3/day )
DIP STP – Carousel ( 10000 m3/day )
Curriculum Vitae Essam Abdulbaky January, 2014
14
Alkhor STP – SBR ( 5680 m3/day )
Al Ain STPs –MBR ( 3x5000 m3/day )
Give Training for :
Ibra STP - Oman
Al Ain STPs – UAE
Al khor STP – Qatar
DIP STPs – UAE
2- Oily Wastewater separators : Verify technically of :
QUEENSLAND CURTIS LNG
(Capacity 2040 m3/day )
Client : BECHTEL INTERNATIONAL INC .
ANGOLA LNG
(Capacity 2280 m3/day )
Client : BECHTEL.
Design of :
QATALUM , UM SAEED - Qatar
Two Oily Separation Packages ( 1x690 m3/day +
1x40 m3/day )
Client: SNC Lavalin
LAFFAN REFINERY PROJECT , RAS LAFFAN -
Qatar
Two Oily Separation Packages (2x480 m3/day )
Client: GS Engineering & Construction
Supervise commissioning of :
API / IGF for
Two Oily Water separation packages ( South pars -
Iran )
Jebel Ali Power Station ph-1- Dubai
Give Training for :
Alkureimat Power Station - Egypt
Jebel Ali Power Station ph-1- Dubai
Edible Oil Company – JAFZA –Dubai
El Tebbin Power Station - Egypt
Sidi Krir Power Station – Egypt
Curriculum Vitae Essam Abdulbaky January, 2014
15
Al Atf Power Station - Egypt
3- Water Treatment Plants (WTP) :
Ramady WTP, - Ramady -Iraq
(Capacity 2 x 1200 m3/day )
Client: Al Barih Contracting Co.
4- Industrial Wastewater Treatment Plants (IWWTP) :
Design of :
Qasco – Um Saeed - Qatar
System used : Extended Aeration – Pressurized
Filtration
System used : Primary Settling – De Oiling –
Pressurized Filtration – Cooling by Plate Heat
Exchangers .
(Capacity 12000 m3/day )
Client: Qatar Steel
Supervise commissioning of :
Qasco IWWTP ( 2x12000 m3/day )
2nd. Company: METITO Arabia Industries - (Saudi Arabia )
from February 2002, to August 2006 .
Occupation : Senior Executive Process Engineer
Assigned Duties : Complete Design and Verification of pre-designed
STPs , Complete Design of IWWTPs , Oily Water
Separators , WTPs Start –up and Commissioning of
all Wastewater Treatment Plants.
1 - IWWTPs:
Hida Date Factory ( 1000 m3/day )
QAFAC - Qatar ( 480 m3/day )
HADCO Poultry Processing Line (2350m3/day-
Lost)
WARAQ Paper Processing Line (2000 m3/day -
Lost)
Curriculum Vitae Essam Abdulbaky January, 2014
16
OBEIKAN RECYCLE WTP (4000 m3/day - Lost)
OBEIKAN (4500 m3/day - lost)
SAUDI PAPER (5000 m3/day - Lost)
SLAUGHTER HOUSE (10 m3/day )
RADWA Poultry Processing Line (2300 m3/day -
Hold)
2-Oily Water Separators
Design of :
KAMCO OILY WATER SEPARATION SYSTEM
( 240 m3/day - Job)
System used : CPI-DAF
KJO OILY WATER SEPARATION SYSTEM (28
m3/day
System used : CPI-DAF
Client : ARAMCO
3 - STPs :
Design of :
Ras Gas – Qatar ( 2112 m3/day )
KJO STP (28 m3/day )
APICORP STP ( 2X150 m3/day )
MIDMAC –QATAR ( 2X200 m3/day )
Bel Haf Yemen / Technip STP ( 2x 1000 m3/day
+ 3 x 110 m3/day )
National Guard Camp STP (2x 150 m3/day +
400 m3/day )
Saudi Oger STP (50 3/day)
Al-Kharj STP (100000 m3 / day ph.2.0)
Al-Hidd STP - Bahrain ( 2* 1174 m3/d )
Tipperary7Villages-Irland (100,70m3/day -Hold)
Start–up and Commission 150 m3/day STP
for ABV Rock – Site 6 – Residential Camp
Design Verification :
Curriculum Vitae Essam Abdulbaky January, 2014
17
Al Baha STP (16200 m3 / day ph.1.0 )
Buraidah STP Upgrade (75000 m3 / day ph.2.0
)
Tabuk STP Upgrade ( 30000 m3 / day ph.2.0 )
El-Namas STP (16895 m3 / day ph.1.0 )
Mahail STP ( 10000 m3 / day ph.1.0 -
Lost)
El Omran STP ( 30000 m3 / day ph.1.0 )
Al-khober STP ( 25000 m3 / day ph.2.0 )
Khamis Mushayt STP (40000 m3 / day ph.1.0 )
Zahran El janoub STP (16895m3/day ph.1.0)
3 - WTPs :
Design of :
Hafr Albatin WTP Expansion ( 40 000 m3/day).
3 rd. Company: Vivendi water USFilter “Egypt “
from February 2001, to February 2002
Occupation : Senior Process / Proposals Engineer
Assigned Duties : Complete design of IWWTPs
Design Verification of STP ( pre –designed) , Cost
Estimation & Evaluation & Offers preparing For
wastewater treatment plants.
1 – Industrial Wastewater Treatment Plants (IWWTPs) :
Design of :
Al-Dawlia for Treatment and Painting Metals Co. 6th of October city -Chromium Removal system. (capacity 100 m3/ d)
El-Nasr Carton Co. – Borg El-Arab City– Physico- Chemical Treatment System. (capacity 400 m3/d)
Rodico Poultry Processing–Belbais city Physico -Chemical Treatment system (capacity 75 m3/d).
Curriculum Vitae Essam Abdulbaky January, 2014
18
Watany for Granite , Marble Co. – Abou Swaire- Ismalia, physico- chemical Treatment system -(capacity 4800 m3/day.)
Stia for Textiles Co. – Alexandria , physico- chemical Treatment system (DAF)-(capacity 260 m3/day.) Elnasr for Tannaries Co. – Alexandria
Gelatin Factory ,physico- chemical Treatment system (DAF)-Extended aeration (capacity 450 m3/day.) Leather Fiber Board Factory ,physico- chemical Treatment system (DAF - capacity 160 m3/day.)
2 - STPs : Design of :
Reem El Fala ( 500 m3 / day).
New Beni Suef City ( 15000 m3 / day ).
Mubarek Academy ( 2000 m3 / day ).
Rus Sudr South Sinai ( 500 m3 / day )
National Officers Village ( 400 m3 / day).
Tushky ( 2 * 375 m3 / day).
El Saffwa Village ( 2 * 250 m3 / day ).
System used : Extended Aeration
4 th. Company: Arab Company for Engineering and Contracting
from January 2000, to February 2001
Occupation : Head of Process Design Section
Assigned Duties :Complete design of IWWTPs Complete design of
Gravity Oil Separators , Verification of STP ( pre
–designed) , Cost Estimation & Evaluation & Offers
preparing for wastewater treatment plant
1 - IWWTPs:
Commissioning and Start up of IWWTPs for Coca-
Cola company (Beni suef Factory , Tanta Factory)
capacity 270 m3/day Biological System (Extended
Aeration – Tertiary ) .
Curriculum Vitae Essam Abdulbaky January, 2014
19
Commissioning and Start up of IWWTPs for Nile
pharmaceutical Industries capacity 400 m3/day
Commissioning and Start up of IWWTPs for
Pachin Painting Factory capacity 100 m3/day
Deign of : El-Motaheda Food Industries Co. Abou Swaire – Ismalia , D A F System -(capacity 160 m3/day). Kaha for Preserved Foods - Kaha , Abou-Kebier , El-Tabia , Rashid - (capacities 150, 180 , 300 , 400 m3/day). Design of pH adjustment system for Cairo Beverage Industries (Coca-cola) capacity 1200 m3/day.
Ameriah Pharmaceutical Co. ( 300 m3 / day ).
2-Oily Water Separators ( CPI , API and IAF )
Design , Commissioning and Start-up :
Nine Units for CO – OP Petroleum ( 50,75,100,125 m3 /
day ).
One Unit for ABB PT ( 984 m3 / day ).
Four Units for Kaha for Preserved Foods .
3- STPs ABB Petroleum Technology ( 50 m3 / day ).
El ain El Sokhna , ( 1500 m3 / day ).
Kahramana Village ( 2 * 2500 m3 / day ).
5 th. Company: Sugar & Integrated Industries Co.(SIIC) Project
Affairs.
from November 1989, to December 1998 .
Occupation : junior, senior, and Head of Environmental Engineering
Dep.
Assigned Duties : Tendering Preparation , Bidding evaluation ,
Feasibility Studies , European Firms Technical
Agreement & Construction Follow – up.
1 - IWWTPs: Construction Management Start–up and Commissioning starting 1993 :
Curriculum Vitae Essam Abdulbaky January, 2014
20
* Eight IWWTPs (Capacity 1200 m3/ day each) for Eight Sugar Cane Factories alongside the River Nile at Upper Egypt (Kom ombou – Edfu – Armant – Quos - Deshna – Nag Hammadi – Guirge – A bou Korkas )
System used : SBR UNITANK .
* One IWWTP SBR Capacity (10000 m3/d) for Delta Sugar Co.- El Hamoul – Kafr El- Schiekh
System used : Anaerobic U A S B pre treatment – UNITANK SBR .
* One IWWTP (Capacity 3000 m3/ day) Central Plant for Sugar By-product Industries, Molasses Desugerization – Yeast Production – Ethanol Production -Sugar Refinery – Glacial Acetic Acid Production) System used : Anaerobic U A S B pre treatment – UNITANK SBR – Tertiary Physico Chemical step.
* Eight Sludge Dewatering plants (Capacity 15 m3/ day) Centrifugation system
* One IWWTP (Capacity 2400 m3/ day) for El- Dakahlia Sugar Co.- (Beet Sugar)- Belkas- Dakahlia,
System used : Oxidation Ditches with Mammoth Rotors. * One IWWTP (Capacity 6000 m3/d) for Nag Hammadi for, Medium Density Fiberboard Co.- Deshna- Quena.
System used : SBR UNITANK.
* One IWWTP (Capacity 2500 m3/ day) – Yeast Production – For Alexandria Starch and Yeast Co.
System used : Anaerobic U A S B pre treatment – UNITANK SBR .
* One IWWTP (Capacity 1000 m3/ day) – Starch Production – For Alexandria Starch and Yeast Co.
System used : Anaerobic U A S B pre treatment – Polishing Aeration .
2 - STPs : Eight STPs (Various Capacities 500,750,1000 m3/d for Abu korkas ,Guirga, Nag Hammady, Deshna, Qus, Armant ,Edfu & Kom Ombou Residential accommodations for Sugar Factories.
System used : Extended Aeration .
Curriculum Vitae Essam Abdulbaky January, 2014
21
from December 1998 , to January 2000. Scholarship in Germany( Diplom Arbeit im Wasser u.Abwasser Management)
6 th. Company: Sideler Co - Borsa st, - Kasr ElNil Cairo .
from May 1989, to November 1989 .
Assigned Duties: - Technical Service after sale of Airless Painting Pumps – Electrostatic Painting.
7 th.Disination : EGYPTIAN ARMED FORCES .
(1986 – 1989 )
Occupation : Reserve Officer
Egyptian Air Forces. Gaseous production factory No .1 Sakkara Road – Giza Products: Liquid Oxygen (Medical, Industrial) & liquid Nitrogen
References:
1- Eng-Mahmoud Dawood- General Director ( Sugar & Integrated Industeries Company )
Tel : + ( 202) 012 –28 44 05 4
2- Dr. Hisham Abdel-Halim ( Faculty of Engineering , Cairo University )
Tel.: + ( 202 ) 012-2190562
3- Eng-Ahmed Elhusseiny– General Director ( Vivendi water “Egypt”)
Tel : + ( 202) 012 –2108677
4- Eng. Wolfgang Scharmar ( Passavant Maschinenfabrick –Aarbergen – Germany ) E-mail :[email protected] 5- Eng. Erick Caelwart Eng . Gert Verheyn ( Seghers Better Technology- Wispellar – Belgium )
6- Metito Overseas LTD staff
Societies Affiliations: -Member of Egyptian Engineers Syndicate.
- Member of IDA. Hobbies : Jogging , Foot ball , Reading , Swimming
Watching German Programs .