13
Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

  • Upload
    hagop

  • View
    28

  • Download
    0

Embed Size (px)

DESCRIPTION

Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013. National Grid is a key investor in Clean Line Energy Partners. National Grid brings extensive experience in building, owning, and operating large transmission projects in the United States and overseas - PowerPoint PPT Presentation

Citation preview

Page 1: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

Despite Order No. 1000Planning Gaps for (Certain) Merchants

OPSI Annual Meeting 2013

Page 2: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

2

National Grid brings extensive experience in building, owning, and operating large transmission projects in the United States and overseas

National Grid owns and operates more than 8,600 miles of transmission in the United States

National Grid joins Clean Line’s existing investors that include private equity firm ZBI Ventures

National Grid is a key investor in Clean Line Energy Partners

Page 3: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

3

Clean Line

projects

Clean Line’s projects connect the best wind resources to demand centers

PJM

Page 4: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

4

Rock Island will connect western Iowa with PJM 765 kV system

Regulatory Interconnection

Converter Stations

Outreach

• Converter station land options acquired in Illinois and Iowa• Development agreement with Siemens for HVDC converter stations

STATUS

Agreements & Partnerships

• PJM Merchant Queue positions under study since 2007 -- Collins• Received FERC negotiated rate approval• Filed with the Illinois Commerce Commission in Oct 2012• Iowa Utilities Board Informational Meetings (precursor to filing) Q3-Q4 2013

• Invited 40,000+ residents to 33 open house meetings

• MOU with Kiewit for EPC development support• Siemens as HVDC technology provider • Preferred supplier agreement with Southwire (IL)

Page 5: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

5

Grain Belt Express has reached key milestones

KEY MILESTONES

Regulatory

Interconnection

Outreach

• Kansas Corporation Commission granted public utility status in Dec 2011• Indiana Utility Regulatory Commission granted public utility status in May 2013

• PJM: System Impact Study underway for 3,500 MW near Sullivan 765 kV• MISO: Studying 500 MW interconnection near Maywood 345kV [old Palmyra

Tap]• SPP: Completed Criteria 3.5 Studies(No Harm)

• Obtained routing feedback from 2,300 Kansans at public open house meetings• Granted Franchise Approvals from 16 Missouri counties in study area • Obtained routing feedback from 1,250 people at public open houses in

Missouri

STATUS

Routing • Proposed Route filed in Kansas in July 2013 – Order expected Nov. 2013• Developing potential routes in MO and IL and will file for approval and utility

status in 2014

Page 6: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

6

Grain Belt Express will deliver wind energy from Kansas to PJM 765 kV and MISO 345 kV systems

$2 billion transmission project that will enable $7 billion of new wind energy investments1.4 million homes powered per year

750-mile overhead, direct current (DC) transmission line

MISOPJM

SPP

Page 7: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

Order No. 1000

Page 8: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

8

What does Order No. 1000 say about merchants?

Order No. 1000 requires a transmission developer proposing a merchant transmission project to “provide adequate information and data to allow public utility transmission providers in the transmission planning region to assess the potential reliability and operational impacts of the merchant transmission developer’s proposed transmission facilities on other systems in the region.”

Order No. 1000, FERC Stats. & Regs. ¶ 31,323 at P 164.

Page 9: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

9

The Order also says…

As the Commission noted in Order No. 1000, “nothing in this Final Rule prevents a merchant transmission developer from voluntarily participating in the regional transmission planning process (beyond providing the information and data required above) even if it is not seeking regional cost allocation for its proposed transmission project…we encourage them to do so.”

Order No. 1000, FERC Stats. & Regs. ¶ 31,323 at P 165.

Page 10: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

10

Compliance Findings…

Unfortunately, the Commission rejected Clean Line’s requests that jurisdictional transmission providers be directed to allow transmission developers to submit merchant transmission projects for full evaluation in the regional transmission planning process – even if not seeking cost allocation.

Page 11: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

11

To What Effect?

PJM, MISO, and SPP all filed compliance plans which failed to include a portal in the regional transmission planning process for merchant developer projects to be submitted for consideration in the regional planning process “not for purposes of cost allocation.”

Page 12: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

12

Participant-funded Merchant Projects are Still Outside Looking In…

Page 13: Despite Order No. 1000 Planning Gaps for (Certain) Merchants OPSI Annual Meeting 2013

13

And then, we have another whole area to discuss…

• Merchant transmission development, benefits, multi-driver approach and partial cost allocation of network upgrades…and, maybe merchant projects themselves.

Any Good Ideas