11
CALIFORNIA I COLORADO I FLORIDA I GEORGIA I HAWAII I ILLINOIS I MARYLAND I NEW YORK NORTH CAROLINA I PENNSYLVANIA I TEXAS I VIRGINIA I WASHINGTON DC I WASHINGTON I WISCONSIN Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011

Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011

  • Upload
    mada

  • View
    32

  • Download
    0

Embed Size (px)

DESCRIPTION

Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011. CALIFORNIA I COLORADO I FLORIDA I GEORGIA I HAWAII I ILLINOIS I MARYLAND I NEW YORK - PowerPoint PPT Presentation

Citation preview

Page 1: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

CALIFORNIA I COLORADO I FLORIDA I GEORGIA I HAWAII I ILLINOIS I MARYLAND I NEW YORKNORTH CAROLINA I PENNSYLVANIA I TEXAS I VIRGINIA I WASHINGTON DC I WASHINGTON I WISCONSIN

Design/Build/Manage: Whitlock Control Room Qualifications for ITS NM, November 4, 2011

Page 2: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

Whitlock Control Room Team

• Craig Orris Taylor: Whitlock Texas, Senior Account Executive, Control Room Specialist

• David Rizzo: Whitlock Texas, System Designer, Control Room Specialist

Page 3: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

How is Whitlock Different?

• Established 1956• Built Organically, no Debt or Private Equity• 40% Growth in 2011!• Unsurpassed Technical Certifications• Multiple National Awards• Design/Build/Manage Model• Manufacturer Agnostic, Over 450 Product Lines:

Barco, Mitsubishi, Jupiter, Evans, Christie, hundreds more

Page 4: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

What Does Whitlock’s Control Room Team Do For ITS?

• Traffic Management Center, Four Walls In Design/Build/Manage Process

• Situational Awareness with Large Display Systems Displaying Streaming Video

• Ergonomic Operator Consoles and Furniture• War Rooms, Conference Rooms, Training

Centers• Managed Services: Training, Maintenance,

Repair

Page 5: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

Whitlock Traffic Management Center Experience

• New Mexico DOT Statewide TMC, Albuquerque

• TxDOT Combined Traffic and Emergency Command Center (CTECC), Austin TX

• FDOT/Palm Beach County TMC, Florida• TDOT Memphis Smartway TMC, Tennessee• Many others

Page 6: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

NMDOT Statewide TMC

Page 7: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

NMDOT Statewide TMC

Page 8: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

FDOT/Palm Beach County TMC

Page 9: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

Whitlock Procurement Vehicles in Place

• NMDOT, multiple contracts• GSA, multiple contracts• Texas State DIR, allows other states to

piggyback• US Communities

Page 10: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

Whitlock is more than a traditional AV Systems Integrator. We have evolved into a full service Solutions Provider, offering support for every phase of the audiovisual technology lifecycle.

• Technology Selection/Procurement• Project Management• Standardization• Design/Engineering• Integration• Programming• Quality Assurance/Testing• Training• Managed Support

Whitlock Process Overview

Page 11: Design/Build/Manage:  Whitlock Control Room Qualifications for ITS NM, November 4, 2011

11

THANK YOU!Craig Orris Taylor, Senior Account Executive

[email protected], 972-815-1126

www.whitlock.com