24
Design to Release PIP Govinda Krishnan Senior Project Manager Jan 19 th 2010 Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.

Design to Release PIP Govinda Krishnan Senior Project Manager Jan 19 th 2010 Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document

Embed Size (px)

Citation preview

Design to Release PIP

Govinda KrishnanSenior Project Manager

Jan 19th 2010

Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.

• Application Integration Architecture • Process Integration Pack • Design to Release PIP Process Supported Extending your business process

• What to Look For• Q & A

Agenda

About the Speaker

Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.

Siebel Analytics Development & QA

UCM Development

Siebel UAN Development & QA

Global support for SAP connector

Siebel 7 Oracle Connector

PIP Development

partner - PeopleSoft CRM, HCM, SRM & ESA

with Oracle & SAP

PeopleTools SustenanceAccelerate

solution for Agile implementation

Productized integration with

Oracle EBS, JDE & SAP

Product development for initial version of Product Costing

Development partner for BEA

Portlets for Siebel and SAP

Ported Siebel UAN on BEA WLI

Development partner for BEA

AquaLogic User Interaction

AIA Co-development partner

Co-developed Oracle APS 11.x

Level 2/3 support for OPM & CPG

OPM Re-engineering from GEMMS

Oracle Internet procurement with

SAP

Leaders in New Oracle Economy

Oracle Partnership

EBS Fusion

Siebel

Enterprise

E1

Others

OAGi

GS1

The Challenge …Standardized implementation across applications

Eliminates Point to Point Duplication- P2P works when connecting two systems but requires a complete re-implementation when you introduce a second service provider / requester

Supports One to Many Model - For Integrations that map one service request to many service providers (or vice versa), EBOs allow re-use of initial implementation and reduces overall number of transformation maps to generate

Hot Pluggable- Common Objects abstracts application service providers from service requesters and centralizes routing and mediation which allows any application to plug into the integrated process flow

Standards Based Content to drive Interoperability- EBOs are based on OAG content and rationalized against Oracle Applications for the most common A2A and B2B integration use cases

E-Biz

Suite

Siebel

Enterprise

E1

Fusion

Others

OAGi

GS1

AB

CS

AB

CS

AB

CS

AB

CS

AB

CS

AB

CS

AB

CS

AB

CSTran

sform

ation

s

EBM EBM

EBMEBM

EBM

EBM

EBM

EBM

Application Integration ArchitectureKey Components

•Best Practice Processes Optimize business performance leveraging Oracle’s extensive experience and best practices

•Process Integration PacksPre-built, out of the box, integrated Oracle Applications for quick implementation of business processes, without the risk. (i.e. Siebel CRM to Oracle E-Business Suite)

•Foundation PacksCreate custom business processes across any of your applications utilizing predefined, application independent object and service definitions

•Powered by Oracle Fusion MiddlewareHot pluggable, open standards based platform

Benefits of Oracle AIA

PLM Process Integration Pack (PIP)

Next Generation PLM Integration Needs

Agile PLM to EBS PIP Design-to-Release Supported Processes

Supporting Bi-directional data sync features (Configurable)• Agile ECO updated real-time with Transfer Status, Effectivity and Implementation

Dates from EBS• Agile Product Record is updated with part lead-times and on-hand balances from EBS

Inventory• Agile Product Record is updated with product/part cost information from EBS Cost

Management• Any EBS Item Master attributes can be mapped and synchronized with Agile attributes

Supporting Bi-directional data sync features (Configurable)• Agile ECO updated real-time with Transfer Status, Effectivity and Implementation

Dates from EBS• Agile Product Record is updated with part lead-times and on-hand balances from EBS

Inventory• Agile Product Record is updated with product/part cost information from EBS Cost

Management• Any EBS Item Master attributes can be mapped and synchronized with Agile attributes

Processes Enabled Overview

New Product Release • Release a new product, its structure and Approved Manufacturer information for each component, to Engineering/Mfg

Product Design Update • Release a new revision of an existing Product packaged as a product design update, with new and revised components, structure and manufacturer information

New Product Request • Request for a new part number to be used in a design.

User Definable Attributes • Expand item attributes by leveraging UDA support resulting in infinite number of attributes

Item Synch • Synch items and their attributes upon demand

Pre-Release Audit • Synch simulation prior to final commit

Support for Variant Management • Agile PLM, PIM/EBS, and Oracle configuration integrations• Manages similar configurations of a product

Agile PLM

PIM/EBS

Create new change order

Add items to change order, specify new revisions and lifecycle phases

Redline assembly BOM to reflect new design, route change order for review

Review ECO impact, validate effectivity dates and release ECO

Apply business rules, determine ERP orgs impacted, BOM Commoning...

Event Trigger

Create new items or update item attributes for existing items in relevant orgs

Update Mfr Part information

Create ECO in each impacted org, associate list of revised items with new revisions and effectivity dates

Schedule ECO for Implementation

AIA

Update BOM (and reference designators) as “Add”/”Delete” components on the assembly on the ECO

ItemEBO

BOMEBO

ChangeEBO

ECO lines Auto-Implemented on reaching Effectivity Dates

Transactions / User updates cause changes to UDAs, Cost, Lead Time, Onhand Qty, etc.

Update new effectivity dates on Change Order, promote change to completed status.

Update transfer status on Change Order (P2 field or lifecycle)

Update information on Item P2 attributes

Event Trigger

Event Trigger

ItemEBO

ChangeEBO

ChangeEBO

Agile PLM to EBS PIP – Flows Details

Agile PLM (A9)

–9.2.2.6 or 9.3*

–AIA for PLM enhancements (patch)

–Modules• Product

Collaboration

Agile PLM (A9)

–9.2.2.6 or 9.3*

–AIA for PLM enhancements (patch)

–Modules• Product

Collaboration

Agile PLM Integration Pack for E-Business Suite: Design to Release

–AIA Foundation Pack Release 2.5–Oracle SOA Suite Version 10.1.3.4–Oracle Database & Apps Server EE

10g–Operating Platform:• OS: Linux & Windows

–Language• English only• Others planned for future release

Agile PLM Integration Pack for E-Business Suite: Design to Release

–AIA Foundation Pack Release 2.5–Oracle SOA Suite Version 10.1.3.4–Oracle Database & Apps Server EE

10g–Operating Platform:• OS: Linux & Windows

–Language• English only• Others planned for future release

Oracle E-Business/PIM

–EBS 11.5.10 CU2–EBS 12.1 (12.1.1)–PIM 12.1 (12.1.1)

–AIA for PLM enhancements (patch)

–ModulesEngineeringInventoryCost Mgmt

Oracle E-Business/PIM

–EBS 11.5.10 CU2–EBS 12.1 (12.1.1)–PIM 12.1 (12.1.1)

–AIA for PLM enhancements (patch)

–ModulesEngineeringInventoryCost Mgmt

/ PIM

Agile PLM to EBS PIP – Solution Components

Agile PLM to SAP PIPDesign-to-Release Supported Process

Processes Enabled Overview1. New Product Release

Agile PLM to SAP• Release a New Product and its Structure to

Manufacturing

2. Product Design UpdateAgile PLM to SAP

• Release a new revision of an existing Product packaged as a product design update, with new and revised components and structure

3. New Part RequestAgile PLM to SAP

• Request new part number for SAP upon part creation in Agile

Supporting Bi-directional data sync features (Configurable)• Agile Product Record is updated with product/part cost information from SAP • Any SAP Item Master attributes can be mapped and synchronized with Agile attributes

Create Parts and Documents (Items)

with Drawings

Create Manufacturer Parts with Spec Sheets

Create Approved Manufacturer Lists (AMLs)

Create Engineering Change Order (ECO) with Affected Items

Route ECO for Approval via NPI

Workflow

Create Bills of Materials (BOMs)

with Reference Designators

Release ECO

Update Dates, Costs, Codes, and

Dispositions

Validate/create/update Items, Mfr. Parts, AMLs, BOMs, and Ref. Designators Released from PLM (via PIP) and

associate the change records to ECO

Set Standard Costs, and Dispositions

PLM

AIA

SAP

Event Trigger

Event Trigger

UIMap, Monitor, Config

Agile 9

ACS

WSXWSD

L

SAP

WSDL

Queue

EBS

EBF

aXML

ABM

EBM

EBM

EBM

EBM

ABM

EBM EBM

EBM EBM

AIA 2.2/ SOA Suite

Process ABCS

AB

CS A

BC

S

AIA 2.4 / SOA Suite

May require extensions

Agile PLM to SAP PIP – Flows Details

Agile PLM to SAP Connectors, Messages, Objects, and Services

ABM

EBM

Create Part

Create Chang

e

Update Costs, Codes, Dates

Update BOM

Update AML

Agile Connector

Service

Enterprise Business Services

SAP Connector

Service

EBM

ABM

Agile PLM Product

Collaboration

Agile PLM Product

Collaboration

SAPERPSAPERP

© 2009 Oracle Corporation – Proprietary and Confidential

Agile PLM Integration Pack For JDE E1 Design-to-Release

Processes Enabled Overview

1. New Product ReleaseAgile PLM to JDE

• Release a New Product and its Structure to Manufacturing

2. Product Design UpdateAgile PLM to JDE

• Release a new revision of an existing Product packaged as a product design update, with new and revised components and structure

3. Initial LoadAgile PLM to JDE

• Initial population of data

Supporting Bi-directional data sync features (Configurable)• Agile Product Record is updated with product/part cost information from JDE • JDE Item Master attributes can be mapped and synchronized with Agile attributes

Configurability and Extensibility

Enrich TransformValidate

Application Business Connector ServiceApplication Business

Object

RequestingSystem

AgilePLM

Enterprise Business Service

3rd Party App

EBS

Adding additional content to the

payload

Changing validation

rules

Altering the enrichment

process

Altering the transform process to account for new fields or to

change the way existing fields are transformed

Modifying the payload object to account for new content from application

Configuring routing rules to identify service provider

Modify error handling

Adding new service

providers

Changing the transport channel

Replacing existing service

providersAdding additional operations (future)

Customers

"We were able to install and implement Oracle Agile PLM to E-Business Suite PIP in less than 30 days. The PIP has enabled us to initiate our Conference Room Pilot leveraging an upgraded Oracle Agile PLM with an existing E-Business suite.“

Jim DonleyCIO

"We were able to install and implement Oracle Agile PLM to E-Business Suite PIP in less than 30 days. The PIP has enabled us to initiate our Conference Room Pilot leveraging an upgraded Oracle Agile PLM with an existing E-Business suite.“

Jim DonleyCIO

Customer Recognition

"As a medical device manufacturer, data integrity and control are critical to our business and this interface allows for a single point of control for our item master. Sierra Atlantic and Oracle services and skills were as advertised and the project was completed in a timely fashion.”

Jim CottenExecutive Advisor to CEO

"As a medical device manufacturer, data integrity and control are critical to our business and this interface allows for a single point of control for our item master. Sierra Atlantic and Oracle services and skills were as advertised and the project was completed in a timely fashion.”

Jim CottenExecutive Advisor to CEO

What to Look for

Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.

Source of Truth

Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.

Beyond Traditional PLM

Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.

SummaryValue of the Design to Release PIP

Questions?

Govinda [email protected]

om

Drop by our Booth for More Information

Copyright © 2008 Sierra Atlantic, Inc. Material contained within this document is confidential and may not be reproduced without prior written consent.