Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Design & Process Standardization
Design Process
Using Modular Filter Modules for the
Kitchen Hoods.
These Modular Filter Modules are
available in particular size & comes with
End Panels which will facilitating the
design process & can cater to any
Length.
These Modules reduces the assembly
time & also has logistics advantages.
DESIGN PROCESS KITCHEN HOODS
DESIGN PROCESS FRP PANELS (WALL , CEILING & SKIRTINGS)
• Fiberglass reinforced panels are used on walls and ceilings, installing it
directly over any existing wall surface as concrete Block, drywall,
plywood, plaster walls and ceramic tiles.
• They provide a durable, scratch resistant surface, easy to clean panel
and provides superior moisture & temperature resistance.
• It can be fixed over the existing Sandwich panels in the Cold rooms so
that demounting of the Panels can be avoided.
• It has a life span of 10-15 years Involving no Maintenance cost that will
have also impact on Operation: like Repaint, manage crack for
ceramics, grouting, delamination, and cleaning issue of PVC.
Above Illustration shows the FRP Panel
applied directly on the Dry wall Partition.
Aluminum Skirting
Components of FRP Panel accessories.
DESIGN PROCESS FRP PANELS (WALL , CEILING & SKIRTINGS)
Standard F&B Equipment
Ordering templates .
Equipment orders to be
Initiated by the Design /
MEP Managers.
Equipment orders
templates contains
Product Name , Model
Number , Make & their Quantities.
DESIGN PROCESS EQUIPMENT ORDERING TEMPLATES
Order Templets will
reduces the design time
and facilitate the
purchasing process.
DESIGN PROCESS STANDARDIZED FABRICATION WORKS
Standardization of the
Fabrication work across
all the Brands by
restricting Custom sizes
& Extra demand.
Helps in Bulk bidding &
in Cross Branding Application
DESIGN PROCESS STANDARDIZED FABRICATION WORKS
DESIGN PROCESS STANDARD MODULAR STORAGE & SHELVING
Standard Modular Dry &
Cold room Storage &
Shelving.
More Storage Feature & Better arrangement Flexibility.
Completely avoids custom Fabrication.
DESIGN CONTROL STANDARDIZED BOQ’S
Standardizing the MEP & Décor BOQ’s
1. Controls & minimize the requirement of the Extra works during the Execution process.
2. Maintain the Standard quality of works along with Uniform details.
3. Repetitive Designs
with the Standard BOQ’s will reduce the project Timelines.
4. Familiarity & ease of
Design or Execution steps for the Contractors.