Upload
kara-wetzel
View
214
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Design Portfolio
Citation preview
KA
RA
WETZEL
Po
rt
fo
li
o
Table Of
Contents
1. Market 2. Housing 3. Construction Tech 4. NICU 5. Incubator 6. Modular Ecology 7. Critical Care Tower 8. Final Study 9. Fabrication10. Professional Work11. CV
Market- Fall 2009Using a pattern develop a canopy system for the Bidwell Farmer’s Market. A system of canopy’s and floors/seat-ing/ shelving that takes over site by connecting to trees. As Trees die the site opens up once again for soccer and frisbee. Develop a masterplan for million Sq ft site in pitts-burgh. Design the market for the site. Using one surface to create the walls and celing developed from the pattern and translated into the floor.
1. Pattern, floor and roof plan2,3. Photo collages4,5,6. section model
2 3 1 4
5 6
1. Pattern, floor and roof plan2,3. Photo collages4,5,6. section model
2 3 1 4
5 6
1. Hourly usage diagram2. Seasonal Usage Diagram3. Weekly Usage Diagram4. Model5. Slice Model6. Model
1 4 2 5 3 6
1. Hourly usage diagram2. Seasonal Usage Diagram3. Weekly Usage Diagram4. Model5. Slice Model6. Model
1 4 2 5 3 6
Housing- Fall 2010On a parkinglot in downtown buffalo create 24 units of housing and a public program. Skating rinks were the public program with housing lifted 40 feet off the ground to allow visual acsess to both rinks and complete the urban square the already existed. The stair towers frame the view of the rink from street level. The thinness allows for passive solar heating and maximum natural light on the south facade.
1. Site Plan2. Floor Plans3. ground plan 04. Ground Plan -205. Ground Plan -406. Partial Floor Plan 17. Partial Floor Plan 2
2 3 4 5 1 6 7
1. Site Plan2. Floor Plans3. ground plan 04. Ground Plan -205. Ground Plan -406. Partial Floor Plan 17. Partial Floor Plan 2
2 3 4 5 1 6 7
1. Partial Elevation2. SE Render3. E/W Section4. South Elevation5. Partial Section6. South Night Render7. NW Render 1 2 3
4 5 6 7
1. Structural Drawings2. South Facade Study Model3. South Facade Study Model4. Construction Details 5. North Facade Model6. Structure Model
4 1 2
3 5 6
A. Wall Detail1” Floor Finish8” concrete slabSteel I Beam5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200
B. Window jamb Detail5/8” Interior Gypsum Board6” Metal Studs6” Window Frame1/2” Sliding Glass Panels1/8” Galvanized Steel Sill5/8” Exterior Gypsum Board3” rigid Insulation
C. Wall DetailDrop Ceiling5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200
D. Window header Detail5/8” Interior Gypsum Board6” Metal Studs6” Window Frame1/2” Sliding Glass Panels5/8” Exterior Gypsum BoardWeep Hole3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200
E. Wall Detail1” Floor Finish8” concrete slabSteel I Beam8” Mechanical Space1” GirtsDrop Ceiling5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts
L. Wall DetailCMU Party Wall5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum Board3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-200
K. Window Detail5/8” Interior Gypsum Board6” Metal Studs5/8” Exterior Gypsum BoardVapor Barrier3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-2001/8” Galvanized Steel End Cap6” Window Frame
J. Wall Detail5/8” Interior Gypsum BoardFire Proofed Steel I Beam6” Metal Studs5/8” Exterior Gypsum BoardVapor Barrier3” rigid Insulation1” Vertical Girts7/8” Metal panel CS-2001/8” Galvanized Steel Corner
H. Wall Detail4” Double Layer Poly Carbonate Wall Panel 5/8” Interior Gypsum BoardFire ProofedSteel I Beam6” Metal Studs5/8” Exterior Gypsum BoardVapor Barrier3” rigid Insulation1” Vertical Girts
G. Stair DetailFire Proofed Steel I Beam4” Double Layer Poly Carbonate Wall Panel
F. Roof Detail2” Dirt4” Gravel10” Concrete Slab8” Mechanical Space1” GirtsDrop Ceiling7/8” Metal panel CS-6604” Double Layer Poly Carbonate Wall Panel
Construction tech - Spring 2010Draw an Axonometric construction detail of a ma-sonry building and a steel framed building from a set of construction documents include a specifica-tion list.
1. Coniber Shel House2. Menefee Cabin
1 2
NICU- Fall 2011Design an open bay and Single Family Room Neo-natal Intensive Care Unit by remodeling the exist-ing unit. - Provide spaces for single family units and open bay areas- Provide positive distractions for the family- Decrease nurse stress
1. Single Family Room Layout2. Family social Area- render3. Single Family Room- render4. Floor Plan5. View from nurses station
4 1
2 3 5
1. Single Family Room Layout2. Family social Area- render3. Single Family Room- render4. Floor Plan5. View from nurses station
4 1
2 3 5
Incubator- Fall 2011Redesign the incubator working in groups with industrial engi-neering students for General Electric.
Features- telescoping arms - moveable tray - sound monitor - gesture recognition - Smart Glass Hood - UV Sanitation - Live Video Feed - Moveable screen - Storage -Touch Screen Display
1. Right Elevation2. Rear Elevation3. Current Incubator4. Telescope boom render5. Screen Render6. Render7. Preemie in incubator
3 6
5 1 2 4 7
Modular Ecology- Fall 2011Ecological design creates a building that not only generates its own power in a responsible manner, but also deals with its waste products responsibly allowing it to be completely self-sufficient. Designing with a module allows for a non-site specific building enabling everyone to live sustainably. The module is an easily repeatable, manufactured unit thatallows for multiple configurations. For the Earth to sustain life in the future, we must adopt this concept of building. As architects this approach should be reflected in all of our projects.
1,2,3,10,11,12. Floor Plans4. Section e/w5. SW perspective Render6. Site Analysis7. South Facade Render8. Section N/S9. West Facade Render
1 6 10 2 4 8 11 3 5 7 9 12
Lake Bryan, TX 1,2,8,9. Floor Plans3. Section E/W4. Site Analysis5. East Facade Render6. Section N/S7. SE Perspective Render
6 1 8 3 4 2 5 7 9
View to Woods
Noise From Parking Lot
Noise Camping Area
View to Lake
Noise From Camping Area
Wind Flow
Critical Care Tower- SPRING 2012An addition to an exisiting hospital in Katy, TX. The idea was to create a stepped building that connected to exist-ing Hospital.
1. Site Plan2. Floor Plan3. ne perspective
2 1 3
1. Section2. PT Room Plan3. PT Room
2 1 3
Final Study- Spring 2013The MORGAN CENTER- A pre-school for immune compromised children located in the medical center district of Houston, Texas. This is a place for these children to go to when they are healthy enough to leave the hospital, but not attend school. This is a place for cognitive, social, and gross motor develop-ment to occur. The other half of the site is a park that can be used by the public and is an extension of the Bayou park system.
1. First floor plan of Preschool2. Site Plan
2 1
1. NW-SW Section2. Perspective3. Interior4. Program Diagram
1 3 2 4
1. Reading Room2. Park across Bayou View3. Park to Campus view4. Nightshot
1 4 2 3
Fabrication- Fall 2011“BLACK NARCISSUS”- Group Design Project that was in-stalled in a local restaurant. I helped with the packing of files and fabrication of the 1,000 pieces and construction.
1. Middle Section2. Air Flow Diagram3. Closeup 4. Flowers5. Conifer6. Left Section7. Conifer
3 4 1 5 2 6 7
Fabrication- Fall 2012“Pop-Op”-Group Design Project that was installed in Texas A&M Bright Building. It is a kinetic piece of art. I helped with the packing of files and fabrication of the pieces, the wiring and construction.
1. Wall2. Flower Wiring3. Flower4. Wall5. Close-up of wall
4 3 1 2 5
Professional work - 2013 - 2015HHS Masterplans- Ben Taub and LBJ Hospitals The focus of these two projects was to to look at LBJ as a whole and determine the best utilization of space based on current volumes and future growth of the hospital depart-ments. At Ben Taub the focus was to determine the best use of the square footage on the second floor for an OR Suite.
My responsibilities included diagrams, forecasting, assembling the document and attending meetings with the clients.
1. Forecating Cardiology2. Space Projections for Cardiology3. Diagram of Second Floor Concept
2 1 3
Ben Taub General Hospital Master Plan, FKP Architects, Feb 2014
4141
Cardiac Catheterization LabCARDIOLOGY VOLUME – HISTORICAL AND PROJECTED
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
PatientsEnrolled inRemoteMonitoring
Clinic Visits
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
Stress Test
Holter
Nuclear
ECHO
Department 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
ECHO Volume 6,616 8,177 8,825 9,106 10,211 11,022 11,834 12,646 13,458Nuclear Volume 2,614 3,037 2,853 2,346 2,466 2,367 2,268 2,169 2,070Holter Volume 208 865 1,095 1,172 1,346 1,712 1,970 2,229 2,487 2,745Stress Test Volume 158 632 921 3,960 3,620 3,280 2,940 2,600 2,260 1,920EKG Volume 8,547 37,921 65,259 66,685 67,410 93,111 99,837 111,090 122,343 133,596
Cath
Cardiac Cath Procedures 1297 1831 1769 1647 1,883 1,982 2,081 2,179 2,278
EP Cases Procedures 216 246 282 270 303 323 343 362 382
Clinic
Clinic Patients Visits 6,835 9,444 10,877 9,265 11,286 12,158 13,031 13,903 14,775Patients Enrolled in Remote Monitoring
Number90 180 375 480 623 759 896 1,032 1,169
Notes:
The volume includes Nuclear.
This volume includes Ben Taub inpatient units, Ben Taub EC, Baylor clinics and Quentin Mease
Key Driver Type
Future ProjectionsHistorical Volume
1. Forecating Cardiology2. Space Projections for Cardiology3. Diagram of Second Floor Concept
2 1 3
Ben Taub General Hospital Master Plan, FKP Architects, Feb 2014
5656
Space Projections – Cardiology
5 Rooms
DGSF
2,000 Visits / 1,400 DGSF
1,500 Visits / 750 DGSF
High Throughput
Low Throughput
7 Rooms - 9,240 DGSF
9 Rooms – 6,729 DGSF
ECHO
Existing Conditions
Existing Conditions Industry StandardIndustry Standard 5 Year Need5 Year Need
NUCLEAR CARDIOLOGY
2 Rooms
996 DGSF
2,000 Visits / 1,000 DGSF
1,000 Visits / 800 DGSF
High Throughput
Low Throughput
1 Rooms – 1,035 DGSF
2 Rooms – 1,656 DGSF
1 Rooms
59 DGSF
6,500 Visits / 750 DGSF
3,500 Visits / 750 DGSF
High Throughput
Low Throughput
1 Rooms – 317 DGSF
1 Rooms – 588 DGSF
HOLTER
3 Rooms
DGSF
1,200 Visits / 1,400 DGSF
1,000 Visits / 1,000 DGSF
High Throughput
Low Throughput
6 Rooms – 8,477 DGSF
7 Rooms – 7,240 DGSF
STRESS TEST
1 Rooms
266 DGSF
6,000 Visits / 1,400 DGSF
3,500 Visits / 750 DGSF
High Throughput
Low Throughput
1 Rooms – 1,680 DGSF
2 Rooms – 1,543 DGSF
EKG
Ben Taub General Hospital Master Plan, FKP Architects, Feb 2014
6868
IR(4 PROCEDURE)
CATH LAB(3 CATH
1 EP)
CENTRAL PREP(20 STATIONS)
(Space for 26 stations)
CENTRAL RECOVERY(27 STATIONS)
(Space for 38 stations)
CENTRAL STERILE PROCESSING
SUPPORTSUPPORT
ORMD
OFF.
M.D.OFF.
M.D.CARDIAC
OFF.
WAITING WAITING WAITING
CONSULTCONSULT
TLT TLT
MECHMECH
MALE LOCKERS
FEMALE LOCKERS
STER.CORE
SUPP
PREP/HOLD
SUPPANESTH. SUPP.OR
CONTROL
MECHELEC
CARIOLOGY CLINIC
(7 EXAM RM)
MECH
ELEC. SWITCH
NUC. MED
(2 SPECT/CT4 STRESS
TESTS)
ELEC
NON-INVASIVE CARDIOLOGY(6 ECHO, 1 EKG,
1 HOLTER, 1 NUC CAM, 1 CT/SPECT)
TRAUMA
THORACIC / VASCULAR
NEURO
THORACIC/ VASCULAR
HYBRID
HYBRID??
ORTHO
ORTHO
TRAUMA
GENERAL+ GYN ONC
CONNECTION TO BT TOWER
GENERAL+ GYN ONC
SUPP
ST
AFF
PU
BLI
C
PU
BLI
C
RECEP.
Master Plan Recommendations Level 2
Level 2 – Concept Diagram
HHS Ben Taub Specialty ClinicsThe program for this project was to move the current specialty clinics to allow for growth and better flow. The team and I worked with the users from programming through CD phases of the project.
My responsibilities included forecasting for future growth dur-ing programming, SD-CD drawings, and coordinating with MEP, equipment and signage consultants.
1. Elevations 2. Audiolgy Department Floor Plan3. Typical Clinic Exam Room Perspective4. Typical Clinic Exam Room Perspective5. Typical Clinic Exam Room Floor Plan
3 1 2 4 5
ALIG
N
4' -
8"
0' - 6" 2' - 0"
215
338
232EQ EQ
0' - 3"0' - 3"
5' -
0"
901
0' - 7"0' - 6" 2' - 0"
W1224 W1224 W1224
C1824C1824 C6024
EQ REFER TO PLAN EQ
216 255
254
260
0' - 6"0' - 6" 5' - 4"
1' - 3"0' - 6"1' - 2"0' - 6"1' - 3"0' - 6" 1' - 6" 2' - 3" 0' - 6"
333333333222
301301301
C1030
0' - 6"1' - 0"
1CB24
W1230 W1236
CEILINGENCLOSURE
14D
317
254312 255
261
901
0' - 9" 1' - 9" 4' - 6"
1' - 9"
222316314315310
318
2' - 10"
901
1' - 0"0' - 9"0' - 9" 2' - 11"
3' - 0" 3' - 9"
333333
901
0' - 6"0' - 10" 0' - 6"0' - 6"3' - 0"
214
255
334
C1833C6024
7CB24
W1224 W1233
CEILINGENCLOSURE
14D
254
901
1' - 7"
0' - 6" 2' - 0" 0' - 6" 2' - 2" 0' - 8"1' - 2" 2' - 2" 0' - 6"1' - 1" 2' - 2" 0' - 6"1' - 3"
2' - 6" 3' - 0" 3' - 0" 1' - 6" 3' - 0"
W1230V W1230V W1230V W1230V W1230V W1230V
221 221 221224224225 217
338338 338
221
901
229
254
221
901
5' - 0" 2' - 2"
0' - 6"0' - 8"0' - 6"
2' - 2" 3' - 0"
214 221 225
901
3' - 0" 0' - 6"0' - 6" 4' - 5" 0' - 6" 1' - 2" 0' - 6" 2' - 0" 0' - 6"
214229 216
217
1DB24
C1830C1830C1830
901
255
254305
312
333
261
901
1' - 2"2' - 11"
0' - 6"0' - 6" 4' - 5"
1' - 5" 0' - 6" 2' - 9" 0' - 6" 1' - 6"
222
301301301
333333
333333
901
F3248
CEILINGENCLOSURE
24D
333
901
0' - 6"0' - 6" 5' - 6"
0' - 6"0' - 6" 4' - 0" 0' - 6"0' - 6" 3' - 0"
310
333333
222
301301301
901
3' - 8"
310
333333
901
4' - 2"
317318
312 254 255338
261
W1230
CEILINGENCLOSURE
14D
901
1' - 8"1' - 5"5' - 0"
338
222
901
901
338
0' - 6" 3' - 6" 0' - 6" 2' - 8"
1' - 8" 0' - 6" 4' - 9" 0' - 6" 2' - 1" 1' - 0"
338
901
1' - 6" 0' - 6" 2' - 9" 0' - 6" 1' - 6" 2' - 0" 0' - 6"
901
338
EQEQ
0' - 3"0' - 3"
5' -
6"6'
- 0"
0' - 6" 6' - 6"
901
338
2' - 6"0' - 6"3' - 6"0' - 6"
901
338
337
1' - 8"
0' - 6" 1' - 9" 0' - 6"1' - 0" 3' - 3"
901
338
0' - 6"1' - 3"0' - 6"1' - 6"0' - 9"
901
338
333
W1230V W1230V
PROJECT NAME
PROJECT NUMBER
ISSUE
DATE
DRAWING TITLE
DRAWING NUMBER
2014 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©
A
B
C
D
E
6 5 4 3 2 1
|Houston Dallas
ARCHITECT OF RECORD
INTERIM REVIEW ONLY
Not to be used forregulatory approval,permit, or construction.
RICHARD M. HARRIS
DATE:
1502 TAUB LOOP, TEXASMEDICAL CENTER,HOUSTON, TX, 77030
35006.00
LEVEL 5ELEVATIONS
A6.8
BEN TAUB TOWERSPECIALTY CLINICS
50% CONSTRUCTIONDOCUMENTS
12/19/2014
12/19/2014
9240 KIRBY, HOUSTON,TEXAS 77064
3/8" = 1'-0"B6 542 TEAM ROOM D SOUTH
3/8" = 1'-0"D2 537F WORK AREA WEST
3/8" = 1'-0"A2 536 ENT EXAM SOUTH 3/8" = 1'-0"A3 536 ENT EXAM NORTH
3/8" = 1'-0"A4 536 ENT EXAM EAST 3/8" = 1'-0"A5 536 ENT EXAM WEST
3/8" = 1'-0"C3 531 NURSE STATION C SOUTH 3/8" = 1'-0"C4 531 NURSE STATION C NORTH
3/8" = 1'-0"C5 531 NURSE STATION C EAST 3/8" = 1'-0"C6 531 NURSE STATION C WEST
3/8" = 1'-0"D4 501A CHECK-IN SCHEDULING NORTH
3/8" = 1'-0"E3 SOILED UTILITY PLAN SOUTH
3/8" = 1'-0"A6 526 ENT EXAM SOUTH
3/8" = 1'-0"D3 531A CLEAN SUPPLY WEST
3/8" = 1'-0"B4 538 SPEECH/ENT EXAM NORTH 3/8" = 1'-0"B3 538 SPEECH/ENT EXAM EAST
3/8" = 1'-0"B2 538 SPEECH/ENT EXAM SOUTH 3/8" = 1'-0"B5 538 SPEECH/ENT EXAM WEST
3/8" = 1'-0"C2 542 TEAM ROOM D EAST
3/8" = 1'-0"D6 540 SPEECH CONSULT
3/8" = 1'-0"E6 543 TEAM ROOM E WEST 3/8" = 1'-0"E5 535 TEAM ROOM C NORTH
3/8" = 1'-0"E4 535 TEAM ROOM C SOUTH 3/8" = 1'-0"E2 537E CONTROL SOUTH
3/8" = 1'-0"D5 537B CONTROL SOUTH
214 FLOOR COPIER, SEE ELECTRICAL.215 PRINTER, MULTI-FUNCTION WITH FAXING CAPABILITIES, SEE
ELECTRICAL.216 PRINTER, HIGH VOLUME 5460 LASER, SEE ELECTRICAL.217 PRINTER, LABEL, SEE ELECTRICAL.221 COMPUTER WORKSTATION, THIN CLIENT, SEE ELECTRICAL.222 PROXIMITY STATION, PROVIDE BLOCKING PER DETAIL XX/XX.XX, SEE
ELECTRICAL.224 PHONE, SEE ELECTRICAL.225 EMERGENCY PHONE, SEE ELECTRICAL.229 CARD READER LOCATION, SEE ELECTRICAL AND DOOR HARDWARE.232 32" MONITOR, WALL MOUNTED, CENTER OF SCREEN AT 60" A.F.F.,
PROVIDE IN WALL BACKING, SEE XX/XX.XX AND ELECTRICAL.254 PAPER TOWEL DISPENSER, OFCI.255 SOAP DISPENSER, OFCI.260 SINK, SEE PLUMBING.261 SINK, ACCESSIBLE, SEE D2/A11.6 AND PLUMBING.301 OUTLETS, MEDICAL GAS, SEE INTERIOR ELEVATIONS AND PLUMBING.305 CLINICAL SINK. SEE PLUMBING.310 SHARPS. OFCI.312 GLOVE DISPENSER. OFCI.314 OTO./OPHTHALMOSCOPE SET, SEE EQUIP. DRAWINGS.315 OTOSCOPE TIPS, SEE EQUIP. DRAWINGS.316 BLOOD PRESSURE CUFF, SEE EQUIP. DRAWINGS.317 TRASH RECEPTACLE, SEE EQUIP. DRAWINGS.318 BIOHAZARD RECEPTACLE, SEE EQUIP. DRAWINGS.333 SCHEDULED EQUIPMENT, SEE EQUIP. DRAWINGS.334 PYXIS MACHINE W/UNDERCOUNTER REF.337 MARKERBOARD, SEE FURNITURE DRAWINGS.338 SCHEDULED FURNITURE, SEE FURNITURE DRAWINGS.901 SCHEDULED BASE.
A1 KEYED NOTES TO SHEET
3/8" = 1'-0"C1 531 NURSE STATION C
3/8" = 1'-0"D1 531 NURSE STATION C
UPUPUPUP
EXAM 5
530
SPEECH THERAPY
540
ENT/SPEECH
538
PATIENT TOILET
529
TEAM ROOM C
535
NURSE STATION C
531
SOUND BOOTH
537B
PATIENT TOILET
533
ADMIN. ASSISTANT
544
SOUND BOOTHCONTROL
537E
CLEAN SUPPLY
531A
DR. CHEN
541
SOILED HOLDING
539
SOUND BOOTHCONTROL
537A
WAITING (42)
512
EXAM 8
536
EXAM 7
534
EXAM 6
532
TEAM WORK
542
SOILEDEQUIPMENTCOLLECTION
545
STAFF LOUNGE
546
SOUND BOOTH
537D
SOUND BOOTH
537C
TEAM WORK
543
ELECTRICAL
504
IT/IDF
503
TOILET
548
TOILET
547
18
19
20
21
G K
I
J
TANK STORAGE
549
STAIR -G
500-G
CORRIDOR
537
VACUUM PUMP
550
A6.7A6
CORRIDOR
500.05
CORRIDOR
500.10
CORRIDOR
500.15
CORRIDOR
500.20
A6.8
A3
A4
A2
A5
A6.8
A6.8
C3
C4
C6 C5
DIRECTOR OFSPECIALTY CLINICS
544A
1
WORK AREA
537F
A6.8D2
2
8
4' -
0"
5' - 6"
A6.8
B6
W1230 W1236
W1230
C1030
F3248
B6
/MATCHLINE - SEE DRAWING A6 A2.5B
D3
A6.8B5
B4
B3
B2
542
543
544
544A
548
547
546
545
13.3
S
13.3 S
13.3
S
13.3 S
13.3 S
1.3
S
11.6
S
11.3
1.3
S
1.3 S
13.3
HOLD8' - 0"
CLEAR5' - 0"
500.10
537A
541
540
537E
539
535
536
538
1.3
1.3
1.3
S
1.3 S
1.3
S
1.3 S1.3 S
3.3
S
11.1
1.31.3
1.3
1.3
1.3
S
1.3 S
1.3
S
1.3 S
1.3 S
1.3
S
1.3 S
13.3
1.3
S
1.3
S
1.3 S
13.3 S
13.3
S
1.3
1.3
S
11.3
11.3
1.3
531A
A
531AB
13.3
13.3
S13
.3 S
13.6
S
13.6
S
13.6
S
13.6 S 13.3 S
13.3 S
13.3 S
534
532
1.6
S
1.3 S
3.3
S
13.3
1.3
1.3 S
530
529
1' -
1"
229 229
229
221221
3CB24
255254255
206
229
255
254
221
226
221 226
221226
216
231
221
220
221 221
221
252
221
221
221
220
233
215
261
260
201
214
229
220224
221 221224 224
255
254
261
312318
317
310301301301
1CB24
301301301 222
312 254255
261
317
318
310
316
314
315
245
245
245
338
222
333333333
338
338
338
338
215
221224
224
338
249
249
HOLD6' - 0"
214
334
254
2557CB24
W1224W1233
C1833 C6024
221221 221 221224224
224
225
217
W1230V W1230V W1230V W1230V W1230V W1230V
229
229
219
C18
33C
1833
C31
361C
B24
C1830
C18
33
W12
33W
1233
W12
36
333333333
255
254
260
333
333
A6.8 C1
A6.8
D1
A6.8
D6
A6.8
E5
E4
A6.8
E2
A6.8
D5
A6.8E6
C2
A6.9 D6
D5
A6.9
1
2
B
A
D
C
PLAN NORTH
EXISTING NOT IN CONTRACT
PROJECT NAME
PROJECT NUMBER
ISSUE
DATE
DRAWING TITLE
DRAWING NUMBER
2014 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©
A
B
C
D
E
6 5 4 3 2 1
|Houston Dallas
ARCHITECT OF RECORD
INTERIM REVIEW ONLY
Not to be used forregulatory approval,permit, or construction.
RICHARD M. HARRIS
DATE:
1502 TAUB LOOP, TEXASMEDICAL CENTER,HOUSTON, TX, 77030
35006.00
FLOOR PLAN LEVEL5 AREA A
A2.5A
BEN TAUB TOWERSPECIALTY CLINICS
50% CONSTRUCTIONDOCUMENTS
12/19/2014
12/19/2014
9240 KIRBY, HOUSTON,TEXAS 77064
1/4" = 1'-0"A6 LEVEL 5 A
A. INFORMATION SHOWN OR REFERENCED ON ENLARGED AND/OR 1/4”SCALE DRAWINGS WILL GENERALLY NOT BE SHOWN ON THE SMALLERSCALE DRAWINGS.
B. PARTITION TYPES ARE SCHEDULED ON PLANS BY NUMBER. SEE THE"GENERAL NOTES TO PARTITION TYPES" ON __/___ AND PARTITIONTYPES ON SHEET A___ FOR THE DEFINITION OF PARTITION TYPEREFERENCES KEYED ON PLANS.
C. FIELD COORDINATE ALL FIELD ROUTED PIPE, CONDUIT RUNS, ETC.,WITH LOCATIONS OF RECESSED ACCESSORIES AND EQUIPMENT. INTHE EVENT OF A CONFLICT, ACCESSORY LOCATIONS TAKEPRECEDENCE.
D. CLOSE ALL JOINTS BETWEEN PLUMBING FIXTURES/ACCESSORIES ANDDISSIMILAR MATERIALS W/SEALANT (I.E. BETWEEN SINKS ANDCOUNTERTOPS, TOILET FIXTURES AND ACCESSORIES TO WALL, ETC.)
E. CABINET NUMBERS NOTED ON ENLARGED PLANS REFER TO CABINETCOMPONENT NUMBERS, FIXTURES, ACCESSORIES, ETC. THAT AREDEFINED OR ELEVATED ON SHEET _____ UNLESS SPECIFIC DETAILREFERENCES ARE KEYED.
F. PLAN DIMENSIONS ARE TO FINISHED FACE OF PARTITIONS ANDGENERALLY ARE TIED TO A COLUMN CENTERLINE UNLESSSPECIFICALLY SHOWN CENTERED ON A PARTICULAR BUILDINGELEMENT I.E. A CHASE WALL, WINDOW MULLION, ETC.
G. FOR VERTICAL MOUNTING HEIGHTS OF SHOWER ACCESSORIES, SEEDETAIL _________.
H. FOR VERTICAL MOUNTING HEIGHTS OF TYPICAL TOILET STALLACCESSORIES, SEE DETAIL _________.
I. FOR VERTICAL MOUNTING HEIGHTS OF ACCESSIBLE TOILET STALLACCESSORIES, SEE DETAIL _________.
J. FOR VERTICAL MOUNTING HEIGHTS OF TYPICAL RESTROOMACCESSORIES, SEE DETAIL __________.
K. FOR VERTICAL MOUNTING HEIGHTS OF ACCESSIBLE ACCESSORIES ATRESTROOMS, SEE DETAIL __________.
L. FOR VERTICAL MOUNTING HEIGHTS OF SERVICE ACCESSORIES, SEEDETAIL __________.
M. FOR PARTIAL ENLARGED PLAN AT JANITOR CLOSETS, SEE DETAIL__________.
N. PUBLIC/HANDICAPPED RESTROOM GRAPHICS WILL BE FURNISHEDAND INSTALLED BY THE OWNER’S GRAPHICS SUPPLIER.
O. STANDARD EQUIPMENT WALL MOUNTING HEIGHTS, SEEDETAIL_______.
P. MEDICAL EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL_______.Q. FIRE PROTECTION EQUIPMENT WALL MOUNTING HEIGHTS, SEE
DETAIL_____.R. COMMUNICATION EQUIPMENT WALL MOUNTING HEIGHTS, SEE
DETAIL_____.S. EQUIPMENT MOUNTING HEIGHTS AT COUNTERTOPS, SEE
DETAIL_____.T. EQUIPMENT MOUNTING HEIGHTS AT DESKTOPS, SEE DETAIL_____.
D1 GENERAL NOTES TO PLANS
A1 KEY PLAN LEVEL 5
B1 LEGEND
C1 KEYED NOTES TO SHEET
201 FIRE EXTINGUISHER AND CABINET, SEE DETAIL B6/A11.3.206 EYE WASH AT SINK, SEE PLUMBING.214 FLOOR COPIER, SEE ELECTRICAL.215 PRINTER, MULTI-FUNCTION WITH FAXING CAPABILITIES, SEE
ELECTRICAL.216 PRINTER, HIGH VOLUME 5460 LASER, SEE ELECTRICAL.217 PRINTER, LABEL, SEE ELECTRICAL.219 COMPUTER WORSTATION CONNECTED TO 42" MONITOR220 COMPUTER WORKSTATION WITH CD-ROM DRIVE, SEE ELECTRICAL.221 COMPUTER WORKSTATION, THIN CLIENT, SEE ELECTRICAL.222 PROXIMITY STATION, PROVIDE BLOCKING PER DETAIL XX/XX.XX, SEE
ELECTRICAL.224 PHONE, SEE ELECTRICAL.225 EMERGENCY PHONE, SEE ELECTRICAL.226 TRANSLATOR PHONE, SEE ELECTRICAL.229 CARD READER LOCATION, SEE ELECTRICAL AND DOOR HARDWARE.231 42" MONITOR, WALL MOUNTED, CENTER OF SCREEN AT 60" A.F.F.,
PROVIDE IN WALL BACKING, SEE XX/XX.XX AND ELECTRICAL.233 32" MONITOR, WALL MOUNTED, TOP OF MONITOR AT 7'-8" A.F.F.,
PROVIDE IN WALL BACKING, SEE XX/XX.XX AND ELECTRICAL.245 TYPICAL ENT EXAM ROOM, SEE EXAM ROOM # 536, SHEET A2.5A FOR
TYPICAL/SIMILAR LAYOUT.249 SINGLE USER TOILET. SEE DETAIL XX/XX.XX FOR ACCESSORIES
ONLY.252 OUTLETS AT FLOOR LEVEL, PROVIDE ANODIZED ALUMINUM
RACEWAY, SEE ELECTRICAL.254 PAPER TOWEL DISPENSER, OFCI.255 SOAP DISPENSER, OFCI.260 SINK, SEE PLUMBING.261 SINK, ACCESSIBLE, SEE D2/A11.6 AND PLUMBING.301 OUTLETS, MEDICAL GAS, SEE INTERIOR ELEVATIONS AND PLUMBING.310 SHARPS. OFCI.312 GLOVE DISPENSER. OFCI.314 OTO./OPHTHALMOSCOPE SET, SEE EQUIP. DRAWINGS.315 OTOSCOPE TIPS, SEE EQUIP. DRAWINGS.316 BLOOD PRESSURE CUFF, SEE EQUIP. DRAWINGS.317 TRASH RECEPTACLE, SEE EQUIP. DRAWINGS.318 BIOHAZARD RECEPTACLE, SEE EQUIP. DRAWINGS.333 SCHEDULED EQUIPMENT, SEE EQUIP. DRAWINGS.334 PYXIS MACHINE W/UNDERCOUNTER REF.338 SCHEDULED FURNITURE, SEE FURNITURE DRAWINGS.
Dept. Rep. Date As Shown As Noted
DESIGN DEVELOPMENT
PROJECT INFORMATION
Project #:
Date:
Scale:
INTERIM REVIEW ONLY.Not to be used for regulatory approval, permit, or construction.
RICHARD M. HARRIS
DATE:
ARCHITECT OF RECORD:
2014 FKP Architects, Inc. All rights reserved. No part of the document may be reproduced or utilized in any form without prior written authorization of FKP Architects,Inc.
C
35006.00EXAM OPTION 2BT TOWER SPECIALTY CLINICS
10/27/1410/27/14
2 OPTION 2 VIEW 2
3 OPTION 2 VIEW 31 OPTION 2 AXO
106 SFEXAM 12
387
GEN. SURG.
119 SFEXAM 13
389
GEN. SURG.
FAMILY CHAIRS
BIOHAZARD RECEPTACLE
EXAM TABLEOTOSCOPE TIPSOTOSCOPEBLOOD PRESSURE CUFF
A3.14 2
5
4
3
LINEN HAMPER
GLOVE DISPENSER
PRINTER CABINET
SOAP DISPENSERWALL MOUNTED SINKPAPER TOWEL DISPENSERTRASHSHARPS
PRINTER
3' - 4"3' - 4"
3' - 4"
FAMILY CHAIRS
WALL MOUNTED COMPUTER
CARD READER
BLOOD PRESSURECUFF
EXAM TABLE
WALL MOUNTEDCOMPUITER
EXAM TABLE
BLOODPRESSURE CUFFOTOSCOPEOTOSCOPE TIPS
BIOHAZARD RECEPTACLE
WALL MOUNTEDCOMPUTER
PAPER TOWEDISPENSER
LINEN HAMPER
WALLMOUNTED SI
PRINTERCABINET
BIOHAZARDRECEPTACLE
PRINTER
GLOVE DISPENSERSOAP DISPENSERWALL MOUNTED SINK
SHARPSPAPER TOWEL DISPENSER
TRASHRECEPTAC
Dept. Rep. Date As Shown As Noted
DESIGN DEVELOPMENT
PROJECT INFORMATION
Project #:
Date:
Scale:
INTERIM REVIEW ONLY.Not to be used for regulatory approval, permit, or construction.
RICHARD M. HARRIS
DATE:
ARCHITECT OF RECORD:
2014 FKP Architects, Inc. All rights reserved. No part of the document may be reproduced or utilized in any form without prior written authorization of FKP Architects,Inc.
C
As indicated
35006.00EXAM OPTION 2BT TOWER SPECIALTY CLINICS
10/27/1410/27/14
1/4" = 1'-0"1 TYPICAL EXAM OPTION 2
3/8" = 1'-0"2 EXAM NORTH WALL
3/8" = 1'-0"3 EXAM EAST WALL
3/8" = 1'-0"4 EXAM SOUTH WALL
3/8" = 1'-0"5 EXAM WEST WALL
Dept. Rep. Date As Shown As Noted
DESIGN DEVELOPMENT
PROJECT INFORMATION
Project #:
Date:
Scale:
INTERIM REVIEW ONLY.Not to be used for regulatory approval, permit, or construction.
RICHARD M. HARRIS
DATE:
ARCHITECT OF RECORD:
2014 FKP Architects, Inc. All rights reserved. No part of the document may be reproduced or utilized in any form without prior written authorization of FKP Architects,Inc.
C
35006.00EXAM OPTION 2BT TOWER SPECIALTY CLINICS
10/27/1410/27/14
2 OPTION 2 VIEW 2
3 OPTION 2 VIEW 31 OPTION 2 AXO
Dayton Children’s HospitalThe program was to design a data center/ central plant for the campus and a new 7 story tower to go on the existng campus in a courtyard that had buildings on the three sides.
My responsibilities included exterior brick design on the data center and on tower, preliminary renders, SD and DD drawing sets for exterior package, interior floor patterns, and interior boards during SD.
1. S/W Extreior Render2. South Elevation3. Enlarged Elevation4. Wall Section
2 4 1 3
LEVEL 1100' - 0"
LEVEL 2E112' - 8"
LEVEL 2119' - 0"
LEVEL 3E125' - 4"
LEVEL 4138' - 0"
LEVEL 5153' - 0"
LEVEL 6168' - 0"
LEVEL 7183' - 0"
LEVEL 8198' - 0"
LEVEL 9213' - 0"
ROOF233' - 0"
65432
BASEMENT84' - 0"
1 2.6 3.5 4.4 5.4
A5.13C6
A5.13A6
A5.13C3
A5.13A3
13a12a
11a10a
9a
8a1.7
A.B. LAST NAMELICENSE #
EXPIRATION DATE 00/00/0000
PRELIMINARYDRAWING
ONLY
NOT TO BEUSED FOR
CONSTRUCTION
ISSUANCES
t h i n k c h a m p l i n . c o m
4 S o u t h M a i n S t . , S t e 1 3 0 0D a y t o n , O H 4 5 4 0 2
T 937.224.4474
Drawn By
Checked By
ProjectNumber
ClientNumber
|Houston Dallas
1400 West Dorothy LaneDayton, OH 45409-1310Tel: 937.224.0861 Fax: 937.224.5777
6305 Centre Park DriveWest Chester, OH 45069Tel: 513.779.7851 Fax: 513.779.7852
3233 Newmark DriveMiamisburg, OH 45342Tel: 937.228.1225 Fax: 937.228.7443
222 Linwood StreetDayton, OH 45405Tel: 937.461.5390 Fax: 937.298.5732
2202 S. Patterson Blvd.Dayton, OH 45409Tel: 937.298.4631 Fax: 937.298.5732
8/26
/201
4 12
:45:
17 P
M
A5.07
NEW PATIENTTOWER
DD
Author
51001.0100
EXTERIOR ELEVATION
3/32" = 1'-0"A6 SOUTH ELEVATION
No. Description Date1 DESIGN DEVELOPEMENT 8/25/2014
1. S/W Extreior Render2. South Elevation3. Enlarged Elevation4. Wall Section
2 4 1 3
LEVEL 5153' - 0"
LEVEL 6168' - 0"
LEVEL 7183' - 0"
LEVEL 8198' - 0"
LEVEL 9213' - 0"
5432 2.6 3.5 4.4
ELEVATOR ROOF218' - 0"
GL-3 GL-3 GL-3 GL-3
GL-2GL-2 GL-2 GL-2
GL-3 GL-3GL-3GL-3
GL-2 GL-2 GL-2 GL-2
GL-3 GL-3
GL-2GL-2 GL-2 GL-2
GL-3GL-3
GL-3 GL-3
GL-2GL-2 GL-2 GL-2
GL-3GL-3
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1
ACM-1 ACM-1 ACM-1ACM-1
ACM-1ACM-1ACM-1 ACM-1
ACM-1ACM-1
ACM-1 ACM-1
A6A6.15
A2A6.15
A6A6.16
ACM-1A
ACM-1A
ACM-1A
ACM-1A
ACM-1A
GL-4
GL-1
GL-1
ACM-4 ACM-4
ACM-4
ACM-4ACM-4
ACM-4
GL-1
GL-1
GL-1
GL-1
ACM-1
ACM-1
ACM-1 11a10a
GL-4
GL-4
GL-4 GL-4
GL-4GL-4
GL-4 GL-4
GL-1
GL-1
LEVEL 1100' - 0"
LEVEL 2119' - 0"
LEVEL 4138' - 0"
54321 2.6 3.5 4.4
GL-2 GL-2 GL-2 GL-2 GL-2 GL-2
GL-2GL-2GL-2GL-2GL-2GL-2
ACM-3M-1
A5A6.15
A4A6.15
A5A6.16
M-1
CS-1 CS-1
10a
M-1 M-1 M-1
MASONARY SOLDIERCOURSE
PREFINISHED STEELOVERHEAD ROLL-UP DOORPREFINISHED STEEL
OVERHEAD ROLL-UP DOOR
MASONRY SOLDIERCOURSE
MASONRY SOLDIERCOURSE
CAST STONE BANDING
CAST IN PLACE CONCRETECURB
LEVEL 5153' - 0"
LEVEL 6168' - 0"
LEVEL 7183' - 0"
LEVEL 8198' - 0"
LEVEL 9213' - 0"
65 5.4
ACM-4 ACM-4
ACM-4
ACM-4
ACM-4ACM-4
ACM-4
ACM-4
GL-4GL-4
ACM-4 ACM-4
ACM-2
ACM-2
ACM-2
ACM-2
ACM-2
A4A6.16
ACM-4
ACM-4
ACM-4
12a
PREFINISHED METALCOPING SEE MATERIALLEGEND FOR FINISH
GL-1 GL-1
GL-1 GL-1
GL-1GL-1
GL-1 GL-1
GL-1 GL-1
GL-1 GL-1
EXTRUDED ALLUMINUMMULLION CAP WITHPREFINISHED COATING
EXTRUDED ALLUMINUMMULLION CAP WITHPREFINISHED COATING
GL-4
?
GL-4
GL-2
GL-4
GL-4
GL-4
GL-4
GL-4
GL-4
GL-4
GL-4
GL-2
GL-2
GL-2
LEVEL 1100' - 0"
LEVEL 2119' - 0"
LEVEL 4138' - 0"
65 5.4
ACM-2
ACM-2
GL-1 GL-1
GL-1GL-1
A3A6.16
M-1
M-1
ACM-3ACM-3
GL-2 GL-2
13a12a
M-1
REVEAL IN COMPOSITEMETAL PANEL
REVEAL IN COMPOSITEMETAL PANEL
CAST IN PLACE CONCRETECURB
MASONARY SOLDIERCOURSE
CAST STONE BANDING
PRE-FINISHED CURTAINWALL SYSTEM, SEEELEVATIONS FOR TYPE
SINGLE COARSE SOLIDBRICK ACCENT BAND
MASONRY SOLDIERCOURSE
thinkchamplin.com
937-224-4474Dayton, OH 45402
Suite 13004 South Main Street
PROJECT NAME
PROJECT NUMBER
ISSUE
DATE
DRAWING TITLE
DRAWING NUMBER
2014 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©
A
B
C
D
E
6 5 4 3 2 1
|Houston Dallas
51001.0100
PARTIALELEVATIONS
A5.13
NEW PATIENTTOWER
DD
08/25/14
1/8" = 1'-0"C6 SOUTH TOWER- SOUTHWEST ELEVATION
1/8" = 1'-0"A6 SOUTH BASE- SOUTHWEST ELEVATION
1/8" = 1'-0"C3 SOUTH TOWER- BEACON
1/8" = 1'-0"A3 SOUTH BASE- SOUTHEAST CORNER
CS-1
1 DESIGN DEVELOPEMENT 8/25/2014
LEVEL 5153' - 0"
LEVEL 6168' - 0"
LEVEL 7183' - 0"
LEVEL 8198' - 0"
LEVEL 9213' - 0"
2
7' -
0"7'
- 6"
7' -
6"7'
- 6"
7' -
6"7'
- 6"
7' -
6"7'
- 6"
10' -
0"
15' -
0"
15' -
0"
15' -
0"
15' -
0"
5' -
0"
5' - 0"
6' - 6"
5' -
6"2'
- 0"
5' -
0"2'
- 6"
5' -
6"2'
- 0"
5' -
0"2'
- 6"
5' -
6"2'
- 0"
5' -
0"2'
- 6"
5' -
6"2'
- 0"
A7.01C2
A7.01B5
A7.01A5
ROOF SYSTEM TYPE-1OVER TAPEREDINSULATION
COMPOSITE METALPANEL SYSTEM.SEE ELEVATIONSFOR TYPE
INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE
GROUND96' - 0"
LEVEL 1100' - 0"
LEVEL 2119' - 0"
LEVEL 4138' - 0"
LEVEL 5153' - 0"
21
STR
ETC
HER
CO
UR
SES
4' -
8" =
211'
- 4"
STR
ETC
HER
CO
UR
SES
2' -
8" =
12
19' -
0"
19' -
0"
15' -
0"
A7.01A5
A7.02D2
SIM
A7.02D3
A7.02C2
4' - 6"INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE
PRE-FINISHEDWINDOW WALLSYSTEM
MODULAR BRICK
13' -
0"
8' -
8"8'
- 0"
10' -
10"
8' -
0"
10' -
0" =
45
STR
ETC
HER
CO
UR
SES
10"
2' - 10"
SEE
ELEV
ATIO
NS
FOR
EXT
ERIO
R F
INIS
HIN
DEP
END
ENTL
Y SU
PPO
RTE
D 3
HO
UR
SEP
ERAT
ION
WAL
L,
4' - 6"
3' - 11 3/4"
5' - 6"
8a1.7
LEVEL 1100' - 0"
LEVEL 2119' - 0"
LEVEL 4138' - 0"
LEVEL 5153' - 0"
2
BASEMENT84' - 0"
13' -
0"
10' -
10"
8' -
0"
19' -
0"
19' -
0"
15' -
0"
A7.01A5
A7.02D3
A7.02D2
A7.02C3
8' -
8" R
OU
GH
OPE
NIN
G8'
- 0"
STR
ETC
HER
CO
UR
SES
4' -
8" =
21
1' -
4"ST
RET
CH
ER C
OU
RSE
S2'
- 8"
= 1
2 10
' - 0
" = 4
5 ST
RET
CH
ER C
OU
RSE
S10
"
4' - 6"
INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE
2' - 10"
4' - 6"
PRE-FINISHEDWINDOW WALLSYSTEM
MODULAR BRICK
5' - 6"
A7.03A6
POLYSTERENEBOARD INSULATION
WATERPROOFMEMBRANE
INSULATED ROLL DOWNDOOR
GROUND96' - 0"
LEVEL 1100' - 0"
LEVEL 2119' - 0"
LEVEL 4138' - 0"
LEVEL 5153' - 0"
2
26' -
8" =
120
STR
ETC
HER
CO
UR
SES
19' -
0"
19' -
0"
15' -
0"
A7.01A5
SEE
EXTE
RIO
R E
LEVA
TIO
NS
FOR
EXT
ERIO
R F
INIS
HIN
DEP
END
ENTL
Y SU
PPO
RTE
D 3
HO
UR
SEP
ERAT
ION
WAL
L.
MODULAR BRICK
5' - 6"
5' - 1 3/8"
2' -
6"
6' -
0"10
"1'
- 8"
4' - 6"
INSULATED GLASSUNIT. SEEELEVATIONS FORGLASS TYPE
PRE-FINISHEDWINDOW WALLSYSTEM
27' -
6"
8' -
0"
WATERPROOF MEMBRANE
ROOF SYSTEM TYPE 1OVER TAPEREDINSULATION
A7.02D3
A.B. LAST NAMELICENSE #
EXPIRATION DATE 00/00/0000
PRELIMINARYDRAWING
ONLY
NOT TO BEUSED FOR
CONSTRUCTION
ISSUANCES
t h i n k c h a m p l i n . c o m
4 S o u t h M a i n S t . , S t e 1 3 0 0D a y t o n , O H 4 5 4 0 2
T 937.224.4474
Drawn By
Checked By
ProjectNumber
ClientNumber
|Houston Dallas
1400 West Dorothy LaneDayton, OH 45409-1310Tel: 937.224.0861 Fax: 937.224.5777
6305 Centre Park DriveWest Chester, OH 45069Tel: 513.779.7851 Fax: 513.779.7852
3233 Newmark DriveMiamisburg, OH 45342Tel: 937.228.1225 Fax: 937.228.7443
222 Linwood StreetDayton, OH 45405Tel: 937.461.5390 Fax: 937.298.5732
2202 S. Patterson Blvd.Dayton, OH 45409Tel: 937.298.4631 Fax: 937.298.5732
8/26
/201
4 12
:58:
28 P
M
A6.10
NEW PATIENTTOWER
DD
Author
51001.0100
WALL SECTIONS
1/4" = 1'-0"A6 TOWER SECTION -WEST 1/4" = 1'-0"A5 TYPICAL RATED WALL - WEST
1/4" = 1'-0"A4 SOUTH WEST AT ROLLING DOOR 1/4" = 1'-0"A3 MASONRY WALL - WEST
No. Description Date1 DESIGN DEVELOPEMENT 8/25/2014
TCH OB/GYN Research LabThe program called for a lab to be designed in 5,000 sqft of shell space that had seperate spaces for animal and human culture testing.
My responsibilities included SD - CA phases of the project. I attended meetings with the users and helped make real time changes to the model based on their input. I was in charge of RFI’s, attended OAC meetings and helped punch the space.
1. Floor Plan2. Elevations
1 2
UP
REF.
A5.0
D6
A5.0
C6
A5.0
A5.0
C5
D3
A5.0
C3
D5
A5.0B6
A5.0
A6
A5.0B5B4
A5.0A5
A5.0
B3
OFFICEC.1850.32
OFFICEC.1850.34
WORK ROOMC.1850.46
OFFICEC.1850.48
CHASE DC.1800.00B
BREAK ROOMC.1800.24
C.E.C.C.1880.16
AUTOCLAVEC.1880.17
FREEZERC.1880.12
STORAGEC.1880.13
ANIMAL TISSUEC.1880.11
MICROSCOPYC.1880.04TISSUE CULTURE
1880.03
H ROOMC.1880.02
TISSUE CULTUREC.1880.01
OPEN LABC.1870.11
SHELLC.1890.00
DT18-30606CB30
SK-13CB30SK-1
DT18-3060
DT18-3060
DT18-3060
CAS
1-30
60
DAS1-3060
C3130
SK-2
VW15
72VW
1572
VW15
72
VW1360
VW13
482
CT1
8-30
72C
T15-
3072
DT1
5-30
72CT1
5-30
72C
T15-
3072
CT1
5-30
72
DT1
5-30
48
6CB30(2)
VW15
72VW
1572
VW15
72
VW1360
VW13
48
CT1
8-30
72C
T15-
3072
CT1
5-30
72CT1
5-30
72C
T15-
3072
CT1
5-30
72
DT1
5-30
48
DT1
5-30
48
C3130
SK-2
VW15
72VW
1572
VW15
72
VW1360
VW13
48
CT1
8-30
72C
T15-
3072
CT1
5-30
72
CT1
5-30
72C
T15-
3072
CT1
5-30
72
DT1
5-30
48
DT1
5-30
48
6CB30(2)
CT13-3060
VW1560VW1560
VW13
60
CT15-3060CT15-3060
CT15-3060 CT15-3060
VW1560VW1560
VW13
60
CT15-3060CT15-3060
CT15-3060 CT15-3060
CAS1-3048CAS1-3048
6CB30(2)
C3130
SK-2
C31306CB30
(2)CT13-3060
VW1360
6CB30(2)C3130
VW1360
CT13-3060
VW1360VW1360
SK-2
C31306CB30
(2)CT13-3060
VW1360
CT1
5-30
72
VW15
72
CT1
8-30
72C
T15-
3072
DT1
5-30
72D
T15-
3048
DT1
5-30
48C
T15-
3072
CT1
5-30
72
VW15
72VW
1572
VW13
48
SK-2SK-2
CT1
5-30
72
VW15
72
CT1
8-30
72C
T15-
3072
CT1
5-30
72D
T15-
3048
VW13
48VW
1572
VW15
72
CT1
5-30
72C
T15-
3072
DT1
5-30
48
CT1
8-30
72C
T15-
3072
CT1
5-30
72
DT1
5-30
48
CT1
8-30
72C
T15-
3072
DT1
5-30
72VW
1348
2
VW15
72VW
1572
VW15
72
CT1
5-30
72C
T15-
3072
CT1
5-30
72C
T15-
3048
VW13
48VW
1572
VW15
72VW
1572
CT1
8-30
72C
T15-
3072
CT1
5-30
72D
T15-
3048
CT1
5-30
72C
T15-
3072
CT1
5-30
72D
T15-
3048
CT1
5-30
72C
T15-
3072
CT1
8-30
72
VW15
72VW
1572
VW15
72VW
1348
2
CT1
5-30
72C
T15-
3072
CT1
5-30
72D
T15-
3048
CT1
5-30
72C
T15-
3072
CT1
5-30
72
VW15
72VW
1572
VW15
72VW
1348
2
OFFICEC.1850.36
OPEN OFFICEC.1850.27
OPEN OFFICEC.1850.38
B4030B3324
M13
18
M13
18B
3324
B33
24B
4030
B40
30
B33
24
B33
24
M13
18
M13
18B
3324
B33
24B
4030
B33
24
B33
24
M13
18
B33
24
B33
24B
4030
B33
24
B33
24
M13
18
M13
18B
3324
B33
24B
4030
B33
24
B33
24
M13
18
M13
18B
3324
B33
24B
4030
B33
24
B33
24
M13
18
B33
24
B33
24B
4030
B33
24
B33
24
M13
18
B33
24
B33
24B
4030
B33
24
B33
24
M13
18B
3324
B33
24B
4030
B33
24
B33
24
M13
18B
3324
B33
24B
4030
B33
24
B332
4B4
030
B40
30
B40
30
B40
30
B40
30
B40
30
B40
30
B40
30
C3130 C1848C1324
CT1
5-30
72C
T15-
3072
VW13
72VW
1372
VW13
72
B33
24B
4030
VW13
VW1360VW1360
6CB3
0C
3130
C42
36
C1330C1736C3130
B4030B3324
B3324B3324
B3324B3324
CO2 @ 96"N2
LVLA
LVLA
O2LVLA
O2LVLA
LVLA
LVLA
LVLA
LVLA
LVLA
CO2N2
LVLACO2N2
LVLA
LVLA
LVLA
LVLA
LVLA
LVLA
LVLA
LVLA
LVLA
CO2 @ 96"N2
CO2N2
CO2 REGULATORN2
LVLA
LVLA
LVLA
LVLA
LVLA
73224
F383
6C
1042
C10
42C
3142
3CB3
0SH 31
48SH 31
48
SH3160
SH3160
SH3160
SH3160
SH3136
SH3136
DAS1-3048
B4242
SH 3148
C.1870.06
C.1870.02
C.1870.03A1
C.1870.03A2
C.1870.03B1
C.1870.03B2
C.1870.04
C.1
870.
03 C.1
870.
11C
1
C.1
870.
11C
2
C.1
870.
11D
1
C.1
870.
11D
2
C.1
870.
11E1
C.1
870.
11E2
C.1
870.
11F1
C.1
870.
11F2
C.1
870.
11G
1
C.1
870.
11G
2
C.1
870.
11H
1
C.1
870.
11H
2
C.1
870.
11J1
C.1
870.
11J2
C.1
870.
11K1
C.1
870.
11K2
C.1
870.
11L2
C.1
870.
11L1
C.1
870.
11M
1
C.1870.12
C.1870.13C.1870.14
C.1870.16
C.1
870.
22
C.1870.21
C.1
870.
01
C.1870.22
C.1870.23
W3124
C13
18
LVLA
C31
30
M1318
CO2 REGULATOR
O2N2
CO2O2
O2N2
N2 FILLTANK
FLOORSINK
O2N2
MANIFOLD
O2LA
O2LA
O2LA
O2LA
MILLIPORE MILLIPORE
M1324 M1324
M1324M1324
DT18-3048
C10
30C
1030
C10
30C
3130
SK-2
A5.0C2
F384
2F3
842
F384
2
C18
42
6CB30
SH3148
SH3148
SH3148
W3124
A5.0A4
M33
24
C46
48
HW/CWDIEW-1
HW/CWDI
HW/CWDI
HW/CWDIEW-1
HW/CWDIEW-1
HW/CWDIEW-1
HW/CWROEW-1
HW/CWROEW-1
DIHW/CW
EW-1
HW/CWRO
EW-1
HW/CW
9' -
6 7/
8"
8' -
4 3/
4"1'
- 10
"
36.3
B
36.3
B
13.3
13.3
11.2
9 9
2.3 2.3
13.3
13.3
13.3
36.3 B
11.2
11.2
13.3
13.3
36.3
B
13.3 13.3
36.3
B
1.3
13.3
13.3
1.3
11.3
11.3
1.3
9
9
99
9
9
9
11.3
9
9
9
9
9
9
9
1.3
13.3
2.3
99
11.2
C1880.12B
C18
80.1
7
C1880.13
C1890.00
C18
80.1
2A
C1880.11C1880.04
C18
80.0
3
C18
80.0
2
C18
50.3
8
SK-1
SK-3
SK-2
HW/CWEW-1
C1880.01
73229
73227
7323
6
80051
7323
273
231
71216
8005
880
058
8005
880
058
8005
9
800398003980039
80039
7121
9X71
219X
7121
9X
7322
1
73237
1' - 10 3/4"
6' -
6 1/
8"
4' - 7 3/4"
1' -
8 3/
4"
DR
-2
DR
-2
DR-2
DR-2 DR-2 DR-2 DR-2
DR-2
DR-2
36.3 B
11.2
A
10' - 0"
TYP.5' - 0"
10
9
8
LJGFD K
72817 71221X 80060 72917
72891 72891 7289180049
72891 73230
7322
7 -
73227
7235
772
357
201 214
215 215
216
201
214
218217 218217
218217218218
217
216
218217
SH 3136
SH 3136
AS NEEDED
220 220
221221221 221
221221
221221221
SH 3148
215
10' -
6"
8' -
10 7
/8"
TYP.1' - 6"
7' - 8"11' - 0 1/8"10' - 5 3/8"
5' - 11"5' - 9 3/8"
1' -
7 7/
8"8'
- 9
3/8"
36.3 A
13.3 9' - 7 1/8" 10' - 11 3/4"
6' - 9 1/4"
10' -
11
3/8"
10' -
9"
3' -
7 7/
8"
1' - 0 3/4" 1' - 10 7/8"12' - 1 3/8"
2' -
9 3/
8"
4' - 3 3/4"TYP.
10' - 6"
LVLA
6' -
3 1/
2"
229
A11.2D5
A5.0
B2
222
A11.1D4
Sim
230
230 230230
231
C18
70.2
2
222 222
C18
70.0
1
EQEQ EQEQ
3CB30
36.3
S
36.3
S
232
7322
3
71760
7176
071
760
7176071760
7322
3
80032
76218
80032
PROPOSED
EXISTINGCONSTRUCTION
N
PROJECT NAME
PROJECT NUMBER
ISSUE
DATE
DRAWING TITLE
DRAWING NUMBER
2012 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©
A
B
C
D
E
6 5 4 3 2 1
|Houston Dallas
ARCHITECT OF RECORD
CYNTHIA WALSTON
03/13/14
8261.00
ARCHITECTURALFLOOR PLAN
A3.1
FEIGIN OB-GYNRESEARCH LAB
CONSTRUCTIONDOCUMENTS
3/13/14
1/4" = 1'-0"A6 Level 18
A. INFORMATION SHOWN OR REFERENCED ON ENLARGED AND/OR 1/4” SCALEDRAWINGS WILL GENERALLY NOT BE SHOWN ON THE SMALLER SCALEDRAWINGS.
B. PARTITION TYPES ARE SCHEDULED ON PLANS BY NUMBER. SEE THE "GENERALNOTES TO PARTITION TYPES" ON D1/A11.1 AND PARTITION TYPES ON SHEETA11.1 FOR THE DEFINITION OF PARTITION TYPE REFERENCES KEYED ONPLANS.
C. FIELD COORDINATE ALL FIELD ROUTED PIPE, CONDUIT RUNS, ETC., WITHLOCATIONS OF RECESSED ACCESSORIES AND EQUIPMENT. IN THE EVENT OF ACONFLICT, ACCESSORY LOCATIONS TAKE PRECEDENCE.
D. CLOSE ALL JOINTS BETWEEN PLUMBING FIXTURES/ACCESSORIES ANDDISSIMILAR MATERIALS W/SEALANT (I.E. BETWEEN SINKS AND COUNTERTOPS,TOILET FIXTURES AND ACCESSORIES TO WALL, ETC.)
E. CABINET NUMBERS NOTED ON ENLARGED PLANS REFER TO CABINETCOMPONENT NUMBERS, FIXTURES, ACCESSORIES, ETC. THAT ARE DEFINED ORELEVATED ON SHEET A5.0 UNLESS SPECIFIC DETAIL REFERENCES ARE KEYED.
F. PLAN DIMENSIONS ARE TO FINISHED FACE OF PARTITIONS AND GENERALLYARE TIED TO A COLUMN CENTERLINE UNLESS SPECIFICALLY SHOWN CENTEREDON A PARTICULAR BUILDING ELEMENT I.E. A CHASE WALL, WINDOW MULLION,ETC.
G. STANDARD EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL A4/A11.1.H. FIRE PROTECTION EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL A2/A11.1.J. COMMUNICATION EQUIPMENT WALL MOUNTING HEIGHTS, SEE DETAIL B6/A11.1.K. EQUIPMENT MOUNTING HEIGHTS AT COUNTERTOPS, SEE DETAIL A6/A11.1.L. EQUIPMENT MOUNTING HEIGHTS AT DESKTOPS, SEE DETAIL A5/A11.1.
A1 GENERAL NOTES TO PLANS
Architecturally Significant Equipment
CRYOSTAT, RESEARCH, FLOOR 73230 OFVICABINET, FLAMMABLE STORAGE, 60 GAL 73231 OFOICABINET, ACID STORAGE, 45 GAL 73232 OFOIINCUBATOR (N2) 73236 OFOIICEMAKER, DISPENSER, FLOOR, CHEWBLET, 400 LBS. CA 73237 OFCISTERALIZER, SCIENTIFIC, FREESTANDING 76218 OFVIREFRIGERATOR, FLOOR 80032 OFOIFREEZER, -20, UPRIGHT 80039 OFOICENTRIFUGE, REFRIGERATED, COUNTERTOP, MEDIUM 80041 OFOIREFRIGERATOR, CHROMATOGRAPHY, DOUBLE DRS, GLA 80049 OFOIINCUBATOR (NAPCO) 80051 OFOIFREEZER, -80, UPRIGHT (REVCO UFX) 80058 OFOIFREEZER, -80, UPRIGHT (REVCO ULTIMA II) 80059 OFOI
Architecturally Significant Equipment
FREEZER, UNDERCOUNTER, 4.9 CU FT, -30 C 71216 OFOIFREEZER, -20, UPRIGHT 71219X OFOICENTRIFUGE, REFRIGERATED, COUNTERTOP, SMALL 71221X OFOIHOOD, BIOLOGICAL, 4', NON VENTED 71760 OFOIINCUBATOR (CO2 AIRJACKET) 71880 OFOIMETRO SHELVING 72357 OFOICENTRIFUGE, REFRIGERATED, COUNTERTOP 72817 OFOIREFRIGERATOR, LAB, 20.3 CU FT, GENERAL PURPOSE 72891 OFOICENTRIFUGE, BENCH TOP, REFRIGERATED 72917 OFOICENTRIFUGE, ULTRA, FLOOR 73221 OFOIHOOD, FUME, 4' (WITH FLAMMABLE CABINET) 73223 OFOIINCUBATOR 73227 OFOIREFRIGERATOR 73229 OFOI
201 FIRE EXTINGUISHER AND CABINET. COORDINATE WITHFIRE RATING OF WALL. SEE DETAIL B5/A11.2.
214 SAFETY SHOWER.215 TELEPHONE.216 BLACKOUT CURTAIN.217 SOAP DISPENSER. OFCI.218 PAPER TOWEL DISPENSER. OFCI.220 VISUAL DISPLAY BOARD.221 CORNER GUARD.222 SUBSTITUTE FOR 90 MIN RATED DOOR. SEE SCHEDULE.229 H-ROOM - PURPOSE OF H-ROOM IS TO STORE
CHEMICALS THAT EXCEED THE ALLOWABLE AMOUNTSFOR THE CONTROL AREA ACCORDING TO TABLE 307.1.
230 EXISTING EXTERIOR WALL. TYPICAL.231 WINDOW SHADES.232 EXISTING 2-HR RATED PARTITION
A2 NOTES TO SHEETA5 REFERENCE PLAN
N
A6 PLAN LEGEND
C1848C1324C3130
6CB30
9' -
0"
DR-2
73229
SH3136
SH3136
911
912
SK-1
VW1360 VW1560
CT15-3060 B4030 B3324
VW1560
CT15-3060
SP1 SP2 SP1 SP2
DT18-3060DT18-3060
SH3160
SH3160
M1324 M1324
216
CT15-3072 B3324
VW1572
CT13-3060 CT15-3072 B4030
VW1572
CT15-3072 B3324
VW1572 VW1348
M1318DT15-3048EQUIPMENT
TACK BOARD
9' -
6"
9' -
0"
SP1 SP2 SP1 SP2 SP1 SP2
914
914 914
915
914
914 914
OPEN OPEN
SK-2
DR-2
VW1360
9' -
6"
912911
FC-1918
917
6CB30(2)
DAS1-3048 M131873227 71760
C3130
6CB30
C1318
SH3148
DR-2
73233
SK-1
913
C4236
CEILINGENCLOSURE
22D
918
911
917
912 FC-1
3CB30
C3130 C1330C1736
FC-1
SH3148
SH3148
SH3148
DT18-3048
DR-2
SK-1
71216
911
912
917
918O2N2
CO2N2
71760 71760 CAS1-3060 M3324
7322773236
71880
SH3148
SH3148
C1042C3142C1042
3CB30
DR-2
SK-3
FC-1
917 918
912
911
B4242 CAS1-3048 CAS1-3048
D
916
C1030
C3130
C1030C1030
3CB30
C3130
SH3136
SH3136
SK-1
SH3148
VW13 VW1372 VW1372
C1842 C3130B4030B3324 CT15-3072
VW1372
CT15-3072
6CB30
VWEC
F3836C3130
SK-2
6CB30(2)
D2
A11.2
Sim
DR-2
917
F
901
221
905915
919
215
221908
920
921
221605 922 922
2' - 3"
3' -
0"2'
- 10
"
9' -
0"
PROJECT NAME
PROJECT NUMBER
ISSUE
DATE
DRAWING TITLE
DRAWING NUMBER
2012 FKP Architects, Inc. All rights reserved. No part of this document may be reproduced or utilized in any form without prior written authorization of FKP Architects, Inc.©
A
B
C
D
E
6 5 4 3 2 1
|Houston Dallas
ARCHITECT OF RECORD
CYNTHIA WALSTON
03/13/14
8261.00
ELEVATIONS
A5.0
FEIGIN OB-GYNRESEARCH LAB
CONSTRUCTIONDOCUMENTS
3/13/14
1/2" = 1'-0"D6 1880.01 TISSUE CULTURE
1/2" = 1'-0"C5 WEST ELEVATION BENCHES 1/2" = 1'-0"C6 MICROSCOPY
1/2" = 1'-0"D3 TYPICAL LAB BENCH
1/2" = 1'-0"C3 SINK WEST SIDE
1/2" = 1'-0"D5 1880.01 TISSUE CULTURE 2
1/2" = 1'-0"B6 H ROOM
1/2" = 1'-0"A6 ANIMAL TISSUE
1/2" = 1'-0"B5 1880.03 TISSUE CULTURE 1/2" = 1'-0"B4 1880.03 TISSUE CULTURE 2
1/2" = 1'-0"A5 AUTOCLAVE ROOM
1/2" = 1'-0"B3 SHARED EQUIPMENT SPACE
1/2" = 1'-0"C2 COLD ROOM
1/2" = 1'-0"A4 HOT LAB
215 TELEPHONE.216 BLACKOUT CURTAIN.221 CORNER GUARD.605 SCHEDULED CEILING.901 SCHEDULED BASE.905 SCHEDULED CABINET.908 ELECTRICAL OUTLET. SEE ELECTRICAL.911 SOAP DISPENSER. OFCI.912 PAPER TOWEL DISPENSER. OFCI.913 WALL MOUNTED FIRE EXTINGUISHER.914 OPEN.915 TACK BOARD.916 EXISTING GLASS FAÇADE.917 EYE WASH AT SINK. SEE PLUMBING.918 DI FAUCET.919 MARKER BOARD.920 MARKER TRAY.921 MAP RAIL.922 PAINT, ACCENT COLOR. SEE FINISHES PLAN
FOR TYPE.
A1 NOTES TO SHEET
3/8" = 1'-0"B2 ELEVATION AT COLUMN
Colorado Children’s Executive Suite The program called for creating a space witihin the existing hospital that had a library, kitchen, lounge, conference space, and offices that could be used by the executives and physi-cians.
My responsibilities included work on sketch-up and revit mod-els through DD phase, producing elevations and helping with renders.
1. Elevations2. Render3. Prespective of Suite
2 1 3
1. Elevations2. Render3. Prespective of Suite
2 1 3
Interviews for future projects - The focus of this work was to earn the project through the interview phase.
My responsibilities included diagrams, schematic floor plans, boards for presentations, physical models, and 3d-printed models.
1. Site Forces Diagram2. Model 3. Model
2 1 3
Golisano Children’s Hospital of Southwest FloridaThe program of this project was the interior design of the new 7 story tower that connected to an existing hospital.
My responsibilities included elevations, ceiling plans, floor patterns, presentation boards for fundraising, and helping with finish material boards.
Level 3 – NICU Patient Corridor Elevation
Original Option
1. Corridor Elevation2. Floor Pattern3. Corridor Perspective
2 1 3
Level 2 – DD Floor Pattern
Level 5 Hemo-Oncology– Corridor Intersection
Kara [email protected](607) 229-9779
WK