Design Organisation ApprovalPrinciples & Airbus experience
Patrick LE GUIRRIEC Director Airbus - Design Organisation Approval (DOA) expertise
UAC International Seminar
Moscow 17th-18th MAY 2011
A contributor to Safety
Airbus experience
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Contents
General Principles of EASA DOA
Why a DOA?
What is a DOA?
When a DOA?
Airbus way of compliance
Conclusion
Page 3
INTRODUCTION TO EASA DOA (Design Organisation Approval)
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Organisational structure
Responsibilities
Procedures
Resources
Page 4
Approval of organisations...1
PART 21 DOA - GENERAL PRINCIPLES (1/2)
… not a delegation to individuals1
EASA Part-21 does not contain provision to delegate
actions to individuals.
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
NON EU DOA applicant and holders
AMERICA (2)
USA (1) Canada (1)
EUROPA (3)
Iceland (1)Turkey (2)
ASIA (5)
Japan (1) Singapore (2) United Arab Emirates (2)
Page 5
2Approvals delivered to any organisation,
regardless of its geographical location
PART 21 DOA - GENERAL PRINCIPLES (2/2)
In EU there is no Approval of Design Organisations
by National Aviation Authority
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Why a DOA?
WHY a DOA? (1/8)
Page 6
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
To establish a "qualified network"
for the various activities related to the
compliance demonstration with the
requirements applicable to the product
to be certified
To enable EASA to accept statements
from DOA holders, that the regulations
have been complied with.
Page 7
WHY a DOA? (2/8)
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
A DOA holder has an organisation with:
• Appropriate management,
• Clear allocation of responsibilities,
• Workable Procedures,
• Resources sufficient and qualified,
for the accomplishment of the activities defined in the scope of
DOA
And a DOA holder has a system that:
• Monitors the performance of the organisation
• Ensures that the need for effective corrective action is
identified and secured.
Page 8
Establish a Qualified network...WHY a DOA? (3/8)
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
“Certification of the Organisation”
The DOA brings the confidence that the design of a
product complies with the applicable requirements
based on:
“Certification of the design of the product”
AND
WHY a DOA? (7/8)
Page 11
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
DOA is a tool for
Aviation Authorities
and for
the Industry
to use so that they can deploy their
resources
in the most
effective and economic manner.
Page 12
WHY a DOA? (8/8)
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
WHAT is a DOA? (1/8) - Design Assurance System (DAS)
Page 13
INTRODUCED BY EASA DOA (2003)
Head of Design Organisation
Design function
Design tasks
& Designers
Chief of the
Office of Airworthiness
Certification
and
Airworthiness
tasks
Chief of the DOA
Independent monitoring
DOA management
and
Independent Monitoring
tasks
The Design Assurance tasks
Provide proof of
compliance
• Declare compliance
• Verify Compliance (CVE)
• Classify changes & repairs
• Approve o Minor changes
o Repairs
o Instructions for continued
airworth.
oFlight permit / condition
privileges
Design
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Resp
on
sib
ilities
(21A
.26
5)
A Design Assurance System (21A.239)
A Design Organisation Manual(21A.243)
Terms of Approval of DOA Certificate(21A.251 + 21A.263)
WHAT is a DOA? (2/8)
The RIGHT PEOPLE,
at the RIGHT PLACES,
with the RIGHT MEANS(21A.243 + 21A.245)
Page 14
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
• To maintain the DOM up to date (organisation, procedures, signatories)
• To use DOM as a basic working document
• To determine that design complies with applicable
requirements
• To submit statements of compliance
Page 19
ResponsibilitiesWHAT is a DOA? (8/8)
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Mandatory for organisations that
have to undertake:
• Type Certification (or restricted)
• Supplemental Type Certification
• Other formal processes to get
approval of design by EASA
Page 20
- Links with EASA as the Competent Authority
WHEN a DOA ?
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
I. List the DOA activities per family
II. Establish a roadmap per DOA
family
III. List the tasks of each DOA roadmap
IV. Sequence the DOA steps
V. Measure maturity of DOA tasks
VI. Verify DOA tasks are effective
VII. Ensure DOA monitoring of
deliverables
Page 21
Airbus way of compliance - Manage the DOA as a project
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Airbus way of compliance - Establish DOA Roadmaps
1. Program / Design organization (H. Fricke BYM - C. Thomas)
2. DOA critical steps (T. Martens BSMI - I. Bevziuk)
3. Design worksharing Document (A. Pelletier BYO - V. Hiebel)
4. Configuration Management (P. Raynal BYO - A. Corjon)
5. DOA Capability for delegation (J.-B. Estadieu EDS - A. Tropis)
6. DOA Procedures (A. Schmidt BYO - U. Silinski)
7. DOA tools (F. Ros BYO – U. Silinski)
8. DOA Deliverables (J.-B. Estadieu EDS - A. Tropis)
9. Control of DOA suppliers (R. Jeske BSEY - V. Hiebel)
10. DO - PO arrangements (L. Lageyre BYO - I. Bevziuk)
11. DO - MO arrangements for flight tests (C. Bohlen BSEM - V. Hiebel)
12. DOA Tests (J. Meister BSEY - V. Hiebel)
13. Design Organisation Manual (T. Özgül EQON – P. Le Guirriec)
14. DOIDs (interface document with supplier) (T. Özgül EQOE P. Le Guirriec)
3201 PtoF DOA maturity – DOA Roadmaps status 09MAY11
y Page 22
14 DOA roadmaps are created to bring visibility and show the DOA maturity status
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Report to E 09JUN10
A3201 PtoF DOA maturity – DOA Roadmaps 09MAY Page 23
Airbus way of compliance - Document the DOA Tasks
Steps Target Date Status
Establish workplan (below) 09MAY11
Establish list of suppliers needing a DO-PO
arrangement12 MAY11
See roadmap 9.
List provided 14APR11 (Aerostructure 19
Equipment 11)
Establish DO-PO applicable procedure 30JUN11See roadmap 6
(ref. SA PtoF001)
Establish DO-PO arrangement with Irkut-Irkutsk
(brackets)15APR11
Irkutsk used as pilot (arrangement signed
15APR11)
Establish DO-PO arrangement with EFW
(floor panel)TBD
Clarify floor panel manufacturing link with Irkut
(contract?) and route of design data
Establish arrangement with each relevant supplier
(Note: just after contract signature)
On a case by
case basis
(about 29, Irkut done)
Visibility through indicators
Verify DO-PO process in place and effective at a
supplier 1 (Mecachrome)31DEC11 Visibility through indicators
Verify DO-PO process in place and effective at a
supplier 2 (SICAMB) 31DEC11 Visibility through indicators
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Page 24
Airbus way of compliance - Document the DOA critical steps
Steps Target Date Status of maturity
DOA application to EASA
Major mod application to EASA
Design Organisation Manual
SEP09
16OCT06
30JUN11
List of design and certification Procedures
List of DOA deliverable
31MAY11
31MAY11
First Manufacturing drawings to be signed by
Airbus, EFW and Irkut
DO-PO with manufacturing suppliers
First Concessions at EFW and Irkut and to their
manufacturing suppliers
30JUN11
-
21DEC11
30NOV11
-
Specification issued by EFW and Irkut and to their
design suppliers
Tests (aerostructure and system at Airbus, EFW
and Irkut – including suppliers))
30APR11
-
31MAY11
-
Certification basis
Certification programme
First compliance document to be signed by EFW
and Irkut approver
31AUG11
31AUG11
TBD
-
EFW and Irkut DOIDs
Airbus Design OM
EASA investigation for extension
21DEC11
21DEC11
JUN11
DOA certificate of extension
First flight
Approval of the Major modification
21DEC11
03AUG12
26NOV12
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
DOA ASSESSMENT
MEASURE
DOA
MATURITY
DOA ROADMAPS
Page 25
Airbus way of compliance - Measure DOA maturity
DOA RoadmapsAssign
ment
Sheet
signed
Deliverabl
es / tasks
known
Workplan
availableMaturity
Target
Assess
ment
plans
issued
Asses
sment
starte
d
Asses
sment
on
time
Asses
sment
close
d
Assessment
Target
1. Program / Design organizationH. FRICKE
YES YES YES JUN11 NO NO NO NO DEC11
2. Program milestones T. MARTENS YES pending YES JUN11 NO NO NO NO DEC11
3. Work sharing Report 6/WADA. PELLETIER
YES YES YES JUN11 NO NO NO NO DEC11
4. Configuration ManagementP. RAYNAL
YES YES YES JUN11 NO NO NO NO DEC11
5. Capability Assessment for
Delegation JB. ESTADIEUYES pending NO JUN11 NO NO NO NO DEC11
6. DOA Procedures A. SCHMIDT YES YES YES JUN11 NO NO NO NO DEC11
7. DOA Tools F. ROS YES YES YES JUN11 NO NO NO NO DEC11
8. DOA Deliverables (DTLL)JB. ESTADIEU
YES pending NO JUN11 NO NO NO NO DEC11
9. Control of DOA SuppliersR. JESKE
YESYES YES JUN11 NO NO NO NO DEC11
10. DO-PO Arrangement L. LAGEYRE YES YES YES JUN11 NO NO NO NO DEC11
11. DO-MO arrangement – A/C tests C. BOHLEN
YES NO NO JUN11 NO NO NO NO DEC11
12. DOA Tests J. MEISTER YES YES YES JUN11 NO NO NO NO DEC11
13. DOM T. ÖZGÜL YES YES YES JUN11 NO NO NO NO DEC11
14. DOIDs T. ÖZGÜL YES YES YES JUN11 NO NO NO NO DEC11
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
CONCLUSION
Page 26
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
DOA is contributing to safety of design
DOA is an approval of a “design organisation”
DOA allows establishment of a qualified network
DOA “sets the scene” for product certification related activities
DOA moves from individual certification task review to design assurance
system review
DOA is the right people at the right place with the right means
DOA enables the EASA to accept statements of compliance
DOA is a tool for Aviation Authorities and for the Industry to deploy their
resources in the most effective and economic manner
DOA is managed at Airbus as a project
DOA is used at Airbus as a « management tool » enabling the
establishment of an optimised organisation while securing safe aircraft
design.
Page 27
Conclusion
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. Month 200X Use Tab 'Insert - Header & Footer' for Presntation Title - Siglum - Reference Page 28
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by the
delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be
used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting
grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.
AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.