Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

Embed Size (px)

Citation preview

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    1/36

    1

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Design of Temporary Excavation

    and Lateral Support System

    for the DSD Sheung Wan

    Stormwater Pumping Station

    By Eric Li - GCG (Asia)

    Presented to the HKIE Geotechnical Division

    18th June 2008

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Sheung Wan StormwaterPumping Station (SWSPS)

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    2/36

    2

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Project Set Up

    DSD Contract DC/2006/10

    Contract Sum : HK$ 78 million (approx)

    Designer : Drainage Services Department

    (with GEO as in-house geotechnical consultant)

    Site Supervision : DSD Drainage Project Division

    (with the engagement of an IGE)

    Contractor : China National Chemical Engineering Group

    ELS Designer : Geotechnical Consultant Group (Asia) Ltd.

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    43m

    57m

    Pile Cap Layout Plan

    ~ -5.9mPD

    ~ -7.1mPD

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    3/36

    3

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    43m

    Retaining Wall

    Pile Cap / Base Slab

    Typical North-South Section

    ~ +4.0mPD

    ~ -5.9mPD~ -7.1mPD

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Selection of Retaining Wall Type

    Wall Types Considered:

    Diaphragm Wall

    Bored Pile Wall

    Pipe Pile Wall

    Sheet Pile Wall No wall (open cut)

    Design Objectives:

    Approximate max. 10m deep excavation

    Effective control of settlement due to excavationand groundwater drawdown

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    4/36

    4

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Reclamation and Seawall Dredging Plan

    Approx. Location of Site

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Typical Cross Section

    Vertical Seawall (Indicative)Approx. Extent of SWSPS

    Victoria Harbour

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    5/36

    5

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Pre-Contract Borehole Location Plan

    Pre-Contract Ground investigation

    2 series in 2002 & 2006 (32 holes) Common sampling, field and laboratory tests In situ vane & pressuremeter tests

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    North-South Geological Section

    Sand Fill

    Rock Fill

    CDG

    Marine Deposits

    Alluvium

    Fill

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    6/36

    6

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    East-West Geological Section(away from Seawall)

    Marine Deposits

    Fill

    CDG

    Alluvium

    Existing SaltWater PS

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Isopach of Soft Marine Clays

    Seawall Cope Line

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    7/36

    7

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Seawall Cope Line

    Small sink hole at sea wall

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    5m3 sink hole

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    8/36

    8

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    15m3 sink hole

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    -0.300

    -0.200

    -0.100

    0.00021/8/06

    31/8/06

    10/9/06

    20/9/06

    30/9/06

    10/10/06

    Se

    ttlemen

    t(m

    )

    SS1

    SS2

    SS3

    SS4

    Settlement near Seawall-0.300

    -0.200

    -0.100

    0.00021/8/06

    31/8/06

    10/9/06

    20/9/06

    30/9/06

    10/10/06

    Se

    ttlemen

    t(m)

    GS20

    GS21

    GS24

    GS25

    SS Markers on Seawall

    GS Markers on Ground Adjacent to Seawall

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    9/36

    9

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Design Considerations Reclamation Site

    Sensitive Structures nearby, i.e. WSD Pumping Station

    High water table, i.e. 1.2m below existing ground level

    (+3.0mPD)

    Presence of thick layer of variable FILL

    & soft MARINE DEPOSITS

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Design Methodology

    Drained and Undrained Conditions

    Lateral Stability

    Global Slope Stability

    Base Stability

    Hydraulic Stability

    Dewatering

    Ground Deformation / Settlement

    Structural Capacities

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    10/36

    10

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Plot of SPT-N against Elevation

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Plot of Undrained Shear Strength (Cu) against Elevation

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    11/36

    11

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Adopted Shoring Layout Plan

    FSP IV Sheet PileWalings & Struts(3 levels)

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Longitudinal Cross Section further from Seawall

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    12/36

    12

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Longitudinal Cross Section nearest Seawall

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Transverse Cross Section

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    13/36

    13

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Elevation of Wall D(Showing Grouting Ground Improvement)

    Penetration(T.A.M.) Grout Jet Grout

    Sheetpile(not shown for clarity)

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Fill

    Marine DepositAlluvium

    CDG

    EastWestCulvert

    Grout A

    Grout B

    Finite Element Analysis(East-West Section)

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    14/36

    14

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Wall Deflection (East-West Section)

    East WallWest Wall

    max = 60mm

    max = 115mm

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Ground Settlement (East-West Section)

    West WallEast Wall

    max = 18mm

    max = 82mm

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    15/36

    15

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Wall Deflection (North-South Section)

    South Wall North Wall

    max = 102mm

    max = 88mm

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Ground Settlement (North-South Section)

    North WallSouth Wall

    max = 53mm

    max = 75mm

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    16/36

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    17/36

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    18/36

    18

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Settlement against Time

    -0.350

    -0.300

    -0.250

    -0.200

    -0.150

    -0.100

    -0.050

    0.000

    0.050

    01-Aug-06

    01-Sep-06

    01-Oct-06

    01-Nov-06

    01-Dec-06

    01-Jan-07

    01-Feb-07

    01-Mar-07

    01-Apr-07

    01-May-07

    01-Jun-07

    01-Jul-07

    01-Aug-07

    01-Sep-07

    01-Oct-07

    01-Nov-07

    01-Dec-07

    01-Jan-08

    Date

    Settlement(m)

    SS3 SS2 SS1 SS4

    Settlement against Time

    -0.600

    -0.500

    -0.400

    -0.300

    -0.200

    -0.100

    0.000

    01-Aug-06

    01-Sep-06

    01-Oct-06

    01-Nov-06

    01-Dec-06

    01-Jan-07

    01-Feb-07

    01-Mar-07

    01-Apr-07

    01-May-07

    01-Jun-07

    01-Jul-07

    01-Aug-07

    01-Sep-07

    01-Oct-07

    01-Nov-07

    01-Dec-07

    01-Jan-08

    Date

    Settlement(m)

    GS23 GS24 GS20

    Ground Settlement Time Plot behind North Wall (Seawall)

    SS Markers on Seawall

    GS Markers on Ground Adjacent to Seawall

    ExcavationH-Piling, Sheetpiling, Ground Improvement Grouting

    Pile Cap

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Settlement against Time

    -0.500

    -0.450

    -0.400

    -0.350

    -0.300

    -0.250

    -0.200

    -0.150

    -0.100

    -0.050

    0.000

    01-Aug-0

    6

    01-Sep-0

    6

    01-Oc

    t-06

    01-Nov-0

    6

    01-Dec-0

    6

    01-Jan-0

    7

    01-Fe

    b-0

    7

    01-Mar-

    07

    01-Apr-

    07

    01-May-0

    7

    01-Jun-0

    7

    01-Ju

    l-07

    01-Aug-0

    7

    01-Sep-0

    7

    01-Oc

    t-07

    01-Nov-0

    7

    01-Dec-0

    7

    01-Jan-0

    8

    Date

    Se

    ttlemen

    t(m)

    GS31 GS34 GS28

    Ground Settlement Time Plot behind East Wall

    Excavation

    H-Piling, Sheetpiling, Ground Improvement Grouting

    Pile Cap

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    19/36

    19

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Ground Deformation behind East Wall(due to excavation only)

    GS28 (6.2m) GS31 (9.6m) GS34 (15.6m)

    Inclinometer IN2 (1m)

    Predicted max = 115mm

    Predicted max = 82mm

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Settlement against Time

    -0.070

    -0.060

    -0.050

    -0.040

    -0.030

    -0.020

    -0.010

    0.000

    0.010

    01-Aug-0

    6

    15-Aug-0

    6

    29-Aug-0

    6

    12-

    Sep-

    06

    26-

    Sep-

    06

    10-Oc

    t-06

    24-Oc

    t-06

    07-

    Nov-0

    6

    21-

    Nov-0

    6

    05-

    Dec-0

    6

    19-

    Dec-0

    6

    02-Jan-0

    7

    16-Jan-0

    7

    30-Jan-0

    7

    13-Fe

    b-0

    7

    27-Fe

    b-0

    7

    13-Mar-

    07

    27-Mar-

    07

    10-Apr-

    07

    24-Apr-

    07

    08-May-0

    7

    22-May-0

    7

    05-Jun-0

    7

    19-Jun-0

    7

    03-Ju

    l-07

    17-Ju

    l-07

    31-Ju

    l-07

    14-Aug-0

    7

    28-Aug-0

    7

    11-

    Sep-

    07

    25-

    Sep-

    07

    09-Oc

    t-07

    23-Oc

    t-07

    06-

    Nov-0

    7

    20-

    Nov-0

    7

    04-

    Dec-0

    7

    18-

    Dec-0

    7

    01-Jan-0

    8

    Date

    Se

    ttlemen

    t(m

    )

    SS13 SS9 SS10 SS14

    Ground Settlement Time Plot behind West Wall

    Predicted max = 18mm

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    20/36

    20

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    -18.0

    -16.0

    -14.0

    -12.0

    -10.0

    -8.0

    -6.0

    -4.0

    -2.0

    0.0

    2.0

    4.0

    0 5 10 15Displacement (mm)

    Eleva

    tion

    (mPD)

    "+" toward excavation

    Ground Deformation behind West Wall(due to excavation only)

    Inclinometer IN5 (1m)

    Predicted max = 60mm

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Jet grouting

    Jet grout cuts insitu soft clay and mixes that withinjected cement

    Disturbed clay is displaced to surface in slurryform

    Jet nozzle is typically 1.4mm to 3mm dia.

    Applicable to more cohesive soils where T.A.M.grouting may not work

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    21/36

    21

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Typical Set up of Jet Grouting

    (Double Tube Method)

    Temporary casing fordrilling through fill.Withdrawn prior to jetting.(optional)

    Jet Grout Zone

    Soil Overburden

    PVC tubing to assist spoilreturn. (optional)

    Ref. : CNCEC

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    1. Set up rig 2. Drill to toe level 3. Test jetting

    6. Jet grout completed.Withdraw grout string

    5. Simultaneously withdrawal androtation of grout string to next level4. Commence Jetting

    Sequence of Jet GroutingRef. : CNCEC

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    22/36

    22

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Jet grout parameters Jet grout parameters adopted at SWSPS

    Target grouted dia. = 1500 2000 mm

    Grout pressure = 300 400 bars

    Air pressure = 8 - 12 bars

    Withdraw rate = 13 to 15 min/m

    Rotation rate = 6 7 rev/step

    Target strength & stiffnessUCS = 600 kPa

    Elastic modulus = 150 MPa

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    23/36

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    24/36

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    25/36

    25

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Hole S2Hole S5

    Jet Grout Core Sample

    (UCS: typically 7-10 MPa, sometimes >40 MPa)

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    T.A.M. Grout Core Sample

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    26/36

    26

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    T.A.M. Grout Core Sample

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Sheetpiling (by push-in method)

    Suitable in area where vibration is undesirable

    With limited penetration depth

    Difficult to overcome obstruction

    Tend to be more costly

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    27/36

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    28/36

    28

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Augering to assist penetration

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    29/36

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    30/36

    30

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Alignment out-of-line whenencountering obstructions

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Groundwater leaking throughretaining wall

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    31/36

    31

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Excavation in progress

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Disposal by barge

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    32/36

    32

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Installing waling and strut

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Excavation completed

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    33/36

    33

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Concreting in progress

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Concreting in progress(3 concrete pumps & 13 concrete trucks)

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    34/36

    34

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Foundation Completed

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Ref. : DSD

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    35/36

    35

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Before Commencement After Completion

    Ref. : DSD

    Asia HKIE Technical Talk ELS Design for SWSPS 18 June 2008

    Summary

    Issues to be considered in ELS design

    Site history

    Site characterization

    Design parameters (drained or undrained)

    Design objective and constraints

    Retaining wall installation effects

    Economy and construction programme

  • 8/10/2019 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

    36/36