1
Design of Offshore Platforms
Lecture 1
Introduction1
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 2/67
2
Outline
Introducing myself
Course objectives
Course syllabus
Course application
Class policies
Reference books
2
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 3/67
3
Introducing myself
PhD, The Universityof Texas at Austin
Research interests:
OffshoreEngineering
MarineHydrodynamics
SedimentTransport
Renewable Energy
FPSO
3
FPSO
FPSO
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 4/67
4
Offshore Engineering
Simulation of Platforms/Risers/Pipelines
4
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 5/67
5
Renewable energy5
Danish west coast
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 6/67
6
Class time
Class times: Mondays, 6:00-7:30 pm
TA Class times: Tuesdays, 6:00-7:30 pm
6
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 7/67
7
Course objective:
Introduces the student to
loading,
behavior,
analysis and
design of offshore platforms
7
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 8/67
8
Description:8
This is intended as an advanced course in the
Marine Structures area.
It is assumed that the students have the basic
knowledge of the structural analysis,
marine hydrodynamics and
steel structures design The course focuses on design of fixed platforms and
it only introduces the floating platforms.
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 9/67
9
Course Evaluation:9
Term Project/Homeworks: 40%
Final Exam: 60%
Pop-up quizzes/ 5 Min. Presentation : Extra scores
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 10/67
10
Class policies10
Original homework/project must be submitted by
each student.
The assignment will be graded for solution
procedure, numerical results, clarity and appearance.
Late assignments will not be accepted.
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 11/67
11
Course Outline:11
تی
س ار ص رم و چخر مدم
رد يوس عاوا شآ
و
گژو
درم
رري
... و يز تث يوس رم-وش يوس رم
ز
ثت
سوي
ز تث يوس مر ازا
ز
ثت
سوي
سسمي
رم
دسا دراوم و يز تث يوس بم و ازم
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 12/67
12
Course Outline:12
س
برگذاري
فرع
ث ير:دز و هدرم ير
درم ير:آ نشم يدرم يور وزن مشن آت
ش و يور غرات رارت ش از مرد مشن آت
مط
ري
:م
رارت
غرات
رن
مد
و
زر
موج
د
وضوم رس:
Marine Growth, Vortex Shedding, Wave Slamming
ص نمز يراذگر
ژو
ا:ري
ش
رخورد
زز
ارط ير بر
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 13/67
13
Course Outline:13
س وآنلیز
حارط
و
س يزآ رم و م
ارط لوادم ي م نآ رم
(API-RP2A – Noble Denton-DNV)
رر نمز رد زآ
:Inplace
ص
زمن
آزي
: Loadout, Tow, Lift, Launch, Floatation & Upending
ژو
ري
ت
:آز
Fire, Dynamic Loading, Earthquake, Boat Impact, Explosion
ا
و
اصت
ارط
و
:(Tubular Joints)آز
سخ
آز
:(Wind & Wave Fatigue)مخ
روشي
و
ط
...مش ارط و زآ
((Pile Design
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 14/67
14
Course Outline:14
حس
فرا
ي
سزه
حارط
و
آنلیز
افزاري
نرم
ب
ینشآ
ونش يو س
رف
– درر
– ارط
روشی
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 15/67
15
Main References:15
Useful websites: http://www.fgg.uni-lj.si/~/pmoze/esdep/master/wg15a/toc.htm
www.offshore-mag.com
زن
دكر
مر
ثت
سكوي
اراي
و
ارط
دا
رد يوكس يارا و حرط م دشوخ کمس
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 16/67
16
Other References:16
قدص
ر
رد
ی
سزه
و
در
سوال
سدم
ی هزسس رد
لگ مری رد ی هزسشا
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 17/67
17
Other Reference:17
S. K. Chakrabarti, 2005. HANDBOOK OF OFFSHORE ENGINEERING, ELSEVIER.
B. C. Gerwick, 2007. Construction of Marine and offshore structures, CRC press.
Ivar Holand, Ove T.Gudmestad and Erik Jersin, 2000. Design of Offshore ConcreteStructures, Spon press.
Patel, Minoo H., 1989. Dynamics of Offshore Structures, Butterwork & Co. Ltd.
S. K. Chakrabarti, 1987. Hydrodynamics of Offshore Structures, Springer. Dawson, Thomas H., 1983. Offshore Structural Engineering, Prentice-Hall Inc.
Hsu, Teng H., 1984. Applied Offshore Structural Engineering, Gulf PublishingCompany.
Robert T. Hudspeth, 2006. WAVES AND WAVE FORCES ON COASTAL ANDOCEAN STRUCTURES, World Scientific Publishing Co.
John B. Herbich, 1999. DEVELOPMENTS IN OFFSHORE ENGINEERING, GulfPublishing Company.
James F. Wilson, 2003. Dynamics of Offshore Structures, John Wiley & Sons, Inc.
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 18/67
18
Progress to deep water
offshore drilling and production of petroleum
resources:
Steady progress to deep water1947-1998
Water depth: 6 m to more than 500 m
18
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 19/67
19
Design for waves loads
platforms are designed for wave heights up to the order
of 25 meters
19
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 20/67
20
Cost
Expensive Structures
20
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 21/67
21
Platform Failure
It requires a good estimate of environmental forces
(wave, wind, current, …) to avoid failure.
21
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 22/67
22
1ST Lecture Objective
identify the basic vocabulary
introduce the major concepts for offshore platform
structures
explain where the basic structural requirements fordesign are generated
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 23/67
23
Outline
Definition
Application
Importance
basic steps in the development process
major structural concepts
Fixed
Floating
major codes
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 24/67
24
Definition
Offshore Platform: a structure in the sea that does
not have direct access to the land
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 25/67
25
Application of offshore platforms
Oil and gas industry
Geotechnical surveys
Offshore wind turbines
Military purpose
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 26/67
26
Importance for Iran
Ranking of Oil/Gas recoverable reserves
155
1166
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 27/67
27
Importance for Iran
Most of Iran’scommon
reservoirs are
offshore
Foroozan
(common with
Saudi)
Arash (commonwith Kuwait)
South Pars
(common with
Qatar)
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 28/67
28
Ranking of Oil Companies
1. Saudi Armco
2. NIOC
3. Exxon Mobile
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 29/67
29
COST ASPECTS
The economic feasibility of an offshore project depends onmany aspects:
capital expenditure (CAPEX),
operational expenditure (OPEX)
tax royalties
In a typical offshore field development the CAPEX isdivided to:
1/3 on the platform 1/3 on the drilling of wells
1/3 on the pipelines
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 30/67
30
OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD
Factors involved in the evaluation
number of wells required
fixed or floated production facilities
pipeline or tanker off-loading
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 31/67
31
OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD
main technical activities prior to production:
engineering and design
fabrication and installation
drilling of production wells providing the off loading system
Pipelines
Tankers
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 32/67
32
Offshore Platforms
Includes
Superstructure:
supports the equipments
Substructure:withstand weight of
superstructure + Env. Loads
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 33/67
33
Superstructure
design depends on
capacity of production
type of reservoir
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 34/67
34
Substructure
design depends on
Weight of superstructure
Environment
water depth at location soil, at sea-bottom and in-depth
wind speed, air temperature
waves, tide and storm surge, current
ice
earthquakes
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 35/67
35
Hydrocarbon Superstructures functions
Reservoir drilling
Oil/gas production
Oil/gas storage
Personnel accommodation
Flare
Support bridges
A combinations of above functions
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 36/67
36
2. Major structural concepts
Fixed
Jacket
Compliant tower
GCS TLP
Floating
FPSO Spar
Semi-submersible
Fixed/Floating: Jack-ups
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 37/67
37
Water depth definition
h<1300 ft Shallow water
1300 ft<h<5000 ft Deep water
h>5000 ft Ultra-deep water
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 38/67
38
Platforms types versus water depth
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 39/67
39
Fixed Platforms
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 40/67
40
Jackets
majority of platforms are piled-jacket all built in
steel
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 41/67
41
Gravity concrete structure (GCS)
North Sea
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 42/67
42
Compliant Towers
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 43/67
43
TLP 43
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 44/67
44
Floating Platforms44
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 45/67
45
Semi-submersible 45
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 46/67
46
Anchorage via 8 cable chain system
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 47/67
47
47
•Anchorage via 8 cable-chain system•Platform weight: 14000 ton
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 48/67
48
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 49/67
49
FPSO
Goodfor PG,WA,
Brazil,Asia
OFFLOADING
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 50/67
50
OFFLOADING
FLOATING HOSE REEL 50
FPSO
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 51/67
51
Spar51
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 52/67
52
World's deepest platform
Perdido Spar in the Gulf of Mexico
water depth of 2,450 m (8,000 feet)
weigh around 55,000 tonnes
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 53/67
53
Transportation of Perdido
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 54/67
54
Jack-up Platforms
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 55/67
55
Construction
These factors combined with the size and weight of
the items, require that a designer must carefully
consider all construction activities between shop
fabrication and offshore installation.
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 56/67
56
Codes
API-RP2A: worldwide leading structural code for
jacket platforms
Lloyds rules
DnV rules
9-300اران
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 57/67
57
Certification and Warranty Survey
Government authorities require that recognized
bodies appraise the aspects of structural integrity
and issue a certificate
Insurance companies covering transport andinstallation require the structures to be reviewed by
warranty surveyors before acceptance
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 58/67
58
Certification and Warranty Survey
major certification bodies are:
Det norske Veritas (DnV)
Lloyds Register of Shipping (LRS)
American Bureau of Shipping (ABS)Bureau Veritas (BV)
Germanischer Lloyd (GL)
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 59/67
59
OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD
initial phases which include
seismic field surveying
one or more exploration wells are drilled (Jack-up
drilling rigs are used for this purpose for water depthsup to 100 - 120 m; for deeper water floating rigs are
used)
results are studied and the economics and risks of
different development plans are evaluated
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 60/67
60
OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD
Factors involved in the evaluation may include
number of wells required
fixed or floated production facilities
number of such facilities pipeline or tanker off-loading
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 61/67
61
OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD
As soon as exploitation is decided and approved,
there are four main technical activities, prior to
production:
engineering and design fabrication and installation of the production facility
drilling of production wells, taking 1 - 3 months/well
providing the off loading system (pipelines, tankers,
etc.)
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 62/67
62
Jacket Based Platform for Shallow Water
First the jacket is installed. The wells are then drilled
by a jack-up drilling unit standing close by with a
cantilever rig extending over the jacket
Design and construction of the topside areprogressed parallel to the drilling, allowing
production to start soon after deck installation
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 63/67
63
CANTILEVER
UPPER PACK
LOWER PACK
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 64/67
64
Jacket and Gravity Based Platform for Deep Water
The wells are drilled
from a drilling rig on
the permanent
platform Drilling starts after
the platform is built
and completely
installed
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 65/67
65
Jacket and Gravity Based Platform for Deep Water
Consequently production starts between one and
two years after platform installation
In recent years pre-drilled wells have been used to
allow an earlier start of the production
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 66/67
66
1st Lecture Summary
Class Policies/Syllabus/References
Definitions/ structural concepts
Basic steps in development process
A
7/23/2019 Design of Offshore Platforms
http://slidepdf.com/reader/full/design-of-offshore-platforms 67/67
67
Assignment
Read Section 1 to 3 of
wg15a/l0100.htm#SEC_1