DESIGN OF ENERGY FACILITIES

Moscow, 2013

Page 2: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Inter RAO - Engineering is the engineering asset of Inter RAO Group

A leading engineering service provider focused on construction and rehabilitation of energy facilities in Russia and worldwide

10 successful projects (new construction and rehabilitation) with 2.7 GW of combined capacity

Current portfolio: 10 projects with combined capacity of 3,5 GW A team of 500 highly skilled professionals

2

Page 3: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

BOT/BOO project organization

Sales of core and auxiliary

equipment

Decommissioning of legacy equipment

Start-up and adjustment of new

facilities

Integrated offer based on 6FA gas

turbines

Owner's Engineering

Design of energy facilities

EPC/EPCM project management

Our Services

3

Page 4: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

12

3

6 7

18

14 13

11

5 10

2

1

9

15

8 4

16

17 19

Project Geography

10 completed projects with

combined capacity of 2.7 GW

10 projects in progress with combined

capacity of 3,5 GW

1. Sochinskaya TPP, 80 MW, 2009

2. Kaliningradskaya TPP-2, 450 MW, 2011

3. Urengoyskaya TPP, 491 MW, 2012

4. Kharanorskaya TPP, 225 MW, 2012

5. Ivanovskiye CPP, 325 MW, 2012

6. Tomskaya TPP-1, 15 MW, 2012

7. Omskaya TPP-3, 85 MW, 2013

8. Gusinoozyorskaya TPP, 210 MW, 2013

9. Dzhubginskaya TPP, 180 MW, 2013

10. Cherepetskaya TPP, 450 MW, 2013-2014

11. Yuzhnouralskaya TPP-2, 850 MW, 2013-2014

12. Nizhnevartovskaya TPP, 400 MW, 2014

13. Verkhnetagilskaya TPP, 420 MW, 2015

14. Permskaya TPP, 800 MW, 2015

Tajikistan 15. Sangtuda HPP-1, 670 MW, 2009

Venezuela 16. Delivery of gas turbines with combined rating of 423.8 MW for BARIVEN S.A., 2015

Ecuador 17. Toachi Pilaton Hydro Project, 252 MW, 2015

Kazakhstan 18. Ekibastuzskaya TPP-2, 636 MW, 2015

Ecuador 19. Termogas Machala TPP, 170 MW, 2016

Projects in Progress

Completed Projects

International projects

Russian projects

4

Page 5: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Design of energy facilities

Today, this subsidiary has more than 40 professionals with many years of experience in design of energy facilities in Russia and other countries

The company offers a full range of services in design and development of thermal power generation, including general designer services:

Feasibility studies, design of concepts, system solutions and decisions on the core equipment of a

power plant based on the analysis of customer's technical requirements.

Design of projects (P Stage) and project documentation.

Development of working documents (design based on 3D model, development of project and

cost documentation, relaying of specific project activities on individual buildings and constructions

to local subcontractors).

Supervision of construction activities.

Development of standardized projects to reduce project costs and timeframes, improve financials

and minimize pre-investment workload and costs.

Participation in coordination of principal technical solutions, design timeframe analysis and

monitoring, and acceptance of project documentation designed by external project organizations.

In 2012, LLC Inter RAO — Engineering served as the base for the new project management division, Teploenergoproekt

5

Page 6: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Our Advantage

Highly skilled team with many years of experience and unique expertise in design of energy facilities in Russia and other countries.

The reference list of our employees includes more than 40 energy design and construction projects. These include joint projects with the leading international partners such as ABB, Alstom Power, Siemens, GE Energy.

Stable partnerships with large energy project organizations in Russia.

One-of-a-kind completed project database helping to quickly find the best project solutions.

Modern design technologies including 3D modeling systems.

Ideal timeframes and costs.

6

Page 7: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

References (1)

№ Country Project General designer Number of generation

units and capacity

1 Iran Working documents of Ramin TPP, units 5 and 6. JSC Zarubezhenergoproekt 2 х 300 MW

2 Russia

Development of working documents for Mutnovskaya GTPP. JSC Zarubezhenergoproekt 2 х 25 MW

3 Libya

Development of technical proposal and conceptual solutions for West Tripoli

TPP. JSC Zarubezhenergoproekt 2 х 325 MW

4 Hungary

Development of working documents for Geller TPP, PGU-240. JSC Zarubezhenergoproekt 1 х 240 MW

5 India

Development of working documents for Barh TPP. Boiler Island. JSC Zarubezhenergoproekt 3 х 660 MW

6 India

Development of working documents for Sipat TPP. Turbine Island. JSC Zarubezhenergoproekt 3 х 660 MW

7 Iraq

Development of working documents for Harta TPP. Replacement of boilers. JSC Zarubezhenergoproekt 2 х 210 MW

8 Greece

Development of working documents for Meliti-Ahlada TPP. Turbine Island. JSC Zarubezhenergoproekt 1 х 330 MW

List of facilities designed with the help of employees of Teploenergoproekt, the Ivanovo branch of LLC Inter RAO — Engineering

7

Page 8: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

№ Country Project General designer

Number

of generation units

and capacity

9 Russia Rehabilitation of Krasnodarskaya TPP. JSC Е4 – SibCOTES 1 х 410 MW

10 Russia

Technical support and adaptation of Unit 8 construction project

(PGU-420, TPP-26, a subsidiary of JSC Mosenergo) to Russian

standards, rules and regulations.

JSC Mosenergoproekt 1 х 420 MW

11 Russia

Technical proposal for turnkey construction of Unit 9 at

Novocherkasskaya TPP.

LLC EMAlliance –

Teploenergoproekt 1 х 330 MW

12

Bosnia and

Herzegovina

Serbia

Technical proposal for turnkey construction of 330 MW Stanari TPP. LLC EMAlliance –

Teploenergoproekt 1 х 330 MW

13 Russia

Technical proposal for turnkey construction of 50 MW GTU-TPP at

Sinarsky Pipe Works.

LLC EMAlliance –

Teploenergoproekt 2 х 25 MW

14

Bosnia and

Herzegovina

Serbia

Technical component of 350 MW Stanari TPP contract. LLC EMAlliance –

Teploenergoproekt

1 х 350 MW

15 Russia Tender documentation for the bid for PGU-470 construction for

Khabarovskaya TPP.

LLC EMAlliance –

Teploenergoproekt 1 х 470 MW

References (2)

8

Page 9: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

№ Country Project General designer

Number

of generation units

and capacity

16 Iran Technical proposal for the boiler island of two 325 MW units for

Tabas TPP.

LLC EMAlliance –

Teploenergoproekt 2 х 325 MW

17 Venezuela Technical proposal for the construction of TPP. LLC EMAlliance –

Teploenergoproekt

1 х 300 MW

(1 boiler +1 steam

turbine)

18 Russia Development of core equipment source data for the construction of

90 MW PGU at Omskaya TPP-3 for the general designer. JSC Е4 –SibCOTES

1 х 90 MW

(2 gas turbines + 2

boilers + 1 steam turbine)

19 Russia Working documents for the construction of Unit 8, PGU-420, TPP-26,

a subsidiary of JSC Mosenergo.

LLC EMAlliance –

Teploenergoproekt

1 х 420 MW

(1 gas turbine + 1 boiler

+ 1 steam turbine)

20 Ukraine Development of working documents for the reconstruction of boiler 1

at Zaporiska DRES.

LLC EMAlliance –

Teploenergoproekt

1 х 300 MW

(1 boiler +1 steam

turbine)

21 Ukraine Technical proposal for rehabilitation of Unit 3 at Zaporiska DRES. LLC EMAlliance –

Teploenergoproekt

1 х 300 MW

(1 boiler +1 steam

turbine)

22 Russia Technical proposal for the construction of GTPP at the site of

Kuznetskaya TPP.

LLC EMAlliance –

Teploenergoproekt

2 х 136 MW

(2 GTUs)

References (3)

9

Page 10: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

№ Country Project General designer

Number

of generation units

and capacity

23 Russia Technical proposal for the construction of Units 2 & 3 of the Energy Complex

at Yuzhnouralskaya TPP-2.

LLC EMAlliance –

Teploenergoproekt 2 х 400 MW

24 Serbia

Development of Technical Concept of Energy Infrastructure Rehabilitation for

the City of Belgrade

Installation of gas turbines in existing main building of Novi Beograd power

plant.

LLC EMAlliance –

Teploenergoproekt

3 х 32 MW

25 Serbia

Development of Technical Concept of Energy Infrastructure Rehabilitation for

the City of Belgrade

Construction of steam turbine unit on the site of Novi Beograd power plant.

LLC EMAlliance –

Teploenergoproekt

2 х 76.5 MW

+ 1 х 77 MW

26 Serbia

Development of Technical Concept of Energy Infrastructure Rehabilitation for

the City of Belgrade

Construction of gas turbine unit and TPP on the site of Vozdovac power plant.

LLC EMAlliance –

Teploenergoproekt 3 х 55 MW

27 Russia Development of working documents for TPP-5 PGU capital construction project

in Ufa.

Customer: JSC KOTES

28 Russia Development of working documents for direct steam pipes and superheater

for the generation unit of Station 9 at Novocherkasskaya TPP.

Customer: ZAO PIK

Energotrust

29

Moldova Delivery of pre-feasibility study for the rehabilitation of PGU-250 units of

Stations 11 and 12 of Moldova TPP with replacement of existing GT-35-770-3

turbines with modern gas turbines.

Client:

Moldova TPP

10

References (4)

Page 11: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Development of concept projects and investment justifications

# Contents

Project scope

In-house With

third parties

1. General annotation X X

2. General plan and transport X

3. Heat mechanics solutions X

4. Water treatment and schedule X

5. Electrotechnical solutions X

6. Communications and alarms X

7. Industrial control system for technology process X

8. Hydraulic solutions X

9. Key construction solutions X

10. Considerations for construction arrangements X

11. Human resources and social development X

12. Technology and economics X X

13. Assessment of environmental footprint X

Project documentation competencies (1)

11

Page 12: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Development of individual sections of project documentation as per Resolution 87 of 16.02.2008 of the Government of Russia

# Contents Project scope

In-house With third parties

1. Annotation X X

2. Parcel development plan X

3. Architectural solutions X

4. Structural and spatial design X

5.

Details of engineering equipment and infrastructure, list of engineering steps and contents of engineering solutions

X X

a) Power Supply System X b) Water Supply System X c) Drainage System X d) HVAC and heating pipelines X e) Communications networks X f) Gas supply X g) Technology solutions, including the following: X X

- Start-up circuit and calculation of power balances Х X - Solid fuel delivery X - Hydraulic infrastructure X - Thermal insulation and rust-proofing X - Water treatment X

6. Construction management project X

7. Demolition and dismantling management project X

8. List of environmental protection initiatives X

9. Fire safety initiatives X

10. Accessibility initiatives X

11. Capital construction estimate X X

- Return on investment, technology and economics X

12. Other documents mandated by federal laws X

Project documentation competencies (2)

12

Page 13: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Project documentation competencies (3)

Development of working documents for integrated construction project

# Contents Project scope

In-house With third

parties

1. General plan X

2. Main building, including water treatment facilities X X

2.1

Construction component, including the following: X X

- Turbine foundations X

- Building structure, including the foundations X

- Chimney X

- Architectural and planning charts Х

- Engineering systems X X

2.2. Technology components X

2.3 Electrotechnical solutions, including the following: X X

- Electric lighting and welding wiring X

2.4 Industrial control system and measuring instruments X

2.5 Communications and alarms X

2.6 Telemechanics and energy metering systems of the master infrastructure X

3. Electrotechnical constructions, including the following: X X

- High-voltage distributors X

4. Solid fuel handling equipment X

5. Liquid fuel and oil handling equipment X

13

Page 14: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Development of working documents for integrated construction project

# Contents

Project scope

In-house With third parties

6. Gaseous fuel handling equipment X

7. Water treatment stations at the industrial site Х

8. Production and supply of specialty gases X

9. Process water supply (with coolers and recharge systems)

Х

10. Technology communications Х

11. Heat delivery Х

12. Process and drinking water supply, including hot water supply

Х

13. Process and fire water supply Х

14. Sewer, process and rainwater drainage X

15. Hydro cleaning of fuel supply X

16. Deashing X

17. External dust removers X

18. Utility buildings X

19. Civil defense infrastructure X

20. Transportation infrastructure X

21. Repair and maintenance workshops X

22. Warehousing X

Project documentation competencies (4)

14

Page 15: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

Аppendix

Page 16: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

16

SRO Certificate (1)

Page 17: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

17

SRO Certificate (2)

Page 18: DESIGN OF ENERGY FACILITIES - Инжиниринг»irao-engineering.ru/upload/pdf/IRAO_TEP_ENG.pdfWorking documents for the construction of Unit 8, PGU-420, TPP-26, a subsidiary of

TITLE THANK YOU!

LLC Inter RAO - Engineering

Russia, 123610,

Moscow, Krasnopresnenskaya Naberezhnaya 12.

Phone: +7 (495) 664-88-40

Fax: +7 (495) 664-88-41

E-mail: [email protected]

Teploenergoproekt

Russian Federation, 153000,

Ivanovo, Bagaeva 59, Office 6.

Phone: +7 (4932)-41-55-20;

+7 (4932)-41-55-35

E-mail: [email protected]