1.0 Introduction

Many companies in Zimbabwe are facing economic downturn due to use of poor maintenance systems (machine stoppages and breakdowns). This project will focus on a company named Steel Force which currently is practising poor maintenance.

Page 4: Design of an RCM System Aimed at Improving

1.1 Problem Background

Steel Force (Pvt) Ltd is a small concern that runs 3 lines of business ,a wire nail manufacturing plant, a bicycle assembly section and trades in other steel products. The plant’s current output is pegged at 65% of design capacity. Instead of producing 2500 kg of nails a day, the plant is only managing about 1600 kg.

Page 5: Design of an RCM System Aimed at Improving

1.2 Problem Statement

The wire nail manufacturing plant at Steel Force is producing 35% below the design capacity and coupled to this, is a loss of 5 kg of raw material and 20% loss of production time per day.

Page 6: Design of an RCM System Aimed at Improving

1.3 Aim

• Designing an RCM system for implementation at Steel Force (Pvt) Limited so as to improve productivity of the wire nail production plant.

Page 7: Design of an RCM System Aimed at Improving

1.4 Objectives

• 1. To improve productivity from 65% to 71.5%. • 2. To reduce machine stoppages from an

average of five to three stoppages per day per machine.

• 3. To reduce scrap generation from 5 to 3 kilogrammes per day.

• 4. To design an asset register for Steel Force (Pvt) Limited.

Page 8: Design of an RCM System Aimed at Improving

1.5 Scope

The system will help Steel Force (Pvt) Ltd improve its productivity however other companies in similar circumstances can also use the system.

Page 9: Design of an RCM System Aimed at Improving

1.6 Justification

• The system could save valuable time if implemented effectively

• The system will help counterfit the economic downturn at the company.

• The project is in support of the Zim-Asset cluster on value addition and beneficiation

Page 10: Design of an RCM System Aimed at Improving

1.7 Research Questions

• 1. Why are machines constantly breaking down? • 2. What type of maintenance system is currently

in place? • 3. What alternative maintenance system can be

used? • 4. Why does it take long to re-set the machines

after minor stoppages? • 5. What type of asset register is suitable for Steel

Force?

Page 11: Design of an RCM System Aimed at Improving

1.8 Limitations

• Frequent visits to Steel Force will not be possible

• The inadequate of technical books in the HIT library especially for the design.

Page 12: Design of an RCM System Aimed at Improving
Page 13: Design of an RCM System Aimed at Improving

1.9 Conclusion

• The design should enable most companies including Steel Force to increase their productivity significantly.