DESIGN PROCEDURE FOR IRRIGATION CHANNELS

Design of a Channel Reach

Embed Size (px)

Citation preview

Page 1: Design of a Channel Reach

DESIGN PROCEDURE

FOR

IRRIGATION CHANNELS

Page 2: Design of a Channel Reach

Cross-section of an Irrigation Canal

A typical and most desired section of a canal, i.e. partly in cutting and

partly in filling, is shown in the following figure.

NSL = Natural Surface Level

CBL = Canal Bed Level

FSL = Full Supply Level

When NSL is above the top of the bank, the canal section will have to be

cut, and it shall be called “canal in cutting”.

When NSL is lower than the CBL, the canal section will have to be built

in filling, and it is called “canal in filling”.

Page 3: Design of a Channel Reach

Side Slopes

Side slopes (H:V) are fixed according to stability requirements,

depending upon the type of the soil (angle of repose of soil).

A comparatively steeper slope can be provided in cutting because soil is

naturally consolidated, and hence, more stable.

Generally adopted slopes:

In cutting: 1:1 to 1½: 1

In filling: 1½:1 to 2:1

For channels with silt laden water, the actual capacity of the channel is

worked out with ½ :1 side slopes.

Page 4: Design of a Channel Reach

Berms

Berm is the horizontal distance left at ground level between the toe of

the bank and the top edge of cutting.

If s1:1 is the slope in cutting and s2:1 in filling, then initial berm width

= (s2-s1) d1

Since NSL fluctuates considerably, while canal bed level (CBL) varies

very slightly, d1 shall vary; and, therefore, the berm width shall vary.

After the water flows in the channel for some time, the silt gets

deposited on the sides giving them a slope of ½:1.

The position of the berm, therefore, changes from ground level to FSL.

as shown in Fig. and its width becomes equal to (s2- ½ ).y.

If s2 = 1 ½ then the final berm width = y, i.e. equal to the depth of the

canal. (where, y = Full Supply Depth)

Page 5: Design of a Channel Reach

The berms when fully formed, serves the following purposes:

(i) The silt deposited on the sides is very fine and impervious. It,

therefore, serves as a good lining for reducing losses, leakage and

consequent breaches, etc.

(ii) They help the channel to attain regime conditions, as they help in

providing a wider waterway, if required. Even fluctuations of

discharge do not produce much fluctuations in depths because of

wider waterway.

(iii) They give additional strength to the banks and provide protection

against erosion and breaches.

(iv) The possibility of breaches gets reduced because the saturation line

comes more in the body of the embankment.

(v) They protect the banks from erosion due to wave action.

(vi) They provide a scope for future widening of the canal.

(vii) Berms can be used as borrow pits for excavating soil to be used for

filling.

Page 6: Design of a Channel Reach

Freeboard

The margin between FSL and bank level is known as freeboard.

The amount of freeboard depends upon the size of the channel. The

generally provided values of freeboard are given in following table.

Values of Freeboard in Canals

Discharge (cumec) Extent of Free board (m)

1 to 5 0.5

5 to 10 0.6

10 to 30 0.75

30 to 150 0.90

Page 7: Design of a Channel Reach

Banks

The primary purpose of banks is to retain water. They can be used as

means of communication and as inspection paths.

They should be wide enough, so that a minimum cover of 0.5 m is

available above the saturation line, as shown in below Fig.

High banks will have to be designed as earth dams.

Service Roads/Inspection Path

Service roads are provided on canals for inspection purposes, and may

simultaneously serve as the means of communication in remote areas.

They are provided 0.4 m to 1.0 m above FSL, depending upon the size of

the channel.

Page 8: Design of a Channel Reach

Dowlas

As a measure of safety in driving, dowlas 0.3 m high and 0.3 to 0.6 m

wide at top, with side slopes of 1:1 to 2:1, are provided along the banks,

as shown in below figure.

They also help in preventing slope erosion due to rains, etc.

Page 9: Design of a Channel Reach

Back Berm or Counter Berms.

Even after providing sufficient section for bank embankment, the

saturation gradient line may cut the downstream end of the bank.

In such a case, the saturation line can be kept covered at least by 0.5 m

with the help of counter berms, as shown in following figure.

The straight saturation gradient line may be drawn with the following

slopes.Assumed Values of Saturation Gradients in Different

Soils

Type of soil Slope (H:V)

Clay 1 in 4

Clayey loam 1 in 6

Loam 1 in 8

Loamy sand 1 in 10

sand 1 in 15

Page 10: Design of a Channel Reach

Spoil Banks.

When the earthwork in excavation exceeds earthwork in filling, even

after providing maximum width of bank embankments, the extra earth

has to be disposed off economically.

To dispose off this earth by mechanical transport, etc. may become very

costly, and an economical mode of its disposal may be found in the form

of collecting this soil on the edge of the bank embankment itself.

The soil is, therefore, deposited in such a case, in the form of heaps on

both banks or only on one bank, as shown in following figure.

These heaps of soil are discontinued at suitable intervals and longitudinal

drains running by their sides are excavated for the disposal of rain water.

Cross drains through the spoil banks may also be excavated, if needed.

Page 11: Design of a Channel Reach

Borrow Pits

When earthwork in filling exceeds the earthwork in excavation, the earth

has to be brought from somewhere.

The pits, which are dug for bringing earth, are known as borrow pits.

If such pits are excavated outside the channel, they are known as external

borrow pits, and if they are excavated somewhere within the channel,

they are known as internal borrow pits.

It is a very costly affair to bring soil from distances. Even in the nearby

areas, these pits may cause mosquito nuisance due to collection of rain

water in these pits, and hence, external borrow pits are not preferred.

When needed, internal

borrow pits are excavated

on the bed of the canal, as

shown in figure.

Page 12: Design of a Channel Reach

The borrow pits should start from a point at a distance more than 5 m

from the toe for small channels, and 10 m for large channels.

The width of these pits (b) should be less than half the width of the canal

(B), and should be dug in the centre.

The depth of these pits should be equal to or less than 1 m.

Longitudinally, these pits should not run continuous but a minimum

space of 0.5 L should be left between two consecutive pits. (where L is

the length of one pit) as shown in following figure.

Page 13: Design of a Channel Reach

Balancing Depth for Excavating Canals

Maximum economy can be achieved in canal construction. if the

earthwork in excavation equals the earthwork in filling. Such a thing is

possible when a canal is constructed partly in filling and partly in cutting,

which mostly happens in practical life.

If this balance between cutting and filling can occur. then the need for

spoil banks or borrow pits is entirely eliminated. and moreover.

earthwork has to be paid only once in a single item.

For a given cross-section of a channel. there can be only one depth. for

which such a balance between cutting and filling will occur. This depth

is known as the Balancing depth.

This depth can be worked out easily by equating the areas of cutting and

filling.

Page 14: Design of a Channel Reach

Example

Calculate the balancing depth for a channel section having a bed width equal to 18 m

and side slopes of 1:1 in cutting and 2:1 in filling. The bank embankments are kept 3.0

m higher than the ground level (berm level) and crest width of banks is kept as 2.0 m.

Solution

The channel section is shown in Fig. Let d1 be the balancing depth, i.e. the depth for

which excavation and filling becomes equal.

Area of cutting = (18+d1).d1 m2

Equating cutting and filling, we get (18+d1).d1 = 48

Solving for d1, we get

Balancing depth = 2.35 m

2m 4832

1422 filling of Area

Page 15: Design of a Channel Reach

Example

Design and Prepare the longitudinal section, schedule of area statistics

and channel dimensions of an irrigation channel from the following data:

Longitudinal leveling of channel alignment gives the following results:

Assume a datum level of 150.00 m, Full Supply Level of parent channel

as 157.70 m, and Bed Level of parent channel as 156.00 m.

km Ground level km Ground level

0.0 155.20 2.6 155.35

0.2 157.26 2.8 155.17

0.4 157.29 3.0 155.12

0.6 156.21 3.2 154.95

0.8 156.56 3.4 154.70

1.0 156.52 3.6 154.39

1.2 156.51 3.8 154.28

1.4 156.28 4.0 154.19

1.6 156.11 4.2 154.10

1.8 156.14 4.4 153.74

2.0 155.83 4.6 153.58

2.2 155.68 4.8 153.38

2.4 155.58 5.0 153.18

Page 16: Design of a Channel Reach

Commanded areas are given as follows:

Total loss below km 5 is 0.5 cumec. Losses are to be calculated at the rate of 2 cumecs

per million square metres of the wetted perimeter.

Take side slope of the channel section as 1V:0.5H, m = 1, and Kutter’s N = 0.0225.

Below km GCA (ha) CCA (ha)

0 24000 16000

1 22000 14000

2 18000 12000

3 16000 11000

4 14000 10000

5 12000 8000

Intensity of irrigation Rabi (wheat) 30% Kharif (Rice) 12.5%

Kor-period (B) 4 weeks 2.5 weeks

Kor-depth (∆) 13.4 cm 19 cm

Page 17: Design of a Channel Reach

Solution:

Design Procedure:

1.The longitudinal section (L-section) of the ground is plotted first.

2.The slope of the channel is calculated with Lacey’s formula or taken from Lacey’s

diagrams and is tabulated in Schedule of Area Statistics.

3.A trial slope line for full supply level is marked. The position and depth of falls are

also tentatively marked.

4.The actual channel design is thereafter carried out by filling in the table of Schedule

of Area Statistics.

5.The outlet discharge factor for controlling crops is determined as follows:

(a)

where, B = kor period = 4 x 7 days; and ∆ = kor depth = 0.134 m

(b)

where, B = kor period = 2.5 x 7 days; and ∆ = kor depth = 0.19 m

B64.8 Rabifor factor dischargeOutlet

cumecha / 18000.134

748.64 factor dischargeoutlet Hence

B64.8 Khariffor factor dischargeOutlet

cumecha / 0760.19

72.58.64 factor dischargeoutlet Hence

Page 18: Design of a Channel Reach

The outlet discharge factor for the controlling crops is the one which gives maximum

discharge.

Let us assume the CCA as 16000 ha. (CCA below 0 km, as given in the data)

Hence outlet discharge factor to be adopted = 1800 ha/cumecs.

ha 48000.30 16000 30% as I.I. with crop Rabiunder Area

cumecD

A 67.2

1800

4800 crop Rabifor needed Discharge

ha 20000.12516000 12.5% as I.I. with crop Kharifunder Area

cumecD

A 63.2

760

2000 crop Rabifor needed Discharge

Page 19: Design of a Channel Reach

Design of Channel at various sections:

The design is started from the tail where the losses are known.

At km 5.0:

Culturable Commanded Area (CCA) = 8000 ha

Intensity of irrigation in Rabi = 30%

Area to be irrigated for Rabi crops = 8000 x 0.3 = 2400 ha

Outlet discharge factor = 1800 ha/cumec

Total losses after 5.0 km = 0.5 cumec (Given)

Total discharge at km 5.0 = 1.34 + 0.5 = 1.84 cumec

Adopt design discharge Q, 10% more than the total discharge.

Therefore,

Design discharge = 1.84 x 1.1 = 2.02 cumec

V/Vo = m = 1.0 (Given), and

N = 0.0225

Assume slope S = 0.25 m per km = 1/4000

cumecD

A 34.1

1800

2400 crop Rabifor needed Discharge

Page 20: Design of a Channel Reach
Page 21: Design of a Channel Reach
Page 22: Design of a Channel Reach

Garret's diagram:

It gives the graphical method of designing the channel dimensions based on Kennedy's Theory.

The diagram has discharge plotted on the abscissa.

The ordinates on the left indicate the slope and on the right water depth in the channel (D) &

critical velocity (Vo).

The discharge lines are curved and the bed width lines are shown dashed.

Procedure to use Garret's diagram in channel design:

1.Find out the discharge for which the channel is to be designed through Schedule of Area

Statistics.

2. Find out the slope of the channel through longitudinal section.

3. Follow the discharge line and find out its intersection with the horizontal line from the slope.

Interpolation may be done if needed.

Mark the intersection point P.

4. Draw the vertical line through the intersection point. This will cut several bed width curves.

Each point of intersection gives a depth (D) & Vo on right hand side of ordinates.

5. Choose a pair of bed width, depth and Vo corresponding to point of intersection obtained

above.

6. Calculate the area of channel section A corresponding to channel bed width and depth.

7. Calculate the velocity corresponding to the area A.

8. Calculate the ratio V/Vo. This should be equal to unity or as given for the channel design.

9. Repeat the procedure for other values of bed width and depth till the value of V/Vo is the same

value as given for channel design.

Page 23: Design of a Channel Reach

From Garret's diagram: At km 5.0

Discharge Q

(Cumecs)

Slope S

Bed width B

(m)

Water Depth D

(m)

Area A

Velocity V = Q/A (m/s)

Critical Velocity Vo

(m/s)

Critical Velocity

Ratio

5.50 0.73 4.28 0.472 0.450 1.05

2.02 1 in 4000 4.90 0.79 4.18 0.483 0.473 1.02

4.55 0.84 4.17 0.484 0.492 0.98

Page 24: Design of a Channel Reach

At km 4.0:

Culturable Commanded Area (CCA) = 10,000 ha

Intensity of Rabi irrigation = 30%

Area to be irrigated for Rabi crops = 10,000 x 0.3 = 3000 ha

Outlet discharge factor = 1800 ha/cumec

Losses below km 5.0 = 0.5 cumec (Given)

Losses in channel between km 5.0 and km 4.0

Note: For calculation of losses adopt section at km 5.0 as section at km 4.0 is not yet

calculated.

Total losses at km 4.0 = losses below km 5.0 + losses between km 5.0 and km 4.0

= 0.5 + 0.013 = 0.513 cumec.

Therefore total discharge required at km 4.0 = 1.67 + 0.513 = 2.183 cumec

Adopt design discharge Q 10% more than the total discharge.

Therefore design discharge = 2.183 x 1.1 = 2.40 cumec, Similar approach is used in

calculating discharge at km 3.0, 2.0, 1.0 and 0.0.

cumecD

A 67.1

1800

3000 crop Rabifor needed Discharge

mD 445.684.0555.45B= 5.0 kmat section channel ofperimeter Wetted

cumec 013.02000,000,1

10006.445 4.0 km to5.0 km fromreach in loss Thus,

Page 25: Design of a Channel Reach

Below

kmGCA CCA

Area to be irrigatedOutlet

discharge

factor

Outlet

discharge

Loss

in

reach

Total

losses

Total

discharge

Channel dimensions

Velocity V/VoRabi

30%

Sugar

Cane

Kharif

12.5%

Bed

slope

Bed

width

Water

depth

Design

Discharge

Height

of bank

Width of

bank

ha ha ha ha ha ha ha/cumec cumeccume

ccumec cumec

cm/

kmm m cumec m m m/sec

0 24000 16000 4800 Nil 2000 1800 2.667 0.015 0.569 3.236 22.5 5.500 1.040 3.56 2.0 0.570 1.015

1 22000 14000 4200 Nil 1750 1800 2.333 0.014 0.554 2.888 22.5 5.200 1.007 3.17 2.0 0.555 1.000

2 18000 12000 3600 Nil 1500 1800 2.000 0.014 0.540 2.540 22.5 4.850 0.975 2.80 2.0 0.538 1.000

3 16000 11000 3300 Nil 1375 1800 1.833 0.014 0.527 2.360 24.0 4.700 0.945 2.60 2.0 0.532 1.000

4 14000 10000 3000 Nil 1250 1800 1.667 0.013 0.513 2.180 24.0 4.550 0.915 2.40 2.0 0.521 1.000

5 12000 8000 2400 Nil 1000 1800 1.333 0.500 1.833 25.0 4.550 0.840 2.02 2.0 0.484 0.992

Schedule of Area Statistics

Page 26: Design of a Channel Reach

Schedule of area statistics and Channel Dimensions

The design of channel cross section from km to km is done in tabular form & is called

schedule of area statistics & channel dimensions. The column wise calculation is done

as follows:

Col 1: The actual design of the channel is done from km to km. If any channel is off

taking in between the kms the channel dimensions are also found downstream

of the cross regulator.

Col 2: It indicates the Gross Commanded Area (GCA) below that particular km.

Col 3: It indicates the Culturable Commanded Area (CCA) below that particular km.

Col 4 – 6: They indicate the % of area under the Rabi, Perennial, & Kharif crops.

Col 7: It indicates the outlet discharge factor for the controlling crop.

Col 8: It indicates the outlet discharge required which is found by multiplying the

area to be irrigated with the outlet discharge factor.

Col 9: It indicates the losses in the reach from km to km. Generally these

transmission losses are assumed as 2.5 cumecs per million square metres of

wetted perimeter for unlined channels and 0.6 cumecs per million square

metres of wetted perimeter for lined channels.

Page 27: Design of a Channel Reach

Schedule of area statistics and Channel Dimensions (continued)

Col 10: It indicates the total losses in the channel below any particular km.

Col 11: It indicates the total discharge for which the channel has to be designed which

includes outlet discharges and losses.

Col 12 – 17: These columns pertain to channel dimensions and are to be filled up after

designing the channel in each reach.

Col 18: It indicates the velocity in the channel

Col 19: It indicates the critical velocity ratio