6
Updated 05/24/2018 Printed 06/28/2019 Page 1 of 1 Project No. 45737-C DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER EMPIRE STATE PLAZA ALBANY, NY 12242 CONSTRUCTION WORK PROVIDE LEAD MITIGATION OGDENSBURG STATE ARMORY 225 ELIZABETH STREET OGDENSBURG, NEW YORK ADDENDUM NO. 1 TO PROJECT NO. 45737C July 11, 2019 NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual. Acknowledge receipt of this Addendum in the space provided on the Bid Form. 1. Revised Drawing: Drawing Nos. H-201 through H-205 noted “REVISED DRAWING 06/20/2019” accompany this Addendum and supersede the same numbered originally issues drawings. END OF ADDENDUM Erik T. Deyoe, P.E. Director, Division of Design Design & Construction

DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

Updated 05/24/2018Printed 06/28/2019 Page 1 of 1 Project No. 45737-C

DESIGN & CONSTRUCTION GROUPTHE GOVERNOR NELSON A. ROCKEFELLER

EMPIRE STATE PLAZAALBANY, NY 12242

CONSTRUCTION WORK PROVIDE LEAD MITIGATION

OGDENSBURG STATE ARMORY 225 ELIZABETH STREET

OGDENSBURG, NEW YORK

ADDENDUM NO. 1 TO PROJECT NO. 45737C

July 11, 2019

NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.Acknowledge receipt of this Addendum in the space provided on the Bid Form.

1. Revised Drawing: Drawing Nos. H-201 through H-205 noted “REVISED DRAWING 06/20/2019”accompany this Addendum and supersede the same numbered originally issues drawings.

END OF ADDENDUM

Erik T. Deyoe, P.E.Director, Division of DesignDesign & Construction

Page 2: DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

DESIGN & CONSTRUCTION

45737-C

H-201

PHASE 1 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 15'

FIRST FLOOR

H-201

1

SCALE: 1" = 15'

SECOND FLOOR

H-201

2

LEGEND

PHASE LIMITS

PHASE 1 FINISH SCHEDULE

Room Number Room Function Floor Walls

Ceiling Window Systems

Miscellaneous

First and Second Floor

16 Drill Hall

Provide Metal Floor

Grate, Stain /

Polyeurethane (Stairs)

Provide 4 Tackboards,

Paint

- - -

16A Drill Hall Lockers

Stain / Polyeurethane

Paint (Walls and

Chain-Link Cage)

- -

Stain / Polyeurethane

Wood Lockers

16B Closet - - - - -

25

Drill Hall Balcony Stain / Polyeurethane

Paint - - -

*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. See Parge Coat General Notes on G-003.

Page 3: DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

EXISTING IT

EQUIPMENT

DESIGN & CONSTRUCTION

45737-C

H-202

PHASE 2 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 15'

FIRST FLOOR

H-202

1

SCALE: 1" = 15'

THIRD FLOOR ATTIC

H-202

3

SCALE: 1" = 15'

FOURTH FLOOR ATTIC

H-202

4

LEGEND

PHASE LIMITS

SCALE: 1" = 15'

SECOND FLOOR

H-202

2

PHASE 2 FINISH SCHEDULE

Room Number Room Function Floor Walls

Ceiling Window Systems

Miscellaneous

15 Office

Stain / Polyeurethane

Provide 1 Tackboard Paint

Stain / Polyeurethane

Provide Runner Mat

Entryway

VCT and 4" Rubber Cove

Base

- Paint

20 Office

Stain / Polyeurethane

Provide 1 Tackboard Paint

Stain / Polyeurethane

Provide Runner Mat

20A Bathroom

Stain / Polyeurethane Stain / Polyeurethane

Hallway Connecting Office 20 and 2nd Floor Hall Stain / Polyeurethane

Paint

21 Locker Room

Stain / Polyeurethane

-

Stain / Polyeurethane

Stain / Polyeurethane Wood

Lockers

21A Bathroom

Stain / Polyeurethane

-

Stain / Polyeurethane

22 Office

Stain / Polyeurethane

- Paint

Stain / Polyeurethane

23 Bathroom

Stain / Polyeurethane

-

Stain / Polyeurethane

24 Classroom

Stain / Polyeurethane

- Paint

Stain / Polyeurethane

2nd Floor Hall

Stain / Polyeurethane

Outdoor Balcony

Provide One 3/8" Thick

6' x 10' Rubber Mat

- - - -

A1

Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

A2

Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

A3

Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

A4

Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

A5

Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

A6

Fourth Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

A7

Fourth Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane

*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. See Parge Coat General Notes on G-003.

Page 4: DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

DESIGN & CONSTRUCTION

45737-C

H-203

PHASE 3 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

LEGEND

PHASE LIMITS

PROVIDE PARGE COAT OF FIELD STONE FOUNDATION WALL

SCALE: 1" = 15'

BASEMENT FLOOR

H-203

1

SCALE: 1" = 15'

FIRST FLOOR

H-203

2

PHASE 3 FINISH SCHEDULE

Room Number Room Function Floor Walls

Ceiling Window Systems

Miscellaneous

Basement Level

Foyer

- - Paint - -

1 Men's Bathroom

Epoxy Floor with Grit

Additive** in Locations of

Concrete Patches (match

existing elevation and color)

Parge Coat of Concrete*, Paint

- - -

Foundation Walls - Drylok® Waterproofing

1A

Storage Room

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*, Paint

Paint - -

Foundation Walls - Drylok® Waterproofing

2 State Office

Epoxy Floor with Grit

Additive**

Paint Paint - -

3

Storage Room

Epoxy Floor with Grit

Additive**, Reinstall Metal

Caged Storage Partition.

Parge Coat of Concrete*, Paint

Paint - -

Foundation Walls - Drylok® Waterproofing

4A

Storage Room

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*

Paint - -

Foundation Walls - Drylok® Waterproofing

4B

Storage Room

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*

Paint - -

Foundation Walls - Drylok® Waterproofing

5

Storage Room

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*

Paint - -

Foundation Walls - Drylok® Waterproofing

5B

Storage Room

Epoxy Floor with Grit

Additive**

Paint Infill Wall and Paint - -

7 Former IFR

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*, Encapsulate

Sheetrock, Paint- -

Foundation Walls - Drylok® Waterproofing

First Floor

Entryway

VCT and 4" Rubber Cove

Base

- Paint Provide Runner Mat

10 Women's Bathroom - Paint

Paint Metal Ceiling,

Provide 2' x 2' Drop

Ceiling Tile and

Reattach all Light

Fixtures

Stain / Polyeurethane -

11

Office and Hallway to

Entryway

Stain / Polyeurethane

Provide 1 Tackboard -

Hallway Between

Room 11 and

Entryway

Stain / Polyeurethane

-

12 Office

Stain / Polyeurethane

- Paint

Stain / Polyeurethane

Stain / Polyeurethane Wood

Lockers

13 State Office

Stain / Polyeurethane

Provide 1 Tackboard Paint

Stain / Polyeurethane -

14 Office

Stain / Polyeurethane

Provide 3 Tackboards Paint

Stain / Polyeurethane -

Stairs - - - - -*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. Assume 10' Ceiling Height. See Parge Coat General Notes on G-003.

**In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or concrete block walls, provide epoxy cove

base up to the horizontal grout seam closest to 4".

Page 5: DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

AREA OF INTERLOCKING

RUBBER FLOOR OVER

EPOXY FLOOR

DESIGN & CONSTRUCTION

45737-C

H-204

PHASE 4 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 15'

BASEMENT FLOOR

H-204

1

PHASE 4 FINISH SCHEDULE

Room Room Function Floor Walls

Ceiling Window Systems

Miscellaneous

6

Cafeteria / Weight-Room

Epoxy Floor with Grit

Additive**, Interlocking

Rubber Floor Tile

Parge Coat of Concrete*,

Paint

Paint - Provide Runner Mat

Foundation Walls - Drylok®

Waterproofing

Supply

Epoxy Floor with Grit

Additive**

Encapsulant Encapsulant

-

Vault

Epoxy Floor with Grit

Additive**

Encapsulant

Encapsulant

-

*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. Assume 10' Ceiling Height. See Parge Coat General

Notes on G-003.

**In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or

concrete block walls, provide epoxy cove base up to the horizontal grout seam closest to 4".

LEGEND

PHASE LIMITS

PROVIDE PARGE COAT OF FIELD STONE FOUNDATION WALL

Page 6: DESIGN &CONSTRUCTION GROUP THE GOVERNOR NELSON …online.ogs.ny.gov/dncaddenda/45737/Addendum 01 C.pdfupdated 05/24/2018 printed 06/28/2019 page 1 of 1 project no. 45737-c design&constructiongroup

DESIGN & CONSTRUCTION

45737-C

H-205

PHASE 5 -REPLACEMENT FINISHES

ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:

THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE

PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM

CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND

PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE

COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE

INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY

CODE SUPPLEMENTS.

SCALE: 1" = 15'

BASEMENT FLOOR

H-205

1

LEGEND

PHASE LIMITS

PROVIDE PARGE COAT OF FIELD STONE FOUNDATION WALL

PHASE 5 FINISH SCHEDULE

Room Room Function Floor Wall

Ceiling

Window

Systems

Miscellaneous

2

Storage Room

Epoxy Floor with Grit

Additive**, Reinstall Wood

Walls

Encapsulant Encapsulant

-

8 Boiler Room

Epoxy Floor with Grit

Additive**

Paint Paint -

Provide 2(double-door)

Half-Glass Doorsand Frames toMatch Existing,

Paint

8A

Storage Room

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*, Encapsulant

Encapsulant

-

Provide 1Half-Glass Door

and Frame toMatch Existing,

PaintFoundation Walls - Drylok® Waterproofing

8B

Storage Room

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*, Encapsulant

Encapsulant

-

Provide 1Half-Glass Door

and Frame toMatch Existing,

PaintFoundation Walls - Drylok® Waterproofing

9

Storage Room

Epoxy Floor with Grit

Additive**

Encapsulant

Encapsulant

-

Foundation Wall - Drylok® Waterproofing

Loading Dock

Epoxy Floor with Grit

Additive**

Parge Coat of Concrete*, Encapsulant

Encapsulant

-

Provide 1(double-door)

Half-Glass Doorsand Frames toMatch Existing,

PaintFoundation Walls - Drylok® Waterproofing

*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. Assume 10' Ceiling Height. See Parge Coat General Notes on G-003.

**In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or concrete block

walls, provide epoxy cove base up to the horizontal grout seam closest to 4".