Updated 05/24/2018Printed 06/28/2019 Page 1 of 1 Project No. 45737-C
DESIGN & CONSTRUCTION GROUPTHE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZAALBANY, NY 12242
CONSTRUCTION WORK PROVIDE LEAD MITIGATION
OGDENSBURG STATE ARMORY 225 ELIZABETH STREET
OGDENSBURG, NEW YORK
ADDENDUM NO. 1 TO PROJECT NO. 45737C
July 11, 2019
NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.Acknowledge receipt of this Addendum in the space provided on the Bid Form.
1. Revised Drawing: Drawing Nos. H-201 through H-205 noted “REVISED DRAWING 06/20/2019”accompany this Addendum and supersede the same numbered originally issues drawings.
END OF ADDENDUM
Erik T. Deyoe, P.E.Director, Division of DesignDesign & Construction
DESIGN & CONSTRUCTION
45737-C
H-201
PHASE 1 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 15'
FIRST FLOOR
H-201
1
SCALE: 1" = 15'
SECOND FLOOR
H-201
2
LEGEND
PHASE LIMITS
PHASE 1 FINISH SCHEDULE
Room Number Room Function Floor Walls
Ceiling Window Systems
Miscellaneous
First and Second Floor
16 Drill Hall
Provide Metal Floor
Grate, Stain /
Polyeurethane (Stairs)
Provide 4 Tackboards,
Paint
- - -
16A Drill Hall Lockers
Stain / Polyeurethane
Paint (Walls and
Chain-Link Cage)
- -
Stain / Polyeurethane
Wood Lockers
16B Closet - - - - -
25
Drill Hall Balcony Stain / Polyeurethane
Paint - - -
*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. See Parge Coat General Notes on G-003.
EXISTING IT
EQUIPMENT
DESIGN & CONSTRUCTION
45737-C
H-202
PHASE 2 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 15'
FIRST FLOOR
H-202
1
SCALE: 1" = 15'
THIRD FLOOR ATTIC
H-202
3
SCALE: 1" = 15'
FOURTH FLOOR ATTIC
H-202
4
LEGEND
PHASE LIMITS
SCALE: 1" = 15'
SECOND FLOOR
H-202
2
PHASE 2 FINISH SCHEDULE
Room Number Room Function Floor Walls
Ceiling Window Systems
Miscellaneous
15 Office
Stain / Polyeurethane
Provide 1 Tackboard Paint
Stain / Polyeurethane
Provide Runner Mat
Entryway
VCT and 4" Rubber Cove
Base
- Paint
20 Office
Stain / Polyeurethane
Provide 1 Tackboard Paint
Stain / Polyeurethane
Provide Runner Mat
20A Bathroom
Stain / Polyeurethane Stain / Polyeurethane
Hallway Connecting Office 20 and 2nd Floor Hall Stain / Polyeurethane
Paint
21 Locker Room
Stain / Polyeurethane
-
Stain / Polyeurethane
Stain / Polyeurethane Wood
Lockers
21A Bathroom
Stain / Polyeurethane
-
Stain / Polyeurethane
22 Office
Stain / Polyeurethane
- Paint
Stain / Polyeurethane
23 Bathroom
Stain / Polyeurethane
-
Stain / Polyeurethane
24 Classroom
Stain / Polyeurethane
- Paint
Stain / Polyeurethane
2nd Floor Hall
Stain / Polyeurethane
Outdoor Balcony
Provide One 3/8" Thick
6' x 10' Rubber Mat
- - - -
A1
Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
A2
Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
A3
Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
A4
Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
A5
Third Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
A6
Fourth Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
A7
Fourth Floor Attic Space Polyeurethane Clear Encapsulant Clear Encapsulant Polyeurethane
*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. See Parge Coat General Notes on G-003.
DESIGN & CONSTRUCTION
45737-C
H-203
PHASE 3 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
LEGEND
PHASE LIMITS
PROVIDE PARGE COAT OF FIELD STONE FOUNDATION WALL
SCALE: 1" = 15'
BASEMENT FLOOR
H-203
1
SCALE: 1" = 15'
FIRST FLOOR
H-203
2
PHASE 3 FINISH SCHEDULE
Room Number Room Function Floor Walls
Ceiling Window Systems
Miscellaneous
Basement Level
Foyer
- - Paint - -
1 Men's Bathroom
Epoxy Floor with Grit
Additive** in Locations of
Concrete Patches (match
existing elevation and color)
Parge Coat of Concrete*, Paint
- - -
Foundation Walls - Drylok® Waterproofing
1A
Storage Room
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*, Paint
Paint - -
Foundation Walls - Drylok® Waterproofing
2 State Office
Epoxy Floor with Grit
Additive**
Paint Paint - -
3
Storage Room
Epoxy Floor with Grit
Additive**, Reinstall Metal
Caged Storage Partition.
Parge Coat of Concrete*, Paint
Paint - -
Foundation Walls - Drylok® Waterproofing
4A
Storage Room
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*
Paint - -
Foundation Walls - Drylok® Waterproofing
4B
Storage Room
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*
Paint - -
Foundation Walls - Drylok® Waterproofing
5
Storage Room
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*
Paint - -
Foundation Walls - Drylok® Waterproofing
5B
Storage Room
Epoxy Floor with Grit
Additive**
Paint Infill Wall and Paint - -
7 Former IFR
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*, Encapsulate
Sheetrock, Paint- -
Foundation Walls - Drylok® Waterproofing
First Floor
Entryway
VCT and 4" Rubber Cove
Base
- Paint Provide Runner Mat
10 Women's Bathroom - Paint
Paint Metal Ceiling,
Provide 2' x 2' Drop
Ceiling Tile and
Reattach all Light
Fixtures
Stain / Polyeurethane -
11
Office and Hallway to
Entryway
Stain / Polyeurethane
Provide 1 Tackboard -
Hallway Between
Room 11 and
Entryway
Stain / Polyeurethane
-
12 Office
Stain / Polyeurethane
- Paint
Stain / Polyeurethane
Stain / Polyeurethane Wood
Lockers
13 State Office
Stain / Polyeurethane
Provide 1 Tackboard Paint
Stain / Polyeurethane -
14 Office
Stain / Polyeurethane
Provide 3 Tackboards Paint
Stain / Polyeurethane -
Stairs - - - - -*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. Assume 10' Ceiling Height. See Parge Coat General Notes on G-003.
**In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or concrete block walls, provide epoxy cove
base up to the horizontal grout seam closest to 4".
AREA OF INTERLOCKING
RUBBER FLOOR OVER
EPOXY FLOOR
DESIGN & CONSTRUCTION
45737-C
H-204
PHASE 4 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 15'
BASEMENT FLOOR
H-204
1
PHASE 4 FINISH SCHEDULE
Room Room Function Floor Walls
Ceiling Window Systems
Miscellaneous
6
Cafeteria / Weight-Room
Epoxy Floor with Grit
Additive**, Interlocking
Rubber Floor Tile
Parge Coat of Concrete*,
Paint
Paint - Provide Runner Mat
Foundation Walls - Drylok®
Waterproofing
Supply
Epoxy Floor with Grit
Additive**
Encapsulant Encapsulant
-
Vault
Epoxy Floor with Grit
Additive**
Encapsulant
Encapsulant
-
*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. Assume 10' Ceiling Height. See Parge Coat General
Notes on G-003.
**In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or
concrete block walls, provide epoxy cove base up to the horizontal grout seam closest to 4".
LEGEND
PHASE LIMITS
PROVIDE PARGE COAT OF FIELD STONE FOUNDATION WALL
DESIGN & CONSTRUCTION
45737-C
H-205
PHASE 5 -REPLACEMENT FINISHES
ENERGY CONSERVATION CONSTRUCTION CODE STATEMENT:
THIS DESIGN COMPLIES WITH THE NEW YORK STATE UNIFORM FIRE
PREVENTION AND BUILDING CODE (AS AMENDED BY THE 2017 UNIFORM
CODE SUPPLEMENT). TO THE BEST OF MY KNOWLEDGE, BELIEF AND
PROFESSIONAL JUDGEMENT, THESE DRAWINGS AND THE
COMPLIMENTARY SPECIFICATIONS ARE IN COMPLIANCE WITH THE
INTERNATIONAL ENERGY CODE, INCLUDING NEW YORK STATE ENERGY
CODE SUPPLEMENTS.
SCALE: 1" = 15'
BASEMENT FLOOR
H-205
1
LEGEND
PHASE LIMITS
PROVIDE PARGE COAT OF FIELD STONE FOUNDATION WALL
PHASE 5 FINISH SCHEDULE
Room Room Function Floor Wall
Ceiling
Window
Systems
Miscellaneous
2
Storage Room
Epoxy Floor with Grit
Additive**, Reinstall Wood
Walls
Encapsulant Encapsulant
-
8 Boiler Room
Epoxy Floor with Grit
Additive**
Paint Paint -
Provide 2(double-door)
Half-Glass Doorsand Frames toMatch Existing,
Paint
8A
Storage Room
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*, Encapsulant
Encapsulant
-
Provide 1Half-Glass Door
and Frame toMatch Existing,
PaintFoundation Walls - Drylok® Waterproofing
8B
Storage Room
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*, Encapsulant
Encapsulant
-
Provide 1Half-Glass Door
and Frame toMatch Existing,
PaintFoundation Walls - Drylok® Waterproofing
9
Storage Room
Epoxy Floor with Grit
Additive**
Encapsulant
Encapsulant
-
Foundation Wall - Drylok® Waterproofing
Loading Dock
Epoxy Floor with Grit
Additive**
Parge Coat of Concrete*, Encapsulant
Encapsulant
-
Provide 1(double-door)
Half-Glass Doorsand Frames toMatch Existing,
PaintFoundation Walls - Drylok® Waterproofing
*Provide Wire Mesh/Parge Coat of Concrete to Stone Foundation Walls as shown within the Basement. Assume 10' Ceiling Height. See Parge Coat General Notes on G-003.
**In rooms with epoxy floor finish, provide epoxy cove base on each wall extending 4" up from finish floor level. For epoxy cove base application onto brick or concrete block
walls, provide epoxy cove base up to the horizontal grout seam closest to 4".