1 Design, CM and Construction Opportunities TRANSACTION April 2017

Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

  • Upload
    vandiep

  • View
    223

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

1

Design, CM and Construction Opportunities TRANSACTION

April 2017

Page 2: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

2

Opportunities

CAPITAL PROGRAMS

Strategic investments:

State-of-Good-Repair Rolling stock Infrastructure Technology Asset Management Portal Bridge

Resilience Program Strategic Resilience

Expansion TOC Opportunities Resilience Program

Substations Repairs Facilities Repairs

Page 3: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

3

PROJECT ADVERTISE DATE PROJECT COST

SOGR North

Elizabeth Station

•Design In-House

$2M •CM In-House

•Construction 3Q17

Rail Stations Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR

New Brunswick

Station Platform Extension

•Design Awarded

$6M •CM TOC

•Construction 4Q18

PROJECT ADVERTISE DATE PROJECT COST

SOGR

New Brunswick

Station Escalator

•Design Awarded

$2M •CM In-House

•Construction 1Q18

Page 4: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

4

Rail Stations Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR Princeton Junction

Safety

•Design In-House

$1M •CM In-House

•Construction 3Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR

New Brunswick

Station Elevator Upgrade

•Design Awarded

$3M •CM In-House

•Construction 3Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR Perth

Amboy Station

•Design Awarded

$45M •CM 1Q18

•Construction 2Q18

Page 5: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

5

Rail Stations Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR Mahwah Station

•Design In-House

$2M •CM In-House

•Construction 3Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR Elizabeth Station

•Design In-House

$60M •CM 2Q17

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR Lyndhurst Station

•Design TOC/ In-House

$22M •CM 3Q17 •Construction 1Q18

Page 6: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

6

Rail Stations Opportunities

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Long Slip Platforms

•Design Award Pending

$86M •CM TBD •Construction 3Q18

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Long Slip Fill

•Design Awarded $110M •CM 3Q17

•Construction 1Q18

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Hoboken Signal Power

•Design Awarded

$25M •CM TOC

•Construction 4Q17

Page 7: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

7

Rail Infrastructure Opportunities PROJECT ADVERTISE DATE PROJECT COST

SOGR

Portal Bridge Early

Action

•Design Awarded

$20M •CM Awarded

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Raritan Yard

Environ. Upgrade

•Design TOC

$2M •CM TOC

•Construction 4Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR Port Morris

Environ. Upgrade

•Design TOC

$2M •CM TOC

•Construction 4Q17

Page 8: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

8

Rail Infrastructure Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR Bridge Inspections

•Three Consultants per Contract

$3M •Contracts Bid Every Two

Years

PROJECT ADVERTISE DATE PROJECT COST

SOGR Culvert Program

•Designs In-House $3M •Two Contracts Bid per

Year

PROJECT ADVERTISE DATE PROJECT COST

SOGR Bridge

Painting Program

•Designs In-House

$10M •CM In-House •Three to Four Bridge

Contracts per Year

Page 9: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

9

Rail Infrastructure Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR Mill Road Bridge

•Design 3Q17

$15M •CM In-House

•Construction 3Q20

PROJECT ADVERTISE DATE PROJECT COST

SOGR Roosevelt

Ave. Bridge

•Design Awarded

$8M •CM TOC

•Construction 2Q18

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Hacken-sack Street Bridge

•Design RFP 2Q18

$5M •CM In-House

•Construction In-House

Page 10: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

10

Rail Infrastructure Opportunities

PROJECT ADVERTISE DATE PROJECT COST

EXPANSION Lacka-wanna Cutoff

•Design Awarded

$61M •CM 2Q17

•Construction D/B 2Q17

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Hoboken Boiler and

Ferry Terminal

•Design Awarded

$17M •CM TOC

•Construction Advertised

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Observer Hwy.

Switch House Repair

•Design Awarded

$4M •CM In-House

•Construction Advertised

Page 11: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

11

Rail Infrastructure Opportunities

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Hoboken Terminal House Power

•Design Awarded

$24M •CM 2Q17

•Construction Advertised

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Henderson Substation

•Design Awarded

$21M •CM 2Q17

•Construction 3Q17

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Bay Head Substation

•Design Awarded

$24M •CM 2Q17

•Construction 3Q17

Page 12: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

12

Rail Infrastructure Opportunities

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Maple-wood

Substation

•Design Awarded $1M •CM In-House

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Delco Lead S&I

•Design Awarded

$370M •CM 3Q17

•Construction 2Q17(EA) 1Q18

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Raritan Draw Bridge

•Design Awarded $595M •CM 2Q17

•Construction 2018

Page 13: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

13

Rail Facilities Opportunities

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

MMC ROC Flood

Control

•Design Awarded

$23M •CM TOC

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

ROC Sub-

station

•Design Awarded $7M •CM TOC

•Construction 2Q18

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

ROC UPS Raising

•Design Awarded

$5M •CM TOC

•Construction 2Q17

Page 14: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

14

Light Rail Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR NLR Track

Repair Phase I

•Design TOC

$10M •CM TOC/ In-House

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR NLR Track

Repair Phase II

•Design TOC

$15M •CM TOC/ In-House

•Construction 2Q18

PROJECT ADVERTISE DATE PROJECT COST

SOGR

NLR Norfolk Station Rehab

•Design Awarded

$2M •CM In-House

•Construction 4Q18

Page 15: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

15

Light Rail Opportunities

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

Newark Light Rail

Flood Control

•Design Awarded

$2M •CM In-House

•Construction 2Q18

Page 16: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

16

Bus Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR Market

Street Bus Garage

•Design Awarded

$30M •CM TOC/In House

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR Maple-wood

Generator Upgrades

•Design Awarded

$3M •CM In-House

•Construction 3Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Maple-wood

Parking Deck

•Design Awarded

$7M •CM TOC

•Construction 4Q18

Page 17: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

17

Bus Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Orange Garage Environ.

Upgrade

•Design Awarded

$2M •CM TOC

•Construction 4Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR Avandale Park and

Ride

•Design In-House

$6M •CM TOC/ In-House

•Construction 2Q17

PROJECT ADVERTISE DATE PROJECT COST

SOGR WRTC Deck

Repair

•Design In-House

$2M •CM In-House

•Construction 2Q17

Page 18: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

18

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Newark Garage

UST Upgrades

•Design TOC

$4M •CM TBD

•Construction TBD

Bus Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Newton Ave.

Garage UST

Upgrades

•Design TOC

$2M •CM TBD

•Construction TBD

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Meadow-lands

Garage UST

Upgrades

•Design TOC

$3M •CM TBD

•Construction TBD

Page 19: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

19

Bus Opportunities

PROJECT ADVERTISE DATE PROJECT COST

SOGR

Howell Garage

UST Upgrades

•Design TOC

$3M •CM TBD

•Construction TBD

Page 20: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

20

Multi-Modal Opportunities

PROJECT ADVERTISE DATE PROJECT COST

RESILIENCE PROGRAM

NJ TRANSIT-

GRID

•Design Awarded $577M •CM TBD

•Construction TBD

PROJECT ADVERTISE DATE

PROJECT COST

TASK ORDER CONTRACTS

• Bridge & Engineering 3Q17

TBD • Transit-Friendly Planning 3Q17

• Travel Demand Forecasting 3Q17

• Architectural Engineering 3Q17

PROJECT ADVERTISE DATE

PROJECT COST

TASK ORDER CONTRACTS

• AccessLink 4Q17

TBD • Community Transportation 4Q17

• Construction Management 4Q17

• Vertical Transportation 4Q17

Page 21: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

21

Multi-Modal Opportunities

PROJECT ADVERTISE DATE PROJECT COST

TASK ORDER CONTRACTS

•Emergency Response/Resilience 4Q17 TBD

Page 22: Design, CM and Construction Opportunities - NJ Transit Rolling stock Infrastructure Technology Asset Management Portal Bridge Resilience Program Strategic Resilience

22

New Requirements

AUDIT AND INSPECTION OF RECORDS

The Contractor shall retain all Contract records and permit the authorized representatives of NJ TRANSIT, the State of New Jersey, the USDOT , the FTA and the Comptroller General of the United States and their duly authorized representatives, such as Project Management Oversight, Integrity Oversight Monitors, etc. to inspect and audit all financial data, operational data and other records including but not limited to disclosure forms, payment requests, change orders, invoices, certified payrolls, manifests, etc. relating to products, transactions or services provided under this Contract including its performance and the performance of its subcontractors under this Contract from the date of the Advertisement of the Invitation for Bid and for five years after final payment under this Contract has been made.

─ Subcontractors are required to meet the same standards.

The Contractor shall maintain all documentation related to products, transactions or services under this contract for a period of five years from the date of final payment. Such records shall be made available to the New Jersey Office of State Comptroller upon request.

The periods of access and examination described above, for records which relate to: ─ Appeals under the "Disputes" clause of the Contract ─ Litigation or the settlement of claims arising out of the performance of this Contract ─ Costs and expenses of this Contract