Design-Build Done Right!

Design-Build Institute of America National Update

Presented by: Lisa Washington, CAE

Executive Director/CEONovember 18, 2015

Design-Build Done Right!

Membership by Region

Design-Build Done Right!

Industry Partner Membership

Design-Build Done Right!

DBIA Membership Trends

2012 2013 2014 20153600

3800

4000

4200

4400

4600

4800

5000

4034

4815

Design-Build Done Right!

Annual Conference – Registration

2007-DAL 2008-Vegas 2009-DC 2010-Vegas 2011-ORL 2012-NOLA 2013-Vegas 2014-DAL 2015-DEN0

500

1,000

1,500

2,000

2,500

Atten

dees

Design-Build Done Right!

Annual ConferenceOwners Attendance Trends

2010 - Vegas 2011 - Orlando 2012 - NOLA 2013-Vegas 2014-Dallas 2015-Denver0

50

100

150

200

250

Design-Build Done Right!

Design-Build EducationSold Out Workshops:

Seattle, WA

Long Beach, Sacramento and San Diego, CA

Portland, OR

Washington, DC

Added Workshops:

Charlotte, NC

Honolulu, HI

Design-Build Done Right!

DBIA Certification

Design-Build Done Right!

Financial Trend Data

2010 2011 2012 2013 2014 Forecast 2015 Budget 2016 ( 1,000,000 )

-

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

7,000,000

8,000,000

9,000,000

Revenues Expenses Surplus/(Loss)

Design-Build Done Right!

Design-Build Done Right™

Design-Build Done Right!

Award-Winning Projects from Across

the Nation

Design-Build Done Right!

Excellence in Teaming

St. Jude Medical Center Northwest Tower

Owner: St. Joseph Health Systems with Petra Integrated Construction Strategies

Location: Fullerton, CA

Duration: 38 Months

Cost: $228,046,424

Design-Build Done Right!

Excellence in Design (Engineering)

I-485/I-85 Turbine Interchange

Owner: North Carolina Department of Transportation

Location: Charlotte, NC

Duration: 36 Months

Cost: $98,743,679

Design-Build Done Right!

Excellence in Design (Architecture) andExcellence in Process

Benjamin P. Grogan and Jerry L. Dove Federal Building

Owner: General Services Administration (GSA)

Location: Miramar, Florida

Duration: 25 Months

Cost: $157,200,728

Design-Build Done Right!

Design-Build Done Right!

2016 – 2018 Goals

Design-Build Done Right!

2016 High Priorities

• Implement New Database• Update Core Curriculum• Update Certification Exam• Education, Tools & Resources• Engage Students and Young Professionals• Develop Library of One-Page Case Studies

Design-Build Done Right!

Questions?

Design-Build Done Right! 19