Design and Construction of Metro Stations and Underground Structures

Embed Size (px)

Citation preview

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    1/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Engineers IrelandEngineers Ireland -- Geotechnical Society ofGeotechnical Society of

    IrelandIreland

    Design and Construction of MetroStations and Underground Structures to

    Eurocode 7 - with Case Histories

    David Beadman

    Byrne Looby Partners

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    2/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    ContentsContents

    The Eurocodes and Eurocode 7

    Jubilee Line, London North Greenwich Station

    Jubilee Line, London Canary Wharf Station

    Copenhagen Metro Eurocode 2

    Copenhagen Metro Observational Method

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    3/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    British StandardsBritish Standards

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    4/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    TheThe EurocodesEurocodes and Eurocode 7and Eurocode 7

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    5/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Eurocode SuiteEurocode Suite

    EN 1990 Eurocode: Basis of structural design

    EN 1991 Eurocode 1: Actions on structures

    EN 1992 Eurocode 2: Design of concrete structures

    EN 1993 Eurocode 3: Design of steel structures

    EN 1994 Eurocode 4: Design of composite steel and concrete structures

    EN 1995 Eurocode 5: Design of timber structures

    EN 1996 Eurocode 6: Design of masonry structures

    EN 1997 Eurocode 7: Geotechnical design

    EN 1998 Eurocode 8: Design of structures for earthquake resistance

    EN 1999 Eurocode 9: Design of aluminium structures

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    6/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Structure of theStructure of the EurocodesEurocodes

    EN 1990

    EN 1991

    EN 1992 EN 1993 EN 1994

    EN 1995 EN 1996 EN 1999

    EN 1998EN 1997

    Actions onstructures

    Design and detailing

    Geotechnical

    and Seismicdesign

    Basis of

    structural design

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    7/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    a

    b

    cd

    ef

    aa NationalNational titletitle pagepage

    bb NationalNational forewordforeword

    cc ENEN titletitle pagepage

    dd ENEN texttext

    ee ENEN AnnexAnnex(es)(es)

    ff NationalNational annexannex

    National version of a EurocodeNational version of a Eurocode

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    8/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    National Annex?National Annex?

    The member states refinement of the CEN released

    Eurocode to reflect its own national practices Values of Nationally Determined Parameters (NDPs)

    The decisions where main text allows alternatives

    The choice to adopt informative annexes Non-contradictory complementary information (NCCI)

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    9/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    CIRIA C580CIRIA C580

    Embedded retaining

    walls guidance foreconomic design.

    London 2003

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    10/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Eurocode 7Eurocode 7

    Approved by

    CEN on 23

    April 2004.

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    11/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Release of Eurocode to BSI by CEN

    Develop National Annex Modify Existing Standards

    BSI Publish Eurocode with National Annex

    2

    Yea

    rs

    Coexistence of Eurocode with British

    Standard

    Withdrawal of British Standard

    3

    Years

    ImplementationImplementation

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    12/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Operation and ApplicationOperation and Application

    Principles

    General statements and definitions for which there is

    no alternative.

    Requirements for analytical models for which noalternative is permitted

    Principle clauses are identified with the letterP

    The verb shall is used (meaning must)

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    13/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Operation and ApplicationOperation and Application

    Application rules

    Generally recognised rules which satisfy the

    Principles, but alternative rules may be used.

    Verbs should, may, can etc used

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    14/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    ContentsContents

    Section 1: General

    Section 2: Basis of geotechnical design

    Section 3: Geotechnical data

    Section 4: Supervision of construction, monitoring and

    maintenanceSection 5: Fill, dewatering, ground improvement and

    reinforcement

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    15/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    ContentsContents

    Section 6: Spread foundations

    Section 7: Pile foundations

    Section 8: Anchorages

    Section 9: Retaining structures

    Section 10: Hydraulic failure

    Section 11: Overall stability

    Section 12: Embankments

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    16/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    ContentsContents

    Annex A: Recommended partial factors

    Annex B-J: Supplementary information

    EN1997-2 Performance and evaluation of field and

    laboratory measurements

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    17/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    EurospeakEurospeak

    Actions (c.f. Loads)

    Permanent & Variable (c.f. Dead and Live)

    Geotechnical action 1.5.2.1

    Action transmitted to the structure by the ground, fill,standing water or ground-water

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    18/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    EurospeakEurospeak 1.5.2.71.5.2.7

    Resistance

    capacity . to withstand actions without mechanical

    failure e.g. resistance of the ground, bending resistance,

    buckling resistance, tensile resistance

    Norm

    Standard EN Euro-Norm i.e. European Standard

    Characteristic

    The value of a parameter to be used in design; usually

    the value of an action only likely to occur with a

    probability of 0.02 per annum or a material property

    likely to be achieved with a probability of 0.95.

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    19/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Calculations 2.4Calculations 2.4

    Characteristic Values 2.4.5.2 (2)P

    The characteristic value of a geotechnical parameter

    shall be selected as a cautious estimate of the value

    affecting the occurrence of the limit state.

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    20/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Soil ParametersSoil Parameters

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    21/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Ultimate Limit States 2.4.7Ultimate Limit States 2.4.7

    Internal failure or excessive deformation of the structure

    or structural elements, including e.g. footings, piles orbasement walls, in which the strength of structural

    materials is significant in providing resistance (STR);

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    22/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Ultimate Limit States 2.4.7 (STR)Ultimate Limit States 2.4.7 (STR)

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    23/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Ultimate Limit States 2.4.7Ultimate Limit States 2.4.7

    Failure or excessive deformation of the ground, in which the

    strength of soil or rock is significant in providingresistance (GEO);

    NOTE Limit state GEO is often critical to the sizing of

    structural elements involved in foundations or retaining

    structures and sometimes to the strength of structural

    elements.

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    24/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Ultimate Limit States 2.4.7 (GEO)Ultimate Limit States 2.4.7 (GEO)

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    25/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Design Approach 1 2.4.7.3.4.2Design Approach 1 2.4.7.3.4.2

    Check for a limit state of rupture or excessive deformation: Combination 1: A1 + M1 + R1

    Combination 2: A2 + M2 + R1

    (Except for the design of axially loaded piles and anchors.)

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    26/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Eurocode 7 Table A.3Eurocode 7 Table A.3

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    27/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Eurocode 7 Table A.4Eurocode 7 Table A.4

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    28/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Eurocode 7 Table A.13Eurocode 7 Table A.13

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    29/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Ground surfaces 9.3.2.2 (2)Ground surfaces 9.3.2.2 (2)

    Ultimate limit state level of resisting ground lowered

    by a, where a is, for normal levels of control:

    10% of wall height for a cantilever or 10% of depth

    below the lowest support, limited to a maximum of

    0.5m

    i.e. Overdig allowance

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    30/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Embedded retaining wallEmbedded retaining wall

    Soil strength M(table A.4)

    Combination 2 to determine toe depth (Geo) i.e. BS 8002 design

    Surcharge x F equiv.

    =1.3/1.0 (table A.3)

    Include over-dig

    Resulting section forces

    (BM & SF) x F =1.0

    (table A.3) Designvalues.

    Soil stiffness 2(CIRIA C580)

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    31/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Embedded retaining wallEmbedded retaining wall

    Soil strength M =1.0

    (table A.4)

    Combination 1 to determine section forces (Str) i.e.BS 8110 design

    Surcharge x F equiv.=1.5/1.35 (table A.3)

    Include over-dig

    Resulting section forces

    (BM & SF) x F =1.35

    (table A.3) Designvalues.

    Soil stiffness unfactored

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    32/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Embedded retaining wallEmbedded retaining wall

    Soil strength unfactored

    Serviceability loadcase to determine deflections

    Surcharge unfactored

    No over-dig

    Soil stiffness unfactored

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    33/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    Execution Standards 7.1(3)pExecution Standards 7.1(3)p

    BS EN 1536:1999, Execution of

    special geotechnical works -bored piles

    BS EN 12063:2000, for sheet

    pile walls,

    BS EN 12699:2000, for

    displacement piles.

    BS EN 14199 for micro-piles.

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    34/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    The Jubilee Line Extension, LondonThe Jubilee Line Extension, London

    North Greenwich stationNorth Greenwich station

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    35/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich StationNorth Greenwich Station

    Large internal space

    No internal slabs Temporary propping of

    retaining walls difficult

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    36/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Box designed independently of any temporary works

    London clay

    Thames Gravel

    Alluvium

    Made Ground

    30m

    22m

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    37/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Difficult to build station around temporary props

    London clay

    Thames Gravel

    Alluvium

    Made Ground

    N th G i h t tiN th G i h t ti

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    38/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Construction sequenceConstruction sequence

    Install hard soft secant piles

    London clay

    Thames Gravel

    Alluvium

    Made Ground

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    39/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Excavate outside box to 3m depth

    Excavate inside to 7.5m depth

    Install ground anchors

    London clay

    Thames Gravel

    Alluvium

    Made Ground

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    40/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Excavate to 15.5m depth

    Install prop

    London clay

    Thames Gravel

    Alluvium

    Made Ground

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    41/84

    November 2008 Engineers IrelandGeotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Complete excavation

    London clay

    Thames Gravel

    Alluvium

    Made Ground

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    42/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Open excavation with

    ground anchors

    Construction of box

    avoided building around

    props

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    43/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    44/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Analysed with WALLAP (beam-on-springs program)

    Prop load 1500kN/m (unfactored) i.e 9000kN/prop @ 6m Measured typically 6000kN, one prop 15000kN (2500kN/m)

    Note mismatch of stiffnesses - ground anchors and props

    London clay

    Thames Gravel

    Alluvium

    Made Ground

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    45/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    North Greenwich stationNorth Greenwich station

    Analysis now with factored

    soils, overdig, softening,minimum fluid pressure

    (i.e. in accordance with

    Eurocode 7 and CIRIA

    C580)

    Wall is not stable

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    46/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    The Jubilee Line Extension, LondonThe Jubilee Line Extension, London

    Canary Wharf stationCanary Wharf station

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    47/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Canary Wharf stationCanary Wharf station

    Diaphragm walls

    installed from the

    base of an old dock

    i

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    48/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Diaphragm wallsDiaphragm walls

    Dug under

    bentonite using a

    Grab orHydrofraise

    Insertreinforcement

    cage and concrete

    using tremie pipe

    Di h llDi h ll

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    49/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Diaphragm wallsDiaphragm walls

    Typical joint detail.

    Straight panels, tee

    panels or corner panels.

    Grab length 2.8m

    typical.

    Di h W llDi h W ll

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    50/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Diaphragm WallsDiaphragm Walls

    Reinforcement details: Allow for the tremie pipe;

    Allow for the unreinforced

    area close to the CWS stopend;

    For installation, the cage must

    be lifted.

    C Wh f t tiC Wh f t ti l t t bilitl t t bilit

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    51/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Canary Wharf stationCanary Wharf station slot stabilityslot stability

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    52/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    The Copenhagen MetroThe Copenhagen Metro

    Eurocode 2Eurocode 2

    C h M tC h M t E d 2E d 2

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    53/84

    November 2008Engineers Ireland

    Geotechnical Society of Ireland

    Copenhagen MetroCopenhagen Metro -- Eurocode 2Eurocode 2

    Rules for Buildings

    Piles require some

    special attention for

    buildability

    Copenhagen MetroCopenhagen Metro -- Eurocode 2Eurocode 2

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    54/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Copenhagen MetroCopenhagen Metro Eurocode 2Eurocode 2

    Analysis

    programsunavailable

    Spreadsheets

    written and

    checked

    C i f S 400 S ifi i

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    55/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Comparison of BS5400 and the Metro SpecificationComparison of BS5400 and the Metro Specification

    0.2mm0.25mmMaximum crack width

    90mm75mmMinimum cover for structures cast against

    the ground

    50mm35mmMinimum cover for durability for

    retaining wall members, as concrete castin non-aggressive ground

    fck

    =30N/mm2fcu

    =35N/mm2Concrete grade

    100 years120 yearsDesign life

    Metro

    Specification

    BS5400Requirements

    T d iT d t ti

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    56/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Stage 1 Install

    retaining wall

    Stage 2 Excavate

    and construct roof

    Stage3 Excavate and

    construct waling beam

    Stage 4 Excavate to

    formation level

    Top down construction sequenceTop down construction sequence

    Station crossStation cross--sectionsection

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    57/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Station crossStation cross--sectionsection

    Structure hung from roof

    Large fixed-end moments

    CrackCrack--width for concrete sectionswidth for concrete sections

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    58/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    CrackCrack--width for concrete sectionswidth for concrete sections

    Calculate crack width at cover required for durability

    Eurocode 2Eurocode 2 -- Crack width calculationCrack width calculation

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    59/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Eurocode 2Eurocode 2 - Crack width calculationCrack width calculation

    Eurocode 2Eurocode 2 -- Lapping of barsLapping of bars

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    60/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Eurocode 2Eurocode 2 Lapping of barsLapping of bars

    Principle not permitted to lap bars greater than 32mm

    diameter. (Not satisfied)

    E d 2E d 2 E i l t di t f b b dlE i l t di t f b b dl

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    61/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Bundles of equivalent diameter greater than 55mm notpermitted (Application Rule)

    Eurocode 2Eurocode 2 -- Equivalent diameter of bar bundlesEquivalent diameter of bar bundles

    Bundles to be considered as notional bars for purposesof crack-width calculation (Application Rule)

    E d 2E d 2 E i l t di t f b b dlE i l t di t f b b dl

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    62/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Equivalent perimeter of bundle = 40 x (2 + ) = 206mm

    Number of bars in bundle:

    (Assume 40mm diameter bars)

    Two:

    Equivalent diameter of a

    single bar =

    56mm

    Perimeter of equivalent bar = 56.6 x = 178mm

    Eurocode 2Eurocode 2 -- Equivalent diameter of bar bundlesEquivalent diameter of bar bundles

    E d 2E d 2 E i l di f b b dlE i l t di t f b b dl

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    63/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Equivalent perimeter of bundle = 40 x (3 + ) = 246mm

    Number of bars in bundle:(Assume 40mm diameter bars)

    Three:

    Equivalent diameter of a

    single bar =

    69.3mm

    Perimeter of equivalent bar = 69.3 x = 218mm

    Eurocode 2Eurocode 2 -- Equivalent diameter of bar bundlesEquivalent diameter of bar bundles

    Circular sectionsCircular sections shear capacityshear capacity

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    64/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    p yp y

    Feltham I, The StructuralEngineer, June 2004

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    65/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    The Copenhagen MetroThe Copenhagen MetroThe observational method atThe observational method at

    Norreport stationNorreport station

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    66/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    The Copenhagen MetroThe Copenhagen MetroThe observational method atThe observational method at

    Norreport stationNorreport station

    Description of the project.

    Construction sequence

    and the observational

    method.

    Application

    Results

    The Copenhagen MetroThe Copenhagen Metro

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    67/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Route of the Metro

    Above ground

    works, on

    embankment orviaduct.

    ChallengesChallenges

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    68/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    100 year design life -0.2mm crackwidth limit.

    Design to Eurocodes.

    First significant deepbasement construction in

    Copenhagen.

    Environmental

    standards.

    Programme constraints.

    Architectural

    requirements.

    Architectural challengesArchitectural challenges

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    69/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Natural light available atplatform level.

    No internal columns at platform

    level.

    Minimal internal propping.

    Danish minimalist design details.

    Retaining wall detailsRetaining wall details

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    70/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Ground Conditions:

    Made ground

    Glacial till

    Limestone

    TBMTBM ProgrammeProgramme

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    71/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Islands Brygge

    Ved Stadsgraven

    Islands Brygge

    Ved Stadsgraven

    TBMTBM ProgrammeProgramme

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    72/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Ved Stadsgraven

    Islands Brygge

    Havnegade

    Ved Stadsgraven

    Christianshavn StationChristianshavn Station

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    73/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Bottom up

    construction

    sequence with

    temporary

    props

    TBMTBM ProgrammeProgramme

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    74/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Havnegade

    Islands Brygge

    Ved Stadsgraven

    Medieval BridgeMedieval Bridge

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    75/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Norreport StationNorreport Station -- BridgeBridge

    FoundationsFoundations

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    76/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Medieval BridgeMedieval Bridge

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    77/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    78/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Application of the observationalApplication of the observational

    techniquetechnique

    Observation method managementObservation method management

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    79/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Settlement control

    engineer

    Comet

    Retaining wall

    designer

    Bachy Soletanche

    Permanent works

    designer

    Maunsell

    Clients

    representative

    Cowi

    Temporary works

    designer

    Carillion

    Design managerComet

    Site managerComet

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    80/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Excavation down to Waling BeamExcavation down to Waling Beam

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    81/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    Excavation down to Base SlabExcavation down to Base Slab

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    82/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    83/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland

    EurocodesEurocodes

  • 5/20/2018 Design and Construction of Metro Stations and Underground Structures

    84/84

    November 2008

    Engineers Ireland

    Geotechnical Society of Ireland