Design
*What is Lean-on-Bracing?
*Benefits of Lean-on-Bracing
*How to design a Lean-on-Bracing System
Construction & Research Results
*US 82 Underpass @ 9th Street
*US 82 Underpass @ 19th Street EB & WB
2/15/2012 3
Research Report 1772-1
2/15/2012 4
2/15/2012 5
2/15/2012 6
2/15/2012 7
*Fewer cross frames –
Significant Cost Savings
*Improved Fatigue Performance
*Reduced Construction Timeline
*Simplifies Future Inspections
2/15/2012 8
2/15/2012 9
2/15/2012 10
2/15/2012 11
2/15/2012 12
βt = Torsional system brace stiffness
βb = Brace stiffness
βsec = Cross Section stiffness (web
distortional stiffness)
βg = In-plane girder stiffness
1
𝛽𝑏+
1
𝛽𝑔 +
1
𝛽𝑠𝑒𝑐=
1
𝛽𝑡
2/15/2012 13
Ideal Total Stiffness
Required System Stiffness
2/15/2012 14
2/15/2012 15
2/15/2012 16
Braces @ Mid-span
Braces @ supports b1
E S2
hb2
Ab
ng Ld3
S3
ng 1 2
2/15/2012 17
2/15/2012 18
Mbr = Fbr hb = βt Фo
2/15/2012 19
Fs ng 1 F
Nc
Fs
ng
Nc 2
F
Force in Diagonal
Force in Struts @ Supports
Force in Struts @ Mid-Span
2/15/2012 20
2/15/2012 21
2/15/2012 22
2/15/2012 23
2/15/2012 24
2/15/2012 25
2/15/2012 26
2/15/2012 27
2/15/2012 28
2/15/2012 29
2/15/2012 30
2/15/2012 31
*Changes in Strain
*Girder Rotations
*Girder Deflections
2/15/2012 32
2/15/2012 33
Actual
Predicted
2/15/2012 34
2/15/2012 35
Load Test X2-DT (kips)
Location
(ft.) X2-DB (kips)
Location
(ft.)
Staggered Ahead 0.7 350 -27.8 100
Staggered Back 0.45 220 8.26 220
Side-by-Side South 0.6 350 6.8 240
Side-by-Side North 0.6 140 8.9 120
End to End South 0.5 140 -25.7 120
End to End Central -0.28 220 10.3 100
Load Test X3-DT (kips)
Location
(ft.) X3-DB (kips)
Location
(ft.)
Staggered Ahead 18.5 140 -11.2 140
Staggered Back 11.7 150 -3.6 150
Side-by-Side South 11.4 140 -3.4 140
Side-by-Side North -15.3 140 13.8 140
End to End South 5.5 190 -5.6 180
End to End Central -14 140 36.1 140
2/15/2012 36
*Design of Lean-on-Bracing is not difficult
*Improves fatigue performance
*Significant cost savings
*Reduces construction time
*It is a conservative method of torsional bracing that works
2/15/2012 37
2/15/2012 38
*Will Barnett, P.E.
*Todd Helwig, Ph.D., P.E.