15
Design Activity Update Data collection - on schedule Survey. Geotechnical. Subsurface Utility Exploration (SUE). Environmental. Cultural Resources.

Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Design Activity Update

• Data collection - on schedule

– Survey.

– Geotechnical.

– Subsurface Utility Exploration (SUE).

– Environmental.

– Cultural Resources.

Page 2: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Design Activity Update

• Update/Refine Hydraulic Model

– “Truth” bridge, channel and walkway elevations.

– Update understanding of flood conveyance.

– Gathering watershed data.

– On Schedule.

Page 3: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Design Activity Update

• Gathering record information

– Drawings and other information.

• Advance physical and architectural concepts

– Continue civil layout

– Update architectural cross sections

Page 4: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Lower Reach Area

Page 5: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

STA. 104+00

Page 6: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

STA. 116+00

Page 7: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

STA. 136+00

Page 8: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

STA. 136+00

Page 9: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

OUTLET STRUCTURE

Page 10: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

STA. 142+00

Page 11: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Public Engagement

UTILIZE THE SAN PEDRO CREEK SUBCOMMITTEE MEETINGS / MEMBERS

SARA/COUNTY REVIEW JUNE 30 - JULY 4

SPC COMMITTEE JULY 10

FIRST WORKSHOP JULY 14 - JULY 18

SARA/COUNTY REVIEW SEPT. 1 – SEPT. 5

SPC COMMITTEE SEPT. 11

SECOND WORKSHOP SEPT. 15 – SEPT. 19

SARA/COUNTY REVIEW NOV. 3 – NOV. 7

SPC COMMITTEE NOV. 13

THIRD WORKSHOP NOV. 17 – NOV. 21

Page 12: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Public Engagement

FIRST WORKSHOP – SITE PROGRAMMING

OBJECTIVE: VALIDATE & STRENGTHEN THE CONCEPT

CONTENT: DESIGN CONCEPT UPDATED

MATERIALS: PLANS 1”=20’ WITH CULTURAL MAPPING OVERLAYS

MODEL SECTIONS

MODEL ELEVATIONS

COMPARATIVE DESIGN IMAGES

HISTORICAL / CULTURAL IMAGES

PROCESS: CHARETTE

AGENDA: 15 MIN. INTRODUCTIONS

30 MIN. CONCEPT OVERVIEW

60 MIN. FOCUS GROUP WORK

30 MIN. REPORTING

15 MIN. SUMMARY & NEXT STEPS

Page 13: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Public Engagement

SECOND WORKSHOP – CHARACTER CONCEPT

OBJECTIVE: REVIEW / COMMENT ON LIGHTING, GRAPHICS, LANDSCAPE & MATERIAL CONCEPTS

THIRD WORKSHOP – DESIGN CHARACTER

OBJECTIVE: REVIEW / COMMENT ON INTEGRATED DESIGN

Page 14: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

Public Engagement CHARACTER AREAS / FOCUS GROUPS 1. VILLA LAGUNILLA SPC MEMBER ARCHITECT ENGINEER 2. ALAMEDA/AGUA ANTIGUA SPC MEMBER ARCHITECT ENGINEER 3. MERODEO SPC MEMBER ARCHITECT ENGINEER 4. CANAL PRINCIPAL SPC MEMBER ARCHITECT ENGINEER 5. CAMPO ABAJO SPC MEMBER ARCHITECT ENGINEER 6. “LOWER REACH” SPC MEMBER ARCHITECT ENGINEER

Page 15: Design Activity Update › wp-cont… · third workshop nov. 17 – nov. 21. public engagement first workshop – site programming objective: validate & strengthen the concept content:

END OF PRESENTATION