21
descon.com Corporate Overview

Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

  • Upload
    doannhi

  • View
    247

  • Download
    11

Embed Size (px)

Citation preview

Page 1: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Corporate Overview

Page 2: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Page 3: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

The Descon Group operates four major

business lines

POWER GENERATION

& SERVICES

Engineering

Chemicals

Own & Operate Two Power

Plants with supplies to State.

Providing Operations &

Maintainace to Power

Industry Internationally

Operating in GCC,

Pakistan with a customer

base across globe

Operating Hydrogen Peroxide

Plant with exports to Middle

East, Far East South Asia and

African countries

Skilled Manpower for our

customers across globe

Travel & Logistics Support

Other Lines

Inspection & TestingOperating in GCC,

Pakistan

Page 4: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

Vision

To become a world class

engineering, manufacturing and

construction company operating

internationally.

Core Values

• Safety

• Leadership

• Open Communication

• Teamwork

• Continuous Improvement

• Accountability & Ownership Descon Field Services

Page 5: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Engineering Businesses

Descon Engineering Limited Pakistan

Descon Engineering & Technology

Descon Qatar LLC

Descon Engineering FZE Kuwait

Descon Engineering Abu Dhabi

Descon Engineering FZE Sharjah

Descon Engineering Oman LLC

Descon Engineering FZE - Iraq

Presson Descon Limited

Olayan Descon JV Saudi Arabia

Page 6: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

INSPECTION TESTING CERTIFICATION CALIBRATION

Inspection & Testing

Gray Mackenzie Engineering Services

Page 7: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Power Solutions Operate & Maintenance Service Partner

31.2 MW at ISO conditions

IC Engines – simple cycle

Natural Gas

8 MWM Gas-Fired engines TCG 2032 V16 model

Combined cycle - IPP Project

450 MW at ISO conditions2 gas turbines + 1 steam turbine- Combined cycleFuel Natural Gas Back up Diesel2 x V92 Siemens GTs & 1 x Siemens ST Hp – D30-16

Power Business

Page 8: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

we don’t sell peroxide we sell Eco Friendly solution

Pakistan’s largest and only European Technology plant 30,000 TPA

Largest market share in Pakistan and competing with Global companies in regional

countries

Descon Oxychem Limited

Chemicals Business

Page 9: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

1977

• Company established

1980

• OlayanDesconSaudi Arabia

1982

• Lahore Manufacturing Works

1982

• Abu Dhabi

2000

• Joint Venture with JGC Corporation

Major Milestones

2000

• Joint Venture with Presson, of Canada

2001

• Ruwais shop established in Abu Dhabi

2002

• Yanbu Saudi Arabia

2004

• DesconEngineering Qatar

2005

• HamriyahManufacturing Works in UAE

2006

• Altern Energy and RouschPower acquired

2007• Karachi

Manufacturing Works commissioned

2008• Descon

Oxychem

2008• Entry in

Kuwait

2013• Entry in Iraq

2015• Entry in

Oman

Page 10: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Our Presence

Internationally

United Arab Emirates

Abu Dhabi

Sharjah

Dubai

Saudi Arabia

Pakistan

Qatar

Oman

Iraq

Baghdad

Kurdistan

Geographic Footprint

Future Plan include expansion to

Central Asian States

African Continent

Iran

Existing Markets Target markets

Page 11: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Current Projects in Pakistan

Pakistan Refinery

(CMEI) Isomerization,

Karachi

50 MW Gul Ahmed Wind Energy Ltd. (EPC)

Jinnah Barrage,

Mianwali

Ranolia18 MW HPP

Bisham (EPC)

50 MW Metro Power Co., Ltd.

Wind Farm, Jhampir -Karachi (EPC)

• Power

• Refinery

• Oil & Gas

• Infrastructure

• Chemical/Petro-chemical

Pakistan

Afghanistan

India

China

Iran

Corporate Office

New Khanki

Barrage, Wazirabad

2x10 MW Heat Recovery

Power Plant & Grid Rehab.

K ELectric, Karachi

Lahore

Karachi

Islamabad

PPL Adhi Gas Plant – 3

(EPC)

9 MW Nishat Coal Power Project - Lahore

117 MWFPCL Coal Power

Project (CMEI Works) 50 MW Younas Energy Limited

Gambat GPF (EPC)

Ashmore Can,Plant (CMEI)

KPD-TAY –Wellhead & GPF E&I Work (Procurement & Construction Contract)

Naulong Dam Jhal

Magsi

ICI Soda Ash Plant

Engineering

Khurram Tangi,

KPK Wazirastan

Ghotki Canal, Sindh

Page 12: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Current Projects in Middle East•UAE

•Qatar

QatarGas Long Term

Shutdown 5+2 Years

Pakistan

Afghanistan

India

China

Iran

Saudi ArabiaUAE

Qatar

Kuwait

Oman

Iraq

Yemen

Dolphin Long term

Shutdown 5Years &

Slug Catcher Job

NGL Long term

Contract - NSD

jobs and Manpower

supply

QAPCO- Demolition

of Furnaces

Q-Chem –Tanks

Refurbishment

QAFCO- Mechanical

Piping Job – onshore /

offshore

Miscellaneous

Retrofit Jobs in RLIC

(QG, DEL, Barzan)

Borouge Polyolefins Flare

Recovery Project, Ruwais,

Abu Dhabi (EPC)

ADCO Sahil Field

Development (EPC)

BOROUGE Repair, Replacement

of end tube sheets on convection

modules

ADCO South East Tie-Ins Package B (EPC)Barakah Nuclear Power Plant

(Construction)

ZADCO UZ-750 (Construction)

FERTIL New Bagging and Truck

Loading Facility (EPC)

Page 13: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

54%

17%

17%

12%Engineering

Power

Chemicals

Others

Revenue Mix Business wise - 2015

Nationalities & Number of Employees

Number of Nationalities No.26 Number of Employees over 20K

Cultural Diversity supports our International businesses

Annual Revenue

is US$1 Billion

Order Book is of

US$3 Billion

Page 14: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Business Divisions

Power

Oil & Gas

Infrastructure Manufacturing

Plant Construction Plant Maintenance

Engineering & Technology

EPC

Page 15: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Industry Sectors

ChemicalsOil & Gas

FMCG

Hydro electric

FertilizerPower

Renewable Energy InfrastructureCement

Page 16: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Sharjah UAE

Manufacturing Facilities

Yanbu – Saudi Arabia(Process Equipment & General

Fabrication)

Alkhor – Qatar(General Fabrication)

Lahore – Pakistan(Boilers & Process Equipment)

Al Jubail – Saudi Arabia(Process Equipment)

Karachi – Pakistan(Wind Tower, General Fabrication)

Page 17: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Plant Engineering - Lahore

Design Centers

Plant Engineering

Karachi

Product Engineering

Sharjah

Process Equipment Engineering Lahore

Product Engineering

Al Jubail - KSA

Plant Engineering

Abu Dhabi

Boiler Engineering

Lahore

Total 400 Design Engineers and Professionals

Page 18: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Accumulated Experience

• Construction execution 635 million man-hours

• Engineering execution 7.5 million man-hours

Since1977. . .

• Equipment manufacturing 300,000 tons

• Plant maintenance 61 million man-hours

• ENR Ranking 126 / 250 in International category & 208 / 250 in

Global category

Page 19: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Corporate Social Responsibility - CSR

Descon Technical Institute

• Established in 1998.

• Trained more than 15,000 skilled and semi-skilled workers.

• International standards followed.

• Welders’ Certification conducted by 3rd Party for Welders Qualification

Test (WQT) for Advanced Welding (6G) and Electric Welding (3G).

Major Courses Offered:

- Advance Welder 6G

- Electric Welder 3 G

- Electrical Supervisor

- Pipe Fabricator

- Pipe & General Fitter

- Millwright

- Electrical Technician

- Safety Inspector

- Rigger / Scaffolder

- Safety Assistant

Education for Livelihood

Page 21: Descon Corporate Overview - Descon - Engineering, …descon.com/MD/docs/Descon-Engineering-Corporate... · descon.com 1977 •Company established 1980 •Olayan Descon ... •Karachi

descon.com

Thank You!