Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
1
Liebherr developed a new derrick. This derrick is able to dismantle craneparts up to 10t. Even the 355HC-L, with the 500HC-tower, can be dismantled with it. Its components have the dimentionsand weights which allow that itscomponents can be transported in a elevator.
Derrick 200 DR 5-10
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
2
General drawing
7,4t
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
3
Derrick 200 DR 5-10, most important components identifier
Strut
Stiff leg
Outrigger
Jib
Mast
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
4
Strut and stiff leg
Strut
Stiff leg
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
5
Derrick 200 DR 5-10
Without stiff-legs, able to slew n x 360
With stiff-legs, able to slew 180
With special connecting points
For lifting loads with the mast only(only for erection or dismantling of derrick parts)
This derrick can be used:
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
6
Derrick 200 DR 5-10, technical key featuresReving: 1-/2-fallControl: PLCDrives: with frequence
converterJib lenghts: 20m and 25mMax. tip load: 9,8 7,4t Max. load 1-fall: 5,4t Max. Load 2-fall: 10,6tHoist gear: 45KWHoisting speed: 0-100m/min, 2-fall.
0-186m/min,1fallMax. hook height: 320m 2-fallLuffing gear: 37KWJib slewing angleswithout stiff legs: n x 360with stiff legs: 180Derrick base: 4m x 4mSlewing radius: 5,6mCounterweight: steel, 8 x 1.0t=8tHeaviest component: 1050 kg
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
7
Derrick 200 DR 5-10, without stiff legs and struts
The derrick has a luffing jib with a working radiusfrom 5,06m to 25m.Slewing platform radius = 5,6m.Slewing angle = n x 360
5,06m
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
8
Derrick 200 DR 5-10, load momentsThe load moment increase from108,78 mt without stifflegs
to 201,88 mt with stifflegs
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
9
Climbing inside the building (optional)
Climbing inside the building on the 132HC tower. Tower height around 30m.Climbing step 10m.Windspeed.In service, up to 72Km/hOut of service, up to 165 Km/h
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
10
With special connecting points
The slewing ring support (without stifflegs and struts) can be connected on a cruciform, on another steel structure or direct to the floor.
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
11
With special connecting pointsWith special stifflegs, connected to the building.
Out of
also have the opposite direction
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
12
Load lifting with the mast
M
a
s
t
The Struts and the jib can beerected and dismantled withthe mast. Derrick parts can belowered to the ground
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
13
Drives
Hoist gear45KW
Slewing gear5KW
Luffing gear37KW
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
14
Switchgear cabinets
S1
S4
S2
Switchgear cabinet, PLC control, EMS-2
Switchgear cabinet S4, luffing gear.
Switchgear cabinet S2, hoist gear
S1
S2
S4
Each switchgear cabinet has itsown resistors. The derrick mast can be moved with thedismantled S1 and S2 switchgear cabinets.
All electrical connections are equipped withplugs and sockets
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
15
PLC control System (Programmable logic controller)
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
16
Radio remote controlSlewing gear/Luffing gear Hoisting gear
Pre-setting of hoistingspeed
90% pre-warning max. loadWind warning (>50Km/h)
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
17
Load chart, without stifflegs and struts
JL JL
320m
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
18
Some outrigger positions, without stifflegs and struts
Other positions are possible
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
19
Outrigger position without stifflegs and struts
The derrick can be connected directly to the floor, if it is able to transmit the corner forces.
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
20
Outrigger position, without stifflegs and struts
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
21
Outrigger corner pressures, without stifflegs and struts
+ +
Jibpositions
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
22
++
Outrigger corner pressures, without stifflegs and struts
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
23
++
Outrigger corner pressures, without stifflegs and struts
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
24
++
Outrigger corner pressures, without stifflegs and struts
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
25
++
Outrigger corner pressures, without stifflegs and struts
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
26
Load chart with stiff-legs (with and without struts)
JL JL
320m
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
27
Stifflegs corner pressures with stiff-legs and struts
With Struts S
In sevice and until 200Km/h, out of service jib position = 80
X/Y
XH/YH
The forces D/C, d/c, a/b and A/B must beconsidered and taken from the tables shownbefore (Outrigger corner pressures).
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
28
Corner pressures, with stifflegs and without struts
In sevice and until 200Km/h, out of service jib position = 80
X/Y
X/YH
In sevice and until 200Km/h, out of service jib position = 80
The forces X/YH and X/Y out of thestiff-legs are transmitted directly to the floor
The forces D/C, d/c, a/b and A/B must beconsidered and taken from the tablesshown before (Outrigger cornerpressures).
X/YH
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
29
Some outrigger positions with stiff legs and with strutsSome outrigger positionswith Struts S with Struts S
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
30
Some outrigger pos. with stifflegs and with strutsSome outrigger positionswith Struts S With Struts S
The lateral stability isnt given.
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
31
Some outrigger positions with stifflegs and without struts
Some outrigger positions without Struts S.
The stiff legs must be connected directly to thefloor or to a steel structure.
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
32
Load chart, lifting with the mast
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
33
Connection conditions
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
34
Connection conditions for outriggers
4 bolts M30
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
35
Connection conditions for outriggers
Outrigger fixing strut
Threaded rod,the lenght must beadjusted beforebolted to the outriggerand slewing ring support..
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
36
Connection conditions for stiff-legs with struts
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
37
Connection requests for stiff-legs with struts
On a steel structuremin.4 bolts M 27
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
38
Connection requests for stifflegs, without struts
On concrete (floor)min.8 anchor bolts M 27
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
39
Slewing ring support connection pointsThe slewing ring support, withoutoutriggers, struts and stiff-legsmust be connected to thestructure.
The slewing ring support can beconnectedto a tower, to a steelworkor directly to a floor.
The 2 bigger holes are forconnecting the slewing ring support to the tower orsteelwork, the 4 smaller holesare for connecting the supportdirectly to the floor
Acting forcesIn service out of service until 175KM/hM = 1175 KNm M= 1175 KNmH = 11KN H = 71KNV = 307 KN V = 233 KNMd = 156 KNm Md = 94 KNm
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
40
Safety devices
Load measuringaxle, hoist gear
Angle transmitter
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
41
Safety devices
Load momentmeasuring axle
F
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
42
Safety devices
Min.jib outreachlimit switch
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
43
Safety devices
2 slewing limitswitches.
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
44
Safety
Walkway
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
45
Safety
Personnel protective equipment can be hang up
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
46
Safety
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
47
Safety
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
48
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
49
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
50
Dismantling
M
a
s
t
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
51
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
52
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
53
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
54
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
55
Dismantling
Derrick 200 DR 5-10, 03.2008
C
o
p
y
r
i
g
h
t
L
i
e
b
h
e
r
r
2
0
0
6
56
Dismantling