Procurement Plan For Consultancy Department of Water Supply & Sanitation, Punjab Procurement Report 4 Website: www.pbdwss.gov.in 16-Nov-2012 As on : Contract Status: All Prior Review Package No. Description of Services Estimated Cost (RS Lacs) Method of Selection TOR Finalised Bank's NOC (Date) Contract Numbers, Value(Lac) Name of Consultant/Nationalit y & Zip Code. If USA Services to be Completed (Date) WBR No. Expenditure incurred to date Advertising for short listing (Date) Bank's NOC to RFP (Date) Last date of Receipt of Proposal (Technical/F inancial/Co mbined) (Date) Bank NOC to Proposal (Technical) (Date) Bank NOC to Contract Award (Date) Plan/Actual 8 7 9 12 11 10 13 15 14 16 17 18 3 4 2 5 1 Sr. No. 6 RFP Issued (Date) Zone: South Zone, Circle: Chandigarh Circle, District: SAS Nagar PRWSS-C- 12 Consultancy for developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 15.00 CQ 5-11-2006 21-01-2007 N/A N/A N/A 0 P 1 22-12- 2006 PRWSS-C- 12 Consultancy for developing media strategy and designing meterial, (No.-1, Unit Cost- 15) CQ 5-11-2006 21-01-2007 A 2 22-12- 2006 PRWSS-C- 13 Engineering support for renovation of ponds for Pilor Batch of 5 ponds, (No.1,Unit Cost-1.25) 1.25 CQ 21-11- 2006 06-02-2007 N/A N/A N/A 0 P 3 07-01- 2007 PRWSS-C- 13 Engineering support for renovation of ponds for Pilor Batch of 5 ponds, (No.1,Unit Cost-1.25) CQ 21-11- 2006 06-02-2007 A 4 07-01- 2007 PRWSS-C- 14 Engineering support for small bore sewers for pilot batch of 5 schemes, (No.-1, Unit Cost-2.5) 2.50 CQ 21-11- 2006 06-02-2007 N/A N/A N/A 0 P 5 07-01- 2007 PRWSS-C- 14 Engineering support for small bore sewers for pilot batch of 5 schemes, (No.-1, Unit Cost-2.5) CQ 21-11- 2006 06-02-2007 A 6 07-01- 2007 Procurement Plan For Cosultancy 16/11/2012 19.31.08 Page 1 of 24 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ure Authorized

Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

Procurement Plan For Consultancy

Department of Water Supply & Sanitation, PunjabProcurement Report 4Website: www.pbdwss.gov.in

16-Nov-2012As on :Contract Status: All Prior Review

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

Zone: South Zone, Circle: Chandigarh Circle, District: SAS Nagar

PRWSS-C-12

Consultancy fordeveloping media

strategy and designingmeterial, (No.-1, Unit

Cost- 15)

15.00 CQ 5-11-2006 21-01-2007 N/A N/A N/A 0P122-12-2006

PRWSS-C-12

Consultancy fordeveloping media

strategy and designingmeterial, (No.-1, Unit

Cost- 15)

CQ 5-11-2006 21-01-2007A222-12-2006

PRWSS-C-13

Engineering support forrenovation of ponds forPilor Batch of 5 ponds,(No.1,Unit Cost-1.25)

1.25 CQ21-11-2006

06-02-2007 N/A N/A N/A 0P307-01-2007

PRWSS-C-13

Engineering support forrenovation of ponds forPilor Batch of 5 ponds,(No.1,Unit Cost-1.25)

CQ21-11-2006

06-02-2007A407-01-2007

PRWSS-C-14

Engineering support forsmall bore sewers for

pilot batch of 5schemes, (No.-1, Unit

Cost-2.5)

2.50 CQ21-11-2006

06-02-2007 N/A N/A N/A 0P507-01-2007

PRWSS-C-14

Engineering support forsmall bore sewers for

pilot batch of 5schemes, (No.-1, Unit

Cost-2.5)

CQ21-11-2006

06-02-2007A607-01-2007

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 1 of 24

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb350881
Typewritten Text
wb350881
Typewritten Text
wb350881
Typewritten Text
75470 v1
Page 2: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSS-C-15

Post review of theprocurement

procedure, (No.-Nil,Unit Cost-18)

18.00 CQ 7-3-2007 23-05-2007 N/A N/A N/A 0P723-04-2007

PRWSS-C-15

Post review of theprocurement

procedure, (No.-Nil,Unit Cost-18)

3.50 CQ 11-5-200930-05-2009

24-06-20098169 / 2.25 / in

lacs

Arun KumarShrivastav / 0 /

Indian30-11-2009

238000.00

A801-06-2009

2009-07-07

PRWSS-C-16

Independent waterquality testing

Consultancy for testingpestiside,(No.-1, Unit

Cost-12)

12.00 CQ 5-10-2006 21-12-2006 N/A N/A N/A 0P921-11-2006

PRWSS-C-16

Independent waterquality testing

Consultancy for testingpestiside,(No.-1, Unit

Cost-12)

11.40 CQ27-05-2008

22-07-20081553-56 / 11.40 /

in lacs

District YouthWelfare

Association,Mansa / 0 /

Indian

0.00A1023-06-2008

PRWSS-C-17

Independent waterquality testing

Consultancy for testingother parameters, (No.-

1, Unit Cost-10)

10.00 CQ 5-10-2006 21-12-2006 N/A N/A N/A 0P1121-11-2006

PRWSS-C-17

Independent waterquality testing

Consultancy for testingother parameters, (No.-

1, Unit Cost-10)

12.00 CQA12

PRWSS-C-18

Review of internationalbest ractices for depaquifer drilling and

contaminationprevention, (No.-1, Unit

Cost-25)

25.00 CQ 4-11-2006 20-01-2007 N/A N/A N/A 0P1321-12-2006

PRWSS-C-18

Review of internationalbest ractices for depaquifer drilling and

contaminationprevention, (No.-1, Unit

10.00 CQA14

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 2 of 24

Page 3: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

Cost-25)

PRWSS-C-SPMC-1492

Capacity Building inO&M Phase for 500

Commssioned Villages95.00 QCBS 17-3-2010 3-11-2010

03-11-2010

23-12-2010 24-6-2011 N/A N/A 24-09-2012 N/A 0P1504-11-2010

2011-03-01

PRWSS-C-SPMC-1492

Capacity Building inO&M Phase for 500

Commssioned Villages95.00 QCBS 17-3-2010 11-3-2010

03-11-2010

23-12-20106080 / 83.67 / in

lacs

M/s WapkosLimited,

Gurgaon / 0 /Indian

85 0.00A1604-11-2010

2011-03-01

PRWSSP-C-1

IndependentConstruction Qualityconsultants- for PilotProject (No.-3, Unit

Cost-2)

6.00 IC 27-7-2006 11-9-200611-09-2006

16-10-2006 N/A N/A N/A 0P1716-09-2006

PRWSSP-C-1

IndependentConstruction Qualityconsultants- for PilotProject (No.-3, Unit

Cost-2)

4.50 IC 27-7-200611-09-2006

16-10-2006703670387040 /

0.96 / in lacs

Sh. A.K. Jairath,Sh. L.C.

Sharma & Sh.ACM Bhandari /

0 / Indian

04-03-20108200000.

00A18

16-09-2006

PRWSSP-C-11

Consultant for capacitybuilding for training to

GPWSC Member'sAssistant Accountants

etc on financial,procurement and

Accounting mettersNo.1 Unit cost-15

15.00 CQ 25-9-2006 11-12-2006 N/A N/A N/A 0P1911-11-2006

PRWSSP-C-11

Consultant for capacitybuilding for training to

GPWSC Member'sAssistant Accountants

etc on financial,procurement and

Accounting mettersNo.1 Unit cost-15

14.00 CQ25-07-2007

03-09-20073999 / 14.00 / in

lacs

Davinder S. Jaaj& Co. / 0 /

Indian

434390.00

A2016-08-2007

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 3 of 24

Page 4: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-2/1

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P2113-09-2006

N/A

PRWSSP-C-2/1

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

7.20 SSS N/A30-08-2006

spl-1 / 7.20 / inlacs

Water ResourceDevelopment

Service,Panchkula / 0 /

Indian

19-09-2007 78000.00A22 N/A

PRWSSP-C-2/2

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P2313-09-2006

N/A

PRWSSP-C-2/2

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

10.56 SSS N/A30-08-2006

spl-2 / 10.56 / inlacs

District YouthWelfare

Association,Mansa / 0 /

Indian

19-09-2007157000.0

0A24 N/A

PRWSSP-C-2/3

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P2513-09-2006

N/A

PRWSSP-C-2/3

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

2.40 SSS N/A30-08-2006

spl-3 / 2.40 / inlacs

YouthFoundation,Kharar / 0 /

Indian

19-09-2007 34000.00A26 N/A

PRWSSP-C-2/4

CommunityDeveloopment support-

(pilot schemes)-Extension of existing

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P2713-09-2006

N/A

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 4 of 24

Page 5: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

SO/NGO's contract(No.-5, Unit Cost- 28)

PRWSSP-C-2/4

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

20.16 SSS N/A30-08-2006

spl-4 / 20.16 / inlacs

SIDT,Panchkula / 0 /

Indian19-09-2007 0.00A28 N/A

PRWSSP-C-2/5

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P2913-09-2006

N/A

PRWSSP-C-2/5

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

1.92 SSS N/A30-08-2006

spl-5 / 1.92 / inlacs

Sarv SehyogSociety,

Chandigarh / 0 /Indian

19-09-2007 0.00A30 N/A

PRWSSP-C-2/6

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P3113-09-2006

N/A

PRWSSP-C-2/6

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

7.20 SSS N/A20-11-2007

spl-6 / 7.20 / inlacs

Water ResourceDevelopment

Service,Panchkula / 0 /

Indian

19-09-2008 90000.00A32 N/A

PRWSSP-C-2/7

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P3313-09-2006

N/A

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 5 of 24

Page 6: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-2/7

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

10.56 SSS N/A20-11-2007

spl-7 / 10.56 / inlacs

District YouthWelfare

Association,Mansa / 0 /

Indian

19-09-2008 0.00A34 N/A

PRWSSP-C-2/8

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

140.00 SSS N/A N/A12-09-2006

20-09-2006 N/A N/A N/A 0P3513-09-2006

N/A

PRWSSP-C-2/8

CommunityDeveloopment support-

(pilot schemes)-Extension of existingSO/NGO's contract

(No.-5, Unit Cost- 28)

2.40 SSS N/A20-11-2007

spl-8 / 2.40 / inlacs

YouthFoundation,Kharar / 0 /

Indian

19-09-2008 0.00A36 N/A

PRWSSP-C-3/1

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P3718-09-2006

PRWSSP-C-3/1

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062116 / 12.00 / in

lacs

United Welfareand

DevelopmentSociety,

Chandigarh / 0 /Indian

09-11-2007 60000.00A3820-09-2006

PRWSSP-C-3/10

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P3918-09-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 6 of 24

Page 7: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-3/10

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062125 / 12.00 / in

lacs

Lok KalyanSamiti, Amritsar

/ 0 / Indian09-11-2007

120000.00

A4020-09-2006

PRWSSP-C-3/11

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P4118-09-2006

PRWSSP-C-3/11

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062126 / 12.00 / in

lacs

Pendu Vikasand Samaj

Bhalai Sanstha,Anandpur Sahib

/ 0 / Indian

09-11-2007 60000.00A4220-09-2006

PRWSSP-C-3/12

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P4318-09-2006

PRWSSP-C-3/12

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062127 / 12.00 / in

lacs

SahotaEducation

Society, Mohali /0 / Indian

09-11-2007 60000.00A4420-09-2006

PRWSSP-C-3/13

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P4518-09-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 7 of 24

Page 8: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

Rs. 20 lacs.

PRWSSP-C-3/13

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062128 / 12.00 / in

lacs

MalwaFoundation,Punjab / 0 /

Indian

09-11-2007 60000.00A4620-09-2006

PRWSSP-C-3/14

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P4718-09-2006

PRWSSP-C-3/14

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062129 / 12.00 / in

lacs

Social Work andRural

DevelopmentCentre, Ropar /

0 / Indian

09-11-2007 60000.00A4820-09-2006

PRWSSP-C-3/15

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P4918-09-2006

PRWSSP-C-3/15

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062130 / 12.00 / in

lacs

Saubhagya AllIndia

Foundation forSocial Work,

Gaziabad / 0 /Indian

09-11-2007 60000.00A5020-09-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 8 of 24

Page 9: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-3/16

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P5118-09-2006

PRWSSP-C-3/16

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062131 / 12.00 / in

lacs

Water ResourceDevelopment

Service(Panchkula) / 0 /

Indian

09-11-2007 60000.00A5220-09-2006

PRWSSP-C-3/17

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P5318-09-2006

PRWSSP-C-3/17

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062132 / 12.00 / in

lacs

ProgressiveYouth Forum,Patiala / 0 /

Indian

09-11-2007 60000.00A5420-09-2006

PRWSSP-C-3/2

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P5518-09-2006

PRWSSP-C-3/2

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

12.00 FBS 1-9-200618-09-2006

05-10-20062117 / 12.00 / in

lacs

The SaiDharamsingh

GroverFoundation / 0 /

Indian

09-11-2007 60000.00A5620-09-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 9 of 24

Page 10: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

Rs. 20 lacs.

PRWSSP-C-3/3

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P5718-09-2006

PRWSSP-C-3/3

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062118 / 12.00 / in

lacs

Kheti Virasat,Patiala / 0 /

Indian09-11-2007 60000.00A58

20-09-2006

PRWSSP-C-3/4

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P5918-09-2006

PRWSSP-C-3/4

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

2119 / 12.00 / inlacs

YouthFoundation,Ropar / 0 /

Indian

09-11-2007 60000.00A6020-09-2006

PRWSSP-C-3/5

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P6118-09-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 10 of 24

Page 11: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-3/5

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062120 / 12.00 / in

lacs

Lala JagatNaryanaMemorial

Charitable Trust/ 0 / Indian

09-11-2007 60000.00A6220-09-2006

PRWSSP-C-3/6

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P6318-09-2006

PRWSSP-C-3/6

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062121 / 12.00 / in

lacs

District YouthWelfare

Association,Mansa / 0 /

Indian

09-11-2007 60000.00A6420-09-2006

PRWSSP-C-3/7

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P6518-09-2006

PRWSSP-C-3/7

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062122 / 12.00 / in

lacs

Indian RuralDevelopment

and SocialWelfare Society,

Patiala / 0 /Indian

09-11-2007105000.0

0A66

20-09-2006

PRWSSP-C-3/8

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P6718-09-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.08Page 11 of 24

Page 12: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

Rs. 20 lacs.

PRWSSP-C-3/8

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062123 / 12.00 / in

lacs

EducationWelfare Society,

Ludhiana / 0 /Indian

09-11-2007 60000.00A6820-09-2006

PRWSSP-C-3/9

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

538.00 FBS 1-9-2006 15-9-200615-09-2006

18-10-2006 N/A N/A N/A 0P6918-09-2006

PRWSSP-C-3/9

Communitydevelopment support-

(batch-I Schemes), UnitCost- Misc small

contracts value of eachcontract not to exceed

Rs. 20 lacs.

12.00 FBS 1-9-200618-09-2006

05-10-20062124 / 12.00 / in

lacs

Sarv SehyogSociety,

Chandigarh / 0 /Indian

09-11-2007 60000.00A7020-09-2006

PRWSSP-C-4/1

Preperation of Waterresource map-

extension of existingconsultancy, (No. 1,

Unit Cost- 47)

47.00 SSS N/A N/A10-10-2006

27-10-2006 N/A N/A N/A 0P7120-10-2006

N/A

PRWSSP-C-4/1

Preperation of Waterresource map-

extension of existingconsultancy, (No. 1,

Unit Cost- 47)

17.34 SSS N/A 19-05-20061125 / 17.34 / in

lacs

Punjab RemoteSensing / 0 /

Indian15-12-2010

1718100.00

A72 N/A

PRWSSP-C-4/2

Preperation of Waterresource map-

extension of existingconsultancy, (No. 1,

Unit Cost- 47)

100.00 QCBS 21-9-200614-11-2006

14-11-2006

01-01-2007 20-4-2007 N/A N/A N/A 0P7317-11-2006

2007-02-22

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 12 of 24

Page 13: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-4/2

Preperation of Waterresource map-

extension of existingconsultancy, (No. 1,

Unit Cost- 47)

4.31 QCBSspl-10 / 4.31 / in

lacs

Punjab RemoteSensing / 0 /

Indian0.00A74

2007-03-06

PRWSSP-C-5

Development ofprogram MIS (includingpilot testing training andstate vide roll out), No.-

1, Unit Cost-100

100.00 QCBS 21-9-200614-11-2006

14-11-2006

01-01-2007 20-4-2007 N/A N/A N/A 0P7517-11-2006

2007-02-22

PRWSSP-C-5

Development ofprogram MIS (includingpilot testing training andstate vide roll out), No.-

1, Unit Cost-100

ICBA76

PRWSSP-C-6

Internal auditor-I, (No.1, Unit Cost-25)

25.00 CQ 25-8-2006 10-11-2006 N/A N/A N/A 0P7711-10-2006

PRWSSP-C-6

Internal auditor-I, (No.1, Unit Cost-25)

CQ 8-12-2008 18-02-2009A7815-01-2009

PRWSSP-C-7

Concurrent financialreview-I, (No.-1, Unit

Cost 14.25)7.50 CQ 5-9-2006 21-11-2006 N/A N/A N/A 0P79

22-10-2006

PRWSSP-C-7

Concurrent financialreview-I, (No.-1, Unit

Cost 14.25)14.51 CQ

21-12-2007

19-02-2008

28-03-20085792 / 14.51 / in

lacs

Aggarwal A.Kumar &

Associates / 0 /Indian

23-06-2009130630.0

0A80

29-02-2008

PRWSSP-C-8

Concurrent financialreview-2 (No.-1, Unit

Cost-14.25)7.50 CQ 5-9-2006 21-11-2006 N/A N/A N/A 0P81

22-10-2006

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 13 of 24

Page 14: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

PRWSSP-C-8

Concurrent financialreview-2 (No.-1, Unit

Cost-14.25)CQ

5255 / 26.59 / inlacs

Aggarwal A.Kumar &

Associates / 0 /Indian

23-06-2010324349.0

0A82

SPMC-1Independent

constructions qualitysurvcilance ageny

174.00 QCBS 1-9-2008 1-12-200801-12-2008

01-02-2009 N/A N/A 06-12-2012 N/A 0P8301-12-2008

2010-05-28

SPMC-1Independent

constructions qualitysurvcilance ageny

174.00 QCBS 1-9-200819-11-2009

01-12-2008

01-02-200912144 / 75.75 / in

lacs

VoyantsSolution Pvt.

Ltd. / 0 / Indian06-12-2012 46 0.00A84

01-12-2008

2010-05-28

spmc-10Hiring the service oftheatre groups for

street plays20.00 CQ

15-10-2008

15-10-2008

30-10-2008 N/A N/A 31-01-2009 N/A 0P8518-10-2008

spmc-10Hiring the service oftheatre groups for

street plays0.00 CQA86

spmc-11

Preparation of 2 VideoDocumentaries-(8-10

min) (i) One on successstories with people

participation (ii) One onill effects of

contaminatd water

4.00 LCS N/A15-10-2008

15-10-2008

30-10-2008 N/A N/A 30-11-2008 N/A 0P8718-10-2008

spmc-11

Preparation of 2 VideoDocumentaries-(8-10

min) (i) One on successstories with people

participation (ii) One onill effects of

contaminatd water

4.00 LCS N/A16-04-2009

22-05-20096137 / 2.76 / in

lacs

Genesis MediaPvt. Ltd. / 0 /

Indian30-11-2009

276000.00

A8818-04-2009

spmc-12Preparation & Telecast

of Audio-visual onDoordarshan (TV)

18.00 SSS N/A N/A15-10-2008

31-10-2008 N/A N/A 31-12-2008 N/A 0P8920-10-2008

N/A

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 14 of 24

Page 15: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

spmc-12Preparation & Telecast

of Audio-visual onDoordarshan (TV)

15.05 SSS N/A01-01-2009

03-02-2009939 / 15.05 / in

lacs

DoordarshanJalandhar / 0 /

Indian23-06-2009

1059000.00

A9003-01-2009

N/A

spmc-13Engaging agency forroad show with media

publicity10.00 SSS N/A N/A

15-10-2008

31-10-2008 N/A N/A 31-01-2009 N/A 0P9120-10-2008

N/A

spmc-13Engaging agency forroad show with media

publicity8.35 SSS N/A

01-01-2009

02-02-20095068 / 8.35 / in

lacs

Prasar BhartiDD Jalandhar /

0 / Indian12-05-2009

778000.00

A9203-01-2009

N/A

spmc-14

Advertisement innewspapers (Twice in a

week for 2 monthPunjab Kesri, Jagbani,Ajit, Danik Bhaskar &

The Tribune

32.00 SSS N/A N/A 31-10-2008 N/A N/A 31-01-2009 N/A 0P9315-10-2008

N/A

spmc-14

Advertisement innewspapers (Twice in a

week for 2 monthPunjab Kesri, Jagbani,Ajit, Danik Bhaskar &

The Tribune

SSS N/A 31-10-2008A9415-10-2008

N/A

spmc-15

Preparation of WaterResoruce & QualityMap- Extension of

contract of 16 districtsof state

0.00 SSS N/A N/A N/A N/A N/A 0P95 N/A

spmc-15

Preparation of WaterResoruce & QualityMap- Extension of

contract of 16 districtsof state

106.00 SSS N/A17-02-2010

12-5-20105267 / 106.00 / in

lacs

Punjab RemoteSensing / 0 /

Indian27-11-2011 63

1018116.00

A96 N/A

spmc-16/11Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P97

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 15 of 24

Page 16: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

spmc-16/11Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3668 / 0.00 / inlacs

District YouthWelfare

Association,Mansa / 0 /

Indian

0.00A98

spmc-16/12Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P99

spmc-16/12Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3666 / 0.00 / inlacs

United Welfareand

DevelopmentSociety,

Chandigarh / 0 /Indian

0.00A100

spmc-16/13Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P101

spmc-16/13Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3672 / 0.00 / inlacs

The Sai DharamSingh Grover

Foundation / 0 /Indian

0.00A102

spmc-16/14Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P103

spmc-16/14Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3678 / 0.00 / inlacs

YouthFoundation,Ropar / 0 /

Indian

0.00A104

spmc-16/15Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P105

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 16 of 24

Page 17: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

spmc-16/15Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3664 / 0.00 / inlacs

EducationWelfare Society,

Ludhiana / 0 /Indian

0.00A106

spmc-16/16Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P107

spmc-16/16Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3676 / 0.00 / inlacs

Water ResourceDevelopment

Service(Panchkula) / 0 /

Indian

0.00A108

spmc-16/17Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P109

spmc-16/17Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3670 / 0.00 / inlacs

ProgressiveYouth Forum,Patiala / 0 /

Indian

0.00A110

spmc-16/18Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P111

spmc-16/18Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3674 / 0.00 / inlacs

Lala JagatNarayanaMemorialCharitable

Trust, Mansa / 0/ Indian

0.00A112

spmc-16/19Extension of community

development support(Batch -1 Schemes)

108.00 FBS 31-5-200831-05-2008

N/A N/A 31-12-2009 N/A 0P113

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 17 of 24

Page 18: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

spmc-16/19Extension of community

development support(Batch -1 Schemes)

11.40 FBS30-05-2008

3662 / 0.00 / inlacs

Social Work andRural

DevelopmentCentre, Ropar /

0 / Indian

0.00A114

spmc-17

Extension ofCommunity

development support(Batch-1 Schemes)

18.00 FBS 15-7-200815-07-2008

N/A N/A 31-12-2008 N/A 0P115

spmc-17

Extension ofCommunity

development support(Batch-1 Schemes)

14.90 FBS30-05-2008

spl-11 / 14.90 / inlacs

Saubhagya AllIndia

Foundation forSocial Work,

Gaziabad / 0 /Indian

852000.00

A1162008-07-

14

spmc-18/1

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

120.00 FBS 3-7-2008 15-5-200815-05-2008

30-11-2008 N/A N/A 31-12-2009 N/A 0P11710-10-2008

spmc-18/1

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

9.14 FBS 4-7-200831-05-2008

23-12-2008 101 / 9.14 / in lacs

The NabhaFoundationPatiala / 0 /

Indian

26-02-2010 0.00A11817-11-2008

spmc-18/2

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

120.00 FBS 3-7-2008 15-5-200815-05-2008

30-11-2008 N/A N/A 31-12-2009 N/A 0P11910-10-2008

spmc-18/2

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

9.98 FBS 4-7-200831-05-2008

23-12-2008 932 / 9.98 / in lacs

Confideration ofNGOs of Rural

India, Punjab / 0/ Indian

09-02-2010109000.0

0A120

17-11-2008

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 18 of 24

Page 19: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

spmc-18/3

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

120.00 FBS 3-7-2008 15-5-200815-05-2008

30-11-2008 N/A N/A 31-12-2009 N/A 0P12110-10-2008

spmc-18/3

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

8.28 FBS 4-7-200831-05-2008

23-12-2008G-756203 / 8.28 /

in lacs

Adarsh SevaSamiti, Ropar /

0 / Indian26-02-2010 0.00A122

17-11-2008

spmc-18/4

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

120.00 FBS 3-7-2008 15-5-200815-05-2008

30-11-2008 N/A N/A 31-12-2009 N/A 0P12310-10-2008

spmc-18/4

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

8.43 FBS 4-7-200831-05-2008

23-12-200865123 / 8.43 / in

lacs

ISPER, TarnTaran / 0 /

Indian26-02-2010

214416.00

A12417-11-2008

spmc-18/5

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

120.00 FBS 3-7-2008 15-5-200815-05-2008

30-11-2008 N/A N/A 31-12-2009 N/A 0P12510-10-2008

spmc-18/5

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

8.43 FBS 4-7-200831-05-2008

23-12-2008NGO/10/09 / 9.48

/ in lacs

Lime Centre,Gurdaspur / 0 /

Indian16-03-2010

448991.00

A12617-11-2008

spmc-18/6

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to be

120.00 FBS 3-7-2008 15-5-200815-05-2008

30-11-2008 N/A N/A 31-12-2009 N/A 0P12710-10-2008

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 19 of 24

Page 20: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

signed with respectiveDPMCs

spmc-18/6

Communitydevelopment support(Batch -1 Schemes) -

10 contracts each to besigned with respective

DPMCs

10.67 FBS 4-7-200831-05-2008

23-12-2008930 / 10.67 / in

lacs

RuralAssociation forHuman Interest

/ 0 / Indian

27488.00A12817-11-2008

SPMC19

Hiring Consultancy toprovide a technicalsupport to DWSSPunjab as per Aid

Memoire

2000.00 QCBS 1-9-2007 15-9-200815-09-2008

01-11-2008 N/A N/A N/A 0P12901-10-2008

2009-01-30

SPMC19

Hiring Consultancy toprovide a technicalsupport to DWSSPunjab as per Aid

Memoire

2000.00 QCBS 10-9-200712-11-2008

12-11-2008

08-01-2009 22-6-20098982 / 1994.52 / in

lacs

ConsultingEngineering

Services (India)Pvt. Ltd. / 0 /

Indian

23-10-2012 5242185000

.00A130

18-11-2008

2009-02-04

SPMC-2 Procurement Audit 20.00 CQ 1-10-2008 1-12-200801-12-2008

01-03-2009 N/A N/A N/A 0P13101-12-2008

SPMC-2 Procurement Audit CQ 1-10-200801-12-2008

01-03-2009A13201-12-2008

SPMC-3 InternalAudit 16.00 CQ 1-10-2008 1-12-200801-12-2008

01-03-2009 N/A N/A N/A 0P13301-12-2008

SPMC-3 InternalAudit 5.15 CQ 8-12-2008 18-02-2009 281 / 2.58 / in lacsGianender &

Associates / 0 /Indian

270553.00

A13415-01-2009

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 20 of 24

Page 21: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

SPMC-4Development of aprogramme MIS

100.00 QCBS 1-8-2008 1-9-200801-09-2008

01-11-2008 30-12-2008 N/A N/A 01-04-2010 N/A 0P13501-10-2008

2008-12-15

SPMC-4Development of aprogramme MIS

132.36 QCBS 24-4-2009 14-7-200914-07-2009

25-09-2009 31-5-2010SPMC-4 / 120.00 /

in lacs

Deloittee TouchTohmastu Pvt.Ltd. / 0 / Indian

01-01-2014 336370000.

00A136

16-07-2009

2009-11-06

SPMC-5Annual Training &

Maintenance of MIS5.00 SSS N/A N/A

15-03-2007

01-05-2009 15-6-2009 N/A N/A 01-12-2010 N/A 0P13701-04-2009

N/A

SPMC-5Annual Training &

Maintenance of MISICBA138

spmc-7State Level, Districtlevel & Village level

training20.00 CQ 5-10-2008

15-12-2008

15-12-2008

05-03-2009 N/A N/A N/A 0P13931-12-2008

spmc-7State Level, Districtlevel & Village level

trainingCQ 5-10-2008

15-12-2008

05-03-2009A14031-12-2008

spmc-8

Hiring the services ofParsar Bharti All India

Radio for relay ofjingles for three months

11.00 SSS N/A N/A10-06-2000

18-06-2008 N/A N/A 30-11-2008 N/A 0P14115-06-2008

N/A

spmc-8

Hiring the services ofParsar Bharti All India

Radio for relay ofjingles for three months

10.91 SSS N/A05-06-2008

19-06-20084872 / 10.91 / in

lacs

Prasar Bharti AllIndia Radio / 0 /

Indian03-11-2008

1091000.00

A14211-06-2008

N/A

spmc-9Hiring the services of

public relation &Advertising Agency

12.00 QCBS 5-9-200815-10-2008

15-10-2008

15-11-2008 N/A N/A 31-12-2009 N/A 0P14320-10-2008

2008-12-31

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 21 of 24

Page 22: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

spmc-9Hiring the services of

public relation &Advertising Agency

12.00 QCBS 16-9-200804-11-2008

19-11-20086491 / 14.72 / in

lacsBuzz Imc / 0 /

Indian31-01-2012

1472000.00

A14410-11-2008

SPMC\CCDU-41

Hiring the services ofParsar Bharti All IndiaRadio for road shows

through electronicmedia publicity

10.00 SSS N/A N/A31-12-2010

06-02-2011 N/A N/A N/A 0P14507-01-2011

N/A

SPMC\CCDU-41

Hiring the services ofParsar Bharti All IndiaRadio for road shows

through electronicmedia publicity

SSS N/A31-12-2010

06-02-2011A14607-01-2011

N/A

SPMC\CCDU-47

Hiring the agnency forproviding support toStage IV of project

scheme cycle

60.00 QCBS 19-4-2010 31-8-201031-08-2010

06-10-2010 N/A N/A N/A 0P14707-09-2010

2010-12-03

SPMC\CCDU-47

Hiring the agnency forproviding support toStage IV of project

scheme cycle

70.00 QCBS 17-3-201003-11-2010

23-12-20106080 / 83.67 / in

lacs

M/s WapkosLimited,

Gurgaon / 0 /Indian

85 0.00A14804-11-2010

SPMC\CCDU-48

Partnership support forcommunity mobilization

in the districts ofLudhiana, Sangrur,

Ferozepur, Bathinda,Nawan Shehar,

Gurdaspur & Moga

84.00 FBS 21-4-2010 N/A N/A N/A 0P149

SPMC\CCDU-48

Partnership support forcommunity mobilization

in the districts ofLudhiana, Sangrur,

Ferozepur, Bathinda,Nawan Shehar,

Gurdaspur & Moga

FBS 21-4-2010A150

Procurement Plan For Cosultancy 16/11/2012 19.31.09Page 22 of 24

Page 23: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

SPMC\CCDU-49

Hiring the services ofpublic relation &

Advertisement agency-Extension

15.00 SSS N/A N/A20-10-2010

30-10-2010 N/A N/A N/A 0P15130-10-2010

N/A

SPMC\CCDU-49

Hiring the services ofpublic relation &

Advertisement agency-Extension

SSS N/AA152 N/A

SPMC\CCDU-52

Production of 8 videodocumentaries on best

practices8.00 SSS N/A N/A N/A N/A 26-08-2011 N/A 0P153 N/A

SPMC\CCDU-52

Production of 8 videodocumentaries on best

practices9.00 SSS N/A

09-03-2011

24-03-20114897 / 6.80 / in

lacs

Genesis MediaPvt. Ltd. / 0 /

Indian

661800.00

A15411-03-2011

N/A

SPMC\Finance -44

Internal Audit 5.00 LCS N/A 18-09-2010 N/A N/A N/A 0P15516-08-2010

SPMC\Finance -44

LCS N/A 18-09-2010 281 / 2.50 / in lacsGianender &

Associates / 0 /Indian

270553.00

A15616-08-2010

SPMC\Finance -45

cocurrent FinancialReview

5.50 LCS N/A 20-8-201020-08-2010

30-09-2010 N/A N/A N/A 0P15725-08-2010

SPMC\Finance -45

LCS N/A20-08-2010

30-09-20105937 / 24.69 / in

lacs

Aggarwal A.Kumar &

Associates / 0 /Indian

23-06-2011761451.0

0A158

25-08-2010

SPMC/Proc-20

Hiring Services ofimparting training onWB procedures toofficers of DWSS

punjab

19.00 CQ 1-1-2008 N/A N/A N/A 0P159

Procurement Plan For Cosultancy 16/11/2012 19.31.10Page 23 of 24

Page 24: Department of Water Supply & Sanitation, Punjabdocuments.worldbank.org/curated/en/...developing media strategy and designing meterial, (No.-1, Unit Cost- 15) 1 P 15.00 CQ 5-11-2006

PackageNo.

Description ofServices

Est

imat

ed C

ost

(R

SL

acs)

Met

ho

d o

f S

elec

tio

n

TO

R F

inal

ised

Ban

k's

NO

C (

Dat

e)

Co

ntr

act

Nu

mb

ers,

Val

ue(

Lac

)

Nam

e o

fC

on

sult

ant/

Nat

ion

alit

y &

Zip

Co

de.

If U

SA

Ser

vice

s to

be

Co

mp

lete

d (

Dat

e)

WBRNo.

Exp

end

itu

re in

curr

edto

dat

e

Ad

vert

isin

g f

or

sho

rtlis

tin

g (

Dat

e)

Ban

k's

NO

C t

o R

FP

(Dat

e)

Last date ofReceipt ofProposal

(Technical/Financial/Co

mbined)(Date)

Ban

k N

OC

to

Pro

po

sal (

Tec

hn

ical

)(D

ate)

Ban

k N

OC

to

Co

ntr

act

Aw

ard

(Dat

e)

Pla

n/A

ctu

al

87 9 121110 13 1514 16 17 183 42 51

Sr.No.

6

RFPIssued(Date)

SPMC/Proc-20

Hiring Services ofimparting training onWB procedures toofficers of DWSS

punjab

19.00 CQ 15-2-200801-04-2008

7666 / 18.98 / inlacs

Crown AgentsIndia Pvt. Ltd. /

0 / Indian30-05-2010

1321000.00

A16022-04-2008

SPMC/Procurement-50

Hiring ConsultancyServices for Post

Procurement Reviewfor the contract awarduring the period 01-07-

2008 to 30-06-2010

5.50 SSS N/A N/A21-07-2010

08-08-2010 N/A N/A N/A 0P16123-07-2010

N/A

SPMC/Procurement-50

Hiring ConsultancyServices for Post

Procurement Reviewfor the contract awarduring the period 01-07-

2008 to 30-06-2010

6.66 SSS N/A20-07-2010

18-08-201211566 / 6.66 / in

lacs

Arun KumarShrivastav / 0 /

Indian15-03-2011

566000.00

A16216-08-2011

N/A

SPMC\Technical-42

PerformanceImprovement of

Existing Water SupplySchemes

170.00 QCBS 3-1-2009 8-12-200908-12-2009

29-01-2010 N/A N/A 15-07-2011 N/A 0P16311-12-2009

2010-05-28

SPMC\Technical-42

PerformanceImprovement of

Existing Water SupplySchemes

170.00 QCBS 3-1-200908-12-2009

29-01-20105933 / 209.28 / in

lacs

Center forSocial &

EnvironmentalCare / 0 / Indian

31-01-2013 43 0.00A16411-12-2009

2010-03-25

SPMC\Technical-43

Sansitizing LocalEnterpreneurs of O&M

of RWS Schemes24.00 QBS 25-6-2010

25-06-2010

29-07-2010 N/A N/A N/A 0P16528-06-2010

SPMC\Technical-43

QBSA166

83

Grand Total:

3367.87 722.81