13
Department of Transportation Office of Project Development 700 E Broadway Avenue Pierre, South Dakota 57501-2586 605/773-3268 FAX: 605/773-2614 October 28, 2016 ADDENDUM NO. 1 RE: Item #2, November 16, 2016 Letting - IM 0904(50)189, PCN 00GL, Jones County - PCC Overlay, PCC Surfacing, Asphalt Concrete Surfacing, Culvert Repair, & Edge Drains TO WHOM IT MAY CONCERN: The following addenda to the plans shall be inserted and made a part of your proposal for the referenced project. SPECIAL PROVISIONS: NO CHANGE BID ITEM FILE: NO CHANGE PLANS: Section L was added. Sincerely, Sam Weisgram Engineering Supervisor SW/cj CC: John Forman, Pierre Region Engineer Doug Sherman, Winner Area Engineer Connecting South Dakota and the Nation

Department of Transportation - South Dakotaapps.sd.gov/HC65C2C/EBS/lettings/Addendums/00GLAddendum_1.pdfDepartment of Transportation Office of Project Development 700 E Broadway Avenue

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Department of Transportation Office of Project Development 700 E Broadway Avenue Pierre, South Dakota 57501-2586 605/773-3268 FAX: 605/773-2614

October 28, 2016 ADDENDUM NO. 1

RE: Item #2, November 16, 2016 Letting - IM 0904(50)189, PCN 00GL, Jones County - PCC Overlay, PCC Surfacing, Asphalt Concrete Surfacing, Culvert Repair, & Edge Drains

TO WHOM IT MAY CONCERN: The following addenda to the plans shall be inserted and made a part of your proposal for the referenced project. SPECIAL PROVISIONS: NO CHANGE

BID ITEM FILE: NO CHANGE PLANS: Section L was added. Sincerely, Sam Weisgram Engineering Supervisor SW/cj CC: John Forman, Pierre Region Engineer Doug Sherman, Winner Area Engineer

Connecting South Dakota and the Nation

S.D.

R.

A.

252627

33 34

28

252630

31 32 35 36

2829

234

1415

2 13

910 11 12

1314151617

MURDO

POP. 612

FAS

FA

SFAS

FA

S

FAS

FAS

9083

90

83

Loop

35

Murdo

Dam

BEGIN IM 0904(50)189

END IM 0904(50)189

Exit 191 Exit 192

9083

MRM 191.15 (I-90E)

Str. # 38-166-196

West

Fork

Hay Creek

Hay

Creek

Johnny

Creek

Bull Creek

0+00

52

+70.6

105

+76.9

158

+78.1

209

+80.7

274

+74.5

340

+75.6

397

+20.5

450

+03.9

MRM 192.65 (I-90E)

Str. # 38-180-198

1456

Sta. b 227+77.37

Equation: Sta. a 227+31.49 =

Sta. c 381+36.61

Equation: Sta. b 380+91.82 =

M.R.M.= 198.00 + 0.049

Station c 445+70.00

Median Crossover, In Place

Station c 445+70.00

MRM 194.81 (I-90E)

Str. # 38-200-191/Approach Slabs

Sta. b 272+64 to Sta. b 273+84

Surfacing Exception

Sta. a 38+19.06

Equation: Sta. 38+18.00 =

Median Crossover, In Place

Sta. 0+00.00

MRM = 189.00 +0.634

Station 0+00.00

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

U:\rd\prj\jons00

GL\Title

L.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:7

920

Plotted Fro

m -

trpr1

4341

SECTION L: LIGHTING PLANS

INDEX OF SHEETS

Standard Plates

Wire Diagrams

Conduit Layouts

Estimate with General Notes and Tables

General Layout with Index

L10 to L12

L8 to L9

L4 to L7

L2 to L3

L1

L1 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

...\prj\jons00

GL\N

otesSectionL.d

gn

File -

Plotting Date: 08/10/2016

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

4341

L2 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

...\prj\jons00

GL\T

able

Conduit.d

gn

File -

Plotting Date: 08/10/2016

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

4341

CONDUIT AND CABLE QUANTITIES L3 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

6+007+00

8+00

9+00

10+00

11+00

a 62+00 a 63+00 a 64+00 a 65+00 a 66+00 a 67+00 a 68+00

I-90 EASTBOUND EXIT 191

CONDUIT LAYOUT

EA1

REA1 a 62+69-42’ R

REA2 a 64+68-51’ R

EA2

RAMP D

EA3

JL1

1-90 EASTBOUND

EJB2

EST UNITQUANTKEY ITEM

2" RIGID CONDUIT, SCHEDULE 40 FT

FT1/C #6 AWG COPPER WIRE

40SCH2"

#6

FT

2 EACH(EA1,EA2)REMOVE LUMINAIRE POLE FOOTING

(REA1,REA2)2’ DIAMETER FOOTING

14

2(REA1,REA2)REMOVE AND RESET LUMINAIRE POLE

ESTIMATE OF QUANTITIES

420

1,300

EACH

1 EACH(JL1)TYPE 1 ELECTRICAL JUNCTION BOX

U:\rd\prj\jons00

GL\a

062c.d

gn

File -

Plotting Date: 08/10/2016

Plot Scale -

1:4

0Plotted Fro

m -

trpr1

4341

1" = 40’SCALE

3#6

3#6

#63 40

SCH2"

#63 40

SCH2"

2"RGSC

L4 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

18+00

19+00

20+00

21+00

22+0023+00

a 93+00 a 94+00 a 95+00 a 96+00 a 97+00 a 98+00 a 99+00

24+00

P

I-90 EASTBOUND EXIT 191

CONDUIT LAYOUT

EA6

EA7

REA7 a 96+23-46’ R

REA8 a 98+08-40’ R

EA8

EJB5

RAMP C

1-90 EASTBOUND

LUMINAIR

E EA4

TO EXIS

TING

EST UNITQUANTKEY ITEM

2" RIGID CONDUIT, SCHEDULE 40 FT

FT1/C #6 AWG COPPER WIRE

40SCH2"

#6

FT

2 EACH(EA7,EA8)REMOVE LUMINAIRE POLE FOOTING

(REA7,REA8)2’ DIAMETER FOOTING

14

2(REA7,REA8)REMOVE AND RESET LUMINAIRE POLE

ESTIMATE OF QUANTITIES

390

1,210

EACH

U:\rd\prj\jons00

GL\a

093c.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:4

0Plotted Fro

m -

trpr1

4341

1" = 40’SCALE

3#6

3#6

#63 40

SCH2"

#63 40

SCH2"

2"RGSC

L5 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

6+007+00

8+00

9+00

10+00

a 146+00 a 147+00 a 148+00 a 149+00 a 150+00

P

P

P

1+002+00

a 141+00

CONDUIT LAYOUTI-90 EASTBOUND EXIT 192

1-90 EASTBOUND

ESG9

EC3

EC2

EC1

REC2 a 147+25-47’ R

REC1 a 145+30-37’ R

EXISTING POWER SOURCE

By West Central Electric1 Phase, 3 Wire Service120/240 v.a.c., 60 hz.,

EJC12

EJC13

EJB8

RAMP D

ECE3

RECE3

EJC14JL2

EST UNITQUANTKEY ITEM

2" RIGID CONDUIT, SCHEDULE 40 FT

FT1/C #6 AWG COPPER WIRE

40SCH2"

#6

FT

2 EACH

FT#10 1/C #10 AWG COPPER WIRE

(EC1,EC2)REMOVE LUMINAIRE POLE FOOTING

(REC1,REC2)2’ DIAMETER FOOTING

14

2(REC1,REC2)REMOVE AND RESET LUMINAIRE POLE

50

450

1,395

ESTIMATE OF QUANTITIES

EACH

FTSCRG1.5"

1.5" RIGID GALVANIZED STEEL CONDUIT 15

EC6TO

#63 40

SCH2"

U:\rd\prj\jons00

GL\a

141c.d

gn

File -

Plotting Date: 08/10/2016

Plot Scale -

1:4

0Plotted Fro

m -

trpr1

4341

1" = 40’SCALE

3#6

3#6

#63 40

SCH2"

2"SCH403

#10

2"SCH403

#10

2"SCH40 3

#10

2"SCH403

#10

3#62"

SCH40

2"SCH803

#10

#103

3#62"

SCH80

2"RGSC

SCRG1.5"

(JL2)TYPE 1 ELECTRICAL JUNCTION BOX

1 EACH

L6 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

10+00

11+00

12+00

13+0014+00 15+00

a 168+00 a 169+00 a 170+00 a 171+00 a 172+00 a 173+00 a 174+00

P

CONDUIT LAYOUTI-90 EASTBOUND EXIT 192

RED1 a 172+28-36’ R

ED1

RED2 a 170+27-46’ R

ED2EJB11

1-90 EASTBOUND

ED3

EXISTING POWER SOURCE

By West Central Electric1 Phase, 3 Wire Service120/240 v.a.c., 60 hz.,

RAMP C

ED6TO

TO EJB10

3#6

#6340

SCH2"

3#6

2"SCH80

3#6

#6340

SCH2"

U:\rd\prj\jons00

GL\a

168c.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:4

0Plotted Fro

m -

trpr1

4341

1" = 40’SCALE

3#62"

SCH80

EST UNITQUANTKEY ITEM

2" RIGID CONDUIT, SCHEDULE 40 FT

FT1/C #6 AWG COPPER WIRE

40SCH2"

#6

FT

2 EACH(ED1,ED2)REMOVE LUMINAIRE POLE FOOTING

(RED1,RED2)2’ DIAMETER FOOTING

14

2(RED1,RED2)REMOVE AND RESET LUMINAIRE POLE

ESTIMATE OF QUANTITIES

775

250

EACH

L7 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

WT

LU

MIN

AIR

EB

K

WT

BK

}

WT

LU

MIN

AIR

EB

K

WT

BK

included in these plans.Quantities for bonding conductors are notwith the NATIONAL ELECTRICAL CODE.All circuits shall be bonded in accordanceNOTE:

PHOTOCELL

REA1 REA2

EA3

#6 #6

#6

PHOTOCELL

EA6

#6

#6

#6

REA7 REA8

EJB5

#6

#6

#6

WIRING DIAGRAMI-90 EASTBOUND EXIT 191

RAMP DEASTBOUND

EJB2

(EJB1)JUNCTION BOX

EXISTINGTO

(EA4)LUMINAIREEXISTING

TO

RAMP CEASTBOUND

U:\rd\prj\jons00

GL\0

62099

w.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:8

0Plotted Fro

m -

trpr1

4341

2 amp. Dual Element

Sodium Lamp

LEGEND:

FUSE: 4 amp. Non-Time Delayor

LUMINAIRE: 250 watt High Pressure

BK

WT

LU

MIN

AIR

EB

K

BK

BK

WT

LU

MIN

AIR

EB

K

BK

BK

WT

BK

WTLUMINAIRE

BK

WT

BK

WTLUMINAIRE

BK

WT

BK

WTLUMINAIRE

BK

WT

BK

WTLUMINAIRE

L8 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189WIRING DIAGRAM

I-90 EASTBOUND EXIT 192

included in these plans.Quantities for bonding conductors are notwith the NATIONAL ELECTRICAL CODE.All circuits shall be bonded in accordanceNOTE:

U:\rd\prj\jons00

GL\1

45172

w.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:8

0Plotted Fro

m -

trpr1

4341

Sodium Lamp

LEGEND:

FUSE: 4 amp. Non-Time Delayor

2 amp. Dual Element

LUMINAIRE: 250 watt High Pressure

WTLUMINAIRE

BK

WT

BK

#6

WTLUMINAIRE

BK

WT

BK

REC2

REC1

EJB8

#6 #6 #6

#6

RAMP DEASTBOUND

(EC6)LUMINAIREEXISTING

TO

}(WEST CENTRAL ELECTRIC)EXISTING POWER SOURCE

TO

(ESG9)ROAD CLOSURE GATEEXISTING DROP ARM

TO

BK

WT

BK

WT

LU

MIN

AIR

EB

K

WT

BK

WT

LU

MIN

AIR

E

EC3

PHOTOCELL

#6

WTLUMINAIRE

BK

WT

BK

#6

WTLUMINAIRE

BK

WT

BKED3

RED2

RED1

EJB11

#6 #6#6

#6

}

RAMP CEASTBOUND

(WEST CENTRAL ELECTRIC)EXISTING POWER SOURCE

TO

PHOTOCELL

(ED6)LUMINAIREEXISTING

TO

}(EJB10)

JUNCTION BOXEXISTING

TO

BK

WT

BK

WT

LU

MIN

AIR

EB

K

WT

BK

WT

LU

MIN

AIR

E

141+00 - 55’ R

RECE3

SIG

N

TO W

AR

NIN

G

RSC

REJC14

BOX

JUNCTION

DISCONNECT SWITCH

WIRING

SIGNING

ADVANCED

RESET

SOURCE

POWER

L9 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

...\prj\jons00

GL\s

63501s63521.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

4341

L10 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

...\prj\jons00

GL\s

63555s63565.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

4341

L11 L12

DAKOTA

SOUTH

STATE OFPROJECT

SHEETSHEETS

TOTAL

IM 0904(50)189

...\prj\jons00

GL\s

63565s63576.d

gn

File -

Plotting Date: 08/05/2016

Plot Scale -

1:2

00

Plotted Fro

m -

trpr1

4341

L12 L12