62
STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT T202007801 BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21 Federal Aid No. NH-2020(15) CFDA: 20.205 Advertisement Date: July 31, 2020 INCLUDED IN THIS DOCUMENT: ADDITIONAL BID PROPOSAL ITEMS: BID PROPOSAL: GENERAL DESCRIPTION PROSPECTIVE BIDDERS NOTES GENERAL NOTICES PREVAILING WAGES SPECIAL PROVISIONS STATEMENTS QUANTITY SHEET SUMMARY ATTACHED OR POSTED DOCUMENTS: PROJECT PLANS QUESTIONS & ANSWERS (if posted) GUARDRAIL END-TREATMENT INFO PAPER BIDDERS CONTACT DELDOT FOR BID SUBMITTAL DOCUMENTS: DRUG TESTING AFFIDAVIT CERTIFICATION FORM BID BOND FORM CD FOR BID PRICE ENTRY & PRINTING This Bid Proposal and related documents can be viewed on bids.delaware.gov and bidx.com/de/ Internet Bids for Bidders with Bid Express ® accounts can be submitted at BIDX.com/de; OR; Paper Bids with CD will be received in the Bidder's Room at the DelDOT Administration Building, Dover, DE; ALL BIDS DUE PRIOR TO 2:00 P.M. Local Time, September 1, 2020 Page 1 of 62

DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION

BID PROPOSAL

CONTRACT T202007801

BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21

Federal Aid No. NH-2020(15) CFDA: 20.205

Advertisement Date: July 31, 2020

INCLUDED IN THIS DOCUMENT: ADDITIONAL BID PROPOSAL ITEMS:

BID PROPOSAL: GENERAL DESCRIPTION PROSPECTIVE BIDDERS NOTES GENERAL NOTICES PREVAILING WAGES SPECIAL PROVISIONS STATEMENTS QUANTITY SHEET SUMMARY

ATTACHED OR POSTED DOCUMENTS: PROJECT PLANS QUESTIONS & ANSWERS (if posted) GUARDRAIL END-TREATMENT INFO

PAPER BIDDERS CONTACT DELDOT FOR BID SUBMITTAL DOCUMENTS:

DRUG TESTING AFFIDAVIT CERTIFICATION FORM BID BOND FORM CD FOR BID PRICE ENTRY & PRINTING

This Bid Proposal and related documents can be viewed on bids.delaware.gov and bidx.com/de/

Internet Bids for Bidders with Bid Express® accounts can be submitted at BIDX.com/de; OR;

Paper Bids with CD will be received in the Bidder's Room at the DelDOT Administration Building, Dover,

DE; ALL BIDS DUE PRIOR TO 2:00 P.M. Local Time, September 1, 2020

Page 1 of 62

Page 2: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

Bridge Painting Kent County, SR 1 Overpasses, FY 21 Federal Aid Project No. NH-2020(15)

GENERAL DESCRIPTION

A. BIDS DUE: September 1, 2020 PRIOR TO 2:00 P.M. Local Time – unless changed via Addendum.

LOCATION: Bidder’s Room, DelDOT Administration Building, 800 South Bay Road, Dover, DE 19901. OR; Bidders with Bid Express® accounts can submit bids at BIDX.com/de.

B. PRE-BID MEETING: No

C. DBE GOAL: 10% Disadvantaged Business Enterprise Percent

D. OJT TRAINEES: n/a

E. LOCATION: Kent County These improvements are more specifically shown on the Location Map(s) of the attached Plans.

F. DESCRIPTION: The improvements consist of furnishing all labor and materials for painting 12 bridge overpasses along the SR1 corridor in Kent County.

G. COMPLETION TIME: All work on this contract must be complete within 198 Calendar Days. The Contract Time includes an allowance for 24 Weather Days. The Department's intent is to issue a Notice to Proceed for work to start on or about April 1, 2021.

H. SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, DELAWARE DEPARTMENT OF TRANSPORTATION, AUGUST 2016 apply to this Bid Proposal and Project. The Contractor shall make himself aware of any revisions and corrections (Supplemental Specifications, if any) and apply them to the applicable item(s) of this contract. The Standard and Supplemental Specifications can be viewed here. Units of Measure can be found at 101.04.

I. ATTACHMENTS: Included as part of this Bid Proposal are; Project Plans; Questions & Answers (if posted); Addenda, Referenced Documents, Documents Posted with this Bid Proposal; and Bid documents mailed to contractors.

J. ADDENDA: All Addenda are posted on the internet at bids.delaware.gov, and bidx.com/de/ and are included as part of the Bid Proposal. The Bidder is responsible to check the Website as needed to ensure that the Bidder is aware of Addenda that are included in the Bid Proposal. If Addenda are issued, the final Addendum will be posted no later than the end of the day two business days prior to the bid date. Each Addendum number and issue date must be entered on the submitted Certification Form. This original Bid Proposal will not be updated, you must refer to each Addendum.

K. QUESTIONS: E-MAIL TO; [email protected] Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Please include the Contract number in the subject line. Questions and responses are posted at bids.delaware.gov, and bidx.com/de/. The date of the final posted Questions and Answers document must be entered on the submitted Certification Form.

L. PROSPECTIVE BIDDERS NOTES:

1. BIDDERS MUST BE REGISTERED with DelDOT in order to submit a bid. E-Mail [email protected] or call(302) 760-2031 to request registration information.

Page 2 of 62

Page 3: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

2. BIDS MUST BE SUBMITTED VIA:

(a) Internet - Bidders with Bid Express® accounts can submit bids at www.bidx.com/de/. OR:

(b) Paper Bid with supplied CD and printout of Bid Item prices and all required documents and forms.

For paper bids, contact DelDOT at [email protected] or (302) 760-2031 to request a CD for bidding, required forms, and instructions. Bidders enter their Bid Item prices onto the supplied CD then print the form and submit the form along with the CD and other required documents prior to the Bid due date and time. (CD’s cannot be used to submit bids to bidx.com)

Do not submit both Internet and Paper Bids. If so, the Internet bid will be rejected.

3. SURETY BOND - Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid.

4. DRUG TESTING - Regulation 4104; The state Office of Management and Budget has developed regulations that require Contractors and Subcontractors to implement a program of mandatory drug testing for Employees who work on Large Public Works Contracts funded all or in part with public funds pursuant to 29 Del.C. §6908(a)(6). Refer to the full requirements at the following link: http://regulations.delaware.gov/register/december2017/final/21%20DE%20Reg%20503%2012-01-17.htm Note a few of the requirements;

* At bid submission - Each bidder must submit with the bid a single signed affidavit certifying that the bidder and its subcontractors has in place or will implement during the entire term of the contract a Mandatory Drug Testing Program that complies with the regulation (a blank affidavit form is attached);

* At least two business days prior to contract execution - The awarded Contractor shall provide to DelDOT copies of the Employee Drug Testing Program for the Contractor, each participating DBE firm, and all other listed Subcontractors;

* Subcontractors - Contractors that employ Subcontractors on the job site may do so only after submitting a copy of the Subcontractor's Employee Drug Testing Program along with the standard required subcontractor information. A Subcontractor shall not commence work until DelDOT has approved the program in writing.

5. PERFORMANCE-BASED RATING SYSTEM - 29 Del.C. §6962 (c)(12)(a) requires DelDOT to include a performance-based rating system for contractors. The Performance Rating for each Contractor shall be used as a prequalification to bid at the time of bid. Refer to 'General Notices' for details.

6. NO RETAINAGE will be withheld on this contract unless through the Performance-Based Rating System.

7. EXTERNAL COMPLAINT PROCEDURE can be viewed on DelDOT’s Website,

https://deldot.gov/Business/cr/index.shtml?dc=civil_rights_eeo or request a copy by calling (302) 760-2555.

8. DBE PROGRAM REQUIREMENTS (49CFR §26.53(b)(3)(i)(B)) require submission of DBE participation information from the apparent low bidder no later than five (5) calendar days after bid opening,

9. FLATWORK CONCRETE TECHNICIAN CERTIFICATION TRAINING:

Section 501.03, 503.03, 505.03, 610.03, 701.03 and 702.03 of the 2016 Standard Specifications require contractors to provide an American Concrete Institute (ACI) or National Ready-Mix Concrete Association (NRMCA) certified concrete flatwork technician to supervise all finishing of flatwork concrete.

- end –

remainder of page is blank

Page 3 of 62

Page 4: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

GENERAL NOTICES SPECIFICATIONS : The Delaware specifications entitled "Standard Specifications for Road and Bridge Construction August, 2016", hereinafter referred to as the Standard Specifications; the Supplemental Specifications to the Standard Specifications effective as of the advertisement date of this Bid Proposal and hereby included by reference; the Special Provisions; Notes on the Plans; this Bid Proposal including referenced documents; any Addenda thereto; and any posted Questions and Answers; shall govern the work to be performed under this contract. The Contractor shall make itself aware of these specifications, revisions and corrections, and apply them to the applicable item(s) of this contract. CLARIFICATIONS : Under any Section or Item included in the Contract, the Contractor shall be aware that when requirements, responsibilities, and furnishing of materials are outlined in the details and notes on the Plans and in the paragraphs preceding the " Basis of Payment" paragraph in the Standard Specifications or Special Provisions, no interpretation shall be made that such stipulations are excluded because reiteration is not made in the "Basis of Payment" paragraph. ATTESTING TO NON-COLLUSION : The Department requires as a condition precedent to acceptance of bids a sworn statement executed by, or on behalf of, the person, firm, association, or corporation to whom such contract is to be awarded, certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract. The form for this sworn statement is included in the proposal and must be properly executed in order to have the bid considered. QUANTITIES : The quantities shown are for comparison of bids only. The Department may increase or decrease any quantity or quantities without penalty or change in the bid price. PERFORMANCE-BASED RATING SYSTEM 29 Del.C. §6962 (c)(12)(a) requires a Department of Transportation project, excluding a Community Transportation Fund or municipal street aid contract, to include a performance-based rating system. At the time of bid, the Performance Rating for each Contractor shall be used as a prequalification to bid. Bidders with Performance Rating scores equal to or greater than 85% shall be permitted to bid. Bidders with scores of less than 85% who comply with the retainage requirements of 29 Del.C. §6962 shall be permitted to bid provided the Agreement to Accept Retainage (located on the Certification Page) is executed and submitted with the bid. Lack of an executed Agreement to Accept Retainage will result in the rejection of the bid by the Department. Successful bidders awarded Department contracts who have no performance history within the last five (5) years will be assigned a provisional Performance Rating of 85% at the date of advertisement. Notification of Performance Rating. The Department shall post publicly the Performance Rating for all Contractors on the Department's website. DelDOT will complete performance-based evaluations on the construction company contracted by the Department to build the project (the "Contractor"). Provisions to appeal Performance Ratings are described in the regulations. The regulations are set forth in Section 2408 of Title 2, Delaware Administrative Code, found here. EQUALITY OF EMPLOYMENT OPPORTUNITY ON PUBLIC WORKS : Delaware Code, Title 29, Chapter 69, Section 6962, Paragraph (d), Subsection (7) states;

a. As a condition of the awarding of any contract for public works financed in whole or in part by State appropriation, such contracts shall include the following provisions:

Page 4 of 62

Page 5: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

During the performance of this contract, the contractor agrees as follows: 1. The contractor will not discriminate against any employee or applicant for employment because of race, creed,

color, sex, sexual orientation, gender identity or national origin. The contractor will take positive steps to ensure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, sex, sexual orientation, gender identity or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places available to employees and applicants for employment notices to be provided by the contracting agency setting forth this nondiscrimination clause.

2. The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor,

state that all qualified applicants will receive consideration for employment without regard to race, creed, color, sex, sexual orientation, gender identity or national origin.

3. The contractor will ensure employees receive equal pay for equal work, without regard to sex. Employee pay

differential is acceptable if pursuant to a seniority system, a merit system, a system which measures earnings by quantity or quality of production, or if the differential is based on any other factor other than sex.

TAX CLEARANCE : As payments to each vendor or contractor aggregate $2,000, the Division of Accounting will report such vendor or contractor to the Division of Revenue, who will then check the vendor or contractor's compliance with tax requirements and take such further action as may be necessary to ensure compliance. LICENSE : A person desiring to engage in business in this State as a contractor on a project designated to include federal funds, shall obtain a Delaware business license upon making application to the Division of Revenue. Proof of said license compliance to be made prior to, or in conjunction with, the execution of a contract to which he has been named. SUBCONTRACTOR LICENSE: 29 DEL. C. §6967:

(c) Any contractor that enters a public works contract must provide to the agency to which it is contracting, within 30 days of entering such public works contract, copies of all occupational and business licenses of subcontractors and/or independent contractors that will perform work for such public works contract. However, if a subcontractor or independent contractor is hired or contracted more than 20 days after the contractor entered the public works contract the occupational or business license of such subcontractor or independent contractor shall be provided to the agency within 10 days of being contracted or hired.

DIFFERING SITE CONDITIONS: SUSPENSIONS OF WORK and SIGNIFICANT CHANGES IN THE CHARACTER OF WORK: Differing site conditions: During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract of if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before they are disturbed and before the affected work is performed. Upon written notification, the engineer will investigate the conditions, and if he/she determines that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding loss of anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of his/her determination whether or not an adjustment of the contract is warranted.

Page 5 of 62

Page 6: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice. No contract adjustment will be allowed under their clause for any effects caused on unchanged work. Suspensions of work ordered by the engineer: If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary or inherent to the construction industry) and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit) and modify the contract in writing accordingly. The engineer will notify the contractor of his/her determination whether or not an adjustment of the contract is warranted. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided for or excluded under any other term or condition of this contract. Significant changes in the character of work: The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered. If the alterations or changes in quantities significantly change the character of the work under the contract, whether or not changed by any such different quantities or alterations, an adjustment, excluding loss of anticipated profits, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable. The term "significant change" shall be construed to apply only to the following circumstances:

(A) When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction, or

(B) When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed.

CONFLICT WITH FEDERAL STATUTES OR REGULATIONS: Delaware Code, Title 29, Chapter 69, Section 6904, Paragraph (a):

"If any provision of this subchapter conflicts or is inconsistent with any statute, rule or regulation of the federal government applicable to a project or activity, the cost of which is to be paid or reimbursed in whole or in part by the federal government, and due to such conflict or inconsistency the availability of federal funds may be jeopardized, such provision shall not apply to such project or activity."

Page 6 of 62

Page 7: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

FEDERAL LABOR AND EMPLOYMENT REQUIREMENTS Federal Regulation 23 CFR § 635.117(b) Labor and employment, states:

"No procedures or requirement shall be imposed by any State which will operate to discriminate against the employment of labor from any other State, possession or territory of the United States, in the construction of a Federal-aid project."

CONVICT PRODUCED MATERIALS: (a) Materials produced after July 1, 1991, by convict labor may only be incorporated in a Federal-aid highway

construction project if such materials have been:

(1) Produced by convicts who are on parole, supervised release, or probation from a prison or (2) Produced in a qualified prison facility and the cumulative annual production amount of such materials for use in

Federal-aid highway construction does not exceed the amount of such materials produced in such facility for use in Federal-aid highway construction during the 12-month period ending July 1, 1987.

(b) Qualified prison facility means any prison facility in which convicts, during the 12-month period ending July 1, 1987,

produced materials for use in Federal-aid highway construction projects. RIGHT TO AUDIT The Department shall have the right to audit the books and records of the contractor or any subcontractor under this contract or subcontract to the extent that the books and records relate to the performance of the contract or subcontract. The books and records shall be maintained by the contractor for a period of 3 years from the date of final payment under the prime contract and by the subcontractor for a period of 3 years from the date of final payment under the subcontract (29 Del.C. §6930) TO REPORT BID RIGGING ACTIVITIES: The U. S. Department of Transportation (DOT) operates the below toll-free "hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m. eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such activities. The "hotline" is part of the DOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected.

TO REPORT BID RIGGING ACTIVITIES CALL 1-800-424-9071

Page 7 of 62

Page 8: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY

(EXECUTIVE ORDER 11246) 1. The Offeror's or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal

Employment Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's

aggregate work force in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation In Goals for Female Participation In Each Trade Each Trade

12.3% (New Castle County) 6.9% (Entire State) 14.5% (Kent & Sussex Counties)

These goals are applicable to all the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor also is subject to the goals for both its federally involved and non-federally involved construction.

The Contractor's compliance with the Executive Order and the Executive Order and the regulations in CFR Part 60-4

shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order, and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.

3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs

within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed.

4. As used in this Notice, and in the contract resulting from this solicitation, the "covered area" is the County specified in

the General Description section.

REV. 11-3-80

Page 8 of 62

Page 9: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION CONTRACT SPECIFICATIONS (EXECUTIVE ORDER 11246)

1. As used in these specifications: a. "Covered area" means the geographical area described in the solicitation from which this contract resulted;

b. "Director" means Director, Office of Federal Contract Compliance Programs, United States Department of Labor, or any person to whom the Director delegates authority;

c. "Employer identification number" means the Federal Social Security number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.

d. "Minority" includes:

i. Black (all persons having origins in any of the Black African racial groups not of Hispanic origin); ii. Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish Culture

or origin, regardless of race); iii. Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, Southeast

Asia, the Indian Subcontinent, or the Pacific Islands); and iv. American Indian or Alaskan Native (all persons having origins in any of the original peoples of North America

and maintaining identifiable tribal affiliations through membership and participation or community identification).

2. Whenever the Contractor, or any Subcontractor at any tier, subcontracts a portion of the work involving any construction

trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the Notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this contract resulted.

3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U.S. Department of

Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the Plan area (including goals and timetables) shall be in accordance with that Plan for those trades which have unions participating in the Plan. Contractors must be able to demonstrate their participation in and compliance with the provisions of any such Hometown Plan. Each Contractor or Subcontractor participating in an approved Plan is individually required to comply with its obligations under the EEO clause, and to make a good faith effort to achieve each goal under the Plan in each trade in which it has employees. The overall good faith performance by other Contractors or Subcontractors toward a goal in an approved plan does not excuse any covered Contractor's or Subcontractor's failure to take good faith efforts to achieve the Plan goals and timetables.

4. The Contractor shall implement the specific affirmative action standards provided in paragraphs 7a through 7p of these

specifications. The goals set forth in the solicitation from which this contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered Construction contractors performing construction work in geographical areas where they do not have a Federal or federally assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any Office of Federal Contract Compliance Program Office or from the Federal procurement contracting offices. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified.

5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the Contractor has

a collective bargaining agreement, to refer either minorities or women shall excuse the Contractor's obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.

6. In order for the nonworking training hours of apprentices and trainees to be counted in meeting the goals, such

apprentices and trainees must be employed by the Contractor during the training period, and the Contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor.

Page 9 of 62

Page 10: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully, and shall implement affirmative action steps at least as extensive as the following:

a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and in all facilities at which the Contractor's employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.

b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses.

c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefor, along with whatever additional actions the Contractor may have taken.

d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor, or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations.

e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7b above.

f. Disseminate the Contractor's EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with all management personnel and with all minority and female employees at least once a year; and by posting the company EEO policy on bulletin boards accessible to all employees at each location where construction work is performed.

g. Review, at least annually, the company's EEO policy and affirmative action obligations under these specifications with all employees having any responsibility for hiring, assignment, layoff, termination or other employment decisions including specific review of these items with on-site supervisory personnel such as Superintendents, General Foreman, etc., prior to the initiation of construction work at any job site. A written record shall be made and maintained identifying the time and place of these meetings, persons attending, subject matter discussed, and disposition of the subject matter.

h. Disseminate the Contractor's EEO policy externally by including it in any advertising in the news media, specifically including minority and female news media, and providing written notification to and discussing the Contractor's EEO policy with other Contractors and Subcontractors with whom the Contractor does or anticipates doing business.

i. Direct its recruitment efforts, both oral and written, to minority, female and community organizations, to schools with minority and female students and to minority and female recruitment and training organizations serving the Contractor's recruitment area and employment needs. Not later than one month prior to the date for the acceptance of applications for apprenticeship or other training by any recruitment source, the Contractor shall send written notification to organizations such as the above, describing the openings, screening procedures, and tests to be used in the selection process.

j. Encourage present minority and female employees to recruit other minority persons and women and, where reasonable, provide after school, summer and vacation employment to minority and female youth both on the site and in other areas of a Contractor's work force.

k. Validate all tests and other selection requirements where there is an obligation to do so under 41 CFR Part 60-3.

Page 10 of 62

Page 11: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

l. Conduct, at least annually, an inventory and evaluation at least of all minority and female personnel for promotional opportunities and encourage these employees to seek or to prepare for, through appropriate training, etc., such opportunities.

m. Ensure that seniority practices, job classifications, work assignments and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the EEO policy and the Contractor's obligations under these specifications are being carried out.

n. Ensure that all facilities and company activities are nonsegregated except that separate or single-user toilet and necessary changing facilities shall be provided to assure privacy between the sexes.

o. Document and maintain a record of all solicitations of offers for subcontractors from minority and female construction contractors and suppliers, including circulation of solicitations to minority and female contractor associations and other business associations.

p. Conduct a review, at least annually, of all supervisors' adherence to and performance under the Contractor's EEO policies and affirmative action obligations.

8. Contractors are encouraged to participate in voluntary associations which assist in fulfilling one or more of their

affirmative action obligations (7a through p). The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the Contractor is a member and participant, may be asserted as fulfilling any one or more of its obligations under 7a through p of these Specifications provided that the Contractor actively participates in the group, makes every effort to assure that the group has a positive impact on the employment of minorities and women in the industry, ensures that the concrete benefits of the program are reflected in the Contractor's minority and female work force participating, makes a good faith effort to meet its individual goals and timetables, and can provide access to documentation which demonstrates the effectiveness of actions taken on behalf of the Contractor. The obligation to comply, however, is the Contractor's and failure of such a group to fulfill an obligation shall not be a defense for the Contractor's noncompliance.

9. A single goal for minorities and a separate single goal for women have been established. The Contractor, however, is

required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and non-minority. Consequently, the Contractor may be in violation of the Executive Order if a particular group is employed in a substantially disparate manner (for example, even though the Contractor has achieved its goals for women generally, the Contractor may be in violation of the Executive Order if a specific minority group of women is under utilized).

10. The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person

because of race, color, religion, sex, or national origin. 11. The Contractor shall not enter into any Subcontract with any person or firm debarred from Government contracts

pursuant to Executive Order 11246. 12. The Contractor shall carry out such sanctions and penalties for violation of these specifications and of the Equal

Opportunity Clause, including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as amended, and its implementing regulations, by the Order of Federal Contract Compliance Programs. Any Contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Executive Order 11246, as amended.

13. The Contractor, in fulfilling its obligations under these specifications, shall implement specific affirmative action steps,

at least as extensive as those standards prescribed in paragraph 7 of these specifications, so as to achieve maximum results from its efforts to ensure equal employment opportunity. If the Contractor fails to comply with the requirements of the Executive Order, the implementing regulations, or these specifications, the Director shall proceed in accordance with 41 CFR 60-4.8.

14. The Contractor shall designate a responsible official to monitor all employment-related activity to ensure that the

company EEO policy is being carried out, to submit reports relating to the provisions hereof as may be required by the Government, and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, social security number, race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in status, hours

Page 11 of 62

Page 12: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in an easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records.

15. Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different

standards of compliance or upon the application of requirements for the hiring of local or other area residents (e.g., those under the Public Works Employment Act of 1977 and the Community Development Block Grant Program).

* * * * *

TRAINING SPECIAL PROVISIONS This Training Special Provision supersedes subparagraph 7b of the Special Provision entitled "Specific Equal Employment Opportunity Responsibilities", (Attachment 1), and is in implementation of 23 U.S.C. 140(a). As part of the contractor's equal employment opportunity affirmative action program, training shall be provided as follows: The contractor shall provide on-the-job training aimed at developing full journeyman in the type of trade or job classification involved. The number of trainees to be trained under the special provision will be as set forth in the General Description section of this document. In the event the contractor subcontracts a portion of the contract work, he shall determine how many, if any, of the trainees are to be trained by the subcontractor, provided however, that the contractor shall retain the primary responsibility for meeting the training requirements imposed by this special provision. The contractor shall also insure that this Training Special Provision is made applicable to such subcontract. Where feasible, 25 percent of apprentices or trainees in each occupation shall be in their first year apprenticeship or training. The number of trainees shall be distributed among the work classification on the basis of the contractor's needs and the availability of journeymen in the various classifications within a reasonable area of recruitment. Prior to commencing construction, the contractor shall submit to the Department of Highways and Transportation for approval the number of trainees to be trained in each selected classification and training program to be used. Furthermore, the contractor shall specify the starting time for training in each of the classifications. The contractor will be credited for each trainee employed by him on the contract work who is currently enrolled or becomes enrolled in an approved program and will be reimbursed for such trainees as provided hereinafter. Training and upgrading of minorities and women toward journeyman status is a primary objective of this Training Special Provision. Accordingly, the contractor shall make every effort to enroll minority trainees and women (e.g., by conducting systematic and direct recruitment through public and private sources likely to yield minority and women trainees) to the extent that such persons are available within a reasonable area of recruitment. The contractor will be responsible for demonstrating the steps that he has taken in pursuance thereof, prior to a determination as to whether the contractor is in compliance with this Training Special Provision. This training commitment is not intended, and not be used, to discriminate against any applicant for training, whether a member of a minority group or not. No employee shall be employed as a trainee in any classification in which he has successfully completed a training course leading to journeyman status or in which he has been employed as a journeyman. The contractor should satisfy this requirement by including appropriate questions in the employee application or by other suitable means. Regardless of the method used the contractor's records should document the findings in each case. The minimum length and type of training for each classification will be as established in the training program selected by the contractor and approved by the Department of Highways and Transportation and the Federal Highway Administration. The Department of Highways and Transportation and the Federal Highway Administration shall approve a program if it is reasonably calculated to meet the equal employment opportunity obligations of the contractor and to qualify the average trainee for journeyman status in the classification concerned by the end of the training period. Furthermore, apprenticeship programs registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, or with a State apprenticeship agency recognized by the Bureau and training programs approved but not necessarily sponsored by the U.S. Department of Labor, Manpower Administration, Bureau of Apprenticeship and Training shall also be considered acceptable provided it is being administered in a manner consistent with the equal employment obligations of Federal-aid

Page 12 of 62

Page 13: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

highway construction contracts. Approval or acceptance of a training program shall be obtained from the State prior to commencing work the classification covered by the program. It is the intention of these provisions that the training is to be provided in the construction crafts rather than clerk-typists or secretarial-type positions. Training is permissible in lower level management positions such as office engineers, estimators, timekeepers, etc., where the training is oriented toward construction applications. Training in the laborer classification may be permitted provided that significant and meaningful training is provided and approved by the division office. Some off-site training is permissible as long as the training is an integral part of an approved training program and does not comprise a significant part of the overall training. Except as otherwise noted below, the contractor will be reimbursed 80 cents per hour of training given an employee on this contract in accordance with an approved training program. As approved by the engineer, reimbursement will be made for training persons in excess of the number specified herein. This reimbursement will be made even though the contractor receives additional training program funds from other sources, provided such other sources does not specifically prohibit the contractor from receiving other reimbursement. Reimbursement for off-site training indicated above may only be made to the contractor where he does one or more of the following and the trainees are concurrently employed on a Federal-aid project; contributes to the cost of the training; provides the instruction of the trainee; or pays the trainee's wages during the off-site training period. No payment shall be made to the contractor if either the failure to provide the required training, or the failure to hire the trainees as a journeyman, is caused by the contractor and evidences a lack of good faith on the part of the contractor in meeting the requirements of this Training Special Provision. It is normally expected that a trainee will begin his training on the project as soon as feasible after start of work utilizing the skill involved and remain on the project as long as training opportunities exist in his work classification or until he has completed his training program. It is not required that all trainees be on board for the entire length of the contract. A contractor will have fulfilled his responsibilities under this Training Special Provision if he has provided acceptable training to the number of trainees specified. The number trained shall be determined on the basis of the total number enrolled on the contract for a significant period. Trainees will be paid a least 60 percent of the appropriate minimum journeymen's rate specified in the contract for the first half of the of the training period, 75 percent for the third quarter of the training period, and 90 percent for the last quarter of the training period, unless apprentices or trainees is an approved existing program are enrolled as trainees on this project. In fact case, the appropriate rates approved by the Department of Labor or Transportation in connection with the existing program shall apply to all trainees being trained for the same classification who are covered by this Training Special Provisions. The contractor shall furnish the trainee a copy of the program he will follow in providing the training. The contractor shall provide each trainee with a certification showing the type and length of training satisfactorily completed. The contractor will provide for the maintenance of records and furnish periodic reports documenting his performance under this Training Special Provision.

* * * * * INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT

& TRANSPORTATION EQUITY ACT Recipients of Federal-aid highway funds authorized under Titles I (other than Part B) and V of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), or Titles I, III, and V of the Transportation Equity Act for the 21st Century (TEA-21) are required to comply with the regulations of 49 Code of Federal Regulations (CFR) Part 26 - Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs.

Page 13 of 62

Page 14: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM SPECIFICATION The U.S. Department of Transportation (DOT) requires that the Delaware Department of Transportation continue the established Disadvantaged Business Enterprise (DBE) Program for participation in U.S. DOT programs and that the program follow the final rules as stated in 49 CFR Part 26 and the Department's approved DBE Program plan. The following definitions apply to this subpart: Disadvantaged Business Enterprise or DBE means a for-profit small business concern (1) that is at least 51 percent owned by one or more individuals who are both socially and economically disadvantaged or, in the case of a corporation, in which 51 percent of the stock is owned by one or more such individuals; and, (2) whose management and daily business operations are controlled by one or more of the socially and economically disadvantaged individuals who own it. DOT-assisted contract means any contract between a recipient and a contractor (at any tier) funded in whole or in part with DOT financial assistance, including letters of credit or loan guarantees, except a contract solely for the purchase of land. Good Faith Efforts means efforts to achieve a DBE goal or other requirement of this part which, by their scope, intensity, and appropriateness to the objective, can reasonably be expected to fulfill the program requirement. Joint Venture means an association of a DBE firm and one or more other firms to carry out a single, for-profit business enterprise, for which the parties combine their property, capital, efforts, skills and knowledge, and in which the DBE is responsible for a distinct, clearly defined portion of the work of the contract and whose share in the capital contribution, control, management, risks, and profits of the joint venture are commensurate with its ownership interest. Race-conscious measure or program is one that is focused specifically on assisting only DBEs, including women-owned DBEs. Race-neutral measure or program is one that is, or can be, used to assist all small businesses. For the purposes of this part, race-neutral includes gender neutrality. Small Business concern means, with respect to firms seeking to participate as DBEs in DOT-assisted contracts, a small business concern as defined pursuant to section 3 of the Small Business Act and Small Business Administration regulations implementing it (13 CFR part 121) that also does not exceed the cap on average annual gross receipts specified in 49 CFR §26.65(b). Socially and economically disadvantaged individuals means any individual who is a citizen (or lawfully admitted permanent resident) of the United States and who is - (1) any individual who a recipient finds to be a socially and economically disadvantaged individual on a case-by-case basis; (2) any individual in the following groups, members of which are rebuttably presumed to be socially and economically disadvantaged:

(i) Black Americans which includes persons having origins in any of the Black racial groups of Africa;

(ii) Hispanic Americans which includes persons of Mexican, Puerto Rican, Cuban, Dominican, Central or South American, or other Spanish or Portuguese culture or origin, regardless of race;

(iii) Native Americans which includes persons who are American Indians, Eskimos, Aluets, or Native Hawaiians;

(iv) Asian-Pacific Americans which includes persons whose origins are from Japan, China, Taiwan, Korea, Burma (Myanmar), Vietnam, Laos, Cambodia (Kampuchea), Thailand, Malaysia, Indonesia, the Philippines, Brunei, Samoa, Guam, the U.S. Trust Territories of the Pacific Islands (Republic of Palau), the Commonwealth of the Northern Marianas Islands, Macao, Fiji, Tonga, Kirbati, Juvalu, Nauru, Federated States of Micronesia, or Hong Kong;

(v) Subcontinent Asian Americans which includes persons whose origins are from India, Pakistan, Bangladesh, Bhutan, the Maldives Islands, Nepal or Sri Lanka;

(vi) Women;

(vii) Any additional groups whose members are designated as socially and economically disadvantaged by the SBA, at such time as the SBA designation becomes effective.

Page 14 of 62

Page 15: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

DelDOT will establish specific goals for each particular DOT-assisted project which will be expressed as a percentage of the total dollar amount of contract bid. The specific contract goals for this contract are specified in the General Description section of this document. DelDOT continues to reserve the right to approve DBE subcontractors and all substitutions of DBE subcontractors prior to award and during the time of the contract. Bidders are required to submit with their bids the completed DBE Program Assurance portion of the Certification document which will state the bidders intent of meeting the goals established for this contract; or in the instance where a contractor cannot meet the assigned DBE Goals for this contract, he/she shall at the time of bid submit documentation required to verify that he/she has made a Good Faith Effort to meet the DBE Goals. Guidance for submitting a Good Faith Effort is identified in the next section and in the DBE Program Plan. Further, the apparent low bidder must submit to DelDOT within five (5) calendar days after the bid opening, executed originals of each and every DBE subcontract to satisfy contract goals consistent with the DBE Program Assurance submitted as part of the bid package. No contract work shall be performed by a DBE subcontractor until the executed DBE subcontract is approved in writing by DelDOT and the Department has issued the required Notice to Proceed. Any DBE subcontract relating to work to be performed pursuant to this contract, which is submitted to DelDOT for approval, must contain all DBE subcontractor information, the requirements contained in this contract, and must be fully executed by the contractor and DBE subcontractor. Each contract between the prime contractor and each DBE subcontractor shall at the minimum include the following:

1. All pertinent provisions and requirements of the prime contract.

2. Description of the work to be performed by the DBE subcontractor.

3. The dollar value of each item of work to be completed by the DBE subcontractor and the bid price of each item of work to be completed by the DBE subcontractor.

* * * * * CRITICAL DBE REQUIREMENTS

A bid may be held to be non-responsive and not considered if the required DBE information is not provided. In addition, the bidder may lose its bidding capability on Department projects and such other sanctions as the Department may impose. It is critical that the bidder understands: 1. In the event that the bidder cannot meet the DBE goal as set forth in this specification, he/she shall at the time of bid

submit to the Department that percentage of the DBE Goal that will be met, if any, on the written and notarized assurance made a part of this contract. The contractor shall also at the time of bid submit all documentation that the contractor wishes to have the Department consider in determining that the contractor made a Good Faith Effort to meet contract DBE Goals. The Department will not accept Good Faith Effort documentation other than on the scheduled date and time of the bid opening. However, the Department may ask for clarification of information submitted should the need arise.

2. A bid which does not contain either a completely executed DBE Program Assurance and/or Good Faith Effort

documentation, where appropriate, shall be declared non-responsive and shall not be considered by the Department. 3. Failure of the apparent low bidder to present originals of all DBE subcontracts to substantiate the volume of work to be

performed by DBE's as indicated in the bid within five (5) calendar days after the bid opening shall create a rebuttable presumption that the bid is not responsive.

4. Bidders are advised that failure to meet DBE Goals during the term of the contract may subject them to Department

sanctions as identified in the DBE Program Plan.

Page 15 of 62

Page 16: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

5. In the execution of this contract, the successful bidder agrees to comply with the following contract clauses:

Prompt Payment: The prime contractor/consultant receiving payments shall, within 30 days of receipt of any payment, file a statement with the Department on a form to be determined by the Department that all subcontractors furnishing labor or material have been paid the full sum due them at the stage of the contract, except any funds withheld under the terms of the contract as required by Chapter 8, Title 17 of the Delaware Code, annotated and as amended. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of DelDOT. This clause applies to both DBE and non-DBE subcontractors.

Retainage: The prime contractor agrees to return retainage to each subcontractor within 15 calendar days after the subcontractor's work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of DelDOT. This clause covers both DBE and non-DBE subcontractors. As guidance, once a subcontractor has satisfactorily completed the physical work, and has given to the prime contractor a certified statement that all laborers, lower tier contractors, and materialmen who have furnished labor and materials to the subcontractor have been paid all monies due them, the prime contractor shall return retainage to the subcontractor within 15 calendar days.

6. In the execution of this contract, the successful bidder agrees to comply with the following contract assurance and will

include this same language in each subcontractor contract:

"The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such remedy as the recipient deems appropriate." 49 CFR Section 26.13

7. In addition to this specification, bidders must comply with all provisions of the rules and regulations adopted by the

U.S. Department of Transportation for DBE participation in U.S. DOT and DelDOT Programs (49 CFR Part 26) and the Delaware Department of Transportation Disadvantaged Business Enterprise Program Plan; each of which is hereby incorporated and made part of this specification. Bidders are also reminded that they must be responsible and responsive bidders in all other aspects aside from the DBE Program in order to be awarded the contract.

8. In accordance with 49 CFR 26.53(f)(1), DelDOT requires that a prime contractor not terminate a DBE subcontractor

without prior written consent from the DelDOT Civil Rights Office. This includes, but is not limited to, instances in which a prime contractor seeks to perform work originally designated for a DBE subcontractor with its own forces or those of an affiliate, a non-DBE firm, or with another DBE firm.

* * * * *

GUIDANCE FOR GOOD FAITH EFFORT When the DBE Goals established for a contract by DelDOT are not met, the contractor shall demonstrate good faith efforts to meet the DBE contract goals. The contractor shall demonstrate that the efforts made were those that a contractor actively and aggressively seeking to meet the goals established by DelDOT would make, given all relevant circumstances. Evidence of this good faith effort will be submitted with the bid at the time of the bid opening. The contractor is expected to demonstrate good faith efforts by actively and aggressively seeking out DBE participation in the project to the maximum extent, given all relevant circumstances. Following are the kinds of efforts that may be taken but are not deemed to be exclusive or exhaustive and DelDOT will consider other factors and types of efforts that may be relevant: 1. Efforts made to select portions of the work proposed to be performed by DBEs in order to increase the likelihood of

achieving the stated goal. Selection of portions of work are required to at least equal the goal for DBE utilization specified in this contract.

2. Written notification at least ten (10) calendar days prior to the opening of a bid soliciting DBE interest in participating

in the contract as a subcontractor or supplier and for specific items of work. Page 16 of 62

Page 17: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

3. Efforts made to obtain and negotiate with DBE firms for specific items of work:

a. Description of the means by which firms were solicited (i.e. by telephone, e-mail, written notice, advertisement).

b. The names, addresses, telephone numbers of DBE's contacted, the dates of initial contact; and whether initial solicitations of interest were followed-up by contacting the DBEs to determine with certainty whether the DBEs were interested.

c. A description of the information provided to DBE firms regarding the plans, specifications and estimated quantities for portions of the work to be performed.

d. A statement of why additional agreements with DBE's were not reached in order to meet the projected goal.

e. Listing of each DBE contacted but not contracted and the reasons for not entering a contract. 4. Efforts made to assist DBEs that need assistance in obtaining bonding, insurance, or lines of credit required by the

contractor. 5. Reasons why certified DBEs are not available or not interested. 6. Efforts to effectively use the services of available disadvantaged community organizations; disadvantaged contractor's

groups; local, state and federal DBE assistance offices; and other organizations that provide assistance in recruitment and placement of DBEs.

The following are examples of actions that may not be used as justification by the contractor for failure to meet DBE contract goals: 1. Failure to contract with a DBE solely because the DBE was unable to provide performance and/or payment bonds. 2. Rejection of a DBE bid or quotation based on price alone. 3. Rejection of a DBE because of its union or non-union status. 4. Failure to contract with a DBE because the contractor normally would perform all or most of the work in the contract. Administrative reconsideration: Within five (5) days of being informed by DelDOT that it is not responsive because it has not documented sufficient good faith efforts, a bidder may request administrative reconsideration. Bidder should make this request in writing to the following reconsideration official: Director of Finance, DelDOT,800 Bay Road, Dover, Delaware 19901, and Email a copy to [email protected]. The reconsideration official will not have played any role in the original determination that the bidder did not document sufficient good faith efforts. As part of this reconsideration, the bidder will have the opportunity to provide written documentation or argument concerning the issue of whether it met the goal or made adequate good faith efforts to do so. The bidder will have the opportunity to meet in person with the reconsideration official, explaining the basis for finding that the bidder did or did not meet the goal or make adequate good faith efforts to do so. The final decision made by the reconsideration official will be communicated to the bidder in writing. The result of the reconsideration process is not administratively appealable to the U.S. Department of Transportation.

* * * * *

Page 17 of 62

Page 18: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

1

FHWA-1273 -- Revised May 1, 2012

REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS

I. General II. Nondiscrimination III. Nonsegregated Facilities IV. Davis-Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act

Provisions VI. Subletting or Assigning the Contract VII. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water

Pollution Control Act X. Compliance with Governmentwide Suspension and

Debarment Requirements XI. Certification Regarding Use of Contract Funds for

Lobbying ATTACHMENTS A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only) I. GENERAL 1. Form FHWA-1273 must be physically incorporated in each construction contract funded under Title 23 (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. Form FHWA-1273 must be included in all Federal-aid design-build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. Contracting agencies may reference Form FHWA-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract.

3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA. 4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors. II. NONDISCRIMINATION The provisions of this section related to 23 CFR Part 230 are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts. In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR 60, 29 CFR 1625-1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633. The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60-1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3. Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27; and 23 CFR Parts 200, 230, and 633. The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements. 1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35, 29 CFR 1630, 29 CFR 1625-1627, 41 CFR 60 and 49 CFR 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the contractor's project activities under

Page 18 of 62

Page 19: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

2

this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO:

a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. b. The contractor will accept as its operating policy the following statement:

"It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre-apprenticeship, and/or on-the-job training."

2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so. 3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum:

a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer.

b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor.

c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women.

d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees.

e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means.

4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived.

a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees, and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration.

b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions.

c. The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees. 5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability. The following procedures shall be followed:

a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel.

b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices.

c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons.

d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal. 6. Training and Promotion:

a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are

Page 19 of 62

Page 20: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

3

applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved.

b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a).

c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each.

d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion. 7. Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below:

a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment.

b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability.

c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information.

d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency. 8. Reasonable Accommodation for Applicants / Employees with Disabilities: The contractor must be familiar

with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship. 9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract.

b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations. 10. Assurance Required by 49 CFR 26.13(b):

a. The requirements of 49 CFR Part 26 and the State DOT’s U.S. DOT-approved DBE program are incorporated by reference.

b. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agency deems appropriate. 11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA.

a. The records kept by the contractor shall document the following: (1) The number and work hours of minority and non-minority group members and women employed in each work classification on the project;

(2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and

(3) The progress and efforts being made in locating, hiring,

training, qualifying, and upgrading minorities and women;

b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project, indicating the number of minority, women, and non-minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor

Page 20 of 62

Page 21: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

4

will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July. III. NONSEGREGATED FACILITIES This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes. IV. DAVIS-BACON AND RELATED ACT PROVISIONS

This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects.

The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA-1273 format and FHWA program requirements.

1. Minimum wages

a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics.

Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions

of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis-Bacon poster (WH–1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.

b. (1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met:

(i) The work to be performed by the classification requested is not performed by a classification in the wage determination; and

(ii) The classification is utilized in the area by the construction industry; and

(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.

(2) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary.

(3) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Wage and Hour Administrator for determination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or

Page 21 of 62

Page 22: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

5

will notify the contracting officer within the 30-day period that additional time is necessary.

(4) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs 1.b.(2) or 1.b.(3) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.

c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof.

d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

2. Withholding

The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.

3. Payrolls and basic records

a. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-

Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

b. (1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee ( e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency..

(2) Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following:

(i) That the payroll for the payroll period contains the information required to be provided under §5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under §5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete;

(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3;

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

Page 22 of 62

Page 23: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

6

(3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 shall satisfy the requirement for submission of the “Statement of Compliance” required by paragraph 3.b.(2) of this section.

(4) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code.

c. The contractor or subcontractor shall make the records required under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

4. Apprentices and trainees

a. Apprentices (programs of the USDOL).

Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.

The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed.

Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly

rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination.

In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

b. Trainees (programs of the USDOL).

Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration.

The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration.

Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed.

In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

c. Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30.

Page 23 of 62

Page 24: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

7

d. Apprentices and Trainees (programs of the U.S. DOT).

Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program.

5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract.

6. Subcontracts. The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5.

7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12.

8. Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract.

9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.

10. Certification of eligibility.

a. By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1).

b. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1).

c. The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001.

V. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT

The following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards.

1. Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek.

2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1.) of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1.) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1.) of this section.

3. Withholding for unpaid wages and liquidated damages. The FHWA or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2.) of this section.

4. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1.) through (4.) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1.) through (4.) of this section.

Page 24 of 62

Page 25: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

8

VI. SUBLETTING OR ASSIGNING THE CONTRACT This provision is applicable to all Federal-aid construction contracts on the National Highway System. 1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116).

a. The term “perform work with its own organization” refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions: (1) the prime contractor maintains control over the supervision of the day-to-day activities of the leased employees;

(2) the prime contractor remains responsible for the quality of the work of the leased employees;

(3) the prime contractor retains all power to accept or exclude individual employees from work on the project; and

(4) the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements.

b. "Specialty Items" shall be construed to be limited to work

that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract. 2. The contract amount upon which the requirements set forth in paragraph (1) of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions. 3. The contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract. 4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the contracting agency has assured that each subcontract is

evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. 5. The 30% self-performance requirement of paragraph (1) is not applicable to design-build contracts; however, contracting agencies may establish their own self-performance requirements. VII. SAFETY: ACCIDENT PREVENTION T h i s p r o v i s i o n i s applicable to all Federal-aid construction contracts and to all related subcontracts. 1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR 1926) promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). 3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C.3704). VIII. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS T h i s p r o v i s i o n i s applicable to all Federal-aid construction contracts and to all related subcontracts. In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal-aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, Form FHWA-1022 shall be posted on each Federal-aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project: 18 U.S.C. 1020 reads as follows:

Page 25 of 62

Page 26: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

9

"Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or

Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or

Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended and supplemented;

Shall be fined under this title or imprisoned not more than 5 years or both."

IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERALWATER POLLUTION CONTROL ACT

This provision is applicable to all Federal-aid construction contracts and to all related subcontracts.

By submission of this bid/proposal or the execution of this contract, or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows:

1. That any person who is or will be utilized in theperformance of this contract is not prohibited from receiving anaward due to a violation of Section 508 of the Clean Water Actor Section 306 of the Clean Air Act.

2. That the contractor agrees to include or cause to beincluded the requirements of paragraph (1) of this Section X inevery subcontract, and further agrees to take such action asthe contracting agency may direct as a means of enforcingsuch requirements.

X. CERTIFICATION REGARDING DEBARMENT,SUSPENSION, INELIGIBILITY AND VOLUNTARYEXCLUSION

This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more – as defined in 2 CFR Parts 180 and 1200.

1. Instructions for Certification – First Tier Participants:

a. By signing and submitting this proposal, the prospectivefirst tier participant is providing the certification set out below.

b. The inability of a person to provide the certification set outbelow will not necessarily result in denial of participation in this

covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction.

c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default.

d. The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

e. The terms "covered transaction," "debarred,""suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. “First Tier Covered Transactions” refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers).

f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction.

g. The prospective first tier participant further agrees bysubmitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold.

h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration.

Page 26 of 62

Page 27: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

10

i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j. Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. * * * * * 2. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – First Tier Participants: a. The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals: (1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency; (2) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (3) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and (4) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 2. Instructions for Certification - Lower Tier Participants: (Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200) a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below. b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which

this transaction originated may pursue available remedies, including suspension and/or debarment. c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. d. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. “First Tier Covered Transactions” refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (https://www.epls.gov/), which is compiled by the General Services Administration. h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. i. Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the

Page 27 of 62

Page 28: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

11

department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. * * * * * Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion--Lower Tier Participants: 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. * * * * * XI. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20). 1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. 2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 3. The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such recipients shall certify and disclose accordingly.

Page 28 of 62

Page 29: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

CARGO PREFERENCE ACT Requirements in the Federal-aid Highway Program (a) Agreement Clauses. “Use of United States-flag vessels:

(1) Pursuant to Pub. L. 664 (43 U.S.C. 1241(b)) at least 50 percent of any equipment, materials or commodities procured, contracted for or otherwise obtained with funds granted, guaranteed, loaned, or advanced by the U.S. Government under this agreement, and which may be transported by ocean vessel, shall be transported on privately owned United States-flag commercial vessels, if available.

(2) Within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, ‘on-board’ commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (a)(1) of this section shall be furnished to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.

(b) Contractor and Subcontractor Clauses. “Use of United States-flag vessels: The contractor agrees—

(1) To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels.

(2) To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, ‘on-board’ commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (b) (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590.

(3) To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract.

NOTE: This requirement applies to material or equipment that is acquired for a specific Federal-aid highway project. It is not applicable to goods or materials that come into inventories independent of an FHWA funded-contract.

* * * * *

BUY AMERICA Requirements in the Federal-aid Highway Program By signing and submitting this proposal, the bidder certifies that: In accordance with 23 U.S.C, 313 and 23 CFR 635.410, all iron and steel materials permanently incorporated into this project will be produced in the United States and that all manufacturing processes involving these materials will occur in the U.S, except that a minimal amount of foreign steel or iron materials may be used, provided the cost of the foreign materials does not exceed 0.1 percent of the total Contract cost or $2,500.00, whichever is greater. If such minimal amount of foreign steel is used, the Contractor shall maintain a record of the costs to ensure that the allowable limit is not exceeded. This documentation shall be presented to the Department upon request. At the Department's request, I/we will provide manufacturer's/supplier's documentation verifying domestic origin as defined in the Specifications. All Materials accepted on the basis of such Certificate of Compliance may be sampled by the Department and tested at any time. Use of Material on the basis of Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating Material in the Project conforming to the requirements of the Contract. Any Material not conforming to such requirements will be subject to rejection whether in place or not. The Department reserves the right to refuse to permit the use of Material on the basis of Certificate of Compliance.

* * * * *

Page 29 of 62

Page 30: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

APPENDICES TO THE TITLE VI ASSURANCE

APPENDIX A

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows:

1. Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, (Federal Highway Administration (FHWA), or Federal Transit Authority (FTA ), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract.

2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21.

3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color, or national origin.

4. Information and Reports: The contractor will provide all information and reports required by the Acts and the Regulations, and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the Federal Highway Administration (FHWA), or Federal Transit Authority (FTA) to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the Federal Highway Administration (FHWA), or Federal Transit Authority (FTA), as appropriate, and will set forth what efforts ithas made to obtain the information.

5. Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non-discrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the Federal Highway Administration (FHWA), or Federal Transit Authority (FTA) may determine to be appropriate, including, but not limited to:

withholding payments to the contractor under the contract until the contractor complies; and/or cancelling, terminating, or suspending a contract, in whole or in part.

6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through five in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts and the Regulations. The contractor will take action with respect to any subcontract or procurement as the Recipient or the Federal Highway Administration (FHWA), or Federal Transit Authority (FTA) may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.

Page 30 of 62

Page 31: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

APPENDIX E During the performance of this contract, the contractor or consultant, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to:

Pertinent Non-Discrimination Authorities:

Title VI of the Civil Rights Act of 1964 (42 U.S.C. $ 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21.

The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970,(42 U.S.C. $ 460 I), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);

Federal-Aid Highway Act of 1973, (23 U.S.C. $ 324 et seq.), (prohibits discrimination on the basis of sex);

Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. $ 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part27;

The Age Discrimination Act of 1975, as amended, (42 U.S.C. $ 6101 et seq.), (prohibits discrimination on the basis of age);

Airport and Airway Improvement Act of 1982,(49 USC $471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex);

The Civil Rights Restoration Act of 1987,(PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of l964,The Age Discrimination Act of 1975and Section 504 of the Rehabilitation Act of l973,by expanding the defrnition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not);

Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. $$ 12131 - 12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38;

The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. S 41123) (prohibits discrimination on the basis of race, color, national origin, and sex);

Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures nondiscrimination against minority populations by discouraging programs; policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations;

Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);

Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).

* * * * *

Page 31 of 62

Page 32: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

PREVAILING WAGES Included in this proposal are the minimum wages to be paid various classes of laborers and mechanics as determined by the Department of Labor of the State of Delaware in accordance with Title 29 Del.C. §6960, relating to wages and the regulations implementing that Section. REQUIREMENT BY DEPARTMENT OF LABOR FOR SWORN PAYROLL INFORMATION Title 29 Del.C. §6960 stipulates; (b) Every contract based upon these specifications shall contain a stipulation that the employer shall pay all mechanics and

laborers employed directly upon the site of the work, unconditionally and not less often than once a week and without subsequent deduction or rebate on any account, the full amounts accrued at time of payment, computed at wage rates not less than those stated in the specifications, regardless of any contractual relationship which may be alleged to exist between the employer and such laborers and mechanics. The specifications shall further stipulate that the scale of wages to be paid shall be posted by the employer in a prominent and easily accessible place at the site of the work, and that there may be withheld from the employer so much of accrued payments as may be considered necessary by the Department of Labor to pay to laborers and mechanics employed by the employer the difference between the rates of wages required by the contract to be paid laborers and mechanics on the work and rates of wages received by such laborers and mechanics to be remitted to the Department of Labor for distribution upon resolution of any claims.

(c) Every contract based upon these specifications shall contain a stipulation that sworn payroll information, as

required by the Department of Labor, be furnished weekly. The Department of Labor shall keep and maintain the sworn payroll information for a period of 6 months from the last day of the work week covered by the payroll.

Bidders are specifically directed to note the Department of Labor's prevailing wage regulations implementing §6960 relating to the effective date of the wage rates, at Part VI., Section C., which in relevant part states:

"Public agencies (covered by the provisions of 29 Del.C. §6960) are required to use the rates which are in effect on the date of the publication of specifications for a given project. In the event that a contract is not executed within one hundred twenty (120) days from the date the specifications were published, the rates in effect at the time of the execution of the contract shall be the applicable rates for the project."

PREVAILING WAGE REQUIREMENTS

It is DelDOT's understanding that the Davis-Bacon Act is not a preemptive statute in the broad sense, and does not preempt or displace State of Delaware prevailing wage requirements. When a contract for a project contains both Federal Davis-Bacon and State of Delaware prevailing wage standards because of concurrent Federal and State coverage, the employer's minimum wage obligations are determined by whichever standards are higher.

Contractors with questions may contact: Department of Labor, Division of Industrial Affairs, 4425 N. Market Street, Wilmington, DE 19802 Telephone (302) 761-8200 https://dia.delawareworks.com/labor-law/

Page 32 of 62

Page 33: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 33 of 62

Page 34: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

"General Decision Number: DE20200013 02/07/2020

Superseded General Decision Number: DE20190013

State: Delaware

Construction Type: Highway

County: Kent County in Delaware.

HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wageof $10.80 for calendar year 2020 applies to all contractssubject to the Davis‐Bacon Act for which the contract isawarded (and any solicitation was issued) on or after January1, 2015.  If this contract is covered by the EO, the contractormust pay all workers in any classification listed on this wagedetermination at least $10.80 per hour (or the applicable wagerate listed on this wage determination, if it is higher) forall hours spent performing on the contract in calendar year2020.  If this contract is covered by the EO and aclassification considered necessary for performance of work onthe contract does not appear on this wage determination, thecontractor must pay workers in that classification at least thewage rate determined through the conformance process set forthin 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it ishigher than the conformed wage rate).  The EO minimum wage ratewill be adjusted annually.  Please note that this EO applies tothe above‐mentioned types of contracts entered into by thefederal government that are subject to the Davis‐Bacon Actitself, but it does not apply to contracts subject only to theDavis‐Bacon Related Acts, including those set forth at 29 CFR5.1(a)(2)‐(60). Additional information on contractorrequirements and worker protections under the EO is availableat www.dol.gov/whd/govcontracts.

Modification Number     Publication Date          0              02/07/2020

  SUDE2019‐001 06/24/2019

                                  Rates          Fringes

BRICKLAYER.......................$ 55.89             0.00  CARPENTER........................$ 55.63             0.00  CEMENT MASON/CONCRETE FINISHER...$ 35.70             0.00

Page 34 of 62

Page 35: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

  ELECTRICIAN       Electricians................$ 70.49             0.00     Line Workers................$ 47.49             0.00  IRONWORKER.......................$ 26.10             0.00  LABORER..........................$ 41.69             0.00  MILLWRIGHT.......................$ 17.10             0.00  PAINTER..........................$ 71.29             0.00  POWER EQUIPMENT OPERATOR       Piledrivers.................$ 25.98             0.00     Power Equipment Operator....$ 43.32             0.00  SHEET METAL WORKER...............$ 22.21             0.00  TRUCK DRIVER.....................$ 30.88             0.00‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

WELDERS ‐ Receive rate prescribed for craft performingoperation to which welding is incidental.

================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leavefor Federal Contractors applies to all contracts subject to theDavis‐Bacon Act for which the contract is awarded (and anysolicitation was issued) on or after January 1, 2017.  If thiscontract is covered by the EO, the contractor must provideemployees with 1 hour of paid sick leave for every 30 hoursthey work, up to 56 hours of paid sick leave each year.Employees must be permitted to use paid sick leave for theirown illness, injury or other health‐related needs, includingpreventive care; to assist a family member (or person who islike family to the employee) who is ill, injured, or has otherhealth‐related needs, including preventive care; or for reasonsresulting from, or to assist a family member (or person who islike family to the employee) who is a victim of, domesticviolence, sexual assault, or stalking.  Additional informationon contractor requirements and worker protections under the EOis available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included withinthe scope of the classifications listed may be added afteraward only as provided in the labor standards contract clauses(29CFR 5.5 (a) (1) (ii)).

Page 35 of 62

Page 36: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 

The body of each wage determination lists the classificationand wage rates that have been found to be prevailing for thecited type(s) of construction in the area covered by the wagedetermination. The classifications are listed in alphabeticalorder of ""identifiers"" that indicate whether the particularrate is a union rate (current union negotiated rate for local),a survey rate (weighted average rate) or a union average rate(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosedin dotted lines beginning with characters other than ""SU"" or""UAVG"" denotes that the union classification and rate wereprevailing for that classification in the survey. Example:PLUM0198‐005 07/01/2014. PLUM is an abbreviation identifier ofthe union which prevailed in the survey for thisclassification, which in this example would be Plumbers. 0198indicates the local union number or district council numberwhere applicable, i.e., Plumbers Local 0198. The next number,005 in the example, is an internal number used in processingthe wage determination. 07/01/2014 is the effective date of themost current negotiated rate, which in this example is July 1,2014.

Union prevailing wage rates are updated to reflect all ratechanges in the collective bargaining agreement (CBA) governingthis classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate thatno one rate prevailed for this classification in the survey andthe published rate is derived by computing a weighted averagerate based on all the rates reported in the survey for thatclassification.  As this weighted average rate includes allrates reported in the survey, it may include both union andnon‐union rates. Example: SULA2012‐007 5/13/2014. SU indicatesthe rates are survey rates based on a weighted averagecalculation of rates and are not majority rates. LA indicatesthe State of Louisiana. 2012 is the year of survey on whichthese classifications and rates are based. The next number, 007in the example, is an internal number used in producing thewage determination. 5/13/2014 indicates the survey completiondate for the classifications and rates under that identifier.

Page 36 of 62

Page 37: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Survey wage rates are not updated and remain in effect until anew survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicatethat no single majority rate prevailed for thoseclassifications; however, 100% of the data reported for theclassifications was union data. EXAMPLE: UAVG‐OH‐001008/29/2014. UAVG indicates that the rate is a weighted unionaverage rate. OH indicates the state. The next number, 0010 inthe example, is an internal number used in producing the wagedetermination. 08/29/2014 indicates the survey completion datefor the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January ofeach year, to reflect a weighted average of the currentnegotiated/CBA rate of the union locals from which the rate isbased.

 

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

                   WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This canbe:

*  an existing published wage determination*  a survey underlying a wage determination*  a Wage and Hour Division letter setting forth a position on   a wage determination matter*  a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requestsfor summaries of surveys, should be with the Wage and HourRegional Office for the area in which the survey was conductedbecause those Regional Offices have responsibility for theDavis‐Bacon survey program. If the response from this initialcontact is not satisfactory, then the process described in 2.)and 3.) should be followed.

With regard to any other matter not yet ripe for the formalprocess described here, initial contact should be with theBranch of Construction Wage Determinations.  Write to:

            Branch of Construction Wage Determinations            Wage and Hour Division            U.S. Department of Labor

Page 37 of 62

Page 38: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

            200 Constitution Avenue, N.W.            Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then aninterested party (those affected by the action) can requestreview and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

            Wage and Hour Administrator            U.S. Department of Labor            200 Constitution Avenue, N.W.            Washington, DC 20210

The request should be accompanied by a full statement of theinterested party's position and by any information (wagepayment data, project description, area practice material,etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, aninterested party may appeal directly to the AdministrativeReview Board (formerly the Wage Appeals Board).  Write to:

            Administrative Review Board            U.S. Department of Labor            200 Constitution Avenue, N.W.            Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

================================================================

          END OF GENERAL DECISION"

Page 38 of 62

Page 39: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract T202007801BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21

SPECIAL PROVISIONS

S.P. Code SPECIAL PROVISION DESCRIPTION

763508-15 PROJECT CONTROL SYSTEM DEVELOPMENT PLAN763509-15 CPM SCHEDULE UPDATES AND/OR REVISED UPDATES763623-15 NETTING MIGRATORY BIRD EXCLUSION NETTING MIGRATORY BIRD EXCLUSION

Page 39 of 62

Page 40: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

763508 - PROJECT CONTROL SYSTEM DEVELOPMENT PLAN

763509 - CPM SCHEDULE UPDATES AND/OR REVISED UPDATES

Description:

The Contractor shall plan, schedule and construct the Project by using a Critical Path Method Project

Schedule (CPM) meeting the requirements of these specifications. Use the CPM for coordinating and monitoring

the Work specified in the Contract Documents including all activities of Subcontractors, vendors, suppliers, utilities,

railroads, the Department, and all other parties associated with the construction of the Contract. Include all Work

in the CPM; including but not limited to submittals, major procurement, delivery, and construction activities.

Include all activities, including bid items, quantified in the Contract Documents. Base the CPM upon the entirety of

the Contract Documents. Utilize CPM software that generates files compatible with Primavera P6 Project

Management Release: 7.0.0.

Scheduling Representative:

Designate a scheduling representative prior to submission of the Original Critical Path Method Project

Schedule (OCPM). The scheduling representative is the person primarily responsible for development and

maintenance of the CPM schedule; the Contractor=s representative in all matters regarding the schedule; and the

Contractor=s designated attendee for all schedule related meetings. The scheduling representative shall also be

knowledgeable of the status of all parts of the Work throughout the duration of the Project. Replacement of the

scheduling representative will require written approval from the Engineer.

Submit the qualifications of the scheduling representative to the Engineer for approval. This approval is

required before the OCPM will be accepted. The scheduling representative shall have at least three years of

verifiable experience for preparing and maintaining CPM project schedules on Contracts of similar size and

complexity.

Critical Path, Project Completion Date, and Float:

The critical path is defined as the series of activities in a CPM that has the longest path in time. The

submitted activity sequence and durations must generate a CPM with only one critical path. Divide Project wide

activities such as Maintenance of Traffic, Construction Engineering, or Temporary Erosion Control that, by their

nature, generate long durations and complement other activities into Aestablish@ and Aconclude@ activities to

prevent this type of Work from occupying a significant portion of the critical path.

Page 40 of 62

Page 41: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

The project start date, or initial data date, of the original CPM shall be the first chargeable day of Work.

Nonproductive Work and administrative activities may begin and/or end prior to the project start date. The Original

CPM must use all of the Contract Time and contain a critical path containing exactly zero float. Early completion

schedules are not permitted. The schedule ending date of the Original CPM that uses all of the Project Time is the

contract completion date.

Total Float is the difference between the schedule=s finish date and the contract completion date. Free

float is the difference in time between an activity=s early finish and late finish. Free float is a shared commodity for

the use of the Department and the Contractor and is not for the exclusive use or benefit of either party. Both

parties have the full use of free float until depleted.

Submittal of the OCPM; the Start of Work and the Schedule of Record:

Complete and submit the proposed original CPM schedule (OCPM) database and the written narrative (WN)

within 30 calendar days after Contract is Awarded. The WN is a description of any elements of the Schedule that

deviate from the proposed construction sequence shown in the Contract Documents. Submit the OCPM in CPM

format fully compatible with Primavera P6 Project Management Release: 7.0.0 by email or CD ROM as a single

compressed database in CPM format.

The Engineer will complete the review of the OCPM within 30 calendar days after submittal. If required, a

Joint Review Conference will be convened at which time the Engineer and Contractor may make corrections and

adjustments to the proposed OCPM. If a revision is necessary due to the Engineer=s review or the Joint Review

Conference, submit the proposed revision within seven calendar days after receiving the Engineer=s review

comments or within seven calendar days after the date of the Joint Review Conference, whichever is the latest.

Make revisions in accordance with the requirements for the OCPM. The Engineer will respond to the revised OCPM

within seven calendar days after receipt. Clearly identify each submittal and resubmittal for clarity by labeling A2nd

Draft@, A3rd Draft@, etc.

Do not start any Work until the OCPM is accepted. If the Engineer is ready to issue a Notice to Proceed but

the OCPM is not yet accepted, the Engineer may issue the NTP and start Contract Time, but forbid Work to begin

until the OCPM is accepted. The Engineer may partially accept a OCPM and allow Work to begin if the required

corrections to the OCPM are minor, but the Engineer will not accept submittals that do not show the complete

schedule. The Engineer will not pay any estimates until the OCPM is partially accepted. Once the OCPM is partially

accepted, the Engineer will pay the first estimate. If the Contractor fails to make a good faith effort to address the

Engineer=s comments before the second estimate is due for payment, the Engineer will not pay the second estimate

until a good faith effort is made by the Contractor to comply. The Engineer may not withhold an estimate payment

if, within the estimate period in question, the Engineer has failed to provide timely review comments in response

to the Contractor=s submittal. The Engineer may, however, withhold the payment of subsequent estimates if the

Contractor fails to make a good faith effort to address the Engineer=s comments. Upon issuance of the Notice to

Proceed, the start date utilized in the OCPM will be adjusted to comply with the first chargeable day of Work. Any

Page 41 of 62

Page 42: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

delay in starting Work caused by the acceptance of the OCPM by the Engineer will not be considered as a basis for

any adjustment in the Contract amount or time. For Contracts that have fast-tracked starts, the Engineer and the

Contractor may agree to alter the response times and approval dates listed above.

Upon notification that the OCPM has been accepted, the corrected copy will become the CPM of record. The CPM

of record shall be the Contractor=s work plan for completing the entire Contract as specified in the Contract

Documents.

Requirements for the OCPM:

The format of the OCPM database shall be the precedence diagram method with days as the planning unit

and shall be based on Calendar Days. Use the Department=s partially predetermined coding structure (CS) that is

furnished by the Engineer.

Activity Sequencing. Activity sequence must be logical and representative of the Contractor=s order of the

Work. Successors and predecessors determine the schedule logic or activity sequence. A given activity cannot start

until all of the given activity=s predecessors have been completed. Use only finish to start dependency relationships

(links); do not use lag times without approval from the Engineer. The Engineer may request that the Contractor

resequence the activities to reflect realistic job logic. When scheduling using multiple resources, each resource unit

shall have a corresponding activity. Durations of activities include all the time necessary to complete the activity

including, but not limited to, Contractor=s non-work periods (other than those shown on the calendars), reasonably

foreseeable inclement weather, weekends and holidays. Base schedule calculations on retained logic, contiguous

durations, and total float as finish float.

Activity Resources. Sequence activities to reflect resource apportionment. Logically connect and code each

activity to reflect the crew (resource) performing the operation. Submit a summary list of crews, their crew codes,

and their operation(s) with each schedule submission, unless unchanged. Identify responsibility for each activity.

Identify Subcontractors, DBE=s, utilities and Work performed by others that affects the Schedule.

Breakdown and Durations of Activities. An individual activity is required for each construction element or

each activity not under the control of the Contractor that affects the sequence or progress of the Work. The

Engineer reserves the right to require additional breakdown of the Work activities at any time. Each activity must

be identified by a name, symbol and coding, and shall have a duration, sequence, responsibility and resource(s).

Choose activity names that are descriptive and identify single construction elements. Activity symbols, or ID=s, shall

be unique and systematic.

Activity types must be either Atask@, Astart milestone@, or Afinish milestone@. Do not use Ahammock@ type

activities. Date constraints, float and duration constraints, and/or flags for activities are not permitted.

Page 42 of 62

Page 43: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

Assign a reasonable duration to each activity representative of its scope. Durations may not exceed 14

calendar days unless approved by the Engineer. Determine the duration of each activity by using productivity rates

based on Calendar Days.

Include the preparation and approval of Working Drawings as activities. Include phasing (staging)

milestones as activities. Correlate phasing milestones with the sequence of construction provided in the Contract

Documents. Use a separate start and finish milestone activity to delineate each phase (stage).

Utility Work. Include all Work performed by utilities on the Project as activities in the OCPM. Include each

utility item of Work shown in the Contract=s Utility Statement as an activity. Durations for utility activities shall be

the same as the durations shown in the Utility statement for each activity unless otherwise approved by the

Engineer.

Calendars. Assign a calendar to each activity in the schedule. Use a minimum of 6 calendars, when

applicable: (1) Full Schedule; (2) Permit Requirements; (3) Winter Condition; (4) Concrete Work; (5) Asphalt Paving

Work; and (6) Nighttime Asphalt Paving Work. Use additional calendars if needed. Calendar non-work periods shall

reflect the average Delaware weather history for the jobsite and the restrictions identified in the Contract

Documents. The Contractor may choose perform Work during an activity=s calendar non-work period at no

additional cost to the Department if weather conditions are favorable for such Work and the Work does not violate

a set forth in the Contract Documents. The maximum allowable non-work period for each calendar is set forth

below. The Contractor may choose to shorten non-work periods at his/her discretion.

CALENDAR MAXIMUM NON-WORK PERIOD

Full Schedule None

Winter Condition December 1 through March 15

Concrete Work December 1 through March 15

Asphalt Paving November 15 through March 15

Nighttime Asphalt Paving October 15 through April 30

Written Narrative (WN). Provide a written narrative (WN) as part of the OCPM explaining the following:

(a) Relationships between activities not obviously identified

(b) Equipment usage and limitations.

(c) Manpower usage and limitations.

Page 43 of 62

Page 44: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

(d) Use of additional shifts and overtime.

(e) Activity codes, abbreviations, and activity identification system.

(f) All calendars utilized in the CPM and the basis of determining each non-work period

(g) All abbreviations.

(h) Use of calendars.

(i) Any other conditions that affect the schedule and are not readily discernible in the database.

CPM Updates:

Provide monthly updates to the CPM of record. Meet with the Engineer once a month prior to submitting

the update to review the status of the schedule=s activities. Prepare an updated list of activities showing all of the

actual start and actual finish for each of the schedule=s activities so that both parties can agree on the dates. Use

the dates that were agreed upon in the meeting to status the CPM of record and submit the updated schedule to

the Engineer for approval. Assign a unique file name to each update (Number/version). The data date of the update

shall be the next day after the end of the update period. As part of the monthly update, submit a written description

that identifies any delays or disruptions to the schedule experienced during the period of an update, any change in

manpower or equipment, and any potential delays to the completion date of the schedule.

Do not include any revisions to the CPM without prior approval. Failure to submit complete updates in a

timely manner may result in the withholding of estimates by the Engineer. The Engineer agrees to refrain from

withholding estimates unless the Contractor is habitually late in providing updates, is more than four weeks late in

submitting an update or has failed to submit an update that is part of a resolution to a serious problem that must

be addressed immediately.

Revisions to the Schedule of Record:

Revisions are defined as any changes to the database other than status updates, log entries and moving the

data date. Discuss any proposed revisions to the CPM verbally with the Engineer. If the revision is minor in nature,

the Engineer may allow the revision to be included on the next Update of the CPM. If the Engineer determines that

the revision is not minor in nature, submit the proposed revision for review and approval prior to deviating from

the approved CPM. When a revision to the CPM is required due to changes in the Contract initiated by the Engineer,

immediately contact the Engineer to discuss the changes. The Engineer may allow a deviation from the approved

CPM for specific mitigating activities.

The Engineer may direct the Contractor to revise the schedule of record at the Contractor=s expense if: the

critical path has less than minus ten (-10) Calendar Days of total float due to the Contractor=s failure to perform the

Work in accordance with the schedule; the Contractor requests to re-sequence the Work; and/or the Contractor

Page 44 of 62

Page 45: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

has performed a significant amount of Work out of sequence. The Engineer may direct the Contractor to revise the

schedule for any other reason; and such a revision will be paid at the unit cost for a CPM Revision.

The Engineer will review and respond to the proposed revision within 7 Calendar Days after receipt.

Resubmit, if required, within seven calendar days after receipt of the Engineer=s review comments. The Engineer

reserves the right to reject any proposed revision that adversely impacts the Department, utilities, or other

concerned parties.

Extensions of Contract Time and/or Incentive/Disincentive Dates.

Make requests for extension of Contract time in writing and subject to the notice and timeliness of

submission provisions as provided for elsewhere in the Contract. Requests for an extension of Contract time or

change in an incentive/disincentive date will be evaluated by the Engineer=s analysis of the CPM of record and any

proposed revision submitted. Include in the request a written narrative of the events that impacted the schedule

and a detailed explanation of why the Contractor cannot meet the requirements of the schedule of record. Only

delays to activities that affect the Contract completion date or will be considered for an extension of Contract time.

Only delays to activities that affect the completion duration of an incentive/disincentive period will be considered

for an extension of an incentive/disincentive completion date. The extension of the specified Contract completion

date or incentive/disincentive date will be based upon the number of Calendar Days the Contract completion date

or incentive/disincentive date is impacted as determined by the Engineer=s analysis. The Engineer and Contractor

may agree to defer the analysis of a potential impact to the schedule until the completion of the activities that are

affected. Such a deferment does not relieve the Contractor of his/her duty to identify potential impacts to the

schedule in the applicable schedule updates.

All requests for extensions of Contract Time must be supported by the most recent CPM Update. If, within

a reasonable period of time, the Contractor fails to make a good faith effort to produce an acceptable CPM update

and uses an unacceptable CPM update to support a request for a time extension, the Contractor loses the right to

receive that time extension; and/or the right to receive compensation for that delay caused in whole or in part by

the Engineer.

Final As Built Schedule.

Submit a final CPM Schedule database within 14 Calendar Days of Substantial Completion. Failure to submit

a final CPM Schedule may result in the withholding of estimates by the Engineer.

Page 45 of 62

Page 46: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

Method of Measurement:

The Project Control System will be measured in two items. The item, AProject Control System Development

Plan@ will be lump sum. The item ACPM Schedule Updates and/or Revised Updates@ will be measured one each per

update that is submitted and accepted.

Basis of Payment:

The item, A763508 B Project Control System Development Plan@ will be paid at the Contract=s lump sum bid

price on the next monthly estimate after completion of the requirements of the Project Control System

Development Plan, which includes the approval of the Original CPM Schedule. Price and payment will constitute

full compensation for preparing the CPM database, acquiring the necessary software, attending all scheduling

meetings with the Department, submitting and resubmitting all documents and for all labor, tools, equipment and

incidentals necessary to complete the Work.

The item, A763509 B CPM Schedule Updates and/or Revised Updates@ will be paid at the Contract unit price

per each approved CPM schedule update as described above. Price and payment will constitute full compensation

for preparing, submitting and resubmitting all CPM updates, for attendance at all scheduling meetings with the

Department, for preparing and reviewing a list of actual start and actual finish dates with the Engineer, and for all

labor, tools, Equipment and incidentals necessary to complete the Work.

2/11/2015

Page 46 of 62

Page 47: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

763623 - NETTING, MIGRATORY BIRD EXCLUSION

Description:

This item shall consist of the installation, maintenance, and removal of a barrier that will prevent the nesting

of migratory birds. The barrier shall be installed to completely encapsulate the sides and understructure of

the bridges up to the concrete road without holes or sagging, prohibiting access to the girders upon which

migratory birds typically nest.

Materials:

Netting: The netting shall consist of a durable polypropylene mesh of any color. The mesh size shall be no

larger than 3/4” by 3/4" square. Items commonly sold as “bird/aquatic cage or trap netting” typically meet

these specifications. Netting type and mesh size shall be approved by the Engineer prior to installation.

Netting attachment materials: Materials used to attach netting shall be appropriate for the type of netting

used and as approved by the Engineer. Solvent based sealer/adhesive shall not be used on any of the

netting, because it can melt the netting on contact. Materials to support and repair the netting shall also

be appropriate for the type of netting used and as approved by the Engineer.

Construction Methods:

General: The migratory bird exclusion barrier shall consist of netting that is taut against the underside and

sides of the bridge, with no holes or openings. To prevent damage to the netting, the netting shall not drape

into the water. After installation, there shall be no area under or on the sides of the bridge accessible to

migratory birds and available for migratory bird nesting.

Netting and Netting Attachments: Netting shall be installed using methods that are appropriate for the

netting. The use of overhead supports, support cables, netting frames, or any other method as approved

by the engineer may be used to attach the netting. When measuring the netting, a minimum of 6 extra

inches shall be added to each side to allow for overlap. The netting shall be attached such that it shall run

no more than 50 feet in any direction without support, 25 feet is preferred. Stable pipes, beams, and trusses

shall be used to support netting where safe and appropriate. Support cables shall be used when there is

minimal overhead support. Other methods shall be used as approved by the Engineer.

Page 47 of 62

Page 48: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

Construction planning: The migratory bird nesting season begins on April 15 and ends on August 1. During

any year construction may occur, all components of the migratory bird exclusion netting, shall be installed

prior to April 15 the start of the nesting season. The netting and netting materials shall remain in place and

in good working order until the end of the nesting season, or until there is continuous construction on the

bridge as per the Engineer. Bridge deck work and barrier removed shall be considered continuous work.

The netting shall be removed and properly disposed of after August 1 or once continuous construction

begins as stated above.

Maintenance: The Contractor shall inspect the netting on a weekly basis. The Contractor shall maintain

the migratory bird exclusion netting in good working order with out holes or loose areas, making repairs as

necessary or as directed by the Engineer. The Contractor shall repair the netting using appropriate repair

materials as specified in this item.

Method of Measurement:

The quantity of netting and netting attachment hardware will not be measured. The unit will include all

necessary materials, fittings, accessories required per this specification, installation, inspection,

maintenance and disposal of material fitting, accessories required per this specification.

Basis of Payment:

The migratory bird netting will be paid for at the Contract lump sum. Price and payment will constitute full

compensation for furnishing and installing all materials; maintenance and repair of the netting; and the

removal and subsequent disposal of all materials.

This item is a contingency item and the Department reserves the right to delete from the Contract. The

Contractor shall make no claims for additional compensation because of deletion of the item.

11/21/17

Page 48 of 62

Page 49: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Contract No. T202007801

STATEMENTS

Included on the following pages:

UTILITY STATEMENTS

RIGHT-OF-WAY STATEMENTS

ENVIRONMENTAL STATEMENTS

RAILROAD STATEMENTS

Page 49 of 62

Page 50: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 50 of 62

Page 51: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 51 of 62

Page 52: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 52 of 62

Page 53: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 53 of 62

Page 54: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 54 of 62

Page 55: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Page 55 of 62

Page 56: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

April 20, 2020

ENVIRONMENTAL REQUIREMENTS

FOR

Contract Title: Bridge Painting Kent County, SR 1 Overpasses, FY21

State Contract No. T202007801 Federal Aid No.: NH-2020(15)

Class II Action / Level C

CE action: 23 CFR 771.117 (c)(28)

Environmental (NEPA) Approval Date: 4/14/2020

Due to the nature of the proposed construction activities, permits are not required for this project. However, the following construction requirements and special provisions have been developed to minimize and mitigate impact to the surrounding environs. These requirements by DelDOT, not specified within the contract, are listed below. These requirements are the responsibility of the contractor and are subject to risk of shut down at the contractor’s expense if not followed. GENERAL REQUIREMENTS: 1. All construction debris, excavated material, brush, rocks, and refuse incidental to such

work shall be placed either on shore above the influence of flood waters or on some suitable dumping ground.

2. That effort shall be made to keep construction debris from entering adjacent waterways

or wetlands. Any debris that enters those areas shall be removed immediately. 3. The disposal of trees, brush, and other debris in any stream corridor, wetland, surface

water, or drainage area is prohibited.

Page 56 of 62

Page 57: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

2

4. DelDOT Environmental Studies Section must be notified if there are any changes to the project methods, footprint, materials, or designs, to allow the Department to coordinate with the appropriate resource agencies (COE, DNREC, and SHPO), for approval at [email protected] and/or 302-760-2259.

Page 57 of 62

Page 58: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

Amtrak Maryland & Delaware CSX Norfolk Souther

mington & Western

East Penn

No Railroad involvement.

Railroad Agreement unnecessary but railroad flagging required.

Railroad Agreement required. The necessary ailroad greement complete

Railroad related work to be undertaken and completed as required proper coordination with physical construction schedules.

(302) 659-4060.

(302) 659-4060.

12/31/19

NH-2020(15)

Bridge Painting Kent County, SR 1 Overpasses, FY 21

T202007801

N/A N/A N/A

Page 58 of 62

Page 59: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

QuantityDescription UnitItem Number

1LSNETTING MIGRATORY BIRD EXCLUSION763623

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

1LSPROJECT CONTROL SYSTEM DEVELOPMENT PLAN763508

8EAMOCPM SCHEDULE UPDATES AND/OR REVISED UPDATES763509

570SFEPOXY CONCRETE SEALER613000

13850SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

375SFEPOXY CONCRETE SEALER613000

6540SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

350SFEPOXY CONCRETE SEALER613000

5794SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

AASHTOWare Project™ Version 4.2 Report v1

Delaware Department of TransportationQuantity Sheet Summary

Proposal ID: T202007801

Project Descripton: BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21

NOT TO BE USED FOR BIDDING

Page: 1 of 4

This page is for information only. Do not use this page to submit a Bid.

Page 60: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

AASHTOWare Project™ Version 4.2 Report v1

Delaware Department of TransportationQuantity Sheet Summary

Proposal ID: T202007801

Project Descripton: BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21

NOT TO BE USED FOR BIDDING

QuantityDescription UnitItem Number

625SFEPOXY CONCRETE SEALER613000

9767SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

505SFEPOXY CONCRETE SEALER613000

6716SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

683SFEPOXY CONCRETE SEALER613000

9597SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

656SFEPOXY CONCRETE SEALER613000

9758SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

1517SFEPOXY CONCRETE SEALER613000

Page: 2 of 4

This page is for information only. Do not use this page to submit a Bid.

Page 61: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

AASHTOWare Project™ Version 4.2 Report v1

Delaware Department of TransportationQuantity Sheet Summary

Proposal ID: T202007801

Project Descripton: BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21

NOT TO BE USED FOR BIDDING

QuantityDescription UnitItem Number

11023SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

663SFEPOXY CONCRETE SEALER613000

10308SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

663SFEPOXY CONCRETE SEALER613000

10308SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

1LSNETTING MIGRATORY BIRD EXCLUSION763623

1LSTESTING AND DISPOSAL OF EXISTING HAZARDOUS STEEL COATING616003

1LSMAINTENANCE OF TRAFFIC801000

629EADYFURNISH AND MAINTAIN PORTABLE LIGHT ASSEMBLY (FLOOD LIGHTS)804001

12000EADYPLASTIC DRUMS805001

1000HOURTRAFFIC OFFICERS806001

629EADYFURNISH AND MAINTAIN TRUCK MOUNTED ATTENUATOR, TYPE II808002

Page: 3 of 4

This page is for information only. Do not use this page to submit a Bid.

Page 62: DEPARTMENT OF TRANSPORTATION BID PROPOSAL ...gssdocs.deldot.delaware.gov/bids/T202007801 Proposal.pdf2020/07/31  · STATE OF DELAWARE DEPARTMENT OF TRANSPORTATION BID PROPOSAL CONTRACT

AASHTOWare Project™ Version 4.2 Report v1

Delaware Department of TransportationQuantity Sheet Summary

Proposal ID: T202007801

Project Descripton: BRIDGE PAINTING KENT COUNTY, SR 1 OVERPASSES, FY 21

NOT TO BE USED FOR BIDDING

QuantityDescription UnitItem Number

1500EADYTEMPORARY WARNING SIGNS AND PLAQUES810001

180EADYARROW PANELS TYPE C802003

500HOURFLAGGER, KENT COUNTY, FEDERAL811008

1LSINITIAL EXPENSE/DE-MOBILIZATION763000

565SFEPOXY CONCRETE SEALER613000

8525SFSILICONE-BASED ACRYLIC CONCRETE SEALER613001

1LSCLEANING AND PAINTING EXISTING STEEL616000

Page: 4 of 4

This page is for information only. Do not use this page to submit a Bid.