8
BRIDGE I.D. : B00178BH TITLE PAGE 01 08 SURVEYED BY : RITO G. LAROGA ENGINEER II ARCHIE B. DAPAR ENGINEER II ( GEODETIC ENGINEER ) RAIMUNDA M. LUMANTAS CHIEF, PLANNING AND DESIGN SHEET CONTENTS : DESIGNED BY : SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO. JUNIBE C. FROILAN OIC - ASSISTANT DISTRICT ENGINEER MARIO M. MONTEJO DM, MNSA. DISTRICT ENGINEER F.Y. : 2017 CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD ( Tagbilaran-Getafe Section ) K0101+173 - K0101+199.14 BRIDGE LENGTH: 26.14 L.M. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII BOHOL II DISTRICT ENGINEERING OFFICE UBAY, BOHOL

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

BRIDGE I.D. : B00178BH

TITLE PAGE 01

08

SURVEYED BY :

RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

SHEET CONTENTS : DESIGNED BY : SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

JUNIBE C. FROILAN

OIC - ASSISTANT DISTRICT ENGINEER

MARIO M. MONTEJO DM, MNSA.

DISTRICT ENGINEER

F.Y. : 2017

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,

REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD ( Tagbilaran-Getafe Section )

K0101+173 - K0101+199.14

BRIDGE LENGTH: 26.14 L.M.

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL

Page 2: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

0+006.00

0+002.00

0+004.00

0+008.00

0+010.00

0+012.00

0+014.00

0+016.00

0+018.00

0+020.11

UPS

TREA

M

KEY MAP

Luzon

THIS SITE

South

China

Sea

Mindoro

REGION VII

Palawan

Philippine

Sea

Mindanao

Luzon

Strait

Sulu Sea

Cebu

Panay

Negros

Siquijor

Samar

Cebu

BOHOL PROVINCE

N

e

g

r

o

s

O

r

i

e

n

t

a

l

Leyte

THIS SITE

BOHOL

Bohol

REGION VII MAP

0+000.00

N O T T O S C A L E

LOCATION MAP

PROJECT LENGTH DATA

LIMITS

STA.0+000 - STA.0+020.11 20.11 meters

LENGTH

LOCATION MAP, PROJECT LENGTH DATA, INDEX OF SHEET, TRAVERSE, KEY MAP, ANDVICINITY MAP

SHEET NO. SHEET CONTENTS

GENERAL ELEVATION, CROSS SECTIONS, GENERAL ELEVATION,

TITLE PAGE

INDEX OF SHEETS

GENERAL NOTES, SUMMARY OF QUANTITIES

SIDE DRAIN DETAILS, RIPRAP DETAILS, STAIR ELEVATION, SECTION THRU STAIRS

LONGITUDINAL SECTION 4

7 - 8 DETAILED CROSS SECTION - - - - - - STA.0+000 - STA.0+014

6

2

1

3

LOCATION MAP

PROJECT LENGTH DATA

INDEX OF SHEET

TRAVERSE

KEY MAP

VICINITY MAP

02

08

SURVEYED BY :

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

JUNIBE C. FROILANMARIO M. MONTEJO DM, MNSA

SHEET CONTENTS :DESIGNED BY :

PROJECT TITLE / LOCATION SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

DISTRICT ENGINEEROIC-ASST. DISTRICT ENGINEER

TALIBON , BOHOL

GROUP OF B-BOO'S

GROUP OF B-BOO'S

GROUP OF B-BOO'S

GEMELINA GEMELINA

SIGN

END GUARDRAILS

BEG G-RAILS

GUARDRAILS

GUARDRAILS

GUARDRAILS

DO

WN

STR

EAM

TOP EDGE PILE CUP

BM

01

BRIDGE 2nd APPROACHK0101+199.14

BRIDGE 1st APPROACHK0101+173

BEGINNING OF PROJECTSTA.0+000

END OF PROJECTSTA.0+020.11

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14

TYPICAL DETAIL OF PAVEMENT MARKING5

TALIBON, BOHOLPROJECT SITE

MAP PROVINCE OF BOHOL

MABINI

DUERO

UBAY

CANDIJAY

ALICIA

GUINDULMAN

TALIBON

SAN MIGUEL

JAGNA

( 94.00 KM )

DANAO

CARMEN

( 58.80 KM )

( 72.00 KM )

TRINIDAD

DAGOHOY

BIEN UNIDO

SIERRA BULLONES

PILAR

PRES. GARCIA

ANDA

SEVILLA

BUENAVISTA

( 36.00 KM )

( 76.50 KM )

( 51.00 KM )

SAGBAYAN

JETAFE

BATUAN

BATASAN I.

CATIGBIAN

( 35.267 KM )

CUAMING DACU

CLARIN

( 71.400 KM )

INABANGA

LOBOC

BAGUMBANUA I.

ISLA DE UBAY

PANGAPASAN I.

CORELLA

SAN ISIDRO

( 10.195 KM )

ISLAND

HAYA-AN

Pamilacan Island

( 39.000 KM )

CABASIHAN

ISLAND

MARIBOJOC

( 14.310 KM )

ISLAND

INANORAN

ISLAND

BUDLAAN

CALAPE

( 41.365 KM )

ANTEQUERA

MOCABOC I.

CATANG

ISLAND

TAGBILARAN CITY

CORTES

( 9.752 KM )

( 18.626 KM )

N

O

R

T

H

W

E

S

T

B

A

N

K

MAGCALINGAO

CASCATINO I.

CABAGAN I.

SIKATUNA

BALILIHAN

TUBIGON

( 16.568 KM )

( 21.856 KM )

( 53.557 KM )

ISLAND

CABILAO

LOON

( 28.228 KM )

SANDINGAN

ISLAND

S

A

N

-

A

N

G

P

A

S

S

PANGLAO

( 17.090 KM )

ISLAND

PANGANGAN

MARIBOJOC BAY

MANTATAO

( 40.90 KM )

BILAR

N

GARCIA HERNANDEZ

VALENCIA

DIMIAO

LILALOAY

( 242.150 km )

ALBUR

( 248.611 km )

BACLAYON

( 253.629 km )

DAUIS

( 3.326 km )

VICINITY MAP

AutoCAD SHX Text
10.00
AutoCAD SHX Text
10.00
AutoCAD SHX Text
10.00
AutoCAD SHX Text
10.00
AutoCAD SHX Text
10.00
AutoCAD SHX Text
8.00
AutoCAD SHX Text
8.00
AutoCAD SHX Text
9.00
AutoCAD SHX Text
9.00
AutoCAD SHX Text
9.00
AutoCAD SHX Text
9.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
11.00
AutoCAD SHX Text
12.00
AutoCAD SHX Text
12.00
AutoCAD SHX Text
12.00
AutoCAD SHX Text
12.00
AutoCAD SHX Text
12.00
AutoCAD SHX Text
12.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
14.00
AutoCAD SHX Text
CL 1ST APPROACH
AutoCAD SHX Text
153
AutoCAD SHX Text
14.24
AutoCAD SHX Text
12.00
AutoCAD SHX Text
13.00
AutoCAD SHX Text
10.00
AutoCAD SHX Text
10.00
AutoCAD SHX Text
8.00
AutoCAD SHX Text
9.00
Page 3: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

1. ALL WORKS SHALL COMPLY WITH THE FOLLOWING:

- DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS,

VOLUME II

- STANDARD SPECIFICATION FOR HIGHWAY, BRIDGES &

AIRPORTS, 2013 EDITION.

- HIGHWAY SAFETY DESIGN STANDARD PART I & II.

2. UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE

EXPRESSED IN MILLIMETER WHILE DISTANCES AND

ELEVATION ARE IN TERMS OF METER.

3. THE THICKNESS OF THE CONCRETE PAVEMENT, AND

SUB BASE COURSE ARE RECKONED FROM A DESIGN

ANALYSIS IN CONFORMITY WITH THE PROVISIONS OF

DEPARTMENT ORDER No.22 SERIES OF 2011AND DEPART-

ORDER NO.137 SERIES OF 2014

4. PROPER CONNECTION SHALL BE PROVIDED AT THE

BEGINNING AND END OF THE PROJECT, WHEN NECESSARY

TO ENSURE A SAFE TRANSITION BETWEEN THE NEW AND

OLD / EXISTING PAVEMENT.

5. FIELD DATA OF THIS PROJECT IS BASED ON ACTUAL SURVEY

CONDUCTED BY THE SURVEY TEAM OF

THE DPWH BOHOL II DEO, UBAY, BOHOL.

6. THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS OF THE

NECESSARY ACCESSIBILITY AND ROAD SAFETY FACILITIES FOR PERSONS

WITH DISABILITY IN ACCORDANCE WITH D.O., 37 SERIES OF 2009

7. AS-STAKED PLAN SHALL BE PREPARED BY THE WINNING

CONTRACTOR BASED ON THE PRE-CONSTRUCTION SURVEY

JOINTLY CONDUCTED BY THE CONTRACTOR,IMPLEMENTING

OFFICE AND CONSTRUCTION SUPERVISION CONSULTANTS

(csc) IF THE PROJECT CALLS FOR CONSULTANCY SERVICES /

CONTRACTS.

8. IN ACCORDANCE WITH D.O. 28,SERIES OF 2015,UPON THE

ISSUANCE BY THE DPWH OF THE NOTICE TO PROCEED (NTP),

THE IMPLEMENTING OFFICE SHALL PROVIDE THE

CONTRACTOR AN EDITABLE ELECTRONIC COPY OF THE

APPROVED PLANS FOR THE PROJECT TO FACILITATE THE

PREPARATION BY THE CONTRACTOR OF THE AS-STAKED.

ANY DISPARITY BETWEEN THE AS-STAKED PLANS AND THE

APPROVED PLANS MAY SERVE AS THE BASIS FOR INITIAL

VARIATION ORDER.

9. "AS-STAKED PLAN " SHALL BE NEW SET OF PLAN

DEPICTING THE ACTUAL FIELD REQUIREMENT. IN ADDITION

STANDARD DRAWING (e.g) DESIGN PARAMETERS OF ROAD

GEOMETRIC DESIGN FOR HORIZONTAL AND VERTICAL

CURVES AND OTHER DRAWINGS WITHOUT CHANGES NEED

NOT BE REDRAWN IN THE PREPARATION OF AS-STAKED

PLAN. A COPY OF THE APPROVED ORIGINAL DESIGN PLAN

SHALL BE INCLUDED IN THE SUBMISSION OF THE AS-STAKED

PLAN " TO FACILITATE REVIEW / EVALUATION AND APPROVAL

OF THE LATTER.

10. PRIOR CLEARANCE FOR AUTHORITY SHALL BE SECURED

FROM THE REGIONAL DIRECTOR FOR PORTIONS INVOLVING

MAJOR CHANGES IN ROAD ALIGNMENT THAT WOULD ENTAIL/

SURMOUNT TO CERTAIN CHANGES ON THE ORIGINAL ITEMS

OF WORK.

SURVEYED BY :

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

JUNIBE C. FROILANMARIO M. MONTEJO DM, MNSA

SHEET CONTENTS :DESIGNED BY :

PROJECT TITLE / LOCATION SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

DISTRICT ENGINEEROIC-ASST. DISTRICT ENGINEER

TALIBON , BOHOL

GENERAL NOTES

SUMMARY OF QUANTITIES

03

08

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14

QUANTITIES

DESCRIPTIONITEM NO.

UNIT

REMARKS

AS PER PLAN

mo.

PROVISION OF FIELD OFFICE FOR THE ENGINEERS( RENTAL BASIS)A.1.1(8)

302(2)

310(a.3)BITUMINOUS CONCRETE SURFACE WEARING COURSE ( Hot-laid, 50mm)

5.63

1.00

264.00

0.1320

5.63

MOBILIZATION & DEMOBILIZATION

B.9

BITUMINOUS TACK COAT ( Emulsified Asphalt )

1.00PROJECT BILLBOARD / SIGNBOARD

B.5

B.7

OCCUPATIONAL SAFETY AND HEALTH PROGRAM

each

411(a)

150.00

BRIDGE PAINT ( Concrete Structure)

414(1)

1.00

505(5) 60.00

GROUTED RIPRAP CLASS "A"

l.m

8-1

15.00

ASPHALTIC PLUG JOINT

612(1) 100.00REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS, (WHITE)

612(2) 75.00REFLECTORIZED THERMOPLASTIC PAVEMENT MARKINGS, (YELLOW)

mo.

L.S.

m.t.

m

2

L.S.

m

3

m

2

m

2

FORMS AND FALSEWORK

740(1)STRUCTURAL CONCRETE INJECTION AND CRACK BRIDGE

1016(2)BUILT-UP AND PREFORMED MEMBRANE ( Waterproofing on Bridge)

m

m

2

59.60

264.00

m

416(1)b200.07

CARBON FIBER SHEET BONDING ON CONCRETE GIRDERS ( 2 Layers,200

gms / sq. m. per layer)

101(6)

140.00

REMOVAL OF STRUCTURES AND OBSTRUCTION (CONCRETE)

m

3

m

2

101(3)b

264.00

REMOVAL OF EXISTING ASPHALT PAVEMENT(100mm THK.)

m

2

4-7(A)87.84

FORMS AND FALSEWORK

m

2

m

416(1)a

104.00CARBON FIBER PLATE BONDING ON CONCRETE GIRDERS

Page 4: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

1.50

1.20

1.50

1.20

TYPICAL SECTIONSCALE 1:50 METERS

EXISTING BRIDGE

RIVER BED

1.00

1.50

VA

RIE

S

STAIRS

A3

1.50

SURVEYED BY :

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

JUNIBE C. FROILANMARIO M. MONTEJO DM, MNSA

SHEET CONTENTS :DESIGNED BY :

PROJECT TITLE / LOCATION SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

DISTRICT ENGINEEROIC-ASST. DISTRICT ENGINEER

TALIBON , BOHOL

LINK SLABBRIDGE 1st APPROACH

K0101+173

A

BRIDGE 2nd APPROACHK0101+199.14

B

EXISTING BRIDGE

O.W.L. = 10.54 meters

H.F.L. = 15.00 meters

O.G.L. = 8.00 meters

2.80 VA

RIE

S

RIPRAP

BERM

BRIDGE STAIRS

1.501.00

1.501.00

3.90

1.501.00

1.501.00

BERM

RIPRAP

BRIDGE STAIRS

1.50

EXISTING BRIDGE

A4

A3

LINK SLABBRIDGE 1st APPROACH

K0101+173

ABRIDGE 2nd APPROACHK0101+199.14

B

1.00

1.50

GENERAL PLANSCALE 1:120 METERS

A1

GENERAL ELEVATIONSCALE 1:120 METERS

A2

2.80

EXISTING BRIDGE1.501.00

1.501.00

LINK SLABBRIDGE 1st APPROACH

K0101+173

A

BRIDGE 2nd APPROACHK0101+199.14

B

O.W.L. = 10.54 meters

H.F.L. = 15.00 meters

O.G.L. = 8.00 meters

ITEM 104 = EMBANKMENT

ITEM 505 = GROUTED RIPRAP

1.501.00

1.501.00

LONGITUDINAL SECTIONSCALE 1:120 METERS

A4

GENERAL PLAN

GENERAL ELEVATION

LONGITUDINAL SECTION

TYPICAL SECTION

04

08

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14

Page 5: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

NO PASSING LINES ON VERTICAL CURVESMETHOD OF LOCATING AND DETERMINING THE LIMIT

N T S

PAVEMENT MARKING APPLICATION OF NO PASSING ZONES N T S

TWO LANES PAVEMENT MARKING N T S

STRUCTURE

NO PASSING LINES ON HORIZONTAL CURVESMETHOD OF LOCATING AND DETERMINING THE LIMIT

N T S

TYPICAL DETAIL OF PAVE-

MENT MARKINGS

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

BOHOL II DISTRICT ENGINEERING OFFICEUBAY

REGION VII

BOHOL

5 8

MARIO M. MONTEJO DM, MNSA

JUNIBE C. FROILANRAIMUNDA M. LUMANTAS

ARCHIE B. DAPAR RITO L. LAROGA

TALIBON , BOHOL

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14

AutoCAD SHX Text
SHEET CONTENTS
AutoCAD SHX Text
L1
AutoCAD SHX Text
L2
AutoCAD SHX Text
L1
AutoCAD SHX Text
NO PASSING ZONE
AutoCAD SHX Text
NO PASSING ZONE
AutoCAD SHX Text
150mm BROKEN WHITE CENTERLINE
AutoCAD SHX Text
150mm SOLID YELLOW REFLECTORIZED BARRIER LINE
AutoCAD SHX Text
NO-PASSING ZONE A TO B
AutoCAD SHX Text
NO-PASSING ZONE A" TO B"
AutoCAD SHX Text
MINIMUM PASSING SIGHT DISTANCE FOR DESIGN SPEED
AutoCAD SHX Text
MINIMUM PASSING SIGHT DISTANCE FOR DESIGN SPEED
AutoCAD SHX Text
130 m HEIGHT OF OBJECT
AutoCAD SHX Text
A. A" BEGIN NO-PASSING ZONE SIGHT DISTANCE BECOMES LESS THAN THE MINIMUM AS MEASURED BETWEEN POINTS 1.07 METERS ABOVE PAVEMENT.
AutoCAD SHX Text
NO-PASSING ZONE IN OPPOSITE DIRECTIONS MAY OR MAY NOT OVERLAP, DEPENDING ON VERTICAL ALIGNMENT AND DESIGN SPEED.
AutoCAD SHX Text
B. B" END NO-PASSING ZONE SIGHT DISTANCE AGAIN EXCEED MINIMUM.
AutoCAD SHX Text
N O T E :
AutoCAD SHX Text
B
AutoCAD SHX Text
B"
AutoCAD SHX Text
A"
AutoCAD SHX Text
A
AutoCAD SHX Text
107
AutoCAD SHX Text
107
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
TWO-LANE ROAD-TRIPLE STRIPE DESIGN
AutoCAD SHX Text
L2/2
AutoCAD SHX Text
L1
AutoCAD SHX Text
L2
AutoCAD SHX Text
L1
AutoCAD SHX Text
L2/2
AutoCAD SHX Text
L2/2
AutoCAD SHX Text
150mm SOLID YELLOW REFLECTORIZED BARRIER LINE
AutoCAD SHX Text
100mm SOLID WHITE REFLECTORIZED EDGE LINE
AutoCAD SHX Text
EDGE OF ROAD
AutoCAD SHX Text
150
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
150mm BROKEN WHITE REFLECTORIZED BARRIER LINE
AutoCAD SHX Text
150
AutoCAD SHX Text
DESIGN SPEED (KPH)
AutoCAD SHX Text
MINIMUM PASSING SIGHT DISTANCE (M)
AutoCAD SHX Text
30 kph
AutoCAD SHX Text
40 kph
AutoCAD SHX Text
50 kph
AutoCAD SHX Text
60 kph
AutoCAD SHX Text
70 kph
AutoCAD SHX Text
80 kph
AutoCAD SHX Text
90 kph
AutoCAD SHX Text
100 kph
AutoCAD SHX Text
110 kph
AutoCAD SHX Text
120 kph
AutoCAD SHX Text
200 m
AutoCAD SHX Text
285 m
AutoCAD SHX Text
345 m
AutoCAD SHX Text
407 m
AutoCAD SHX Text
482 m
AutoCAD SHX Text
541 m
AutoCAD SHX Text
605 m
AutoCAD SHX Text
670 m
AutoCAD SHX Text
728 m
AutoCAD SHX Text
792 m
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
SHOULDER
AutoCAD SHX Text
ROADWAY
AutoCAD SHX Text
100
AutoCAD SHX Text
100
AutoCAD SHX Text
150
AutoCAD SHX Text
150mm BROKEN WHITE REFLECTORIZED CENTER LINE
AutoCAD SHX Text
EDGE OF ROAD
AutoCAD SHX Text
L1
AutoCAD SHX Text
L2
AutoCAD SHX Text
L1
AutoCAD SHX Text
85% SPEED LIMITS > 60KPH L1 = 9000, L2 = 9000 85% SPEED LIMITS 50KPH L1 = 3000, L2 = 6000
AutoCAD SHX Text
100
AutoCAD SHX Text
100
AutoCAD SHX Text
NO - PASSING ZONE A TO B
AutoCAD SHX Text
MINIMUM PASSING SIGHT DISTANCE FOR DESIGN SPEED
AutoCAD SHX Text
NO - PASSING ZONE A" TO B""
AutoCAD SHX Text
MINIMUM PASSING SIGHT DISTANCE FOR DESIGN SPEED
AutoCAD SHX Text
150mm BROKEN WHITE REFLECTORIZED CENTERLINE
AutoCAD SHX Text
150mm SOLID YELLOW REFLECTORIZED BARRIER LINE SEPARATED FROM ADJACENT LINE BY A SPACE OF 150mm BARRIER LINE MAY OR MAY NOT OVERLAP.
AutoCAD SHX Text
A. A" BEGIN NO-PASSING ZONE SIGHT DISTANCE BECOMES LESS THAN THE MINIMUM AS MEASURED BETWEEN POINTS OF CENTERLINE.
AutoCAD SHX Text
B. B" END NO-PASSING ZONE SIGHT DISTANCE AGAIN EXCEED THE MINIMUM REQUIRED LENGTH.
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
B"
AutoCAD SHX Text
A"
AutoCAD SHX Text
PROJECT TITLE AND LOCATION
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
RECOMMENDING APPROVAL :
AutoCAD SHX Text
DISTRICT ENGINEER
AutoCAD SHX Text
OIC-ASSISTANT DISTRICT ENGINEER
AutoCAD SHX Text
REVIEWED BY:
AutoCAD SHX Text
APPROVED :
AutoCAD SHX Text
SURVEYED BY:
AutoCAD SHX Text
CHIEF, PLANNING & DESIGN SECTION
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
ENGINEER II
AutoCAD SHX Text
ENGINEER II
Page 6: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

SURVEYED BY :

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

JUNIBE C. FROILANMARIO M. MONTEJO DM, MNSA

SHEET CONTENTS :DESIGNED BY :

PROJECT TITLE / LOCATION SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

DISTRICT ENGINEEROIC-ASST. DISTRICT ENGINEER

TALIBON , BOHOL

FACE OF ABUTMENT COPING

Grouted rip rap ( 150mm. - 250mm. stones )

75mm. Ø PVC weep holesstaggered O 2000mm. Each way

0.06mm of 20mm. gravel baggedin polyester non-woven filter cloth

@ each weep hole

1.50

1.00

SCALE 1:30 RIPRAP DETAILS

0.60

0.40

H =

VA

RIE

S

1.50

B2

SCALE 1 : 30

SIDE DRAIN DETAILS

SCALE 1:50E L E V A T I O N

SECTION THRU DRAIN

0.40

1.50

1.00

0.60

H =

VA

RIE

S

EXISTING GRND. LVL.

Grouted rip rap ( 150mm. - 250mm. stones )

1.00

H =

VA

RIE

S

EXISTING GRND. LVL.

2AB

SCALE 1 : 30

B3A

B1

0.30

SCALE 1:30

S E C T I O N

1.70

0.30

0.10

B3A

B2A

B1A

SCALE 1 : 30 STAIR ELEVATION

1.50

VA

RIE

S

BERM(Loose boulder apron)( 250mm. - 300mm. stones )

2.80

DOWNB3

0.80

2.80

H =

VA

RIE

S1.

30

0.40

1.503.901.00 L = VARIES

S C A L E 1 : 30

STAIR RIPRAP DETAILSB4

1.50

1.00

1.50

1.00

1.50

1.00

BERM(Loose boulder apron)( 250mm. - 300mm. stones )

SIDE DRAIN DETAILS

RIPRAP DETAILS

STAIR ELEVATION

SECTION THRU STAIRS

06

08

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14

Page 7: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

OGE = 8.57

FGE = 8.57

000+000

OGE = 8.24

FGE = 8.24

000+003.27

OGE = 8.15

FGE = 8.15

000+006

OGE = 8.44

FGE = 8.44

000+013.02

OGE = 8.27

FGE = 8.27

000+012

OGE = 8.26

FGE = 8.26

000+010

0.00

/8.5

7

-3.7

1/8.

36

-7.5

5/7.

64

-10.

00/9

.45

-10.

81/1

0.00

-15.

79/1

1.85

-12.

46/1

0.82

2.42

/8.7

5

3.62

/9.8

5

6.77

/10.

05

0.00

/8.2

4

-10.

00/1

0.86

10.0

0/11

.42

2.93

/8.3

6

-6.4

0/7.

88

-12.

33/1

2.03

-11.

35/1

1.97

-13.

49/1

4.33

14.3

1/13

.06

0.00

/8.1

5

-10.

00/1

0.67

-13.

55/1

4.20

-12.

33/1

2.05

-11.

30/1

2.04

-7.3

5/8.

36

-6.0

9/7.

97

-3.0

1/7.

93

4.10

/8.2

6

8.16

/10.

00

9.96

/11.

69

12.6

5/14

.27

15.7

1/14

.25

0.00

/8.1

5

-10.

00/1

0.67

-13.

55/1

4.20

-12.

33/1

2.05

-11.

30/1

2.04

-7.3

5/8.

36

-6.0

9/7.

97

-3.0

1/7.

93

4.10

/8.2

6

8.16

/10.

00

9.96

/11.

69

12.6

5/14

.27

15.7

1/14

.25

-13.

31/1

4.40

-12.

34/1

2.08

-11.

34/1

1.96

-10.

00/1

0.97

-8.6

5/9.

98

-5.5

8/9.

14

-4.5

9/8.

56

0.00

/8.2

7

-1.3

8/8.

30

6.63

/8.1

3

8.81

/9.7

4

10.3

0/11

.90

11.4

3/12

.02

12.3

6/14

.09

0.00

/8.4

4

-4.1

9/8.

79

-7.9

3/10

.17

-10.

00/1

0.96

-9.1

3/10

.32

-12.

86/1

2.83

-11.

68/1

2.10

-16.

43/1

4.22

7.09

/8.1

2

9.27

/10.

00

10.4

9/11

.87

11.4

4/11

.94

12.3

3/14

.28 14

.06/

13.8

9

15.3

8/13

.90

0.00

/8.2

4

2.93

/8.3

6

DETAILED CROSS SECTIONSCALE 1:100 meters

DETAILED CROSS SECTION

STA.0+000 - STA.0+013.02

07

08

ELEV. 8.00

9.00

7.00

ELEV. 8.00

9.00

7.00

ELEV. 8.00

9.00

7.00

BEGINNING OF PROJECT

A = 4.89 m²

A = 0.00 m²

101(1)

505

A = 11.13 m²

A = 2.26 m²

101(1)

505

A = 6.92 m²

A = 3.83 m²

101(1)

505

A = 6.48 m²

A = 0.98 m²

101(1)

505

A = 5.66 m²

A = 0.91 m²

101(1)

505

A = 8.24 m²

A = 8.91 m²

101(1)

505

ELEV. 8.00

9.00

7.00

ELEV. 8.00

9.00

7.00

ELEV. 8.00

9.00

7.00

SURVEYED BY :

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

JUNIBE C. FROILANMARIO M. MONTEJO DM, MNSA

SHEET CONTENTS :DESIGNED BY :

PROJECT TITLE / LOCATION SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

DISTRICT ENGINEEROIC-ASST. DISTRICT ENGINEER

TALIBON , BOHOL

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14

Page 8: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION VII

OGE = 8.19

FGE = 8.19

000+018

OGE = 8.18

FGE = 8.18

000+020.11

0.00

/8.5

7

-3.7

1/8.

36

-7.5

5/7.

64

-10.

00/9

.45

-10.

81/1

0.00

-15.

79/1

1.85

-12.

46/1

0.82

2.42

/8.7

5

3.62

/9.8

5

6.77

/10.

05

10.0

0/10

.28

0.00

/8.1

8

-1.6

7/8.

15

-2.2

8/9.

85

-4.5

3/10

.45

-6.7

3/10

.45

-10.

00/1

1.98

SURVEYED BY :

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION VIIBOHOL II DISTRICT ENGINEERING OFFICE

UBAY, BOHOL RITO G. LAROGA

ENGINEER II

ARCHIE B. DAPAR

ENGINEER II

( GEODETIC ENGINEER )

RAIMUNDA M. LUMANTAS

CHIEF, PLANNING AND DESIGN

JUNIBE C. FROILANMARIO M. MONTEJO DM, MNSA

SHEET CONTENTS :DESIGNED BY :

PROJECT TITLE / LOCATION SUBMITTED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET NO.

DISTRICT ENGINEEROIC-ASST. DISTRICT ENGINEER

TALIBON , BOHOL

DETAILED CROSS SECTIONSCALE 1:100 meters

ELEV. 8.00

9.00

7.00

ELEV. 8.00

9.00

7.00

A = 5.85 m²

A = 0.00 m²

101(1)

505

A = 5.37 m²

A = 0.00 m²

101(1)

505

DETAILED CROSS SECTION

STA.0+018 - STA.0+020.11

08

08

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS,REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES AT CANAWAYON

BRIDGE (B00178BH) ALONG TAGBILARAN NORTH ROAD SCA( Tagbilaran-Getafe Section)K0101+173 - K0101+199.14